HomeMy WebLinkAboutZ-7665-C Staff AnalysisJanuary 29, 2015
ITEM NO.: 9 FILE NO.: Z -7665-C
NAME: Rowan Park at Kanis Revised Long -form PD -R
LOCATION: Located at 1000 Kirby Road
DEVELOPER:
Rowan Development
Attn. Jacob Chi
12206 West Markham Suite 200
Little Rock, AR 72211
ENGINEER:
Crafton Tull and Associates
10825 Financial Center Parkway, Suite 300
Little Rock, AR 72211
AREA: 14.03 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE:
NUMBER OF LOTS: 1
go -IF;
FT. NEW STREET: 0 LF
Multi -family at a density of 10.9 units per acre
-m
Multi -family at a density of 18.5 units per acre
VARIANCE/WAIVERS: A variance from Sections 30.43 and 31.210 to allow the
northern driveway as proposed.
BACKGROUND:
Ordinance No. 19,164 adopted by the Little Rock Board of Directors on August 17,
2004, established the Rock Haven Short -form PD -R. The proposed development was
designed based on a concept blended between a zero lot line subdivision and a
horizontal property regime containing 22 single-family lots. The lots were to be
minimally sized to accommodate buildable surface areas between 1,500 and
2,450 square feet on each lot. Homes were proposed with a two-story height maximum.
The bill of assurance was indicated to prescribe minimum and maximum home sizes, as
well as controls for architectural quality that would be administered by an architectural
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont.
Z -7665-C
review committee. Each buildable area was set within one foot of one lot line, and
fourteen to fifteen feet from the other to allow for a small side yard area. All homes
would have enclosed garages located at the rear of the structure and entered from the
looped drive. Homes would front on the interior common park area. The proposed
access to lots was accomplished with a private drive that encircled the property and was
within a common access and utility easement area. This easement was proposed as a
part of the large Lot 1 area, which comprised all of the land not contained within the
residential lots. All improvements and land within Lot 1 would be held in common
ownership by the property owners association and would also be maintained by the
property owners association. The property owners association would also maintain
individual lot area landscaping.
The applicant indicated Tract A as a separate parcel containing 1.91 acres. The
applicant indicated Tract A would be reserved for future development. The applicant
requested a deferral of required street improvements to Kirby Road until development
occurred for proposed Tract A.
The applicant indicated phasing would be utilized for the development. Phase I was to
consist of the development of Lots 1 —11 including all required street improvements and
infrastructure. Phase II would consist of the completion of the access easement located
within Lot 1 and Lots 12 — 22.
Ordinance No. 19,326 adopted by the Little Rock Board of Directors on June 7, 2005,
allowed a revision to the PD -R. The approval allowed the use of an RV as a temporary
sales, construction management and security office on the site. The new homes were
not constructed and the RV was removed.
Ordinance No. 20,301 adopted by the Little Rock Board of Directors on August 2, 2010,
revised the approved PD -R for this site to allow the construction of 72 units of multi-
family housing on this 6.6 acre site. Four (4) three (3) story apartment buildings
containing 18 -units per building were approved. Within the development a clubhouse
building with meeting room space, kitchen and an on-site manager residence were
approved. The clubhouse also provided a swimming pool area. The development
contained 2.85 -acres of paved and rooftop area and 3.75 -acres of green space. The
site plan as approved allowed an overall density of 10.9 -units per acre.
A. PROPOSAUREQUESTIAPPLICANT'S STATEMENT:
The applicant is now proposing a revision to the PD -R zoning and site plan to
allow the site area to be increased and allow an increase in density. The
applicant is proposing to increase the site area from 6.6 -acres to 10.7 -acres.
The number of units will be increased from 72 -units to 198 -units. The site plan
includes seven (7) new buildings. The plan includes the construction of a
maintenance facility, additional dumpster locations and two (2) covered parking
2
January 29, 2015
SUBDIVISION
ITEM NO.: 9 (Cont.) PILE NO.: Z -7665-C
structures. The community currently house a clubhouse/leasing office, pool and
mail center. The new units will share these facilities. Based on the topography
of the site a new driveway is proposed from Kirby Road to serve the new units.
An internal trail/path will connect the new units to the existing amenities of the
development.
