HomeMy WebLinkAboutZ-7605-B Staff AnalysisITEM NO.:Z-7605-B
NAME: Chevaux Court Revised Short -form POD
LOCATION: located on the Southeast corner of Cantrell Road and Chenonceau
Boulevard
DEVELOPER:
Orion Capitol Ventures
2200 N. Rodney Parham Road, Suite 206
Little Rock, AR 72212
FNr,INFFR-
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.4 Acres NUMBER OF LOTS: 1
CURRENT ZONING: POD
FT. NEW STREET: 0
ALLOWED USES: Planned Office Development — 0-3 General Office District
uses
PROPOSED ZONING: Revised POD
PROPOSED USE: Planned Office Development — 0-3 General Office District
uses — creation of lot lines
VARIANCES/WAIVERS REQUESTED:
1. A variance request to allow backing into a service easement.
2. A variance to allow the development of lots without public street frontage.
BACKGROUND:
Ordinance No. 19,098, adopted by the Little Rock Board of Directors on May 18,
2004, established Chevaux Short -form POD. The project consisted of 33,600
square feet of proposed building space containing 0-3, General Office District
uses. The applicant requested ten percent of the building square footage be
allowed the Accessory uses allowed in the 0-3 zoning district. The applicant
indicated 142 parking spaces or 4.23 spaces per 1000 square feet. The
proposed building was indicated as an "L" shaped building and turned away from
existing residential property to the south and east. The rear of the building was
to act as screening to the adjoining properties to the east and south since no
doors or windows were proposed other than those required by fire code. A cross
access easement and shared driveway would be utilized to provide adequate
circulation with the adjacent development to the west.
Ordinance No. 19,451 adopted by the Little Rock Board of Directors on
December 5, 2005, revised the previously approved Planned Office Development
to allow the creation of seven lots and the construction of seven buildings each
on individual lots. The applicant indicated smaller individual building footprints to
allow the construction to match the existing topography of the site. The applicant
indicated site improvements and perimeter landscaping would be constructed as
an overall development. There were variances approved to allow the
development of lots without public street frontage and to allow backing into the
access easement. The applicant indicated each of the lots would be final platted
in a single phase. The applicant also indicated the buildings would be
constructed based on market demand.
A. PROPOSAUREQUEST:
The applicant is now requesting to amend the POD zoning for Chevaux
Office Development. The requested amendment would allow the front
one-half of the site to develop with a branch bank facility, with drive-
through, and the rear remaining two acres would remain relatively
unchanged with five lots as approved in the previous site plan. The
buildings proposed for the five lots will range in size from 4,200 square
feet to 5,000 square feet with 0-3 uses as allowable uses. There are no
changes in the proposed driveway cuts from Cantrell Road with access
being along the eastern perimeter and a shared driveway access near the
western perimeter.
B. EXISTING CONDITIONS.
The site is vacant and sloping slightly from Cantrell Road. There are
single-family homes located to the south and east of the site. To the west
of the site is property recently developed with a strip retail center.
Cantrell Road adjacent to the site is a four lane roadway with a turn lane
at Chenonceau Boulevard. A traffic signal has been installed at the
intersection of Chennonceau Boulevard and Cantrell Road. There is not
a sidewalk in place adjacent to the site.
D. ENGINEERING COMMENTS:
2
Public Works:
1. Per the land alteration regulations, Section 29-186(h), a one time
approval was given by Public Works to allow stockpiling of construction
spoil material on site for a period of six (6) months. The six (6) months
has been exceeded and the material must be removed. A building
permit has been applied for the project.
2. Storm water detention ordinance applies to this property.
3. Obtain permits for improvements within State Highway right-of-way
from AHTD, District VI.
4. Sidewalks with appropriate handicap ramps are required in accordance
with Section 31-175 of the Little Rock Code and the Master Street
Plan.
5. Cantrell Road is classified on the Master Street Plan as a principal
arterial.
