HomeMy WebLinkAboutZ-7605 Staff AnalysisFILE NO.: Z-7605
NAME: Chevaux Short -form POD
LOCATION: on the Southside of Cantrell Road approximately 500 feet East of
Chenonceau Boulevard
DEVELOPER:
Eugene Pfeifer III
P.O. Box 99
North Little Rock, AR 72115
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.4 Acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE:
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
"•t
FT. NEW STREET: 0
Planned Office Development
VARIAN CESM/AIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The project consists of 33,600 square feet of proposed building space containing
0-3, General Office District uses. The applicant is requesting ten percent of the
building square footage to be allowed the Accessory uses allowed in the 0-3
zoning district. The applicant has indicated 142 parking spaces or 4.23 spaces
per 1000 square feet.
The proposed building is "L" shaped and turned away from existing residential
property to the south and east. The rear of the building should act as screening
to the adjoining properties since no doors or windows are proposed other than
those required by fire code.
FILE NO.: Z-7605 Cont.)
A cross access easement and shared driveway will be utilized to provide
adequate circulation with the adjacent development.
B. EXISTING CONDITIONS:
The site contains an existing occupied single-family home. There are single-
family homes located to the south and east of the site. To the west of the site is
a vacant piece of property currently under review for a site plan review (Item #C
— File No. S -1065-C).
Cantrell Road adjacent to the site is a four lane roadway with a turn lane at
Chenonceau Boulevard. This intersection is scheduled for a traffic signal when
warrants are met. There is not a sidewalk in place adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comments from an area residents
concerning the proposed use of the property. All residents who could be
identified located within 300 -feet of the site, the Bayonne, Margeaux Property
Owners Association, the Johnson Ranch Neighborhood Association and all
owners of property located within 200 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. With the building permit, provide design of street conforming to the Master
Street Plan for an arterial street. Construct one-half street improvement to
the street including 5 -foot sidewalk with the planned development.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading and drainage plans will need to be submitted and approved prior to
the start of construction.
3. Storm water detention ordinance applies to this property.
4. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade
permit prior to doing any work in the right-of-way. Contact Traffic Engineering
at (501-379-1817 — Derrick Bergfield) for additional information.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: No comment received.
2
FILE NO.: Z-7605 (Cont
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense. Due to the nature of
this facility, installation of an approved reduced pressure zone backflow
preventer assembly (RPZA) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water
(CAW) requires that upon installation of the RPZA, successful tests of the
assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by CAW. The test results must be sent to
CAW's Cross Connection Section within ten days of installation and annually
thereafter. Contact Carroll Keatts at 992-2431 if you would like to discuss
backflow prevention requirements for this project. This development will have
minor impact on the existing water distribution system. Proposed water facilities
will be sized to provide adequate pressure and fire protection. If there are
facilities that need to be adjusted and/or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer. Contact
Central Arkansas Water at 992-2438 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3752 for additional information.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Single Family for this property. The applicant has applied
for a Planned Office Development for a new office building.
A land use plan amendment for a change to Office is a separate item on this
agenda (Item # 21 — File No. LU04-01-03).
City Recognized Neighborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
Landscape: Areas set-aside for buffers and landscaping meet with ordinance
requirements.
A 6 -foot high opaque screen, either a wooden fence with its face side directed
outward, a wall, or dense evergreen plantings, is required along the eastern and
southern perimeters of the site.
3
FILE NO.: Z-7605 (Cont.
An irrigation system to water landscaped areas will be required.
Prior to a construction permit being issued, it will be necessary to provide
landscape plans stamped with the seal of a Registered Landscape Architect.
G. SUBDIVISION COMMITTEE COMMENT: (April 1, 2004)
Mr. Joe White was present representing the request. Staff presented an
overview of the requesting indicating the Planned Development for an office
development. Staff noted additional information was required to complete the
review process. Staff requested the applicant indicate details concerning fencing
to be added to the site. Staff also requested information concerning any
proposed signage. Staff requested the applicant clarify the proposed users of
proposed facility.
Public Works comments were addressed. Staff stated the development would
require a grading permit and the storm water detention ordinance would apply to
the site. Staff stated street construction per the Master Street Plan would be
required.
Landscaping comments were addressed. Staff stated the areas set aside for
buffers appeared to meet with ordinance minimum standards. Staff stated a six-
foot high opaque screen would be required along the eastern and southern
perimeters of the site. Staff also stated prior to construction, a landscape plan
stamped with the seal of a registered landscape architect would be required.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the April 1, 2004 Subdivision Committee meeting. The applicant has
indicated signage consistent with signage allowed in the Highway 10 Design
Overlay District or a single -ground mounted monument style sign a maximum of
ten feet in height and one hundred square feet in area. Staff is supportive of the
proposed signage.
