HomeMy WebLinkAboutZ-7605-A Staff AnalysisFILE NO_- Z -76M -A
NAME: Chevaux Revised Short -form POD
LOCATION: Located South of Cantrell Road, approximately 500 feet East of
Chenonceau Boulevard
DEVELOPER:
Orion Capitol Ventures
2200 N. Rodney Parham Road, Suite 206
Little Rock, AR 72212
FNr,INFFR-
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.4 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: POD
ALLOWED USES: Planned Office Development — 0-3 General Office District uses
PROPOSED ZONING: Revised POD
PROPOSED USE: Planned Office Development — 0-3 General Office District uses —
creation of lot lines
VARIANCESNVAIVERS REQUESTED:
1. A variance request to allow backing into a service easement.
2. A variance to allow the development of lots without public street frontage.
BACKGROUND:
Ordinance No. 19,098, adopted by the Little Rock Board of Directors on May 18, 2004,
established Chevaux Short -form POD. The project consisted of 33,600 square feet of
proposed building space containing 0-3, General Office District uses. The applicant
requested ten percent of the building square footage be allowed the Accessory uses
allowed in the 0-3 zoning district. The applicant indicated 142 parking spaces or 4.23
FILE NO.: Z-7605-A Cont.
spaces per 1000 square feet. The proposed building was indicated as an "L" shaped
building and turned away from existing residential property to the south and east. The
rear of the building was to act as screening to the adjoining properties to the east and
south since no doors or windows were proposed other than those required by fire code.
A cross access easement and shared driveway would be utilized to provide adequate
circulation with the adjacent development to the west.
A. PROPOSAUREQUEST:
The applicant is now proposing to revise the previously approved Planned Office
Development to allow the creation of seven lots and the construction of seven
buildings each on individual lots. The applicant has indicated the smaller
individual building footprints will allow the developers to more closely match the
existing topography. The applicant has indicated site improvements and
perimeter landscaping will be constructed as an overall development. The
applicant has indicated each of the lots will be final platted in a single phase.
The applicant has indicated buildings will be constructed based on market
demand.
B. EXISTING CONDITION
The site is vacant and sloping slightly from Cantrell Road. There are single-
family homes located to the south and east of the site. To the west of the site is
property recently developed with a strip retail center.
Cantrell Road adjacent to the site is a four lane roadway with a turn lane at
Chenonceau Boulevard. A traffic signal has been installed at the intersection of
Chennonceau Boulevard and Cantrell Road. There is not a sidewalk in place
adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received one informational phone call from an area
resident concerning the proposed use of the property. All residents who could be
identified located within 300 -feet of the site, the Bayonne, Margeaux Property
Owners Association, the Johnson Ranch Neighborhood Association and all
owners of property located within 200 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. Per the Land Alteration Regulations, Section 29-186 (h), a one time approval
was given by Public Works to allow stockpiling of construction spoil material
on site for a period of six (6) months. The six (6) month period has been
exceeded and the material must be removed.
K
FILE NO.: Z -7605-A {Cont.
2. Storm water detention ordinance applies to this property. Show the
proposed location for storm water detention facilities on the plan.
3. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
4. Highway 10 is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required.
5. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
6. All driveways shall be concrete aprons per City Ordinance.
7. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
8. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
9. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
10. Currently, higher grades exist on northwest corner of property at utility pole
compared to western access driveway. Installation of sidewalk and access
ramp in this area could affect stability of utility pole and should be accounted
for in grading plan.
11. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Existing sewer main on site. Indicate easements on the plan and
no construction within the existing easements will be permitted. Contact Little
Rock Wastewater Utility at 688-1414 for additional information.
Entergy: No comment received.
Center -Point Ener : No comment received.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. A water main extension will be required in order to provide
service to this property. Adequate easements must be provided for installation of
water mains. This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
3
FILE NO.: Z -7605-A
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is located near CATA Bus Route #25 — Highway 10 Express
Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planninq Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Office for this property.
The request does not require a change to the Land Use Plan.
City Recognized Neighborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
(Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. Prior approval was granted for the buffer and landscape areas proposed on the
plan.
3. The proposed parking areas do not provide for the eight percent (3,414 square
feet) interior landscaping required. The plan submitted is 1,155 square feet less
than this requirement. A variance from this standard would require City Beautiful
Commission approval.
4. Interior islands are to be a minimum of 7 Y2 feet in width and 150 square feet in
area to receive credit towards the cities minimal interior landscaping
requirements.
5. Berming is encouraged along the scenic Highway 10 corridor.
6. A controlled automatic irrigation system is required.
7. Prior to the issuance of a building permit, it will be necessary to provide
landscape plans stamped with the seal of a Registered Landscape Architect.