6. Dedication of right-of-way to 55 feet from centerline will be required.
7. Repair or replace any curb and gutter or sidewalk that is damaged in
the public right-of-way prior to occupancy.
8. Plans of all work in right-of-way shall be submitted for approval prior to
start of work. Obtain barricade permit prior to doing any work in the
right-of-way from Traffic Engineering at (501) 379-1817 (Derrick
Bergfield).
9. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved
prior to the start of construction.
10. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to
the start of construction.
11. Sidewalk should be installed on east side of the private drive/street.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, to serve
the proposed development. Contact Little Rock Wastewater Utility at 688-
1414 for additional information.
Entergy: No comment received.
Center -Point Enerav: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect
at the time of request for water service must be met. A Capital Investment
Charge based on the size of the meter connection(s) will apply to this project
in addition to normal charges. Additional fire hydrant(s) will be required.
3
Contact the Little Rock Fire Department to obtain information regarding the
required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s). A water main extension
will be required in order to provide service to this property. Easements are
required to adequately install and maintain the water main adjoining the right-
of-way of Cantrell Road, as well as within the development. This development
will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection.
Contact Central Arkansas Water at 377-1225 for additional information.
Fire Department: Install fire hydrants per code. Contact the Little Rock
Fire Department at 918-3700 for additional information.
County lanning: No comment.
CATA: The site is located on CATA Bus Route #25 — the Highway 10
Express Route.
F. ISSUES/TECHNICAL/DESIGN.-
Planning
SSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Chenal Planning District.
The Land Use Plan shows Office for this property. The applicant has
requested to revise a previously approved Planned Office Development to
allow a six lot development with five lots being used as office uses and the
sixth lot being used as a branch bank facility. The request does not
require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is shown as a Principal Arterial on the
Master Street Plan. The primary function of a Principal Arterial is to serve
through traffic and to connect major traffic generators or activity centers
within urbanized areas. Entrances and exits should be limited to minimize
negative effects of traffic and pedestrians on Cantrell Road since it is a
Principal Arterial. Chenonceau Boulevard is shown as a Minor Arterial. A
Minor Arterial provides connections to and through an urban area and
their primary function is to provide short distance travel within the
urbanized area. These streets may require dedication of right-of-way and
may require street improvements.
Bicycle Plan: A Class II Bike Route is shown on Cantrell Road west of
Chenonceau Boulevard. A Class II bikeway is located on the street as
either a five foot shoulder or six foot marked bike lane. Additional paving
and right of way may be required. A Class III bikeway is located on
Chenonceau Boulevard. A Class III bikeway is a signed route on a street
shared with traffic. No additional paving or right-of-way is required. Class
III bicycle route signage may be required.
Ell
City Recognized Neighborhood Action Plan: The property under review is
not located in an area covered by a City of Little Rock recognized
neighborhood action plan.
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. All previous comments apply.
3. Interior islands are to be evenly distributed. An additional island is needed
in the parking area along Cantrell Road.
4. Berming is encouraged along Cantrell Road in accordance with the
Highway 10 Design Overlay District.
5. The plan appears to meet the 25 foot landscape area required per the
Highway 10 Design Overlay District along the side and rear property lines.
6. A controlled automatic irrigation system is required for all new landscaped
areas. Since the site is being reviewed as a single development irrigation
will be required on each of the newly created lots.
7. Since the site is being reviewed as an overall development plan, prior to
the issuance of a building permit, it will be necessary to provide landscape
plans stamped with the seal of a Registered Landscape Architect for each
of the proposed lots.
8. The City Beautiful Commission recommends preserving as many existing
trees as feasible on tree covered sites. Credit toward fulfilling Landscape
Ordinance requirements can be given when preserving trees of six (6)
inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (AUGUST 3, 2006)
Mr. Tim Daters was present representing the request. Staff presented an
overview of the proposed development indicating there were a few
outstanding issues associated with the request. Staff requested the
applicant provide a note concerning the proposed dumpster screening.