The applicant has also indicated a six foot opaque screen along the eastern and
southern perimeters of the site. The proposed screening will provide year around
screening to the adjoining homes. The applicant has also indicated the rear of
the building will be limited to openings required by the Fire Department. Staff is
supportive of the proposed screening.
The applicant has indicated a right-of-way dedication of 55 -feet from the
centerline of Cantrell Road will be provided and the developer will install a five
foot sidewalk. Staff is supportive of the proposed street improvements.
4
FILE NO.: Z-7605 Cont.
The proposed site plan includes the placement of a shared driveway between
Lots 1 and 2 Chenonceau Commercial Subdivision (Item C — File # S -1065-C)
and the proposed planned development. The applicant has indicated the drive
will be labeled as a cross access easement allowing access to both
developments from Cantrell Road.
The proposed site plan includes the placement of 140 parking spaces on the site.
The applicant has indicated a total building area of 33,600 square feet. The
typical minimum parking required for an office development would be 84 parking
spaces. The proposed parking is more than adequate to meet the typical
minimum parking required.
The applicant has indicated the development will operate from 6:00 am to 6:00
pm six days per week. The applicant is requesting 0-3, General Office District
uses and the ten percent accessory uses. Staff is supportive of the requested
days and hours of operation and the requested uses. Staff feels the requested
accessory uses, limited to ten percent of the total floor area, will have little impact
on the proposed development and parking.
The applicant has indicated the dumpster to be located in the front of the
buildings. The proposed location is furthest away from the residentially zoned
properties located to the south and east. The applicant has indicated screening
will be placed as required by the zoning ordinance. Staff is supportive of the
placement and the indicated screening.
The applicant has indicated there is not a Bill of Assurance in effect for the
proposed site. The site is held in a metes and bounds legal description and a Bill
of Assurance has not been executed for the site. Otherwise, to staffs
knowledge, there are no outstanding issues associated with the proposed
request. Staff is supportive of the proposed request.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
PLANNING COMMISSION ACTION: (APRIL 22, 2004)
Mr. Joe White was present representing the request. There was one registered
objectors present. Mr. Ron Underwood addressed the Commission with concerns with
regard to the proposed screening. Mr. White stated he was amending his application to
include a six foot wood fence along the east and southern perimeters of the site.
Mr. Underwood stated this addressed his concern.
5
FILE NO.: Z-7605 (C
There was no further discussion of the item. The Chair placed the item on the consent
agenda for approval. The motion was approved by a vote of 10 ayes, 0 noes and
1 absent.
D
April 22, 2004
ITEM NO.: 21.1 FILE NO.: Z -
NAME: Chevaux Short -form POD
LOCATION: on the Southside of Cantrell Road approximately 500 feet East of
Chenonceau Boulevard
DEVELOPER:
Eugene Pfeifer III
P.O. Box 99
North Little Rock, AR 72115
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.4 Acres
CURRENT ZONIN
ALLOWED USES
PROPOSED ZONING:
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
•
FT. NEW STREET: 0
Planned Office Development
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The project consists of 33,600 square feet of proposed building space containing
0-3, General Office District uses. The applicant is requesting ten percent of the
building square footage to be allowed the Accessory uses allowed in the 0-3
zoning district. The applicant has indicated 142 parking spaces or 4.23 spaces
per 1000 square feet.
The proposed building is "L" shaped and turned away from existing residential
property to the south and east. The rear of the building should act as screening
to the adjoining properties since no doors or windows are proposed other than
those required by fire code.
April 22, 2004
SUBDIVISION
ITEM NO.: 21.1 Cont. FILE NO.: Z-7605
A cross access easement and shared driveway will be utilized to provide
adequate circulation with the adjacent development.
B. EXISTING CONDITIONS:
The site contains an existing occupied single-family home. There are single-
family homes located to the south and east of the site. To the west of the site is
a vacant piece of property currently under review for a site plan review (Item #C
— File No. S -1065-C).
Cantrell Road adjacent to the site is a four lane roadway with a turn lane at
Chenonceau Boulevard. This intersection is scheduled for a traffic signal when
warrants are met. There is not a sidewalk in place adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comments from an area residents
concerning the proposed use of the property. All residents who could be
identified located within 300 -feet of the site, the Bayonne, Margeaux Property
Owners Association, the Johnson Ranch Neighborhood Association and all
owners of property located within 200 -feet of the site were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. With the building permit, provide design of street conforming to the Master
Street Plan for an arterial street. Construct one-half street improvement to
the street including 5 -foot sidewalk with the planned development.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading and drainage plans will need to be submitted and approved prior to
the start of construction.
