HomeMy WebLinkAboutZ-7421 Staff AnalysisFILE NO.: Z-7421
NAME: University Heights PCD
LOCATION: Southeast corner of University Avenue and "C" Street
DEVELOPER:
Strode Property Company
5950 Berkshire Lane #1275
Dallas, TX 75225
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 5.3 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: R-2, R-3, R-4, PCD
ALLOWED USES: Single-family residential uses, Duplex and Commercial
PROPOSED ZONING: PCD — Mixed Uses
PROPOSED USE: Mixed of Commercial, Office and Residential uses-
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
Several zoning actions have taken place in this area from Board of Adjustment building
line variances to actual rezoning action. The most recent was the approval of a PCD for
219 North University Avenue. That request was approved by the Board of Directors on
July 16, 2002 (Ordinance No. 18,718). The site was zoned 0-3 and the applicant
desired to rezone the site to PCD to allow flexibility in order to provide quality tenants to
FILE NO.: Z-7421 _ Cont.
serve the neighborhood area, utilizing the existing building. The PCD outlined specific
uses allowed on the site (Z-7233).
A second rezoning request was also for a PCD located between "B" and "C" Streets on
the east side of University Avenue. The Board of Directors approved the request on
August 29, 2000 with Ordinance No. 18,335. The request was to rezone the site from
R -3/R-5 to PCD to allow for the construction of a 25,600 square foot commercial
building along with 74 parking spaces. The applicant also proposed to realign "C"
Street to line up with the Park Plaza access drive on the west side of University Avenue.
The applicant proposed the hours of operation to be from 9:00 am to 9:00 pm Monday
through Saturday and from 10:00 am to 8:00 pm on Sunday.
The Board of Adjustment approved the use of 5909 and 5911 "C" Street as a
commercial parking lot on residentially zoned property on June 17, 1991. The parking
lot serves employees and patients of the Gastroenterology Associates P.A.
A. PROPOSAL/REQUEST;
The applicant is requesting a rezoning from various zoning classifications to PCD
to allow a two phases development located between West Markham Street and
"C" Street and Pierce Street and University Avenue. The development is
proposed as a mixed-use development complete with residential, office and
commercial uses. The current request is the review and rezoning of the Phase I
portion of the development from various zoning classifications to PCD. The
Phase II portion of the development will be reviewed by the Commission as the
development plans become imminent.
Phase I consist of three commercial buildings containing a total of 49,030 square
feet of gross floor space. The development also contains 255 parking spaces
and is located on a total of 5.3 acres.
The applicant is proposing the realignment of "C" Street from the current location
to the south to align with the existing traffic signal on University Avenue at the
access drive to Park Plaza Mall. The applicant is also proposing the
abandonment of portions of "A" Street and "B" Street and the portion of "C"
Street, which will be realigned.
B. EXISTING CONDITIONS:
The area contains existing single-family, multi -family and non-residential uses.
Located in the Phase I boundaries are single-family homes, office/retail uses and
duplex housing. There is a large multi -family complex located on "C" Street just
east of the development and the St. Vincent Day Care facility is located on "A"
Street just east of the development (located in the Future Phase II area).
Other uses in the area include the Park Plaza Mall, the University Mall, the
I -HOP Restaurant and St. Vincent Hospital.
2
FILE NO.: Z-7421
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Hillcrest Residents Neighborhood Association along with all owners of property
located within 200 feet of the site and all residents, who could be identified,
located within 300 feet of the site were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. University Avenue is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way 55 -feet from centerline will be required.
2. Repair or replace any curb, gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
3. Coordinate design of traffic signal upgrade with proposed street
improvements. Plans to be forwarded to Traffic and Civil Engineering for
approval.
4. Provide the direction of flow and all storm water flows (Q) entering and
leaving the property.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction. A demonstration must be made that downstream
storm water facilities will be adequate.
6. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
7. A public cul-de-sac or suitable hammerhead turn -around must be provided on
"A" and "B" Streets.
8. Some of the additional traffic generated by the proposed development will use
Pierce and C Streets for access. These streets have open ditches and are
too narrow to provide safe two-way access to the site.
9. With the plan, B Street will continue to function as a public street. Back -out
parking lining the street creates a traffic hazard. Permanently closing "B"
Street appears to be the best answer.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater Existing sewer mains on site. Relocation of existing sewer mains
will be at the Developer's expense. Sewer service must be retained for all
existing residences not being removed by this project. Contact the Little Rock
Wastewater Utility at 688-1414 for additional details.
Entergy: No comment received.
3
FILE NO.: Z-7421 Cont.
