Loading...
HomeMy WebLinkAboutZ-7699-B Staff AnalysisITEM NO.: 10 NAME: Highway 10 Development Short -form POD LOCATION: located at 16603 and 16623 Cantrell Road Planning Staff Comments: Z -7699-B 1. Provide notification of property owners located within 200 feet of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than February 14, 2007. The Office of Planning and Development must receive the proof of notice no later than February 22, 2007. 2. The Highway 10 DOD requires a 40 -foot landscape strip and a 100 -foot building setback along the roadway. Indicate on the site plan the location of the 40 -foot landscape strip. 3. The Highway 10 DOD requires a 25 -foot average landscape strip around the perimeters of the site. The eastern perimeter does not appear to meet this minimum requirement. 4. The Highway 10 DOD requires a 30 -foot side yard building setback and a 40 -foot rear yard -building setback. The eastern perimeter does not appear to meet this minimum requirement. 5. Staff feels with the reduction of the total building square footage the landscaping and setbacks of the overlay could be more closely adhered to. 6. Staff is also concerned with the placement of two story buildings along the rear portion of the site. 7. Provide details of the indicated signage on the site plan. Will any additional signage be added with the new development? Provide the location and a note concerning the total height and area. 8. The Highway 10 DOD allows a maximum of one curb cut per 300 feet and no curb cut closure to an intersection than 100 feet. 9. The Highway 10 DOD allows a maximum of one commercial building for every two acres. The site is 2.33 acres and four buildings are being proposed. 10. Provide a note indicating the total height of the proposed buildings. 11. Provide the proposed building construction materials. 12. Will the rear buildings be constructed in a single or in multiple phases? Note a phasing plan if applicable. 13. Will there be limits placed on the hours of service for the dumpster? If so note the hours of service on the site plan. 14. The site is proposed as an office development. The site plan indicates the placement of 90 on-site parking spaces. The ordinance would typically require the placement of 49 parking spaces. The parking appears to be excessive. Indicate the reasoning for the increased number of spaces requested. 15.The site plan indicates site lighting will be installed on the buildings and in the rear parking area for security. The cover letter indicates no pole lighting is proposed. Clarify if pole lighting is proposed or if only ground mounted lighting will be utilized. Item # 10 16.The cover letter indicates the utilization of 0-2 uses as allowable uses for the site. Does the request include the placement of 10 percent of the structures as accessory uses? VariancelWaivers: None requested. Public Works Conditions: 1. Cantrell Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of-way to 55 feet from centerline will be required. 2. Sidewalks with appropriate handicap ramps are required in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 3. Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. 4. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 5. Provide a sketch Grading and Drainage Plan per Section 29-186 (e). 6. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 7. If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 8. Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The lots must share a single driveway access centered on the property line. The width of driveway must not exceed 36 feet. A minimum spacing distance of 300 feet is required between driveways on a principal arterial street. The eastern drive does not meet this standard. 9. Old curb cuts along Cantrell Road should be closed with curb and gutter per AHTD standards. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required with easements. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Energy: Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A Capital Investment Charge based on the size of the meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all meter connections including any metered connections off the private fire system. A water main extension, on-site fire line(s) and additional fire Item # 10 hydrant(s) will be required in order to provide service to this property. The facilities on- site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department; Approved as submitted County Planning: No comment. CATA: The site is located on CATA Bus Route #25 —the Highway 10 Express Route. Planning Division: This request is located in the Chenal Planning District. The Land Use Plan shows Transition for this property. The applicant has applied for a Planned Office Development to allow 0-2 uses. The request does not require a change to the Land Use Plan. Master Street Plan: Cantrell Road is shown as a Principal Arterial on the Master Street Plan. Cantrell Road may require dedication of right-of-way and may require street improvements. The primary function of a Principal Arterial is to serve through traffic and to connect major traffic generators or activity centers within urbanized areas. Entrances and exits should be limited to minimize negative effects of traffic and pedestrians on Cantrell Road since it is a Principal Arterial. Bicycle Plan: Existing or proposed Class I, II, or III Bikeways are not in the immediate vicinity of the development. City Recognized Neighborhood Action Plan: The property under review is not located in an area covered by a City of Little Rock recognized neighborhood action plan. Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. Site plan must comply with the Highway 10 overlay district requirements. 3. Berming is encouraged along Highway 10. 4. The Highway 10 overlay district requires a twenty-five foot wide (25) land use buffer. The proposed plan encroaches into this area. 5. The zoning buffer ordinance requires a twenty-four foot (24') wide land use buffer to separate this proposed development from the residential property on southern perimeter of the site. Currently, the southern perimeter is not meeting this minimum requirement. Seventy percent (70%) of these buffers are to remain undisturbed. 6. The zoning buffer ordinance requires a twelve foot (12') wide land use buffer to separate this proposed development from the residential property on western and eastern perimeters of the site. Currently, these perimeters are not meeting this Item # 10 minimum requirement. Seventy percent (70%) of these buffers are to remain undisturbed. 7. A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense evergreen plantings, is required along the southern, western, and eastern perimeters of the site. Credit towards fulfilling this requirement can be given for existing trees and undergrowth that satisfies this year -around requirement. 8. An automatic irrigation system to water landscaped areas will be required. 9. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 10. The City Beautiful Commission recommends preserving as many existing trees as feasible on this tree covered site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the additional information as noted above) to staff on Wednesday, February 14, 2007. Item # 10 FILE NO.: Z -7699-B NAME: Highway 10 Development Short -form POD LOCATION: Located at 16603 and 16623 Cantrell Road DEVELOPER: Hart Lazenby Commercial 11500 Rodney Parham, Suite 15 Little Rock, AR 72212 ENGINEER: Rickett Engineering, Inc. 78 Aberdeen Drive Little Rock, AR 72212 AREA: 2.33 acres CURRENT ZONING ALLOWED USES PROPOSED ZONING: NUMBER OF LOTS: 1 zoning lot FT. NEW STREET: 0 R-2, Single-family and POD Single-family residential and 0-3, General Office District uses ffl PROPOSED USE: 0-3, General and Professional Office VARIANCESM/AIVERS REQUESTED: None requested. BACKGROUND: The Little Rock Board of Directors adopted Ordinance No. 19,202 on October 5, 2004, establishing the Highway 10 Development Short -form POD. The applicant proposed to construct a 5,600 square foot two story office building and associated parking on a 0.44 acre lot. Fourteen parking spaces were proposed. The proposed site plan indicated signage consistent with signage allowed in the Highway 10 Design Overlay District or a ground mounted monument style sign a maximum of ten feet in height and one hundred square feet in area. The applicant indicated 0-3, General Office uses would be utilized as uses for the site. The office hours were proposed as 8:00 am to 5:00 pm Monday through Friday. The maximum FILE NO.: Z -7699-B (Cont.) building height proposed was 30 -feet. The site plan included the placement of a dumpster on the site along the eastern boundary. The building has been constructed. On February 16, 2006, the Little Rock Planning Commission denied a request to revise the previously approved POD to expand the developed area to the east by 1.89 acres and to allow the construction of two additional buildings. The proposal included the construction a single story office/retail building containing 8,456 square feet and a two story office building containing 7,000 square feet. The site plan indicated a total building square footage of 21,056 square feet for all three buildings with 12,600 square feet of office and 8,456 square feet of retail. Ninety (90) parking spaces were proposed. The site contained a total of 101,495 square feet with 61,642 (63.2%) square feet of impervious area and 39,853 (36.8%) square feet of green space. The applicant's proposed uses for the site were as follows: Existing Building: 0-3 uses only, no accessory uses. Proposed Building A: 0-3 uses, unlimited accessory uses and the following additional commercial uses: small commercial establishments selling gifts, electronics, phones movies or games, home d6cor including paint and wallpaper, sporting goods, liquor sales, furniture and tanning Proposed Building B: 0-3 uses only, no accessory uses. A. PROPOSAL/REQUEST: The applicant proposes to construct three additional buildings similar to the one already built adjacent to the west and a single