HomeMy WebLinkAboutZ-7622-A Staff AnalysisJuly 7, 2005
ITEM NO.: 19
NAME: Bale Chevrolet -Honda — Short -form PCD
LOCATION: Located at 15617 Chenal Parkway
DEVELOPER:
Bale Chevrolet -Honda
13101 Chenal Parkway
Little Rock, AR 72211
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 5.67± acres
CURRENT ZONING
ALLOWED USES
NUMBER OF LOTS: 1
C-3 and OS
General Commercial
PROPOSED ZONING: PCD and OS
.: Z-7622
FT. NEW STREET: 0 LF
PROPOSED USE: Automobile delivery, prep and storage; employee training
VARIANCESMAIVERS REQUESTED:
1. Waiver boundary street improvements
2. Use of gravel parking
BACKGROUND:
The property was formerly the site of Kinco Construction Company. On June 17, 2004,
the Planning Commission voted to recommend approval of a request to rezone the tract
to C-3 with the portion of the property located within the floodway to be zoned OS Open
Space. On August 2, 2004, the Board of Directors approved the C-3 and OS zoning by
the adoption of Ordinance No. 19,153. The site has been unused since that date.
July 7, 2005
SUBDIVISION
ITEM NO.: j Lf Cont. FILE NO.: Z -7622-A
A. PROPOSAL/REQUEST:
The applicant is now requesting approval of a PCD zoning to allow use of the
property by Bale Chevrolet -Honda for up to 5 years for delivery, prep and storage
of vehicles for the dealership which is located farther east on Chenal Parkway
(13101 Chenal Parkway). An existing, two-story building is proposed to be used
for vehicle prep and employee training. The other structures and sheds on the
site are to be removed. Areas of gravel parking are proposed for storage of up to
236 vehicles. Fencing will be installed around the perimeter of the vehicle
storage area. An asphalt driveway is to be extended through to Kanis Road to
accommodate the delivery trucks. After 5 years, the property is to revert to C-3.
B. EXISTING CONDITIONS:
The property currently contains a vacant office building and construction yard,
formerly occupied by Kinco Construction Company. There is an old residential
structure which is located within the south one-half of the property. There is a
paved access drive from Chenal Parkway, with paved parking along the east side
of the office building. There is also a gravel access drive from Kanis Road,
leading to the residential structure.
The general area contains a mixture of uses and zoning. The One Source Home
Center development is located immediately west, with undeveloped C-3 zoned
property and the Kroger PCD development further west. There is undeveloped
0-2 zoned property to the east, with single family residences further east. An
automobile dealership has recently been approved for the undeveloped C-2
zoned property located across Chenal Parkway to the north. A plant nursery,
single family residences on large lots and undeveloped R-2 zoned property is
located to the south across Kanis Road.
A fairly large portion of the property (almost the entire east one-half of the
property) is located in the floodway for Rock Creek, as the creek runs north/south
through the property near the east property line.
C. NEIGHBORHOOD COMMENTS:
All owners of property located within 200 feet of the site, all residents within
300 feet who could be identified and the Parkway Place Neighborhood
Association were notified of this request.
D. ENGINEERING COMMENTS:
The proposal is for a temporary use of property to store vehicles, however
there are a number boundary street, access and flood issues associated with
the re -development or change in use of this property.
July 7, 2005
SUBDIVISION
ITEM NO.: 19 (Cont.) FILE NO.: Z -7622-A
2. Chenal Parkway is classified on the Master Street Plan as a principal arterial.
At this location, right-of-way is adequate except where a property pin extends
to the shoulder. An additional 20 feet is required at this point, tapered back to
other corners.
3. The Master Street Plan calls for a new leg of Kanis Road to be constructed
from Chenal Parkway south along the western boundary of the property. The
new street then turns east in a short radius to meet the existing Kanis Road
alignment. With site re -development, Y2 street improvements to this street
would be required.
4. Parking of vehicles and construction of fencing in the floodway is prohibited.
In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot wide
access easement is required adjacent to the floodway boundary. The
developer must provide access points to the floodway at a maximum interval
of 600 feet.
5. The driveway location on Kanis does not meet the traffic access and
circulation requirements of Sections 30-43 and 31-210. Because of the short
distance between the bridge and future Kanis/Wellington extension, the
property should take access from the Kanis extension near the center of the
property. The width of driveway must not exceed 36 feet.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No Comments received.
