HomeMy WebLinkAboutZ-7626-A Staff AnalysisFILE NO.: Z -7626-A
NAME: Joe T Robinson Middle School Long -form PD -O
LOCATION: Located at 21001 Highway 10
DEVELOPER:
Pulaski County Special School District
925 East Dixon Road
Little Rock, AR 72066
ENGINEER:
Crafton, Tull, Sparks and Associates
10825 Financial Center Parkway, Suite 300
Little Rock, AR 72211
AREA: 67.94 acres
CURRENT ZONING
NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
R-2, Single-family with a CUP for a School
ALLOWED USES: School
PROPOSED ZONING: POD
PROPOSED USE: School —Driveway proposed less than the 300 feet typical standard
as established by the Highway 10 Design Overlay District
VARIAN CESMAIVERS REQUESTED: None requested.
BACKGROUND:
The school site is located outside the City limits but within the City's zoning jurisdiction.
The school was constructed many years prior to the City extending zoning to the area.
The Little Rock Planning Commission approved a Conditional Use Permit for this site on
May 6, 2004. The approval allowed for phased construction of a baseball field, a
softball field, a gymnasium and additional parking. Phase I consisted of a baseball field,
10 parking spaces and a maintenance access drive. Phase II consisted of a softball
field. Phase III, anticipated in 2 to 5 years from the approval, consisted of a gymnasium
and an 80 -space parking lot. The baseball field and gymnasium were to replace
facilities located on property owned by Deltic Timber. The ball fields were to be fenced
and lighted and would include spectator seating areas. The lighting would be directed
FILE NO.: Z -7626-A (Cont.
onto the fields. An architect had not yet designed the Phase III gymnasium so specifics
of building material were not available. The height of the building was limited to 45 feet.
The gymnasium and Phase III parking were to be constructed to the Highway 10 Design
Overlay District standards for setbacks and buffers. The ball fields and gymnasium
were anticipated to be used seven days per week from 8:00 am to 10:00 pm. The
facilities would be available for use by groups other than the Joe T Robinson School
students.
A. PROPOSAUREQUEST:
The applicant is seeking a rezoning of the site from R-2, Single-family to Planned
Office Development to allow the existing school to place a new drive inconsistent
with the typical standards established by the Highway 10 Design Overlay District.
The property currently experiences significant congestion within the site and on
Highway 10 during peak traffic hours. This is due to bus and vehicular traffic
using a common driveway to access the site and several turning conflicts on
Highway 10. Construction of the new driveway and parking lot are intended to
allow for the separation of bus and vehicular traffic by a new concrete plaza
adjacent to the proposed building addition. These improvements will help to
alleviate congestion by improving circulation within the property and eliminating
turning conflicts and vehicle stacking on Highway 10. The request includes the
construction of a new parking lot and a small building addition.
The previous phases of the Conditional Use Permit, which have not been
completed, continue to be a part of this request.
B. EXISTING CONDITIONS:
The site contains a Pulaski County School both a Jr. and High School. An
elementary school is located to the northwest of this site. South and west of the
site are single-family homes located within the Chenal subdivision. North of the
site is wooded, single-family zoned property. Other uses in the area include
churches, an automobile repair shop, a photography studio and a small baseball
park.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All property owners located within 200 feet of the site, all residents, who could be
identified, located within 300 feet of the site and the Coalition of West Little Rock
Neighborhoods were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. The student drop off driveway must be 2 lanes wide for the entire length. The
driveway tapers to one lane near the school building.
2
FILE NO.: Z -7626-A
2. Provide a letter prepared by a registered engineer certifying the sight
distances at the driveways comply with 2004 AASHTO Green Book
standards.
3. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
4. With future site development or expansion, provide the design of the street
conforming to the Master Street Plan. Construct one-half street improvement
to Highway 10 including 5 -foot sidewalk with the planned development.
5. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
6. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Outside the service boundary. No sewer service available.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: The Fire Department having jurisdiction needs to
evaluate this site to determine whether additional public and/or private fire
hydrant(s) will be required. If additional fire hydrant(s) are required, they will be
installed at the Developer's expense.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information. Provide an approval letter from the area
volunteer fire department concerning the proposed construction.
County Planning: Approved as submitted.
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express
Route.
F. ISSUES/TECHNICAQDESIGN:
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Public Institutional for this property. The applicant has
applied for a Planned Office Development to allow an additional driveway on the
site, which does not comply with typical Highway 10 DOD standards.