G. SUBDIVISION COMMITTEE COMMENT: (October 20, 2005)
Mr. Tim Daters of White Daters and Associates was present representing the
request. Staff presented an overview indicting there were additional items
necessary to complete the review process. Staff requested Mr. Daters include
the utility easement located along the eastern perimeter of the site. Staff also
stated the ordinance typically prohibited the backing of automobiles into the
service easement.
4
FILE NO.: Z -7605-A Cont.
Public Works comments were addressed. Staff stated the storm water detention
ordinance would apply to the proposed development. There was a general
discussion concerning the eastern most drive and the indicated parking spaces
along the drive. Staff stated the parking was acceptable. Staff stated Cantrell
Road was a five lane road at this location and the drive allowed for sufficient
stacking.
Landscaping comments were addressed. Staff stated the proposed development
did not comply with the Highway 10 Design Overlay District but was previously
approved as indicated. Staff stated they would continue to support the reduced
landscaping and building setback.
Staff noted comments from the various other reporting departments and
agencies; suggesting the applicant contact them individually for further
clarification. There was no further discussion of the item and the Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan addressing most of the issues raised
at the October 20, 2005, Subdivision Committee meeting. The applicant has
indicated the 15 -foot sanitary sewer easement located along the eastern
perimeter of the site and has shown the proposed drives as a cross access and
utility easement.
The applicant is requesting a variance to allow the backing into a service
easement. Per the Subdivision Ordinance Section 31-210(g)(7) parking spaces
shall not be permitted to back into a service easement. Section 31-2100) states
the Commission may approve a variance of this subsection for applications
before them. Staff is supportive of the applicant's request. The applicant has
indicated as a part of the site development, features such as pedestrian tables
and landscape islands to be used to slow traffic on the site for both motorist and
pedestrians.
The applicant is proposing the development of the site as an office park
development. The applicant has indicated seven lots will be created through the
rezoning process and the development of seven buildings on these lots. The
applicant is proposing the development of lots without public street frontage. The
lots will be served by a 24 -foot access and utility easement. The applicant is
requesting a variance from the Subdivision Ordinance to allow the creation of lots
without public street frontage. Staff is supportive of this variance request. The
applicant has indicated the buildings will range in size from 3,500 square feet to
7,000 square feet. Each of the buildings is proposed as a single -story building.
The applicant has indicated the buildings will be constructed as smaller scale
buildings similar to buildings located at the Ranch Subdivision. The applicant
has proposed 127 parking spaces. The site will contain a total of 32,000 square
FILE NO.: Z -7605-A Cont.
feet of office space. Based on the total square footage, 80 parking spaces would
typically be required.
Site lighting will be low level and directional, directed inward away from
residentially zoned properties per the Highway 10 Design Overlay District
requirement. A single dumpster will serve the development and will be fully
screened to comply with City ordinance requirements. The hours of operation
will be from 6 am to 6 pm seven days per week. The applicant has also indicated
the proposed uses are 0-3, General and Professional Office District uses.
The applicant has proposed a single development sign within the landscaped
area along Highway 10 and each individual lot will have an identification sign.
The applicant has indicated the signage along Highway 10 will be a ground
mounted monument style sign a maximum of ten feet in height and 100 square
feet in area. Each of the development signs will be a maximum of six square feet
in sign area.
Staff is supportive of the applicant's request. The proposed site plan does not
fully comply with the Highway 10 Design Overlay District with regard to
landscaped area and building setback along the eastern and southern property
line. The ordinance would typically require a 30 -foot building setback along the
eastern perimeter and a 40 -foot building setback along the southern perimeter.
The previous approval allowed for the reduced setbacks and a larger scale
building. Staff feels with the proposed development being smaller scale
buildings, the reduced setbacks continue to be acceptable. The applicant's site
plan indicates screening will be provided along the eastern and southern property
line as a six foot opaque fence. Staff recommends the fencing be designed to
match the existing fencing within the subdivision as a wood fence with brick
columns.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions outlined in paragraphs D, E, F and H of the above
agenda staff report.
Staff recommends the fencing be designed to match the existing fencing within
the subdivision as a wood fence with brick columns.
Staff recommends approval of the requested variance to allow backing into a
service easement.
Staff recommends approval of the requested variance to allow the development
of lots without public street frontage.