Staff also stated the indicated signage was less than typically allowed per
the Highway 10 Design Overlay District. Staff also noted the parking on
the site plan did not appear to work since all the parking generators had
been moved to the back of the site and the parking was located on the
front of the property. Staff questioned the proposed parking scheme. Mr.
Daters stated he would review the proposed layout and provide staff
suggestions to the developer and respond to staff as requested.
Public Works comments were addressed. Mr. Daters stated development
was beginning on the site and the stockpiled construction spoil materials
would be removed from the site. Staff also stated street improvements to
Cantrell Road would be required at the time of development of the site and
a dedication of right-of-way 35 -feet from centerline would be required.
5
Landscaping comments were addressed. Staff stated irrigation to water
landscaped areas would be required for each lot as it was developed.
Staff also stated landscape plans stamped by a registered landscape
architect would be required at the time of development for each of the
proposed lots. Staff stated interior islands should be evenly distributed
throughout the parking lot areas.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional
information and clarification. There was no further discussion of the item.
The Committee then forwarded the item to the full Commission for final
action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the
issues raised at the July 13, 2006, Subdivision Committee meeting. The
applicant has indicated a note concerning the required dumpster
screening. The site plan indicates the dedication of right-of-way per the
Master Street Plan requirement. The applicant has not redesigned the
site with regard to the proposed parking layout. The applicant has
indicated the parking as proposed meets the parking demand for the site.
According to the applicant the proposed parking along Cantrell Road will
serves the bank facility by allowing customers to park in front of the
building to access the lobby area. Staff is supportive of the parking as
proposed.
The request is to amend the Planned Office Development changing the
front one-half of the site to allow development of a branch bank facility,
with drive-through. This modification would include two previously
indicated lots combined to one lot. The rear portion of the site will remain
relatively unchanged (with five lots) as approved in the previous site plan
and 0-3, General Office District uses as allowable uses. The buildings
proposed for the five lots will range in size from 4,200 square feet to 5,000
square feet and are proposed as single story buildings. The site plan
indicates the placement of a 25 -foot building setback along the southern
perimeter (rear yard) and the eastern perimeter of proposed Lot 6 (side
yard). The Highway 10 Design Overlay District typically requires the
placement of a 40 -foot building setback around the rear yard and 30 -foot
side yard setback. The building along Highway 10 has been indicated at
100 -feet as required by the overlay district.
The applicant is proposing the development of lots without public street
frontage. The lots will be served by a 24 -foot access and utility easement.
The applicant is requesting a variance from the Subdivision Ordinance to
allow the creation of lots without public street frontage. Staff is supportive
of this variance request.
R
The proposed driveway cuts on Cantrell Road are located in the location
they were previously approved. Access is proposed along the eastern
perimeter and a shared driveway access is located near the western
perimeter. Staff is supportive of the proposed driveway placement.
The site plan indicates the placement of 122 parking spaces. Based on
the total square footage of the proposed buildings a total of 58 parking
spaces would typically be required. The indicated parking is more than
adequate to serve the parking demand of the site.
The applicant has indicated the location of the proposed dumpster
facilities on the site plan and included a note concerning the required
screening. The applicant has also indicated the dumpster service hours
will be limited to normal business hours. The hours of operation proposed
for the development are 6:00 am to 8:00 pm.
The applicant is requesting a variance to allow the backing into a service
easement. Per the Subdivision Ordinance Section 31-210(8)(7) parking
spaces shall not be permitted to back into a service easement. Section
31-2100) states the Commission may approve a variance of this
subsection for applications before them. Staff is supportive of the
applicant's request. The applicant has indicated as a part of the site
development, features such as pedestrian tables and landscape islands
and to be used to slow traffic on the site for both motorist and pedestrians.
Site lighting will be low level and directional, directed inward away from
residentially zoned properties per the Highway 10 Design Overlay District
requirement.
The applicant has proposed a single development sign within the
landscaped area along Highway 10 and each individual lot will have an
identification sign. The applicant has indicated the signage along Highway
10 will be a ground mounted monument style sign a maximum of ten feet
in height and 100 square feet in area. Each of the development signs will
be a maximum of six square feet in sign area. Building signage is
proposed as typically allowed in office zones.