story building adjacent to Cantrell Road. The original development, which had limited parking and only eight suites, will be expanded on approximately 1.89 acres just to the east and will be comprised of office suite, varying in size with approximately 90 parking spaces. Two of the buildings will back up to a small pond which is located east of the development. the request includes 0-2 _uses as allowable uses for the buildings. The \/developers have indicated a reduced side yard setback on the eastern boundary of the property to allow the buildings to move away from the residential property located to the south and west. According to the cover letter all lighting will point away from the homes and originate from the buildings. No pole lighting is proposed within the development. The existing entrance will be widened to a maximum of 36 -feet. The applicant has indicated the site presently drains into an adjoining pond and is requesting the adjoining natural feature be taken into consideration when requiring storm water detention. B. EXISTING CONDITIONS: The site contains a single-family residence and shop building formerly used as a small sandblasting business. There are non-residential uses, office and commercial, located to the west of the site located in the converted single-family 2 FILE NO.: Z -7699-B (Cont. structures. To the east of the site is a large vacant tract abutting Cantrell Road and the west leg of Taylor Loop Road. The area south of the site is a newly developing single-family subdivision accessed from South Katilus Road. There have been homes constructed along the western and southern boundary of the site. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received one informational phone call from an area resident. The Johnson Ranch Neighborhood Association, the Chevaux Court Property Owners Association, the Westchester Property Owners Association, all owners of property located within 200 feet of the site and all residents, who could be identified, located within 300 feet of the proposed development were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Cantrell Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of-way to 55 feet from centerline will be required. 2. Sidewalks with appropriate handicap ramps are required in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 3. Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. 4. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 5. Provide a sketch Grading and Drainage Plan per Section 29-186 (e). 6. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 7. If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 8. Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The lots must share a single driveway access centered on the property line. The width of driveway must not exceed 36 feet. A minimum spacing distance of 300 feet is required between driveways on a principal arterial street. The eastern drive does not meet this standard. 9. Old curb cuts along Cantrell Road should be closed with curb and gutter per AHTD standards. 3 FILE NO.: Z -7699-B Cont. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Energy: Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A Capital Investment Charge based on the size of the meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all meter connections including any metered connections off the private fire system. A water main extension, on-site fire line(s) and additional fire hydrant(s) will be required in order to provide service to this property. The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express Route. F. ISSUES/TECHNICAL/DESIGN: Planning Division: This request is located in the Chenal Planning District. The Land Use Plan shows Transition for this property. The applicant has applied for a Planned Office Development to allow 0-2 uses. The request does not require a change to the Land Use Plan. Master Street Plan: Cantrell Road is shown as a Principal Arterial on the Master Street Plan. Cantrell Road may require dedication of right-of-way and may require street improvements. The primary function of a Principal Arterial is to serve through traffic and to connect major traffic generators or activity centers within urbanized areas. Entrances and exits should be limited to minimize negative effects of traffic and pedestrians on Cantrell Road since it is a Principal Arterial. E FILE NO.: Z -7699-B Cont. Bicycle Plan: Existing or proposed Class I, II, or III Bikeways are not in the immediate vicinity of the development. City Recognized Neighborhood Action Plan: The property under review is not located in an area covered by a City of Little Rock recognized neighborhood action plan. Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. Site plan must comply with the Highway 10 overlay district requirements. 3. Berming is encouraged along Highway 10. 