A
PLANNING COMMISSION ACTION: (NOVEMBER 10, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the comments and conditions outlined in paragraphs
D, E, F and H of the above agenda staff report. Staff presented a recommendation that
the required screening be a fence and the fencing be designed to match the existing
fencing within the subdivision as a wood fence with brick columns and the fence be
installed prior to any building construction or site development related to building
construction. Staff also presented a recommendation of approval of the requested
variance to allow backing into a service easement and a recommendation of approval of
the requested variance to allow the development of lots without public street frontage.
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried by a
vote of 9 ayes, 0 noes and 2 absent.
7
November 10, 2005
ITEM NO.: 22 FILE NO.: Z -7605-A
NAME: Chevaux Revised Short -form POD
LOCATION: Located South of Cantrell Road, approximately 500 feet East of
Chenonceau Boulevard
DEVELOPER:
Orion Capitol Ventures
2200 N. Rodney Parham Road, Suite 206
Little Rock, AR 72212
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.4 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: POD
ALLOWED USES: Planned Office Development — 0-3 General Office District uses
PROPOSED ZONING: Revised POD
PROPOSED USE: Planned Office Development — 0-3 General Office District uses —
creation of lot lines
VARIAN C ESNVAIVE RS REQUESTED:
1. A variance request to allow backing into a service easement.
2. A variance to allow the development of lots without public street frontage.
BACKGROUND:
Ordinance No. 19,098, adopted by the Little Rock Board of Directors on May 18, 2004,
established Chevaux Short -form POD. The project consisted of 33,600 square feet of
proposed building space containing 0-3, General Office District uses. The applicant
requested ten percent of the building square footage be allowed the Accessory uses
November 10, 2005
SUBDIVISION
ITEM NO.: 22 (Cont.) FILE NO.: Z -7605-A
allowed in the 0-3 zoning district. The applicant indicated 142 parking spaces or 4.23
spaces per 1000 square feet. The proposed building was indicated as an "L" shaped
building and turned away from existing residential property to the south and east. The
rear of the building was to act as screening to the adjoining properties to the east and
south since no doors or windows were proposed other than those required by fire code.
A cross access easement and shared driveway would be utilized to provide adequate
circulation with the adjacent development to the west.
A. PROPOSAUREQUEST:
The applicant is now proposing to revise the previously approved Planned Office
Development to allow the creation of seven lots and the construction of seven
buildings each on individual lots. The applicant has indicated the smaller
individual building footprints will allow the developers to more closely match the
existing topography. The applicant has indicated site improvements and
perimeter landscaping will be constructed as an overall development. The
applicant has indicated each of the lots will be final platted in a single phase.
The applicant has indicated buildings will be constructed based on market
demand.
B. EXISTING CONDITIONS:
The site is vacant and sloping slightly from Cantrell Road. There are single-
family homes located to the south and east of the site. To the west of the site is
property recently developed with a strip retail center.
Cantrell Road adjacent to the site is a four lane roadway with a turn lane at
Chenonceau Boulevard. A traffic signal has been installed at the intersection of
Chennonceau Boulevard and Cantrell Road. There is not a sidewalk in place
adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received one informational phone call from an area
resident concerning the proposed use of the property. All residents who could be
identified located within 300 -feet of the site, the Bayonne, Margeaux Property
Owners Association, the Johnson Ranch Neighborhood Association and all
owners of property located within 200 -feet of the site were notified of the public
hearing.
November 10, 2005
SUBDIVISION
ITEM NO.: 22(Cont.)-FILE NO.: Z -7605-A
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. Per the Land Alteration Regulations, Section 29-186 (h), a one time approval
was given by Public Works to allow stockpiling of construction spoil material
on site for a period of six (6) months. The six (6) month period has been
exceeded and the material must be removed. -
2. Storm water detention ordinance applies to this property. Show the
proposed location for storm water detention facilities on the plan.
3. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
4. Highway 10 is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required.
5. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
6. All driveways shall be concrete aprons per City Ordinance.
7. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
8. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
9. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
10. Currently, higher grades exist on northwest corner of property at utility pole
compared to western access driveway. Installation of sidewalk and access
ramp in this area could affect stability of utility pole and should be accounted
for in grading plan.
11. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Existing sewer main on site. Indicate easements on the plan and
no construction within the existing easements will be permitted. Contact Little
Rock Wastewater Utility at 688-1414 for additional information.
Entergy: No comment received.
Center -Point Energy: No comment received.
SBC: No comment received.
3
November 10, 2005
SUBDIVISION
ITEM NO.: 22 Cont.) FILE NO.: Z -7605-A
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. A water main extension will be required in order to provide
service to this property. Adequate easements must be provided for installation of
water mains. This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is located near CATA Bus Route #25 — Highway 10 Express
Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Office for this property.
The request does not require a change to the Land Use Plan.