B. EXISTING CONDITIONS:
The site has developed with the multi -family housing as approved. There are
residential uses located to the east of the site both site built and manufactured
homes. To the southeast of the site is property zoned PCD which was approved
for a mixed use development containing mini -warehouse, office and retail uses
including restaurant uses. To the south of the site is C-1 zoned property which
has developed as a convenience store. To the west of the site is vacant R-2,
Single-family zoned property.
Kirby Road is a narrow unimproved road with open ditches for drainage. Street
improvements to Kirby Road per the Master Street Plan were completed adjacent
to this site and south of the site with the site development of the apartments and
the convenience store.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received a few informational phone calls from area
residents. All owners of property located within 200 -feet of the site along with the
Capitol Hills Estates Property Owners Association, the Gibraltar Heights Point
West Timber Ridge Neighborhood Association, the Parkway Place Property
Owners Association, the Spring Valley Manor Property Owners Association and
the Woodlands Edge Community Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. If proposed to be
constructed in more than 1 phase, is advanced grading proposed to occur
on future phases with construction of phase 1 ? Is grading proposed to
occur west of the units on lot 2?
C
January 29, 2015
SUBDIVISION
ITEM NO.: 9 [Cont.] FILE NO.: Z -7665-C
3. Provide a Sketch Grading and Drainage Plan per Section 29-186 to
determine if variances will be needed for proposed retaining walls, slopes,
and to determine the extent of proposed grading.
4. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
5. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
6. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Greg Simmons, Traffic
Engineering at 501.379.1813; asimmonsOlittlerock arq for more
information.
7. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on a
collector street is 250 feet between driveways. The proposed driveway
does not meet that spacing requirement. A driveway spacing variance must
be requested.
8. Provide a letter prepared by a registered engineer certifying the sight
distance at the intersection(s) comply with 2004 AASHTO Green Book
standards. The sight distance certification was provided and is being
reviewed by staff. The middle of the proposed driveway should be staked
and flagged for staff to visit the site and observe vehicles.
9. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby construction site
shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
10. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After
construction, an as -built certification is required for construction of the
retaining wall.
11. The owner and/or manager of each multi -family residence of 100 or more
dwelling units shall provide recycling and encourage participation by the
tenants, renters, or owners of each unit. Contact Melinda Glasgow
501.371.4646; mplasgow c7 littlerock.orq for more information.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project by extension of private main.
Capacity fee analysis required. Contact Vince Hortho at Little Rock Wastewater
Utility for additional information.
4
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
Enteray: Entergy does not object to this proposal as single phase power is
available from the east side of Kirby Road. Contact Entergy in advance to
discuss service needs and facilities locations.
Center oint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
3. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Contact Central Arkansas Water if additional fire protection or metered water
service is required.
6. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 501.377.1226 if you would like to
discuss backflow prevention requirements for this project.
7. The facilities on-site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's materials
and construction specifications and installation will be inspected by an
5
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: 2-7665-C
engineer, licensed to practice in the State of Arkansas. Execution of a
Customer Owned Line Agreement is required.
8. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are
used, a reduced pressure zone back flow preventer shall be required.
9. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
Fire Department:
Fire Hydrants: Maintain fire apparatus access roads at fire hydrant locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive of
shoulders.
Loading: Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire
apparatus access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of fire apparatus weighing at
least 75,000 pounds.
Dead Ends: Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates: Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall comply
with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation
by one person.
0
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
4. Gate components shall be maintained in an operable condition at all
times and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by
fire department personnel for emergency access. Emergency opening
devices shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is
installed at the gate location.
7. Locking device specifications shall be submitted for approval by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance
with UL 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
Multi -Family Residential Develo meets - As per Appendix D, Section D106.1 of
the 2012 Arkansas Fire Prevention Code Vol. 1. Projects having more than
100 dwelling units. Multiple -family residential projects having more than
100 dwelling units shall be equipped throughout with two separate and approved
fire apparatus access roads.
Exception: Projects having up to 200 dwelling units may have a single approved
fire apparatus access road when all building, including nonresidential
occupancies are equipped throughout with approved automatic sprinkler systems
installed in accordance with Section 903.3.1.1 or 903.3.1.2
As per Appendix D, Section D106.2 of the 2012 Arkansas Fire prevention Code
Vol. 1. Projects having more than 200 dwelling units. Multiple -family residential
projects having more than 200 dwelling units shall be provided with two separate
and approved fire apparatus access roads regardless of whether they are
equipped with an approved automatic sprinkler system.