4. The Highway 10 overlay district requires a twenty-five foot wide (25) land use buffer. The proposed plan encroaches into this area. 5. The zoning buffer ordinance requires a twenty-four foot (24') wide land use buffer to separate this proposed development from the residential property on southern perimeter of the site. Currently, the southern perimeter is not meeting this minimum requirement. Seventy percent (70%) of these buffers are to remain undisturbed. 6. The zoning buffer ordinance requires a twelve foot (12') wide land use buffer to separate this proposed development from the residential property on western and eastern perimeters of the site. Currently, these perimeters are not meeting this minimum requirement. Seventy percent (70%) of these buffers are to remain undisturbed. 7. A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense evergreen plantings, is required along the southern, western, and eastern perimeters of the site. Credit towards fulfilling this requirement can be given for existing trees and undergrowth that satisfies this year -around requirement. 8. An automatic irrigation system to water landscaped areas will be required. 9. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 10. The City Beautiful Commission recommends preserving as many existing trees as feasible on this tree covered site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. G. SUBDIVISION COMMITTEE COMMENT: (February 8, 2007) The applicant was present representing the request. Staff presented an overview of the proposed development indicating there were a few technical 5 FILE NO.: Z -7699-B [Cont. issues associated with the request which were outstanding. Staff stated the site plan did not comply with the Highway 10 Design Overlay District in a number of areas. Staff also stated the indicated parking was excessive to serve an office development and questioned the need for the number of spaces proposed. Staff questioned if the developers were requesting the utilization of the 10 percent accessory uses as listed in the 0-2 zoning district. Staff also questioned the phasing plan for the development` -- Public Works comments were addressed. Staff stated the eastern most drive did not meet the minimum ordinance standards for driveway spacing. Staff also stated the old curb cuts along Cantrell Road should be closed with curb and gutter per AHTD standards. Staff stated prior to any grading activities on the site permits would be required. Landscaping comments were addressed. Staff stated the site did not appear to meet the typical minimum ordinance requirements of the Highway 10 Design Overlay District. Staff also stated berming along Highway 10 was encouraged to screen parking lots. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised site plan to staff addressing most of the technical issues raised at the February 8, 2007, Subdivision Committee meeting. The revised site plan indicates a single drive shared between the two properties and indicated the existing drive will be closed at the time of development. The development is proposed as 100 percent office with no allowance for commercial' or the 10 percent accessory uses as listed in the 0-2 zoning district. The site plan indicates the expansion of the previously approved POD to increase the area by 1.89 acres and allow the construction of four additional buildings. The site plan indicates the construction of a single story office building located adjacent to the existing office building and three two story office buildings located along the eastern perimeter and at the southwest corner of the site. A single dumpster has been located on the site along the eastern perimeter of the site. The applicant has indicated a note concerning the required screening and the dumpster will be serviced during business hours only. The site plan indicates a total area of 19,800 square feet, a building footprint area of 11,400 (20.8%) square feet, parking area of 43,040 (42.4%) square feet and landscaped area of 39,853 (36.8%) square feet. The site plan includes the placement of 90 parking spaces. Based on the minimum parking required for an office development 49 parking spaces would typically be required. According to 0 FILE NO.: Z -7699-B (Cont. the applicant the site will be developed with three buildings of eight (8) suites each and a building of four suites. Each suite could employ three (3) persons, requiring 84 parking spaces. Additionally, the existing building to the west is under -parked by approximately ten (10) spaces and overflow parking would utilize the additional spaces created. The applicant has indicated the parking and the rear three buildings will be constructed in a single phase with a pad set for construction of the single story building located along the northwestern perimeter. The buildings are proposed as stucco, stone and siding. A total building height of 32 -feet is proposed. The site plan does not include the placement of any additional signage. The previous approval allowed for the construction of a ground mounted monument style sign not to exceed ten feet in height and one hundred square feet in area. Building signage is to comply with signage allowed in office zones or a maximum of ten percent of the fagade area. The