3. Storm water detention ordinance applies to this property.
4. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade
permit prior to doing any work in the right-of-way. Contact Traffic Engineering
at (501-379-1817 — Derrick Bergfield) for additional information.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
K
April 22, 2004
SUBDIVISION
ITEM NO.: 21.1 Cont. FILE NO.: Z-7005
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense. Due to the nature of
this facility, installation of an approved reduced pressure zone backflow
preventer assembly (RPZA) is required on the domestic water service. This
assembly must be installed prior to the first point of use. Central Arkansas Water
(CAW) requires that upon installation of the RPZA, successful tests of the
assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by CAW. The test results must be sent to
CAW's Cross Connection Section within ten days of installation and annually
thereafter. Contact Carroll Keatts at 992-2431 if you would like to discuss
backflow prevention requirements for this project. This development will have
minor impact on the existing water distribution system. Proposed water facilities
will be sized to provide adequate pressure and fire protection. If there are
facilities that need to be adjusted and/or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer. Contact
Central Arkansas Water at 992-2438 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3752 for additional information.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Single Family for this property. The applicant has applied
for a Planned Office Development for a new office building.
A land use plan amendment for a change to Office is a separate item on this
agenda (Item # 21 — File No. LU04-01-03).
CitV Recognized Nei hborhood Action Plan: The property under review is not
located in an area covered by a City of Little Rock recognized neighborhood
action plan.
3
April 22, 2004
SUBDIVISION
ITEM NO.: 21.1 Cont. FILE NO.: Z-7605
Landscape: Areas set-aside for buffers and landscaping meet with ordinance
requirements.
A 6 -foot high opaque screen, either a wooden fence with its face side directed
outward, a wall, or dense evergreen plantings, is required along the eastern and
southern perimeters of the site.
An irrigation system to water landscaped areas will be required.
Prior to a construction permit being issued, it will be necessary to provide
landscape plans stamped with the seal of a Registered Landscape Architect.
G. SUBDIVISION COMMITTEE COMMENT: (April 1, 2004)
Mr. Joe White was present representing the request. Staff presented an
overview of the requesting indicating the Planned Development for an office
development. Staff noted additional information was required to complete the
review process. Staff requested the applicant indicate details concerning fencing
to be added to the site. Staff also requested information concerning any
proposed signage. Staff requested the applicant clarify the proposed users of
proposed facility.
Public Works comments were addressed. Staff stated the development would
require a grading permit and the storm water detention ordinance would apply to
the site. Staff stated street construction per the Master Street Plan would be
required.
Landscaping comments were addressed. Staff stated the areas set aside for
buffers appeared to meet with ordinance minimum standards. Staff stated a six-
foot high opaque screen would be required along the eastern and southern
perimeters of the site. Staff also stated prior to construction, a landscape plan
stamped with the seal of a registered landscape architect would be required.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the April 1, 2004 Subdivision Committee meeting. The applicant has
indicated signage consistent with signage allowed in the Highway 10 Design
Overlay District or a single -ground mounted monument style sign a maximum of
ten feet in height and one hundred square feet in area. Staff is supportive of the
proposed signage.
0
April 22, 2004
SUBDIVISION
ITEM NO.: 21.1 Cont. FILE NO.: Z-7605
The applicant has also indicated a six foot opaque screen along the eastern and
southern perimeters of the site. The proposed screening will provide year around
screening to the adjoining homes. The applicant has also indicated the rear of
the building will be limited to openings required by the Fire Department. Staff is
supportive of the proposed screening.
The applicant has indicated a right-of-way dedication of 55 -feet from the
centerline of Cantrell Road will be provided and the developer will install a five
foot sidewalk. Staff is supportive of the proposed street improvements.
The proposed site plan includes the placement of a shared driveway between
Lots 1 and 2 Chenonceau Commercial Subdivision (Item C — File # S -1065-C)
and the proposed planned development. The applicant has indicated the drive
will be labeled as a cross access easement allowing access to both
developments from Cantrell Road.
The proposed site plan includes the placement of 140 parking spaces on the site.
The applicant has indicated a total building area of 33,600 square feet. The
typical minimum parking required for an office development would be 84 parking
spaces. The proposed parking is more than adequate to meet the typical
minimum parking required.