3
FILE NO.: Z -7626-A (Cont.)
There is no use change with this application. The request does not require a
change to the Land Use Plan.
Master Street Plan: Highway 10 is a Principal Arterial. The primary function of a
Principal Arterial is to serve through traffic and to connect major traffic generators
or activity centers within urbanized areas. Entrances and exits should be limited
to minimize negative effects of traffic and pedestrians on Highway 10 since it is a
Principal Arterial. This street may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Pian: There are no bike routes in the immediate vicinity.
Neighborhood Action Plan: This area is not covered by a City of Little Rock
recognized Neighborhood Plan.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. All existing fencing, landscaping, and dumpster enclosures should be in good
condition or replaced in conjunction with this application.
3. The landscape ordinance requires a minimum of eight percent (8%) of the
paved areas be landscaped with interior islands of at least 7 '/2 feet in width
and 300 square feet in area.
4. An automatic irrigation system to water landscaped areas will be required.
5. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
6. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT. (November 20, 2008)
Mr. Brad Peterson of Crafton, Tull, Sparks and Associates was present
representing the school district. Staff presented an overview of the development
stating there were a few outstanding technical issues associated with the
request. Staff stated the site was located within the Highway 10 Design Overlay
District which regulated a number of issues including driveway spacing. Staff
stated the request was to allow the placement of a drive which did not meet the
Overlay criteria for spacing. Staff requested details for proposed signage, future
building additions and expansions and if an electronic sign was being requested.
M
FILE NO.: Z -7626-A (Cont.
Public Works comments were addressed. Staff stated the student drop off
driveway should be two lanes wide for the entire length. Staff stated the design
submitted showed the driveway tapering into one lane near the school building.
Staff also stated permits for improvements within the right of way were to be
obtained from the Highway Department prior to construction.
Landscaping comments were addressed. Staff stated the parking encroached
into the required 40 -foot landscape strip of the Highway 10 Design Overlay
District. Staff also questioned if the front yard landscaped area would provide
berming or plantings to screen the parking lot areas.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact these agencies for additional
information. There being no further issues for discussion, the Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the November 20, 2008, Subdivision Committee meeting. The
applicant has revised the site plan to address staff's concerns related to the
placement of parking within the front yard landscape area. The applicant has
provided details of the proposed building expansion area. The revised cover
letter states no electronic signage is proposed with the request.
The site is located within the Highway 10 Design Overlay District, which has
specific development criteria established. One of the criteria is the placement of
driveways and the minimum spacing requirements for drives along the corridor.
The site currently contains two drives from Cantrell Road. A new drive
approximately 280 feet from the eastern -most drive and 160 feet from the
western -most drive is proposed. According to the applicant, the additional drive
will allow the bus traffic and the vehicular traffic to be separated. The western-
most drive will be one-way into the site and the eastern drive will be one-way
exiting the site.
The plan also includes the addition of a parking lot area containing 41 spaces.
The parking lot is proposed north of the existing parking lot. The parking lot has
been designed to not encroach into the 40 -foot landscape strip per the Highway
10 Design Overlay District. The applicant has indicted landscaping and plantings
will be placed in this area per the typical Overlay requirements. Along the
roadway a berm, wall or dense plantings will be installed per the typical
ordinance requirements to screen the new parking lot.
Signage is proposed as a monument sign six (6) feet in height with a twelve (12)
foot sign panel. Two masonry support columns two feet by two feet are
proposed. The signage is consistent with signage typically allowed per the
Highway 10 Design Overlay District.
5
FILE NO.: Z -7626-A (Cont.
The site plan indicates a 6,200 square foot one story building addition. The
addition will house the new Media Center and ADA accessible covered entry.
The new addition and interior renovation will also serve to rectify current ADA
barriers within the existing facility by creating new accessible routes too much of
the current facility. The addition complies with the Overlay standards for building
setbacks.
Staff is supportive of the request. The desire is to separate bus and vehicular
traffic on the site. The City has approved several other school sites with a similar
configuration and the separation has worked well to ease congestion and
provided a safer pick-up for the children. To staffs knowledge there are no
outstanding technical issues associated with the request. The plan as proposed
compiles with ali standards of the Highway 10 Design Overlay District with the
exception of the placement of a drive, which does not comply with the 300 -foot
typical driveway spacing requirement.