City Recognized Neighborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. Prior approval was granted for the buffer and landscape areas proposed on the
plan.
3. The proposed parking areas do not provide for the eight percent (3,414 square
feet) interior landscaping required. The plan submitted is 1,155 square feet less
than this requirement. A variance from this standard would require City Beautiful
Commission approval.
4. Interior islands are to be a minimum of 7 '/ feet in width and 150 square feet in
area to receive credit towards the cities minimal interior landscaping
requirements.
5. Berming is encouraged along the scenic Highway 10 corridor.
6. A controlled automatic irrigation system is required.
7. Prior to the issuance of a building permit, it will be necessary to provide
landscape plans stamped with the seal of a Registered Landscape Architect.
4
November 10, 2005
SUBDIVISION
ITEM NO.: 22 Cont. FILE NO.: Z -7605-A
G. SUBDIVISION COMMITTEE COMMENT: (October 20, 2005)
Mr. Tim Daters of White Daters and Associates was present representing the
request. Staff presented an overview indicting there were additional items
necessary to complete the review process. Staff requested Mr. Daters include
the utility easement located along the eastern perimeter of the site. Staff also
stated the ordinance typically prohibited the backing of automobiles into the
service easement.
Public Works comments were addressed. Staff stated the storm water detention
ordinance would apply to the proposed development. There was a general
discussion concerning the eastern most drive and the indicated parking spaces
along the drive. Staff stated the parking was acceptable. Staff stated Cantrell
Road was a five lane road at this location and the drive allowed for sufficient
stacking.
Landscaping comments were addressed. Staff stated the proposed development
did not comply with the Highway 10 Design Overlay District but was previously
approved as indicated. Staff stated they would continue to support the reduced
landscaping and building setback.
Staff noted comments from the various other reporting departments and
agencies; suggesting the applicant contact them individually for further
clarification. There was no further discussion of the item and the Committee then
forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan addressing most of the issues raised
at the October 20, 2005, Subdivision Committee meeting. The applicant has
indicated the 15 -foot sanitary sewer easement located along the eastern
perimeter of the site and has shown the proposed drives as a cross access and
utility easement.
The applicant is requesting a variance to allow the backing into a service
easement. Per the Subdivision Ordinance Section 31-210(g)(7) parking spaces
shall not be permitted to back into a service easement. Section 31-2100) states
the Commission may approve a variance of this subsection for applications
before them. Staff is supportive of the applicant's request. The applicant has
indicated as a part of the site development, features such as pedestrian tables
and landscape islands to be used to slow traffic on the site for both motorist and
pedestrians.
5
November 10, 2005
SUBDIVISION
ITEM NO.: 22 Cont. FILE NO.: Z -7605-A
The applicant is proposing the development of the site as an office park
development. The applicant has indicated seven lots will be created through the
rezoning process and the development of seven buildings on these lots. The
applicant is proposing the development of lots without public street frontage. The
lots will be served by a 24 -foot access and utility easement. The applicant is
requesting a variance from the Subdivision Ordinance to allow the creation of lots
without public street frontage. Staff is supportive of this variance request. The
applicant has indicated the buildings will range in size from 3,500 square feet to
7,000 square feet. Each of the buildings is proposed as a single -story building.
The applicant has indicated the buildings will be constructed as smaller scale
buildings similar to buildings located at the Ranch Subdivision. The applicant
has proposed 127 parking spaces. The site will contain a total of 32,000 square
feet of office space. Based on the total square footage, 80 parking spaces would
typically be required.
Site lighting will be low level and directional, directed inward away from
residentially zoned properties per the Highway 10 Design Overlay District
requirement. A single dumpster will serve the development and will be fully
screened to comply with City ordinance requirements. The hours of operation
will be from 6 am to 6 pm seven days per week. The applicant has also indicated
the proposed uses are 0-3, General and Professional Office District uses.
The applicant has proposed a single development sign within the landscaped
area along Highway 10 and each individual lot will have an identification sign.
The applicant has indicated the signage along Highway 10 will be a ground
mounted monument style sign a maximum of ten feet in height and 100 square
feet in area. Each of the development signs will be a maximum of six square feet
in sign area.
Staff is supportive of the applicant's request. The proposed site plan does not
fully comply with the Highway 10 Design Overlay District with regard to
landscaped area and building setback along the eastern and southern property
line. The ordinance would typically require a 30 -foot building setback along the
eastern perimeter and a 40 -foot building setback along the southern perimeter.