The applicant has indicated the development will operate from 6:00 am to 6:00
pm six days per week. The applicant is requesting 0-3, General Office District
uses and the ten percent accessory uses. Staff is supportive of the requested
days and hours of operation and the requested uses. Staff feels the requested
accessory uses, limited to ten percent of the total floor area, will have little impact
on the proposed development and parking.
The applicant has indicated, the dumpster to be located in the front of the
buildings. The proposed location is furthest away from the residentially zoned
properties located to the south and east. The applicant has indicated screening
will be placed as required by the zoning ordinance. Staff is supportive of the
placement and the indicated screening.
The applicant has indicated there is not a Bill of Assurance in effect for the
proposed site. The site is held in a metes and bounds legal description and a Bill
of Assurance has not been executed for the site. Otherwise, to staff's
knowledge, there are no outstanding issues associated with the proposed
request. Staff is supportive of the proposed request.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
5
April 22, 2004
SUBDIVISION
ITEM NO.: 21.1 (Cont.
PLANNING COMMISSION ACTION:
FILE NO.: Z-750
(APRIL 22, 2004)
Mr. Joe White was present representing the request. There was one registered
objectors present. Mr. Ron Underwood addressed the Commission with concerns with
regard to the proposed screening. Mr. White stated he was amending his application to
include a six foot wood fence along the east and southern perimeters of the site.
Mr. Underwood stated this addressed his concern.
There was no further discussion of the item. The Chair placed the item on the consent
agenda for approval. The motion was approved by a vote of 10 ayes, 0 noes and
1 absent.
L
ITEM NO.: 21.1
NAME: Chevaux Short -form POD
FILE NO.: Z-7605
LOCATION: on the South side of Cantrell Road approximately 500 feet East of
Chenonceau Boulevard
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Provide details concerning the rear of the proposed office building abutting the
single-family zoned property. Will there be any windows or doors other than those
required to meet fire code?
3. Label the proposed 36 -foot drive as a cross access easement.
4. Will there be a dumpster located on the site? If so indicate the location along with a
note concerning the required screening.
5. Provide details of any proposed signage on the proposed site plan. Indicate the total
height/sign area and location.
6. Provide details of any proposed fencing to be located on the site including
height/location and construction material.
7. Provide letters from the utility companies and public works concerning the
abandonment of the existing 30 -foot utility and drainage easement. This issue will
have to be resolved prior to being forwarded to the Board of Directors for final
approval.
8. In the general notes section the occupants are listed as general and professional
office users. Is the in fact true or is the request to allow some form of Office Zoning
(0-1, 0-2 or 0-3) office uses?
Variance/Waivers: None requested.
Public Works:
1. With the building permit, provide design of street conforming to the Master Street
Plan for an arterial street. Construct one-half street improvement to the street
including 5 -foot sidewalk with the planned development.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading and drainage plans
will need to be submitted and approved prior to the start of construction.
3. Storm water detention ordinance applies to this property.
4. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501-379-
1817 — Derrick Bergfield) for additional information.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. The Little Rock Fire Department needs to
evaluate this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. Due to the nature of this facility, installation of an approved
reduced pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first point of use.
Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful
tests of the assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by CAW. The test results must be sent to CAW s Cross
Connection Section within ten days of installation and annually thereafter. Contact
Carroll Keatts at 992-2431 if you would like to discuss backflow prevention requirements
for this project. This development will have minor impact on the existing water
distribution system. Proposed water facilities will be sized to provide adequate pressure
and fire protection. If there are facilities that need to be adjusted and/or relocated,
contact Central Arkansas Water. That work would be done at the expense of the
developer. Contact Central Arkansas Water at 992-2438 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
at 918-3752 for additional information.
County Planning: No comment received.
CATA: No comment received.
Planning Division: This request is located in the Chenal Planning District. The Land
Use Plan shows Single Family for this property. The applicant has applied for a
Planned Office Development for a new office building.
A land use plan amendment for a change to Office is a separate item on this agenda.
City Recognized Neighborhood Action Plan: The property under review is not located in
an area covered by a City of Little Rock recognized neighborhood action plan.
Landscape: Areas set-aside for buffers and landscaping meet with ordinance
requirements.
A 6-foot high opaque screen, either a wooden fence with its face side directed outward,
a wall, or dense evergreen plantings, is required along the eastern and southern
perimeters of the site.
An irrigation system to water landscaped areas will be required.
Prior to a construction permit being issued, it will be necessary to provide landscape
plans stamped with the seal of a Registered Landscape Architect.
Revised plat 1plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, April 7, 2004.