Fire Hydrants: Locate Fire Hydrants as per Appendix C of the 2012 Arkansas
Fire Prevention Code. Section C101 — C105, in conjunction with Central
Arkansas Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's
Office (Capt. Tony Rhodes 501-918-3757). Number and Distribution of Fire
Hydrants as per Table C105.1.
County Planninc: No comment
7
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
CATA: The area is currently not served by CATA at this location. This location
is currently in CATA's long range planning. The proposal has no impacts on
service and does not impede pedestrian access to transit. Impressive pedestrian
amenities demonstrated on the site plan indicates a multi -modal approval to
community building by the developer. CATA encourages and supports this
approach as the community expands allowing residents a transportation choice.
Parks and Recreation: No comment received.
F. ISSU ESITECH NICAUDESIGN:
Building Code: Project is subject to full commercial plan review approval prior to
issuance of a building permit. For information on submittal requirements and the
review process, contact a commercial plans examiner: Curtis Richey at
501.371.4724; crichevOlittlerock.org or Mark Alderfer at 501.371.4875;
inalderfer littlerock.or .
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Public Institutional (PI) and Residential Medium
Density (RM) for this property. The Public Institutional (PI) category includes
public and quasi -public facilities that provide a variety of services to the
community such as schools, libraries, fire stations, churches, utility substations,
and hospitals. The Residential Medium Density category accommodates a broad
range of housing types including single family attached, single family detached,
duplex, townhomes, multi -family and patio or garden homes. Any combination of
these and possibly other housing types may fall in this category provided that the
density is between six (6) and twelve (12) dwelling units per acre. The applicant
has applied for a rezoning from R-2 (Single Family District) and PRD (Planned
Residential District) to PDR (Planned District Residential) for expansion of an
existing apartment complex on to adjacent land.
Master Street Plan: Kirby Road is a Collector on the Master Street Plan. The
primary function of a Collector Street is to provide a connection from Local
Streets to Arterials. This street may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
Site plan must comply with the City's landscape and buffer ordinance
requirements.
E;'
January 29, 2015
SUBDIVISION
ITEM NO.: 9 [Cont.
FILE NO.: Z-7
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (1/2) the full width requirement
but in no case less than nine (9) feet. The plantings, existing and purposed,
shall be provided within the City's landscape ordinance requirements.
3. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property. This strip shall be at least nine (9) feet wide.
Provide trees with an average linear spacing of not less than thirty (30) feet
within the perimeter planting strip. Provide three (3) shrubs or vines for every
thirty (30) linear feet of perimeter planting strip.
4. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be three
hundred (300) square feet for developments with more than one hundred fifty
(150) parking spaces. Interior islands must be a minimum of seven and one
half (7 1/2) feet in width. Trees shall be included in the interior landscape
areas at the rate of one (1) tree for every twelve (12) parking spaces.
5. The development of two (2) acres or more requires an approved landscape
plan stamped with the seal of a registered landscape architect prior to the
issuance of a building permit.
6. A landscape irrigation system shall be required for developments of one (1)
acre or larger.
7. Recycling containers must be screened per Section 36-523(d) of the City of
Little Rock Code of Ordinances.
8. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (January 7, 2015)
Mr. Jacob Chi was present representing the request. Staff presented an
overview of the item stating the request was to expand the site and number of
units for a previously approved multi -family development. Staff stated there were
a few outstanding technical issues in need of addressing prior to the full
Commission acting on the request. Staff questioned if the Phase 2 portion of the
development would utilize the amenities of the first phase. Mr. Chi stated they
would. Staff requested Mr. Chi provide a trail system connecting the new
development to the Phase 1 portion of the development. Staff questioned if there
would be a development sign at the new driveway location. Staff also questioned
the proposed construction materials, the hours of dumpster service and the
maximum building height of the structures.
9
January 29, 2015
SUBDIVISION
ITEM NO.: 9 (Cont.
FILE NO.: Z -7665-C
Public Works comments were addressed. Staff stated a grading permit would be
required prior to any development of the site. Staff stated they had received the
engineering sight distance certification for the proposed new driveway. Staff
stated they were agreeable that proper sight distances could be achieved. Staff
stated the development would be required to provide locations for recycling by
the residents to occur. Staff noted the recycling container as well as the
dumpster location were required to be screened.