The previous approval allowed for the reduced setbacks and a larger scale
building. Staff feels with the proposed development being smaller scale
buildings, the reduced setbacks continue to be acceptable. The applicant's site
plan indicates screening will be provided along the eastern and southern property
line as a six foot opaque fence. Staff recommends the. fencing be designed to
match the existing fencing within the subdivision as a wood fence with brick
columns.
[:1
November 10, 2005
SUBDIVISION
ITEM NO.: 22 Cont. FILE NO.: Z -7605-A
STAFF RECOMMENDATION
Staff recommends approval of the request subject to compliance with the
comments and conditions outlined in paragraphs D, E, F and H of the above
agenda staff report.
Staff recommends the fencing be designed to match the existing fencing within
the subdivision as a wood fence with brick columns.
Staff recommends approval of the requested variance to allow backing into a
service easement.
Staff recommends approval of the requested variance to allow the development
of lots without public street frontage.
PLANNING COMMISSION ACTION: (NOVEMBER 10, 2005)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the comments and conditions outlined in paragraphs
D, E, F and H of the above agenda staff report. Staff presented a recommendation that
the required screening be a fence and the fencing be designed to match the existing
fencing within the subdivision as a wood fence with brick columns and the fence be
installed prior to any building construction or site development related to building
construction. Staff also presented a recommendation of approval of the requested
variance to allow backing into a service easement and a recommendation of approval of
the requested variance to allow the development of lots without public street frontage.
There was no further discussion of the item. The Chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried by a
vote of 9 ayes, 0 noes and 2 absent.
7
ITEM NO.: 22, FILE NO.: Z-7605-A
NAME: Chevaux Revised Short-form POD
LOCATION: located South of Cantrell Road, approximately 500 feet East of
Chenonceau Boulevard
Planning Staff Comments:
1. Provide notification of property owners located within 210-feet of the site, 54
complete with the certified abstract list, notice form with affidavit executed and+
proof of mailing.
2. Provide details of any proposed signage to be located within the development.
3. Provide the hours of operation.
4. Provide the dumpster locations and a note concerning the proposed screening.
5. Provide details of any proposed fencing to be located on the site.
6. Any site lighting must be low level and directional, directed inward away from
residentially zoned properties.
7. Section 31-210(g)(7) prohibits parking spaces to back into a service easement.
The provision does allow for parallel parking if the pavement is widened to
provide adequate drive lanes.
Variance/Waivers:
Public Works Conditions:
1. Per the Land Alteration Regulations, Section 29-186 (h), a one time approval
was given by Public Works to allow stockpiling of construction spoil material on
site for a period of six (6) months. The six (6) month period has been exceeded
and the material must be removed.
2. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
3. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
4. Highway 10 is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required.
5. Sidewalks with appropriate handicap ramps are required in accordance with
Section 31-175 of the Little Rock Code and the Master Street Plan.
6. All driveways shall be concrete aprons per City Ordinance.
7. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
8. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
9. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Site grading, and
drainage plans will need to be submitted and approved prior to the start of
construction.
10. Currently, higher grades exist on northwest corner of property at utility pole
compared to western access driveway. Installation of sidewalk and access
ramp in this area could affect stability of utility pole and should be accounted for
in grading plan.
11. Obtain a NPDES storm water permit from the Arkansas Department of
Environmental Quality prior to the start of construction.
Utilities and Fire Department/County Planning:
Wastewater: Existing sewer main on site. Indicate easements on the plan and no
construction within the existing easements will be permitted. Contact Little Rock
Wastewater Utility at 688-1414 for additional information.
Enter
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. A Capital Investment Charge based
on the size of the meter connection(s) will apply to this project in addition to normal
charges. A water main extension will be required in order to provide service to this
property. Adequate easements must be provided for installation of water mains. This
development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is located near CATA Bus Route #25 — Highway 10 Express Bus
Route.
Plannina Division:
Landscape:
1. Compliance with the City's Landscape and Buffer Ordinances is required.
2. Prior approval was granted for the buffer and landscape areas proposed on the
plan.
3. The proposed parking areas do not provide for the eight percent (3,414 square
feet) interior landscaping required. The plan submitted is 1,155 square feet less
than this requirement. A variance from this standard would require City Beautiful
Commission approval.
4. Interior islands are to be a minimum of 7 '/ feet in width and 150 square feet in
area to receive credit towards the cities minimal interior landscaping
requirements.
5. Berming is encouraged along the scenic Highway 10 corridor.
6. A controlled automatic irrigation system is required.
7. Prior to the issuance of a building permit, it will be necessary to provide
landscape plans stamped with the seal of a Registered Landscape Architect.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to
include the additional information as noted above) to staff on Wednesday, October
26, 2005.