Reliant: Approved as submitted.
Southwestern Bell: No Comments received.
Water: All Central Arkansas Water requirements in effect at the time of request
for water service must be met. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would be done
at the expense of the developer. A Capital Investment Charge based on the
size of connection(s) will apply to this project in addition to normal charges.
This fee will apply to all connections including metered connections off the
private fire system. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection.
Fire Department: Place Fire hydrant per code.
3
July 7, 2005
SUBDIVISION
ITEM NO.: 19(Cont)FILE NO.: Z -7622-A
Parks: Consider donation and location for future Rock Creek Trail to support
extension to west Little Rock. Contact Mark Webre at 371-4470.
County Planning: No Comments.
CATA: The site is not located on a CATA Bus Route.
F. ISSUES/TECHN ICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Commercial for this property. The applicant has
applied for a rezoning from C-3 (General Commercial District) to PCD (Planned
Commercial Development) for construction of a car lot associated with a nearby
automotive dealership. The request does not require a change to the Land Use
Plan.
Master Street Plan:
Chenal Parkway is shown as a Principal Arterial on the Master Street Plan. The
primary function of a Principal Arterial is to serve through traffic and to connect
major traffic generators or activity centers within urbanized areas. The Master
Street plan also indicates a proposed Minor Arterial immediately west of the
application. The purpose of a Minor Arterial is to provide connections to and
through an urban area. This proposed Minor Arterial was identified in the 1998
Kanis Road Concept Study and is a continuation of Kanis Road and intersects
with Wellington Hills Road. At the June 17, 2004 Planning Commission hearing
this land was discussed in a previous application. At that time Public Works
commented that any future construction or development of the property would be
subject to Master Street Plan improvements. Chenal Parkway may require
dedication of right-of-way and may require street improvements. The proposed
Minor Arterial may require partial construction. Right of way dedication and
construction may also be required along Kanis Road.
Bicycle Plan:
A Class I bikeway is shown along Chenal Parkway. Parts of this bikeway have
already been constructed in the Chenal Parkway median near the Parkway
Place/Chenal Parkway intersection A Class I bikeway is being is built separate
from or alongside a road. Additional paving and right of way may be required.
City Recognized Neighborhood Action Plan:
The applicant's property lies in the area covered by the Rock Creek
Neighborhood Action Plan. The Office and Commercial Development goal seeks
0
July 7, 2005
SUBDIVISION
ITEM NO.: 19 Cont. FILE NO.: Z -7622-A
to maintain the residential integrity of the neighborhood with an objective and
action statement noting that new development should adhere to the Future Land
Use Plan. The proposed development is not in conflict with the Plan since it is
shown as Commercial. The Natural Environment Goal is to "Preserve and
maintain existing greenways and open spaces in the neighborhood, " and
references one specific action statement recommending preservation of
properties identified as Potential Greenbelts in the Parks and Recreation Master
Plan. Since part of this application is shown as a potential greenbelt that part
should be preserved.
Landscape: Compliance with the City's Landscape and Buffer Ordinance is
required. The plan submitted does not provide for the minimum 6 -foot 9 -inch
wide landscape strip along the majority of the sites western perimeter. An
irrigation system to water landscaped areas will be required. Variances from
these standards will require City Beautiful Commission approval.
It will be necessary to have cross ties placed to protect landscaped areas from
vehicular traffic and gravel intrusion.
G. SUBDIVISION COMMITTEE COMMENT: (June 16, 2005)
The applicants were present. Staff presented the item and noted additional
information was needed regarding signage, days and hours of operation, site
lighting, dumpster location and screening, fencing and gates. The applicant was
asked to provide a more detailed explanation of the proposed uses. It was noted
that fencing and vehicle parking areas needed to be removed from the floodway.
Staff noted that the proposed use was for up to 5 years and the applicant was
requesting a waiver of boundary street improvements and a variance to be
allowed to use gravel parking.
Public Works, Utility and Landscape Comments were noted. Public Works Staff
stated the property should take access from the proposed Kanis Road extension,
not directly off of Kanis Road. Floodway comments were noted. Staff noted that
the landscape strip on the west perimeter did not comply with Ordinance
requirements.