Landscaping comments were addressed. Staff stated perimeter planting strips
were required on each side of the vehicular use area. Staff stated the
development would require the placement of an automatic irrigation system to
water landscaped areas. Staff stated eight percent (8%) of the vehicular use
area was required to be landscaped.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the January 7, 2015, Subdivision Committee meeting. The
revised plan indicates the placement of a sign at the new entrance to the
development, the maximum building height and the proposed construction
materials. The dumpster hours of service are limited to 8 am to 6 pm daily.
The applicant is now proposing a revision to the PD -R zoning and site plan to
allow the site area to be increased and the construction of additional multi -family
units within the expanded area. The applicant is proposing to increase the site
area from 6.6 -acres to 10.7 -acres. The applicant purchased 4.1 -acres from an
adjacent land owner to the north. The applicant is proposing to construct seven
(7) new building within this area. The maximum building height proposed is
47 -feet.
The number of units will be increased from 72 -units which are located on the
existing 6.6 -acre site to 198 -units. The density of the existing multi -family
development is 10.9 units per acre. With the new construction the overall density
of the development will be 18.5 units per acre.
The site plan is proposed with the construction of 191 new parking spaces.
Located on the site plan are two (2) covered parking areas. There are
115 parking spaces located on the site. The total number of parking spaces
proposed is 306. To determine parking for multi -family development 1 1/2 spaces
10
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
per unit is typically required. 297 spaces would typically be required to serve the
development.
The plan includes the construction of a maintenance facility, additional dumpster
locations and two (2) covered parking structures. The Phase I portion of the
development currently house a clubhouse/leasing office, pool and mail center
which the new units will share. An internal trail/path will connect the new units to
the existing amenities of the development.
Based on the topography of the site a new driveway is proposed from Kirby Road
to serve the new units. The developer has provided an engineer's certification of
sight distance for the new driveway location. Staff concurs with the sight
distance certification. The applicant is requesting a variance to allow a variance
for the placement of the driveway.
The site plan indicates the placement of a new development sign at the new
driveway location. The sign is proposed with a maximum height of ten (10) feet
and a maximum sign area of 100 square feet. The existing sign is similar in size
and is located at the clubhouse entrance to the development. The zoning
ordinance typically allows a maximum sign height of six feet and a maximum sign
area of twenty-four square feet.
The site plan notes the existing building coverage is 12 percent, the paved area
is 19 percent and the landscaped area is 69 percent. With the new construction
the building coverage is proposed 18 percent, the paved area is 16 percent and
the landscaped area is 66 percent.
Staff is not supportive of the applicant's request. The site is indicated on the
City's Future Land Use Plan as Residential Medium which allows a development
density between six (6) and twelve (12) dwelling units per acre. This
development is proposed with a density of 18.5 units per acre well in excess of
the density suggested by the Future Land Use Plan. This area is predominately
single-family to the north and west of this site with vacant R-2, Single-family
zoned property immediately west of this development. Staff feels the density of
the existing development allows a transition from commercial uses and zonings
located at the intersection of Kanis and Kirby Roads to the residential uses to the
north. Staff feels a similar density to the existing development should be
maintained. Staff feels the overall density of the development proposed in
excess of 18 units per acre is too intense for this area.
STAFF RECOMMENDATION:
Staff recommends denial of the request.
11
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
PLANNING COMMISSION ACTION: (JANUARY 29, 2015)
Mr. Jacob Chi, Rowan Development, was present representing the request. There were
a number of registered objectors present. Staff presented the item with a
recommendation of denial.
Mr. Chi addressed the Commission on the merits of his request. He stated the
development was proposed as Phase II of an existing development owned by his family.
He stated the existing development was completed in 2012. He stated the units were
one and two bedroom units. He stated most of the residents telecommuted from home
to work. He stated the development maintained a ninety-six percent occupancy rate.
He stated the units were not classified as affordable housing. He stated the
development was a $12.7-millor dollar investment. He stated there were $1.2-millon
dollars in site development costs.
Mr. Chi stated in visiting with the area residents it appeared traffic was the main
concern. He stated the City did not have plans to widen Kanis Road nor improve the
intersection of Kanis/Cooper Orbit/Kirby Roads. He stated how traffic flowed through
the intersection impacted the adjacent streets and traffic in the area. He stated at this
location Kanis Road carried 11,000 vehicles per day. He stated based on these traffic
counts this did not warrant a traffic signal. He stated the speeds of cars was also a
concern. He stated Kanis Road was an 18 -foot roadway with open ditches. He stated
the normal City street had shoulders and 10 -foot travel lanes.