7
Staff is supportive of the applicant's request. The proposed site plan does
not fully comply with the Highway 10 Design Overlay District with regard to
landscaped area and building setback along the eastern and southern
property line. The ordinance would typically require a 30 -foot building
setback along the eastern perimeter and a 40 -foot building setback along
the southern perimeter. The applicant's site plan indicates screening will
be provided along the eastern and southern property line as a six foot
opaque fence. Staff recommends the fencing be designed to match the
existing fencing within the adjacent subdivision as a wood fence with brick
columns.
STAFF RECOMMENDATIONS
Staff recommends approval of the request subject to compliance with the
comments and condition as outlined in paragraphs D, E and F of the
above agenda staff report.
Staff recommends the fencing be designed to match the existing fencing
within the adjacent subdivision as a wood fence with brick columns.
Staff recommends approval of the requested variance to allow backing
into a service easement.
Staff recommends approval of the requested variance to allow the
development of lots without public street frontage.
PLANNING COMMISSION ACTION: (August 3, 2006)
The applicant was present representing the request. There were no
registered objectors present. Staff presented the item with a
recommendation of approval of the request subject to compliance with the
comments and condition as outlined in paragraphs D, E and F of the
above agenda staff report. Staff presented a recommendation the fencing
be designed to match the existing fencing within the adjacent subdivision
as a wood fence with brick columns. Staff presented a recommendation
of approval of the requested variance to allow backing into a service
easement and a recommendation of approval of the requested variance to
allow the development of lots without public street frontage.
There was no further discussion of the item. The Chair entertained a
motion for placement of the item on the Consent Agenda for Approval.
The motion carried by a vote of 9 ayes, 0 noes and 2 absent.
1:3
August 3, 2006
Z -7605-B
NAME: Chevaux Court Revised Short -form POD
LOCATION: located on the Southeast corner of Cantrell Road and Chenonceau
Boulevard
DEVELOPER:
Orion Capitol Ventures
2200 N. Rodney Parham Road, Suite 206
Little Rock, AR 72212
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.4 Acres NUMBER OF LOTS: 1
CURRENT ZONING: POD
FT. NEW STREET: 0
ALLOWED USES: Planned Office Development — 0-3 General Office District uses
PROPOSED ZONING: Revised POD
PROPOSED USE: Planned Office Development — 0-3 General Office District uses —
creation of lot lines
VARIANCES/WAIVERS REQUESTED:
1. A variance request to allow backing into a service easement.
2. A variance to allow the development of lots without public street frontage.
BACKGROUND:
Ordinance No. 19,098, adopted by the Little Rock Board of Directors on May 18, 2004,
established Chevaux Short -form POD. The project consisted of 33,600 square feet of
proposed building space containing 0-3, General Office District uses. The applicant
requested ten percent of the building square footage be allowed the Accessory uses
allowed in the 0-3 zoning district. The applicant indicated 142 parking spaces or 4.23
spaces per 1000 square feet. The proposed building was indicated as an "L" shaped
building and turned away from existing residential property to the south and east. The
rear of the building was to act as screening to the adjoining properties to the east and
south since no doors or windows were proposed other than those required by fire code.
August 3, 2006
ITEM NO.: 10 (CONT) FILE NO.:Z-7605-B
A cross access easement and shared driveway would be utilized to provide adequate
circulation with the adjacent development to the west.
Ordinance No. 19,451 adopted by the Little Rock Board of Directors on December 5,
2005, revised the previously approved Planned Office Development to allow the
creation of seven lots and the construction of seven buildings each on individual lots.
The applicant indicated smaller individual building footprints to allow the construction to
match the existing topography of the site. The applicant indicated site improvements
and perimeter landscaping would be constructed as an overall development. There
were variances approved to allow the development of lots without public street frontage
and to allow backing into the access easement. The applicant indicated each of the lots
would be final platted in a single phase. The applicant also indicated the buildings
would be constructed based on market demand.