revised site plan indicates interior landscape islands adequate to meet the minimum ordinance requirement and a landscape strip around the perimeter complying with the Highway 10 Design Overlay District requirements with the exception of the eastern perimeter. The proposal includes a 100 -foot building setback adjacent to Cantrell Road, a 40 -foot rear yard setback, a 30 -foot side yard setback along the western perimeter and a 15 -foot building setback along the eastern perimeter. The indicated setbacks comply with the minimum setback requirements to the Highway 10 Design Overlay District standard with the exception of the setback along the eastern perimeter. The Highway 10 Design Overlay District typically requires the placement of a 30 -foot side yard building setback. Landscaping per the Highway 10 Design Overlay District should include a 40 -foot front yard landscape strip, a 25 -foot average landscape strip around the remaining perimeters. The site plan indicates the placement of the 40 -foot front yard landscape strip, a 30 -foot landscape strip along the western perimeter and a 28.25 foot landscape strip along the southern perimeter. The landscaping in these areas exceeds the typical minimum ordinance standards. The landscaping strip along the eastern perimeter is indicated at 15 -feet which does not comply with the typical minimum ordinance standards. In addition, the Design Overlay District typically allows the maximum of one building for every two acres. The proposal includes the development of four buildings on a 2.33 acre site. Staff is supportive of the development if consideration is taken to lessen the impact of the development on the adjacent residential uses. The site is designated as Transition on the City's Future Land Use Plan which allows for residential, both single-family and multi -family, and office uses. Historically office developments in the transition classification have been constructed in the suburban office style, by limiting the massing and maintaining a residential character. Staff feels the buildings should be constructed of residential style materials and architectural elements resembling single-family construction. Staff 7 FILE NO.: Z -7699-B (Cont. also feels the perimeter landscaping along the southern and southwestern perimeters should be evergreen trees such as Leyland Cypress, planted with a larger caliper tree than typically required, such as a three inch caliper, and spaced to provide screening to the adjoining residences. Otherwise to staffs knowledge there are no outstanding issues associated with the request. Staff feels the development of this site with an office development, if developed as recommended, should have minimal impact on the adjoining properties. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E, F and H of the above agenda staff report. PLANNING COMMISSION ACTION: (MARCH 1, 2007) The applicant was present representing the request. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E, F and H of the agenda staff report. There was no further discussion of the item. The Chair entertained a motion for placement of the consent agenda for approval. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. March 1, 2007 ITEM NO.: 10 NAME: Highway 10 Development Short -form POD LOCATION: Located at 16603 and 16623 Cantrell Road DEVELOPER: Hart Lazenby Commercial 11500 Rodney Parham, Suite 15 Little Rock, AR 72212 ENGINEER: Rickett Engineering, Inc. 78 Aberdeen Drive Little Rock, AR 72212 AREA: 2.33 acres CURRENT ZONING NUMBER OF LOTS: 1 zoning lot R-2, Single-family and POD FILE NO.: Z -7699-B FT. NEW STREET: 0 ALLOWED USES: Single-family residential and 0-3, General Office District uses PROPOSED ZONING: POD PROPOSED USE: 0-3, General and Professional Office VARIANCESIWAIVERS REQUESTED: None requested. BACKGROUND: The Little Rock Board of Directors adopted Ordinance No. 19,202 on October 5, 2004, establishing the Highway 10 Development Short -form POD. The applicant proposed to construct a 5,600 square foot two story office building and associated parking on a 0.44 acre lot. Fourteen parking spaces were proposed. The proposed site plan indicated signage consistent with signage allowed in the Highway 10 Design Overlay District or a ground mounted monument style sign a maximum of ten feet in height and one hundred square feet in area. The applicant indicated 0-3, General Office uses would be utilized as uses for the site. The office hours were proposed as 8:00 am to 5:00 pm Monday through Friday. The maximum March 1, 2007 SUBDIVISION ITEM NO.: 10 (Cont.) FILE NO.: Z -7699-B building height proposed was 30 -feet. The site plan included the placement of a dumpster on the site along the eastern boundary. The building has been constructed. On February 16, 2006, the Little Rock Planning Commission denied a request to revise the previously approved POD to expand the developed area to the east by 1.89 acres and to allow the construction of two additional buildings. The proposal included the construction a single story office/retail