Mr. Chi stated his company did not own the property at the intersection. He stated his
company could not make improvements to property they did not own. He stated the
topography of this site was such that site development costs were near $1.2-millon
dollars in dirt work. He stated he did not feel opposition to the development was the
solution to the problem. He stated based on the current needs of the City the only way
Kanis Road would be constructed was through private development. He stated his goal
was to improve this area of the City by extending water, sewer, streets and sidewalks.
Mr. Charles Collins addressed the Commission in opposition. He stated his home was
located across Kirby Road from the proposed development. He provided the
Commission with photos of the site looking from his front door and from the property to
his front door. He stated his driveway was located near the entrance to the apartment
development. He stated his concern was an increase in density. He stated he felt this
would cause an increase in crime. He stated he felt the development would impact his
property value.
Mr. Ross Phillips addressed the Commission in opposition of the request. He stated he
lived in the Spring Valley Manor Subdivision and had lived there for 26 -years. He stated
his concern was the number of apartments proposed for development in the area. He
stated he was not opposed to development but was opposed to the concentration of
12
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
apartments in one area. He stated he preferred the Commission to follow the land use
plan and not approve the development.
Ms. Linda Collins addressed the Commission in opposition of the request. She stated
she was a resident of the Kanis Creek Subdivision. She stated Mr. Chi had met with the
residents of Kanis Creek and explained his development. She stated her concern was
not the quality of the development. She stated Mr. Chi's development was top quality.
She stated her concern was density. She stated she felt the development was too
intense for the area. She stated the roads were not constructed for the additional traffic
the apartments would generate. She stated 10 units per acre was much different than
18 units per acre. She stated she would prefer a mixed use development in the area.
Ms. Amy Pierce addressed the Commission in opposition of the request. She stated
she was a resident of the Woodlands Edge Subdivision and was opposed to the density
of the development. She stated residents exiting the Woodlands Edge Subdivision onto
Kanis Road had difficulty turning left. She stated she was concerned with the number of
apartments proposed for Kanis Road.
Ms. Melanie Strigel addressed the Commission in opposition of the request. She stated
her home was located on Cooper Orbit Road. She stated her concern was the same as
staff's concern which was the density of the development. She stated she felt the
construction of seven buildings on 4.1 -acres was too intense. She stated the new
construction was proposed at 30.7 -units per acre which she felt was a significant
consideration. She stated traffic was a concern but not the only concern of the area
residents. She stated there was no bus service in the area and the only parks were
privately owned. She stated the City was aiding the residents and property owners in
the area in developing a Design Overlay District for the area. She stated she felt the
DOD should be completed before the Commission approved any further development in
the area.
Mr. Alvin Weintraub addressed the Commission in opposition of the request. He stated
there were 600 homes in the Woodlands Edge Subdivision and lots were currently
being developed for future home sites. He stated there was a 170 -unit apartment
complex located at Kanis and Cooper Orbit that had been approved and was currently
under construction. He stated traffic and density were two concerns of the residents.
He stated turning left onto Kanis Road at 5:00 pm was difficult. He stated the area did
not need an overflow of apartments. He stated the area had seen an increase in crime.
He stated the area did not need additional apartments at this time.
Mr. Greg Jones addressed the Commission in opposition of the request. He stated he
was on the Woodlands Edge Homeowners Association Board. He stated his concern
was density. He stated in 2008 AHTD indicated there were 8,100 vehicles per day at
this intersection. He stated current numbers indicated 11,000 vehicles per day. He
stated this was a 35.8 percent increase in traffic on Kanis Road. He stated with the
13
January 29, 2015
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -7665-C
current units approved including Panther Branch and Capitol Hills and additional
550 units were approved or being constructed in the area. He stated trip generation for
an apartment development was 6.7 trips per day per unit. He stated with the additional
multi -family proposed for the area this would generate 3,700 trips per day which was a
34 percent increase over last year. He stated the main concerns were traffic and
density.
Ms. Cathi Watkins addressed the Commission in opposition of the request. She stated
the neighborhoods were in the process of developing a Design Overlay District for the
area. She stated the concepts were being developed and meetings with the property
owners were taking place. She stated the residents would like to have the DOD in
place before any additional development was approved. She stated the number of
police officers for the area had been decreased by ten percent. She stated there were
no public parks in the area for the residents to enjoy.