The applicant was advised to respond to staff issues by June 22, 2005. The
Committee forwarded the item to the full Commission.
H. ANALYSIS:
The applicant is requesting rezoning of this C-3 zoned site to PCD to allow use of
the site by Bale Chevrolet -Honda for up to 5 years for delivery, prep and storage
of vehicles for the dealership which is located farther east on Chenal Parkway.
An existing, two-story building is to be used for vehicle prep and employee
5
July 7, 2005
SUBDIVISION
ITEM NO.: 19 (Cont.) FILE NO.: Z -7622-A
training. The other structures on the site are to be removed. Areas of gravel
parking are proposed for parking/storage of the vehicles. Fencing is to be
installed around the perimeter of the vehicle storage area. An asphalt driveway
is to be extended through to Kanis Road to accommodate delivery trucks. After
5 years, the property is to revert to C-3. The applicant is requesting a waiver of
the required street improvements.
Vehicles are proposed to be delivered to the site by transport trucks Monday
through Saturday, 7:00 a.m. to 6:00 p.m. Trucks will enter the site from Kanis
Road, park within the fenced area, unload and then exit onto Chenal Parkway.
The unloaded vehicles would be parked and stored on the site and, as needed,
go into the shop area where the pre -delivery inspection is to take place. The
pre -delivery inspection consists of each vehicle having the protective plastic
removed and inspection for leaks, damage, fit and function. No repairs, clearing
and washing will take place at this site. The applicant has also proposed to bring
used vehicles to this site, to be handled in much the same manner. Needed
repairs or tires being replaced is to occur at the main dealership site. The
applicant also proposes to allow wholesaling of vehicles and viewing of inventory
at this site with any transactions to be completed at the main facility. The training
of personnel is to take place Monday through Friday, 7:30 a.m. to 5:30 p.m.
Lighting of the site will be directed into the site and "used at a minimum'. A
screened dumpster will be located behind the building. Signage is to consist only
of a wall sign on the north (street side) fagade of the building.
The applicant did submit a revised plan and responses to issues raised at
Subdivision Committee. The south driveway has been relocated to the area of
the Kanis Extension. The landscape strip on the west has been shown at the
minimum of 6 feet and 9 inches. The proposed new parking area has been
removed from the floodway, however the fencing has not.
Staff is not able to support the application as proposed. When the issue was first
proposed to staff, the understanding was this was to be a temporary use; for off
loading and preparation of new vehicles that would then be moved to the
dealership for sale. The applicant has now proposed to add wholesaling of
vehicles and customer viewing of vehicles. Prepping of used inventory has also
been added. The nature of the use now seems to be beyond what should be
supported as a temporary use. Staff believes it is appropriate to now treat the
development as one of a more permanent nature. The proposed gravel parking
should be replaced with paving or another approved permeable surface.
Appropriate screening and landscaping should be installed. Fencing must be
removed from the floodway. Commitments must be made to complete the
required street improvements.
n
July 7, 2005
SUBDIVISION
ITEM NO.: 19 Cont. FILE NO.: Z -7622-A
Only when these issues are addressed, can staff begin to consider the other
use -related issues such as wholesaling of vehicles and customer viewing of
inventory.
STAFF RECOMMENDATION:
Staff cannot recommend approval of the PCD, as proposed.
PLANNING COMMISSION ACTION: (JULY 7, 2005)
The applicant was present. There were no registered objectors present. Staff
presented the item and noted that the applicant had amended the application to address
staff objections. The applicant had agreed to pave all vehicular use areas and to
comply with all screening requirements. The applicant had also responded to staffs
concern about the use by submitting the following amendment:
`There will be no inventory viewing or wholesaling from the lot. We (Bale)
will use it for truck loading and unloading, vehicle storage, new and used
pre -delivery vehicle inspection and for training staff members. Only Bale
Honda and Bale Chevrolet personnel will be on the lot for the above listed
needs"
Staff recommended approval of the amended application subject to compliance with the
comments and conditions outlined in Sections D, E and F of the agenda Staff Report.
Staff also recommended approved of a 5 -year deferral of required street improvements.
There was no further discussion.
The item was placed on the Consent Agenda and approved as recommended by staff.
The vote was 11 ayes, 0 noes and 0 absent.