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (DECEMBER 18, 2008)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report.
There was no further discussion of the item. The chair entertained a motion of approval
of the item as recommended by staff. The motion carried by a vote of 6 ayes, 0 noes,
2 absent and 3 open positions.
N
December 18, 2008
ITEM NO.: 10 FILE NO.: Z -7626-A
NAME: Joe T Robinson Middle School Long -form PD -O
LOCATION: Located at 21001 Highway 10
DEVELOPER:
Pulaski County Special School District
925 East Dixon Road
Little Rock, AR 72066
ENGINEER:
Crafton, Tull, Sparks and Associates
10825 Financial Center Parkway, Suite 300
Little Rock, AR 72211
AREA: 67.94 acres
CURRENT ZONING:
ALLOWED USES
NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
R-2, Single-family with a CUP for a School
School
PROPOSED ZONING: POD
PROPOSED USE: School — Driveway proposed less than the 300 feet typical standard
as established by the Highway 10 Design Overlay District
VARIAN CESM/AIVEIRS REQUESTED: None requested.
BACKGROUND:
The school site is located outside the City limits but within the City's zoning jurisdiction.
The school was constructed many years prior to the City extending zoning to the area.
The Little Rock Planning Commission approved a Conditional Use Permit for this site on
May 6, 2004. The approval allowed for phased construction of a baseball field, a
softball field, a gymnasium and additional parking. Phase I consisted of a baseball field,
10 parking spaces and a maintenance access drive. Phase II consisted of a softball
field. Phase 111, anticipated in 2 to 5 years from the approval, consisted of a gymnasium
and an 80 -space parking lot. The baseball field and gymnasium were to replace
December 18, 2008
SUBDIVISION
ITEM NO.: 10 {Cont.} FILE NO.: Z -7626-A
facilities located on property owned by Deltic Timber. The ball fields were to be fenced
and lighted and would include spectator seating areas. The lighting would be directed
onto the fields. An architect had not yet designed the Phase III gymnasium so specifics
of building material were not available. The height of the building was limited to 45 feet.
The gymnasium and Phase III parking were to be constructed to the Highway 10 Design
Overlay District standards for setbacks and buffers. The bail fields and gymnasium
were anticipated to be used seven days per week from 8:00 am to 10:00 pm. The
facilities would be available for use by groups other than the Joe T Robinson School
students.
A. PROPOSAL/REQUEST:
The applicant is seeking a rezoning of the site from R-2, Single-family to Planned
Office Development to allow the existing school to place a new drive inconsistent
with the typical standards established by the Highway 10 Design Overlay District.
The property currently experiences significant congestion within the site and on
Highway 10 during peak traffic hours. This is due to bus and vehicular traffic
using a common driveway to access the site and several turning conflicts on
Highway 10. Construction of the new driveway and parking lot are intended to
allow for the separation of bus and vehicular traffic by a new concrete plaza
adjacent to the proposed building addition. These improvements will help to
alleviate congestion by improving circulation within the property and eliminating
turning conflicts and vehicle stacking on Highway 10. The request includes the
construction of a new parking lot and a small building addition.
The previous phases of the Conditional Use Permit, which have not been
completed, continue to be a part of this request.
B. EXISTING CONDITIONS:
The site contains a Pulaski County School both a Jr. and High School. An
elementary school is located to the northwest of this site. South and west of the
site are single-family homes located within the Chenal subdivision. North of the
site is wooded, single-family zoned property. Other uses in the area include
churches, an automobile repair shop, a photography studio and a small baseball
park.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All property owners located within 200 feet of the site, all residents, who could be
identified, located within 300 feet of the site and the Coalition of West Little Rock
Neighborhoods were notified of the Public Hearing.
E
December 18, 2008
SUBDIVISION
ITEM NO.: 16 Cont. FILE NO.: Z -7626-A
D. ENGINEERING COMMENTS:
E
PUBLIC WORKS CONDITIONS:
1. The student drop off driveway must be 2 lanes wide for the entire length. The
driveway tapers to one lane near the school building.
2. Provide a letter prepared by a registered engineer certifying the sight
distances at the driveways comply with 2004 AASHTO Green Book
standards.
3. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
4. With future site development or expansion, provide the design of the street
conforming to the Master Street Plan. Construct one-half street improvement
to Highway 10 including 5 -foot sidewalk with the planned development.
5. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
6. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Outside the service boundary. No sewer service available.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: The Fire Department having jurisdiction needs to
evaluate this site to determine whether additional public and/or private fire
hydrant(s) will be required. If additional fire hydrant(s) are required, they will be
installed at the Developer's expense.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information. Provide an approval letter from the area
volunteer fire department concerning the proposed construction.
County Planning: Approved as submitted.
3
December 18, 2008
SUBDIVISION
ITEM NO.: 10 (Cont.)
FILE NO.: Z -7626-A
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express
Route,
F. ISSUES/TECHNICAL/DESIGN,
Planning _Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Public Institutional for this property. The applicant has
applied for a Planned Office Development to allow an additional driveway on the
site, which does not comply with typical Highway 10 DOD standards.
There is no use change with this application. The request does not require a
change to the Land Use Plan.
Master Street Plan: Highway 10 is a Principal Arterial. The primary function of a
Principal Arterial is to serve through traffic and to connect major traffic generators
or activity centers within urbanized areas. Entrances and exits should be limited
to minimize negative effects of traffic and pedestrians on Highway 10 since it is a
Principal Arterial. This street may require dedication of right-of-way and may
require street improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
Neighborhood Action Plan: This area is not covered by a City of Little Rock
recognized Neighborhood Plan.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. All existing fencing, landscaping, and dumpster enclosures should be in good
condition or replaced in conjunction with this application.
3. The landscape ordinance requires a minimum of eight percent (8%) of the
paved areas be landscaped with interior islands of at least 7 '/2 feet in width
and 300 square feet in area.
4. An automatic irrigation system to water landscaped areas will be required.
5. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
C!
December 18, 2008
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z -7626-A
6. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (November 20, 2008)
Mr. Brad Peterson of Crafton, Tull, Sparks and Associates was present
representing the school district. Staff presented an overview of the development
stating there were a few outstanding technical issues associated with the
request. Staff stated the site was located within the Highway 10 Design Overlay
District which regulated a number of issues including driveway spacing. Staff
stated the request was to allow the placement of a drive which did not meet the
Overlay criteria for spacing. Staff requested details for proposed signage, future
building additions and expansions and if an electronic sign was being requested.
Public Works comments were addressed. Staff stated the student drop off
driveway should be two lanes wide for the entire length. Staff stated the design
submitted showed the driveway tapering into one lane near the school building.
Staff also stated permits for improvements within the right of way were to be
obtained from the Highway Department prior to construction.
Landscaping comments were addressed. Staff stated the parking encroached
into the required 40 -foot landscape strip of the Highway 10 Design Overlay
District. Staff also questioned if the front yard landscaped area would provide
berming or plantings to screen the parking lot areas.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact these agencies for additional
information. There being no further issues for discussion, the Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the November 20, 2008, Subdivision Committee meeting. The
applicant has revised the site plan to address staff's concerns related to the
placement of parking within the front yard landscape area. The applicant has
provided details of the proposed building expansion area. The revised cover
letter states no electronic signage is proposed with the request.
The site is located within the Highway 10 Design Overlay District, which has
specific development criteria established. One of the criteria is the placement of
driveways and the minimum spacing requirements for drives along the corridor.
5
December 18, 2008
SUBDIVISION
ITEM NO.: 10 Cont. FILE NO.: Z -'626-A
The site currently contains two drives from Cantrell Road. A new drive
approximately 280 feet from the eastern -most drive and 160 feet from the
western -most drive is proposed. According to the applicant, the additional drive
will allow the bus traffic and the vehicular traffic to be separated. The western-
most drive will be one-way into the site and the eastern drive will be one-way
exiting the site.
The plan also includes the addition of a parking lot area containing 41 spaces.
The parking lot is proposed north of the existing parking lot. The parking lot has
been designed to not encroach into the 40 -foot landscape strip per the Highway
10 Design Overlay District. The applicant has indicted landscaping and plantings
will be placed in this area per the typical Overlay requirements. Along the
roadway a berm, wall or dense plantings will be installed per the typical
ordinance requirements to screen the new parking lot.
Signage is proposed as a monument sign six (6) feet in height with a twelve (12)
foot sign panel. Two masonry support columns two feet by two feet are
proposed. The signage is consistent with signage typically allowed per the
Highway 10 Design Overlay District.
The site plan indicates a 6,200 square foot one story building addition. The
addition will house the new Media Center and ADA accessible covered entry.