Ms. Ruth Bell, League of Women Voters Pulaski County, addressed the Commission in
opposition of the request. She stated the League had long been an advocate for a
Design Overlay for Kanis Road. She stated the density of the developments was too
intense. She stated there was a tipping point on all development and a point when
capacity was reached. She stated when this happened there was a decline in the
livability of a neighborhood. She stated the Commission should stick with the plan. She
stated once all infrastructure was in place then additional density could be considered.
Mr. Chi addressed the Commission outlining the resident's concerns. He stated the City
had no plans to improve the area roads and extend the City services to these
properties. He stated the only way improvements would be completed was by private
development. He stated he did not want to leave development of this area to other
developers who did not develop property responsibly. He stated his family developed
property to maintain ownership and improve the area and quality of life for the residents.
Commissioner Bubbus questioned the improvements the developer would complete
with this project. Mr. Chi stated drainage and street construction would be completed
on Kirby Road adjacent to the development. Commissioner Bubbus stated no
improvements to the intersection of Kanis and Kirby would be completed. Mr. Chi
stated he did not own the property at the intersection.
Commissioner Nunnley stated the improvements proposed by Mr. Chi's development
would not improve the intersection of Kanis and Kirby Roads. He stated residents of
Mr. Chi's development would impact this intersection greatly because residents would
be traveling both east and west on Kanis to access shopping.
Commissioner Berry questioned if a market analysis had been completed for the site.
Mr. Chi stated his family had prepared a market analysis and based on the occupancy
rate of the existing development he felt the units were warranted. Commissioner Berry
14
January 29, 2015
SUBDIVISION
ITEM NO.: 9(Cont.)FILE NO.: Z -7665-C
noted the Little Rock market was over capacity and he felt if 1 o'clock was the breaking
point the City was at 12:45. He stated the City was 8.2 percent over the national
average for vacancies of multi -family developments.
Mr. Chi stated there was a shift in mindset. He stated less and less people wanted to
own and more wanted to rent. He stated he felt the vacancies were in the lower tier of
apartment developments, the ones constructed 30 to 40 years ago. He stated the tier
one apartments were maintaining occupancies at a higher rate.
There was no further discussion of the item. The Chair entertained a motion for
approval of the item including all staff recommendations and comments except that of
denial. The motion failed by a vote of 0 ayes, 10 noes, 0 absent and 1 open position.
15
ITEM NO.: 9, Z -7665-C
NAME: Rowan Park at Kanis Revised Long -form PD -R
LOCATION: located at 1000 Kirby Road
Plannina Staff Comments:
1. Provide notification of the property owners located within 200 -feet of the
development including the certified abstract list, notice form with affidavit executed
and proof of mailing. The notice must be mailed no later than January 14, 2015.
The Office of Planning and Development must receive the proof of notice no later
than January 23, 2015.
2. The cover letter indicates the new units will utilize the existing unit's amenities. The
site plan does not include an access from the new to the old units.
3. Provide the setback dimensions for the existing and proposed buildings.
4. What is the area indicated on the site plan "area proposed new construction"?
5. Provide the call box and turn -around for the new driveway.
6. Provide details of any proposed fencing including location, total height and
construction material.
7. Will the hours of dumpster service be limited? If so provide a note on the site plan
indicting the hours of service.
8. Provide the maximum building height proposed for the structures.
9. The elevation provided indicates a combination of materials including brick, stone,
and masonry. Are these the materials proposed for the new construction?
10. Will there be an identification sign for the new units? If so provide the location and
details for the proposed sign including total height and total sign area.
11. Provide the percentage of building coverage, the percentage of paved area and the
percentage of landscape area for the existing and new development on the site plan.
12. Will the new units have covered parking other than the two (2) buildings indicated on
the site plan?
Variance/Waivers: A variance from Sections 30-43 and 31-210 to allow driveways
inconsistent with the typical driveway spacing criteria.
Public Works Conditions:
1. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. If proposed to constructed in more than 1 phase, is
advanced grading proposed to occur on future phases with construction of phase 1?
Is grading proposed to occur west of the units on lot 2?
3. Provide a Sketch Grading and Drainage Plan per Section 29-186 to determine if
variances will be needed for proposed retaining walls, slopes, and to determine the
extent of proposed grading.
4. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
5. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
6. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Greg Simmons, Traffic Engineering at
501.379.1813; gsimmons@littlerock.org for more information.
7. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on a collector street
is 250 feet between driveways. The proposed driveway does not meet that spacing
requirement. A driveway spacing variance must be requested.
8. Provide a letter prepared by a registered engineer certifying the sight distance at the
intersection(s) comply with 2004 AASHTO Green Book standards. The sight
distance certification was provided and is being reviewed by staff. The middle of the
proposed driveway should be staked and flagged for staff to visit the site and
observe vehicles.
9. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
10. Prior to construction of retaining walls, a engineer's certification of design and plans
must be submitted to Public Works for approval. After construction, an as -built
certification is required for construction of the retaining wall.
11. The owner and/or manager of each multi -family residence of 100 or more dwelling
units shall provide recycling and encourage participation by the tenants, renters, or
owners of each unit. Contact Melinda Glasgow 501.371.4646;
mglasgow@littlerock.org for more information.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this project by extension of private main. Capacity
fee analysis required. Contact Vince Hortho at Little Rock Wastewater Utility for
additional information.
Entergy: Entergy does not object to this proposal as single phase power is available
from the east side of Kirby Road. Contact Entergy in advance to discuss service needs
and facilities locations.
Centerpojnt Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
3. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
6. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project.
7. The facilities on-site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's materials and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of a Customer Owned Line
Agreement is required.
8. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives area used, a
reduced pressure zone back flow preventer shall be required.
9. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department:
Fire Hydrants: Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Laa&ng: Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an
asphalt, concrete or other approved driving surface capable of supporting the imposed
load of fire apparatus weighing at least 75,000 pounds.
Dead Ends: Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be provided
with width and turnaround provisions in accordance with Table D103.4. Requirements
for Dead-end fire apparatus access roads.
Gates: Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road
gates. Gates securing the fire apparatus access roads shall comply with all of the
following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or when
a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Multi -Family Residential Development - As per Appendix D, Section D106.1 of the
2012 Arkansas Fire Prevention Code Vol. 1. Projects having more than 100 dwelling
units. Multiple -family residential projects having more than 100 dwelling units shall be
equipped throughout with two separate and approved fire apparatus access roads.
Exception: Projects having up to 200 dwelling units may have a single approved fire
apparatus access road when all building, including nonresidential occupancies are
equipped throughout with approved automatic sprinkler systems installed in accordance
with Section 903.3.1.1 or 903.3.1.2
As per Appendix D, Section D106.2 of the 2012 Arkansas Fire prevention Code Vol. 1.
Projects having more than 200 dwelling units. Multiple -family residential projects having
more than 200 dwelling units shall be provided with two separate and approved fire
apparatus access roads regardless of whether they are equipped with an approved
automatic sprinkler system.
Fire Hydrants: Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's Office (Capt. Tony
Rhodes 501-918-3757). Number and Distribution of Fire Hydrants as per Table C105.1.
County Planning: No comment.
CATA: The area is currently not served by CATA at this location. This location is
currently in CATA's long range planning. The proposal has no impacts on service and
does not impede pedestrian access to transit. Impressive pedestrian amenities
demonstrated on the site plan indicates a multi -modal approval to community building
by the developer. CATA encourages and supports this approach as the community
expands allowing residents a transportation choice.
Parks and Recreation: No comment received.
Building Code: Project is subject to full commercial plan review approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner: Curtis Richey at 501.371.4724;
crichey@littlerock.org or Mark Alderfer at 501.371.4875; malderferC7littlerock.org.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Public Institutional (PI) and Residential Medium Density (RM) for
this property. The Public Institutional (PI) category includes public and quasi -public
facilities that provide a variety of services to the community such as schools, libraries,
fire stations, churches, utility substations, and hospitals. The Residential Medium
Density category accommodates a broad range of housing types including single family
attached, single family detached, duplex, townhomes, multi -family and patio or garden
homes. Any combination of these and possibly other housing types may fall in this
category provided that the density is between six (6) and twelve (12) dwelling units per
acre. The applicant has applied for a rezoning from R-2 (Single Family District) and
PRD (Planned Residential District) to PDR (Planned District Residential) for expansion
of an existing apartment complex on to adjacent land.
Master Street Plan: Kirby Road is a Collector on the Master Street Plan. The primary
function of a Collector Street is to provide a connection from Local Streets to Arterials.