building containing 8,456 square feet and a two story office building containing 7,000 square feet. The site plan indicated a total building square footage of 21,056 square feet for all three buildings with 12,600 square feet of office and 8,456 square feet of retail. Ninety (90) parking spaces were proposed. The site contained a total of 101,495 square feet with 61,642 (63.2%) square feet of impervious area and 39,853 (36.8%) square feet of green space. The applicant's proposed uses for the site were as follows: Existing Building: 0-3 uses only, no accessory uses. Proposed Building A: 0-3 uses, unlimited accessory uses and the following additional commercial uses: small commercial establishments selling gifts, electronics, phones movies or games, home decor including paint and wallpaper, sporting goods, liquor sales, furniture and tanning Proposed Building B: 0-3 uses only, no accessory uses. A. PROPOSAUREQUEST: The applicant proposes to construct three additional buildings similar to the one already built adjacent to the west and a single story building adjacent to Cantrell Road. The original development, which had limited parking and only eight suites, will be expanded on approximately 1.89 acres just to the east and will be comprised of office suite, varying in size with approximately 90 parking spaces. Two of the buildings will back up to a small pond which is located east of the development. The request includes 0-2 uses as allowable uses for the buildings. The developers have indicated a reduced side yard setback on the eastern boundary of the property to allow the buildings to move away from the residential property located to the south and west. According to the cover letter all lighting will point away from the homes and originate from the buildings. No pole lighting is proposed within the development. The existing entrance will be widened to a maximum of 36 -feet. The applicant has indicated the site presently drains into an adjoining pond and is requesting the adjoining natural feature be taken into consideration when requiring storm water detention. 2 March 1, 2007 SUBDIVISION ITEM NO.: 10 Cont. FILE NO.: Z -7699-B B. EXISTING CONDITIONS: The site contains a single-family residence and shop building formerly used as a small sandblasting business. There are non-residential uses, office and commercial, located to the west of the site located in the converted single-family structures. To the east of the site is a large vacant tract abutting Cantrell Road and the west leg of Taylor Loop Road. The area south of the site is a newly developing single-family subdivision accessed from South Katilus Road. There have been homes constructed along the western and southern boundary of the site. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received one informational phone call from an area resident. The Johnson Ranch Neighborhood Association, the Chevaux Court Property Owners Association, the Westchester Property Owners Association, all owners of property located within 200 feet of the site and all residents, who could be identified, located within 300 feet of the proposed development were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Cantrell Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of-way to 55 feet from centerline will be required. 2. Sidewalks with appropriate handicap ramps are required in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 3. Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. 4. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Site grading, and drainage plans will need to be submitted and approved prior to the start of construction. 5. Provide a sketch Grading and Drainage Plan per Section 29-186 (e). 6. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 7. If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 3 March 1, 2007 SUBDIVISION ITEM NO.: 10 (Cont. FILE NO.: Z -7699-B 8. Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The lots must share a single driveway access centered on the property line. The width of driveway must not exceed 36 feet. A minimum spacing distance of 300 feet is required between driveways on a principal arterial street. The eastern drive does not meet this standard. 9. Old curb cuts along Cantrell Road should be closed with curb and gutter per AHTD standards. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Energy: Approved as submitted. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A Capital Investment Charge based on the size of the meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all meter connections including any metered connections off the private fire system. A water main extension, on-site fire line(s) and additional fire hydrant(s) will be required in order to provide service to this property. The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express Route. C! March 1, 2007 SUBDIVISION ITEM NO.: 10 (Cont. F. ISSUES/TECHNICAL/DESIGN: FILE NO.: Z -7699-B Planninq Division: This request is located in the Chenal Planning District. The Land Use Plan shows Transition for this property. The applicant has applied for a Planned Office Development to allow 0-2 uses. The request does not require a change to the Land Use Plan. Master Street Plan: Cantrell Road is shown as a Principal Arterial on the Master Street Plan. Cantrell Road may require dedication of right-of-way and may require street improvements. The primary function of a Principal Arterial is to serve through traffic and to connect major traffic generators or activity centers within urbanized areas. Entrances and exits should be limited to minimize negative effects of traffic and pedestrians on Cantrell Road since it is a Principal Arterial. Bicycle Plan: Existing or proposed Class I, Il, or III Bikeways are not in the immediate vicinity of the development. City Recognized Neighborhood Action Plan: The property under review is not located in an area covered by a City of Little Rock recognized neighborhood action plan. Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. Site plan must comply with the Highway 10 overlay district requirements. 3. Berming is encouraged along Highway 10. 4. The Highway 10 overlay district requires a twenty-five foot wide (25) land use buffer. The proposed plan encroaches into this area. 5. The zoning buffer ordinance requires a twenty-four foot (24') wide land use buffer to separate this proposed development from the residential property on southern perimeter of the site. Currently, the southern perimeter is not meeting this minimum requirement. Seventy percent (70%) of these buffers are to remain undisturbed. 6. The zoning buffer ordinance requires a twelve foot (12') wide land use buffer to separate this proposed development from the residential property on western and eastern perimeters of the site. Currently, these perimeters are not meeting this minimum requirement. Seventy percent (70%) of these buffers are to remain undisturbed. 5 March 1, 2007 SUBDIVISION ITEM NO.: 10 (Cont. G FILE NO.: Z -7699-B 7. A six (6) foot high opaque screen, either a wooden fence with its face side directed outward, a wall, or dense evergreen plantings, is required along the southern, western, and eastern perimeters of the site. Credit towards fulfilling this requirement can be given for existing trees and undergrowth that satisfies this year -around requirement. 8. An automatic irrigation system to water landscaped areas will be required. 9. Prior to the issuance of a building permit, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 10. The City Beautiful Commission recommends preserving as many existing trees as feasible on this tree covered site. Credit toward fulfilling Landscape Ordinance requirements can be given when preserving trees of six (6) inch caliper or larger. SUBDIVISION COMMITTEE COMMENT: (February 8, 2007) The applicant was present representing the request. Staff presented an overview of the proposed development indicating there were a few technical issues associated with the request which were outstanding. Staff stated the site plan did not comply with the Highway 10 Design Overlay District in a number of areas. Staff also stated the indicated parking was excessive to serve an office development and questioned the need for the number of spaces proposed. Staff questioned if the developers were requesting the utilization of the 10 percent accessory uses as listed in the 0-2 zoning district. Staff also questioned the phasing plan for the development. Public Works comments were addressed. Staff stated the eastern most drive did not meet the minimum ordinance standards for driveway spacing. Staff also stated the old curb cuts along Cantrell Road should be closed with curb and gutter per AHTD standards. Staff stated prior to any grading activities on the site permits would be required. Landscaping comments were addressed. Staff stated the site did not appear to meet the typical minimum ordinance requirements of the Highway 10 Design Overlay District. Staff also stated berming along Highway 10 was encouraged to screen parking lots. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. C March 1, 2007 SUBDIVISION ITEM NO.: 10 (Cont. FILE NO.: Z -7699-B H. ANALYSIS: The applicant submitted a revised site plan to staff addressing most of the technical issues raised at the February 8, 2007, Subdivision Committee meeting. The revised site plan indicates a single drive shared between the two properties and indicated the existing drive will be closed at the time of development. The development is proposed as 100 percent office with no allowance for commercial or the 10 percent accessory uses as listed in the 072 zoning district. The site plan indicates the expansion of the previously approved POD to increase the area by 1.89 acres and allow the construction of four additional buildings. The site plan indicates the construction of a single story office building located adjacent to the existing office building and three two story office buildings located along the eastern perimeter and at the southwest corner of the site. A single dumpster has been located on the site