The new addition and interior renovation will also serve to rectify current ADA
barriers within the existing facility by creating new accessible routes too much of
the current facility. The addition complies with the Overlay standards for building
setbacks.
Staff is supportive of the request. The desire is to separate bus and vehicular
traffic on the site. The City has approved several other school sites with a similar
configuration and the separation has worked well to ease congestion and
provided a safer pick-up for the children. To staff's knowledge there are no
outstanding technical issues associated with the request. The plan as proposed
compiles with all standards of the Highway 10 Design Overlay District with the
exception of the placement of a drive, which does not comply with the 300 -foot
typical driveway spacing requirement.
STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (DECEMBER 18, 2008)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report.
N*
December 18, 2008
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z -7626-A
There was no further discussion of the item. The chair entertained a motion of approval
of the item as recommended by staff. The motion carried by a vote of 6 ayes, 0 noes,
2 absent and 3 open positions.
VA
ITEM NO.: 10. Z -7626-A
NAME: Joe T Robinson Middle School Long -form PD -0
LOCATION: located at 21001 Highway 10
Plannina Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than December 3, 2008. The Office of Planning and
Development must receive the proof of notice no later than December 12, 2008.
2. Provide details of the proposed building addition noted on the site plan. The cover
letter indicates driveway construction only. If building construction is proposed as a
part of the POD provide details of the addition.
3. A portion of the parking is located within the 40 -foot landscape strip required by the
Highway 10 Design Overlay District.
4. The Highway 10 Design Overlay District sets forth a minimum driveway spacing
criteria of 300 feet. The drives as proposed are located less than the 300 -foot
requirement.
5. Provide details of any proposed signage including ground mounted or building
signage. All ground -mounted signage must be ground mounted monument style
signage with a maximum height of six feet and seventy-two square feet in area.
6. Will electronic signage be used on this site?
Variance/Waivers: None requested
Public Works Conditions:
1. The student drop off driveway should be 2 lanes wide for the entire length. The
driveway tapers to one lane near the school building.
2. Provide a letter prepared by a registered engineer certifying the sight distances at
the driveways comply with 2004 AASHTO Green Book standards.
3. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
4. With future site development or expansion, provide the design of the street
conforming to the Master Street Plan. Construct one-half street improvement to
Highway 10 including 5 -foot sidewalk with the planned development.
5. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
6. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
Utilities and Fire Department/County Planning:
Wastewater: Outside the service boundary. No sewer service available.
Item # 10.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: The Fire Department having jurisdiction needs to evaluate
this site to determine whether additional public and/or private fire hydrant(s) will be
required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department for additional information. Provide an approval letter from the area
volunteer fire department concerning the proposed construction.
County Planning: Approved as submitted.
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express Route
Planning Division: This request is located in the Chenal Planning District. The Land
Use Plan shows Public Institutional for this property. The applicant has applied for a
Planned Office Development to allow an additional driveway on the site, which does not
comply with typical Highway 10 DOD standards.
There is no use change with this application. The request does not require a change to
the Land Use Plan.
Master Street Plan: Highway 10 is a Principal Arterial. The primary function of a
Principal Arterial is to serve through traffic and to connect major traffic generators or
activity centers within urbanized areas. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on Highway 10 since it is a Principal
Arterial. This street may require dedication of right-of-way and may require street
improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes in the immediate vicinity.
Neighborhood Action Plan: This area is not covered by a City of Little Rock recognized
Neighborhood Plan.
Landscape:
1. The site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. This application is located within the Highway 10 Overlay District and must comply
with the Overlay district requirements. The proposed parking lot encroaches into the
forty foot (40') landscape buffer along Highway 10. If the parking lot is allowed to be
located within this forty foot (40) landscape perimeter strip then landscaping should
Item # 10.
be increased along this area to the equivalent of one and one half times the
minimum requirement.
3. All existing fencing, landscaping, and dumpster enclosures should be in good
condition or replaced in conjunction with this application.
4. The landscape ordinance requires a minimum of eight percent (8%) of the paved
areas be landscaped with interior islands of at least 7'/2 feet in width and 300 square
feet in area. The proposed plan does not currently reflect this minimum.
5. An automatic irrigation system to water landscaped areas will be required.
6. Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a Registered Landscape Architect.
7. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Monday, December 1, 2008.
Item # 10.