A. PROPOSAUREQUEST:
The applicant is now requesting to amend the POD zoning for Chevaux Office
Development. The requested amendment would allow the front one-half of the
site to develop with a branch bank facility, with drive-through, and the rear
remaining two acres would remain relatively unchanged with five lots as
approved in the previous site plan. The buildings proposed for the five lots will
range in size from 4,200 square feet to 5,000 square feet with 0-3 uses as
allowable uses. There are no changes in the proposed driveway cuts from
Cantrell Road with access being along the eastern perimeter and a shared
driveway access near the western perimeter.
B. EXISTING CONDITIO
The site is vacant and sloping slightly from Cantrell Road. There are single-
family homes located to the south and east of the site. To the west of the site is
property recently developed with a strip retail center.
Cantrell Road adjacent to the site is a four lane roadway with a turn lane at
Chenonceau Boulevard. A traffic signal has been installed at the intersection of
Chennonceau Boulevard and Cantrell Road. There is not a sidewalk in place
adjacent to the site.
D. ENGINEERING COMMENTS:
Public Works:
1. Per the land alteration regulations, Section 29-186(h), a one time approval
was given by Public Works to allow stockpiling of construction spoil material
on site for a period of six (6) months. The six (6) months has been exceeded
and the material must be removed. A building permit has been applied for the
project.
2. Storm water detention ordinance applies to this property.
2
August 3, 2006
ITEM NO.: 10 (CON
FILE NO.:Z-7605-B
3. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
4. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
5. Cantrell Road is classified on the Master Street Plan as a principal arterial.
6. Dedication of right-of-way to 55 feet from centerline will be required.
7. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
8. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
9. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
10. If disturbed area is one (1) or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
11. Sidewalk should be installed on east side of the private drive/street.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, to serve the
proposed development. Contact Little Rock Wastewater Utility at 688-1414 for
additional information.
Entergy: No comment received.
Center -Point Enerqy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A Capital Investment Charge based
on the size of the meter connection(s) will apply to this project in addition to normal
charges. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the hydrant(s)
and contact Central Arkansas Water regarding procedures for installation of the
hydrant(s). A water main extension will be required in order to provide service to this
property. Easements are required to adequately install and maintain the water main
adjoining the right-of-way of Cantrell Road, as well as within the development. This
development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection. Contact Central Arkansas Water at 377-1225 for additional information.
3
August 3, 2006
ITEM NO.: 10 CONT FILE NO.:Z-7605-B
Fire Department: Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express
Route.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Office for this property. The applicant has requested to
revise a previously approved Planned Office Development to allow a six lot
development with five lots being used as office uses and the sixth lot being used
as a branch bank facility. The request does not require a change to the Land
Use Plan.
Master Street Plan: Cantrell Road is shown as a Principal Arterial on the Master
Street Plan. The primary function of a Principal Arterial is to serve through traffic
and to connect major traffic generators or activity centers within urbanized areas.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Cantrell Road since it is a Principal Arterial. Chenonceau
Boulevard is shown as a Minor Arterial. A Minor Arterial provides connections to
and through an urban area and their primary function is to provide short distance
travel within the urbanized area. These streets may require dedication of right-
of-way and may require street improvements.
Bicycle Plan: A Class II Bike Route is shown on Cantrell Road west of
Chenonceau Boulevard. A Class II bikeway is located on the street as either a
five foot shoulder or six foot marked bike lane. Additional paving and right of way
may be required. A Class III bikeway is located on Chenonceau Boulevard. A
Class III bikeway is a signed route on a street shared with traffic. No additional
paving or right-of-way is required. Class III bicycle route signage may be
required.
City Recognized Neighborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. All previous comments apply.
3. Interior islands are to be evenly distributed. An additional island is needed in the
parking area along Cantrell Road.
4. Berming is encouraged along Cantrell Road in accordance with the Highway 10
Design Overlay District.