along the eastern perimeter of the site. The applicant has indicated a note concerning the required screening and the dumpster will be serviced during business hours only. The site plan indicates a total area of 19,800 square feet, a building footprint area of 11,400 (20.8%) square feet, parking area of 43,040 (42.4%) square feet and landscaped area of 39,853 (36.8%) square feet. The site plan includes the placement of 90 parking spaces. Based on the minimum parking required for an office development 49 parking spaces would typically be required. According to the applicant the site will be developed with three buildings of eight (8) suites each and a building of four suites. Each suite could employ three (3) persons, requiring 84 parking spaces. Additionally, the existing building to the west is under -parked by approximately ten (10) spaces and overflow parking would utilize the additional spaces created. The applicant has indicated the parking and the rear three buildings will be constructed in a single phase with a pad set for construction of the single story building located along the northwestern perimeter. The buildings are proposed as stucco, stone and siding. A total building height of 32 -feet is proposed. The site plan does not include the placement of any additional signage. The previous approval allowed for the construction of a ground mounted monument style sign not to exceed ten feet in height and one hundred square feet in area. Building signage is to comply with signage allowed in office zones or a maximum of ten percent of the fagade area. The revised site plan indicates interior landscape islands adequate to meet the minimum ordinance requirement and a landscape strip around the perimeter complying with the Highway 10 Design Overlay District requirements with the exception of the eastern perimeter. The proposal includes a 100 -foot building setback adjacent to Cantrell Road, a 40 -foot rear yard setback, a 30 -foot side 7 March 1, 2007 SUBDIVISION ITEM NO.: 10 (Cont. FILE NO.: Z -7699-B yard setback along the western perimeter and a 15 -foot building setback along the eastern perimeter. The indicated setbacks comply with the minimum setback requirements to the Highway 10 Design Overlay District standard with the exception of the setback along the eastern perimeter. The Highway 10 Design Overlay District typically requires the placement of a 30 -foot side yard building setback. Landscaping per the Highway 10 Design Overlay District should include a 40 -foot front yard landscape strip, a 25 -foot average landscape strip around the remaining perimeters. The site plan indicates the placement of the 40 -foot front yard landscape strip, a 30 -foot landscape strip along the western perimeter and a 28.25 foot landscape strip along the southern perimeter. The landscaping in these areas exceeds the typical minimum ordinance standards. The landscaping strip along the eastern perimeter is indicated at 15 -feet which does not comply with the typical minimum ordinance standards. In addition, the Design Overlay District typically allows the maximum of one building for every two acres. The proposal includes the development of four buildings on a 2.33 acre site. Staff is supportive of the development if consideration is taken to lessen the impact of the development on the adjacent residential uses. The site is designated as Transition on the City's Future Land Use Plan which allows for residential, both single-family and multi -family, and office uses. Historically office developments in the transition classification have been constructed in the suburban office style, by limiting the massing and maintaining a residential character. Staff feels the buildings should be constructed of residential style materials and architectural elements resembling single-family construction. Staff also feels the perimeter landscaping along the southern and southwestern perimeters should be evergreen trees such as Leyland Cypress, planted with a larger caliper tree than typically required, such as a three inch caliper, and spaced to provide screening to the adjoining residences. Otherwise to staff's knowledge there are no outstanding issues associated with the request. Staff feels the development of this site with an office development, if developed as recommended, should have minimal impact on the adjoining properties. I. STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E, F and H of the above agenda staff report. PLANNING COMMISSION ACTION: (MARCH 1, 2007) The applicant was present representing the request. There were no registered objectors present. Staff presented the item with a recommendation of approval of the W March 1, 2007 SUBDIVISION ITEM NO.: 10(Cont.)FILE NO.: Z -7699-B request subject to compliance with the comments and conditions as outlined in paragraphs D, E, F and H of the agenda staff report. There was no further discussion of the item. The Chair entertained a motion for placement of the consent agenda for approval. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. 1061