This street may require dedication of right-of-way and may require street improvements
for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape -
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half ('/2) the full width requirement but in no case
less than nine (9) feet. The plantings, existing and purposed, shall be provided within
the city's landscape ordinance requirements.
3. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property. This strip shall be at least nine (9) feet wide. Provide trees
with an average linear spacing of not less than thirty (30) feet within the perimeter
planting strip. Provide three (3) shrubs or vines for every thirty (30) linear feet of
perimeter planting strip.
4. Eight percent (8%) of the vehicular use area must be designated for green space;
this green space needs to be evenly distributed throughout the parking area(s). The
minimum size of an interior landscape area shall be three hundred (300) square feet
for developments with more than one hundred fifty (150) parking spaces. Interior
islands must be a minimum of seven and one half (7 1/2) feet in width. Trees shall
be included in the interior landscape areas at the rate of one (1) tree for every twelve
(12) parking spaces.
5. The development of two (2) acres or more requires an approved landscape plan
stamped with the seal of a registered landscape architect prior to the issuance of a
building permit.
6. A landscape irrigation system shall be required for developments of one (1) acre or
larger.
7. Recycling containers must be screened per Section 36-523(d) of the City of Little Rock
Code of Ordinances.
8. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/Dian; Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, January 14, 2015.
RESPONSES TO LITTLE ROCK PLANNING STAFF COMMENTS
ROWAN PARK AT KANIS REVISED LONG FORM PD -R
Planning Staff Comments:
1. Will comply.
2. The site plan has been revised to show sidewalk access to the existing
community amenities.
3. Will comply.
4. The area indicated as "area proposed new construction" is comprised of the
4.1 acres acquired from the Disciples of Arkansas Church located to the north
of the existing Rowan Park at Kanis multi -family development. It does not
comprise any of the property owned by the Smith Family, `located to the west
of the existing Rowan Park at Kanis community.
5. Will comply.
6. The existing 6' wooden fence along the current Rowan Park at Kanis
community will be taken down. A 6' wooden fence will be constructed along
the northern and western boundaries of the property. A 6' black iron fence will
be constructed along the eastern boundary of the property and connected to
existing fencing along Kirby Road.
7. Dumpster service will be limited to 8pm-6pm. Notes will be added to the site
plan.
8. 47'
9. Yes.
10.A 10'x10' Sign is proposed. It's location is noted on the site plan.
11. Percentages of each category requested are noted on the site plan.
12. No other covered parking will be provided besides the proposed garages.
Variance/Waivers: We concur.
Public Works Conditions:
1. Will comply.
2. Will comply. There will be no advanced grading. All new construction will
occur in one phase.
3. Will comply.
4. Will comply.
5. Will comply.
6. Will comply.
7. A variance from Sections 30-43 and 31-210 to allow driveways inconsistent
with the typical driveway spacing criteria is being requested at this time.
8. The corresponding letter from Peters Engineering has been provided to Staff.
To our knowledge, Staff has inspected field conditions and indicated that it
approves of the proposed driveways placement along Kirby Road.
Positioning of the proposed driveway along Kirby Road has been staked and
marked.
9. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
10. Will comply.
11. Will comply.
Utilities and Fire Department/County Planning:
Wastewater: We concur.
Enterav: We concur.
Centerpoint Energy: We concur_
AT & T. We concur.
Central Arkansas Water:
1. Will comply.
2. Will comply.
3. Will comply.
4. Will comply.
5. Will comply.
6. Will comply.
7. Will comply.
8. Will comply.
9. We concur.
Fire Department:
Fire Hydrants: Will comply.
Loading: Will comply.
Dead Ends: Will comply.
Gates: Will comply.
Multi -Family Residential Develo ments: Will comply. One approved fire
apparatus access road will be provided as all buildings will be equipped with
automatic sprinkler systems.
Fire Hydrants: Will comply.
County Planning: We concur.
CATA: We concur.
Parks and Recreation: We concur.
Building Code: Will comply.
Planning Division. We concur.
Master Street Plan: We concur. Rowan Development has previously widened
and improved Kirby Road along the property frontage of both existing and
proposed phases of Rowan Park at Kanis.
Bicycle Plan: We concur.
Landscape:
1.
Will comply.
2.
Will comply.
3.
Will comply.
4.
Will comply.
5.
Will comply.
6.
Will comply.
7.
Will comply.
8.
Will comply.