4
August 3, 2006
ITEM NO.: 10 CONT FILE NO.:Z-7605-B
5. The plan appears to meet the 25 foot landscape area required per the Highway
10 Design Overlay District along the side and rear property lines.
6. A controlled automatic irrigation system is required for all new landscaped areas.
Since the site is being reviewed as a single development irrigation will be
required on each of the newly created lots.
7. Since the site is being reviewed as an overall development plan, prior to the
issuance of a building permit, it will be necessary to provide landscape plans
stamped with the seal of a Registered Landscape Architect for each of the
proposed lots.
8. The City Beautiful Commission recommends preserving as many existing trees
as feasible on tree covered sites. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT:
(AUGUST 3, 2006)
Mr. Tim Daters was present representing the request. Staff presented an
overview of the proposed development indicating there were a few outstanding
issues associated with the request. Staff requested the applicant provide a note
concerning the proposed dumpster screening. Staff also stated the indicated
signage was less than typically allowed per the Highway 10 Design Overlay
District. Staff also noted the parking on the site plan did not appear to work since
all the parking generators had been moved to the back of the site and the parking
was located on the front of the property. Staff questioned the proposed parking
scheme. Mr. Daters stated he would review the proposed layout and provide
staff suggestions to the developer and respond to staff as requested.
Public Works comments were addressed. Mr. Daters stated development was
beginning on the site and the stockpiled construction spoil materials would be
removed from the site. Staff also stated street improvements to Cantrell Road
would be required at the time of development of the site and a dedication of right-
of-way 35 -feet from centerline would be required.
Landscaping comments were addressed. Staff stated irrigation to water
landscaped areas would be required for each lot as it was developed. Staff also
stated landscape plans stamped by a registered landscape architect would be
required at the time of development for each of the proposed lots. Staff stated
interior islands should be evenly distributed throughout the parking lot areas.
Staff noted comments from the various other reporting departments and
agencies suggesting the applicant contact them directly for additional information
and clarification. There was no further discussion of the item. The Committee
then forwarded the item to the full Commission for final action.
5
August 3, 2006
ITEM NO.: 10 (CC
H. ANALYSIS:
FILE NO.:Z-7605-B
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the July 13, 2006, Subdivision Committee meeting. The applicant has
indicated a note concerning the required dumpster screening. The site plan
indicates the dedication of right-of-way per the Master Street Plan requirement.
The applicant has not redesigned the site with regard to the proposed parking
layout. The applicant has indicated the parking as proposed meets the parking
demand for the site. According to the applicant the proposed parking along
Cantrell Road will serves the bank facility by allowing customers to park in front
of the building to access the lobby area. Staff is supportive of the parking as
proposed.
The request is to amend the Planned Office Development changing the front
one-half of the site to allow development of a branch bank facility, with drive-
through. This modification would include two previously indicated lots combined
to one lot. The rear portion of the site will remain relatively unchanged (with five
lots) as approved in the previous site plan and 0-3, General Office District uses
as allowable uses. The buildings proposed for the five lots will range in size from
4,200 square feet to 5,000 square feet and are proposed as single story
buildings. The site plan indicates the placement of a 25 -foot building setback
along the southern perimeter (rear yard) and the eastern perimeter of proposed
Lot 6 (side yard). The Highway 10 Design Overlay District typically requires the
placement of a 40 -foot building setback around the rear yard and 30 -foot side
yard setback. The building along Highway 10 has been indicated at 100 -feet as
required by the overlay district.
The applicant is proposing the development of lots without public street frontage.
The lots will be served by a 24 -foot access and utility easement. The applicant is
requesting a variance from the Subdivision Ordinance to allow the creation of lots
without public street frontage. Staff is supportive of this variance request.
The proposed driveway cuts on Cantrell Road are located in the location they
were previously approved. Access is proposed along the eastern perimeter and
a shared driveway access is located near the western perimeter. Staff is
supportive of the proposed driveway placement.
The site plan indicates the placement of 122 parking spaces. Based on the total
square footage of the proposed buildings a total of 58 parking spaces would
typically be required. The indicated parking is more than adequate to serve the
parking demand of the site.
M
August 3, 2006
ITEM NO.: 10 (CON
FILE NO.:Z-7605-B
The applicant has indicated the location of the proposed dumpster facilities on
the site plan and included a note concerning the required screening. The
applicant has also indicated the dumpster service hours will be limited to normal
business hours. The hours of operation proposed for the development are 6:00
am to 8:00 pm.
The applicant is requesting a variance to allow the backing into a service
easement. Per the Subdivision Ordinance Section 31-210(g)(7) parking spaces
shall not be permitted to back into a service easement. Section 31-2100) states
the Commission may approve a variance of this subsection for applications
before them. Staff is supportive of the applicant's request. The applicant has
indicated as a part of the site development, features such as pedestrian tables
and landscape islands and to be used to slow traffic on the site for both motorist
and pedestrians.
Site lighting will be low level and directional, directed inward away from
residentially zoned properties per the Highway 10 Design Overlay District
requirement.
The applicant has proposed a single development sign within the landscaped
area along Highway 10 and each individual lot will have an identification sign.
The applicant has indicated the signage along Highway 10 will be a ground
mounted monument style sign a maximum of ten feet in height and 100 square
feet in area. Each of the development signs will be a maximum of six square feet
in sign area. Building signage is proposed as typically allowed in office zones.
Staff is supportive of the applicant's request. The proposed site plan does not
fully comply with the Highway 10 Design Overlay District with regard to
landscaped area and building setback along the eastern and southern property
line. The ordinance would typically require a 30 -foot building setback along the
eastern perimeter and a 40 -foot building setback along the southern perimeter.
The applicant's site plan indicates screening will be provided along the eastern
and southern property line as a six foot opaque fence. Staff recommends the
fencing be designed to match the existing fencing within the adjacent subdivision
as a wood fence with brick columns.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the request subject to compliance with the
comments and condition as outlined in paragraphs D, E and F of the above
agenda staff report.
Staff recommends the fencing be designed to match the existing fencing within
the adjacent subdivision as a wood fence with brick columns.
Staff recommends approval of the requested variance to allow backing into a
service easement.
August 3, 2006
ITEM NO.: 10
FILE NO.:Z-7605-B
Staff recommends approval of the requested variance to allow the development
of lots without public street frontage.
PLANNING COMMISSION ACTION:
(August 3, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval
of the request subject to compliance with the comments and condition as outlined
in paragraphs D, E and F of the above agenda staff report. Staff presented a
recommendation the fencing be designed to match the existing fencing within the
adjacent subdivision as a wood fence with brick columns. Staff presented a
recommendation of approval of the requested variance to allow backing into a
service easement and a recommendation of approval of the requested variance
to allow the development of lots without public street frontage.
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried
by a vote of 9 ayes, 0 noes and 2 absent.
8
ITEM NO.: 10.
NAME: Chevaux Court Revised Short -form POD
Z -7605-B
LOCATION: located on the Southeast corner of Cantrell Road and Chenonceau
Boulevard
Plannina Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than July 19, 2006. The Office of Planning and
Development must receive the proof of notice no later than July 28, 2006.
2. Site lighting must comply with the minimum standards of the Highway 10 Overlay
District.
3. Provide the location of the proposed dumpster and include a note concerning the
required screening. (One location indicated)
4. Provide the hours of service of the proposed dumpster in the general notes section
of the site plan.
5. Correct Note 3 concerning the proposed garbage collection.
6. The site plan indicates the total building height of 45 -feet. Is this a realistic building
height? If the buildings are proposed as single story building provide the total height
as proposed.
7. The site plan indicates the placement of a single development sign. Is this correct or
will additional ground mounted signs be requested? The sign is indicated with a
maximum of 8 -feet in height and 80 -square feet. The Highway 10 DOD allows a
maximum of 10 -feet in height and 100 -square feet in area for single development
signs.
8. The parking indicated on the site plan does not work. The parking has been left in
the front and the demand for parking has been located to the rear of the site.
9. The site plan indicates a 25 -foot building setback along the rear property line. The
Highway 10 DOD typically requires the placement of a 30 -foot building setback.
10. Note on the site plan the fencing will be a six foot wood fence with brick columns.
Variance/Waivers: A variance to allow the development of lots without public street
frontage.
Public Works Conditions:
1. Per the land alteration regulations, Section 29-186(h), a one time approval was
given by Public Works to allow stockpiling of construction spoil material on site
for a period of six (6) months. The six (6) months has been exceeded and the
material must be removed. A building permit has been applied for the project.
2. Storm water detention ordinance applies to this property.
Item 9 10
3. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
4. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
5. Cantrell Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required.
6. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
7. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
8. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Site grading, and
drainage plans will need to be submitted and approved prior to the start of
construction.
9. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
10. Sidewalk should be installed on east side of the private drive/street.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, to serve the
proposed development. Contact Little Rock Wastewater Utility at 688-1414 for
additional information.
Entergy:
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A Capital Investment Charge based on
the size of the meter connection(s) will apply to this project in addition to normal
charges. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the hydrant(s)
and contact Central Arkansas Water regarding procedures for installation of the
hydrant(s). A water main extension will be required in order to provide service to this
property. Easements are required to adequately install and maintain the water main
adjoining the right-of-way of Cantrell Road, as well as within the development. This
development will have minor impact on the existing water distribution system. Proposed
water facilities will be sized to provide adequate pressure and fire protection. Contact
Central Arkansas Water at 377-1225 for additional information.
Fire Department- Install fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
Item # 10
CATA: The site is located on CATA Bus Route #25 — the Highway 10 Express Route
Planning Division: This request is located in the Chenal Planning District. The Land
Use Plan shows Office for this property. The applicant has requested to revise a
previously approved Planned Office Development to allow a six lot development with
five lots being used as office uses and the sixth lot being used as a branch bank facility.
The request does not require a change to the Land Use Plan.
Master Street Plan: Cantrell Road is shown as a Principal Arterial on the Master Street
Plan. The primary function of a Principal Arterial is to serve through traffic and to
connect major traffic generators or activity centers within urbanized areas. Entrances
and exits should be limited to minimize negative effects of traffic and pedestrians on
Cantrell Road since it is a Principal Arterial. Chenonceau Boulevard is shown as a
Minor Arterial. A Minor Arterial provides connections to and through an urban area and
their primary function is to provide short distance travel within the urbanized area.
These streets may require dedication of right-of-way and may require street
improvements.
Bicycle Plan: A Class II Bike Route is shown on Cantrell Road west of Chenonceau
Boulevard. A Class II bikeway is located on the street as either a five foot shoulder or
six foot marked bike lane. Additional paving and right of way may be required. A Class
III bikeway is located on Chenonceau Boulevard. A Class III bikeway is a signed route
on a street shared with traffic. No additional paving or right-of-way is required. Class III
bicycle route signage may be required.
City Recognized Neighborhood Action Plan: The property under review is not located in
an area covered by a City of Little Rock recognized neighborhood action plan.
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. All previous comments apply.
3. Interior islands are to be evenly distributed. An additional island is needed in the
parking area along Cantrell Road.
4. Berming is encouraged along Cantrell Road in accordance with the Highway 10
Design Overlay District.
5. The plan appears to meet the 25 foot landscape area required per the Highway
10 Design Overlay District along the side and rear property lines.
6. A controlled automatic irrigation system is required for all new landscaped areas.
Since the site is being reviewed as a single development irrigation will be
required on each of the newly created lots.
7. Since the site is being reviewed as an overall development plan, prior to the
issuance of a building permit, it will be necessary to provide landscape plans
stamped with the seal of a Registered Landscape Architect for each of the
proposed lots.
8. The City Beautiful Commission recommends preserving as many existing trees
as feasible on tree covered sites. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
Item # 10
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, July 19, 2006.
Item # 10