Center -Point Energy: Center -Point Energy has existing facilities on "A", "B" and
"C" Streets from Pierce Street to University Avenue. Cost associated with the
termination of lines at the east edge of the property will be 100 percent
responsibility of the developer. Contact Center -Point Entergy at 377-4539 for
additional details.
SBC: A ten foot easement is required along the east, west and north property
lines. A five foot easement is required along the south property line. Contact
SBC at 373-5112 for additional details.
Central Arkansas Water: A water main extension and on-site fire protection
installed at the Developer's expense will be required in order to provide
service to this property. The Little Rock Fire Department needs to evaluate
this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed
at the Developer's expense. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would also be
done at the expense of the developer. All Central Arkansas Water
requirements in effect at the time of request for water service must be met.
This development will have minor impact on existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection. Contact Central Arkansas Water at 992-2438 for
additional details.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division: This request is located in the Heights - Hillcrest Planning
District. The Land Use Plan shows that the majority of the site is shown as
Mixed Use. The applicant has applied for a Planned Commercial Development
for a retail development.
Since more than 50% of the site is shown as Mixed Use, a commercial
development with a Planned Zoning District does not require a change to the
Land Use Plan.
Citv Reco nized Nei hborhood Action Plan: The applicant's property lies in the
area covered by the Hillcrest Neighborhood Plan a "Blueprint" of our Community.
The list of supplemental issues listed a land use objective of encouraging new
buildings to relate to the architecture of the neighborhood and a community
M
FILE NO.: Z-7421 (Cont.
development objective stating that commercial uses should not be open later
than midnight.
Landscape: A perimeter landscaping strip will be required between new
property lines where vehicular use areas exist unless the area(s) are platted as
access easement(s).
The proposed land use buffer along the eastern perimeter drops below the
average twenty-four (24) foot width requirement. Also, it drops below the six (6)
foot seven (7) inch minimum width allowed at any given point by both the zoning
and landscape ordinances.
The proposed street buffers along "C" Street and along University Avenue drop
below the twenty-four (24) foot average width requirement and below the twelve
(12) foot width minimum at any given point.
Interior landscape islands must be at least 225 square feet in area and 5.6 feet in
width to count toward fulfilling interior landscaping requirements of the landscape
ordinance.
All of the landscape and buffer requirements take into account the reductions
allowed within the designated mature area of the City.
A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall or dense evergreen plantings is required along the
eastern perimeter where adjacent to residential properties.
An irrigation system to water landscaped areas will be required. Prior to
obtaining a building permit, it will be necessary to provide approved landscape
plans stamped with the seal of a Registered Landscape Architect. Compliance
wit the City's Landscape and Buffer Ordinances is requested.
Building Codes: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (June 5, 2003)
The applicant was present representing the request. Staff introduced the
proposed development indicating there were additional items needed on the
proposed site plan. Staff questioned if there would be any outdoor activities
and/or dining located on the site and the measures the applicant would take to
screen the adjoining property owners from noise of the outdoor activities and/or
dining.
Staff also questioned the proposed signage requesting the details of any signage
that would be located on the site.
9
FILE NO.: Z-7421 (Cont.
Public Works comments were addressed. Staff stated there were concerns with
the closure of "A" Street and the remaining single-family home not being a part of
the development. Staff also stated the street could not be closed before their
property line. Staff also stated some form of turn -around was needed at the end
of "A" and "B" Streets. The applicant questioned if the turn -around could be in
the parking lot. Staff stated if the area was dedicated as public through a cross
access easement then this would be satisfactory.
Staff stated University Avenue would require a dedication of right-of-way. Staff
stated currently there was 40 feet of right-of-way and the Master Street Plan
required 55 -feet from the centerline. The applicant stated he would work with
Public Works on this issue.
Landscaping comments were addressed. Staff stated the eastern land use
buffer fell below the minimum allowed under both the zoning and landscape
ordinance. Staff stated the strip should average 24 feet and be a minimum of 6.7
feet.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the June 5, 2003 Subdivision Committee meeting. The applicant has
indicated "A" Street will remain open to a point on the west property line of the
indicated out -parcel; a single-family home which is not participating in the
development. The applicant has indicated a hammer -head turn around on "A"
Street as requested by the Public Works Department. The applicant has also
indicated "B" Street will terminate into the parking lot. The applicant has broken
the street and installed a four -foot walking trail in this area to connect the
residences to the shopping center. The area adjoining the parking lot will be
dedicated as a service easement allowing the city service vehicles a way to
turn -around after accessing the homes on "B" Street.
The applicant has also verified the operational hours to be from 5:00 am to 1:00
am seven days per week. The applicant has indicated there are possible
activities taking place outside in the northern building adjacent to the single-
family homes. Staff has concerns with the use of this area as an outdoor dining
area and the noise from customers affecting to the near -by homes at a late hour.
The applicant has indicated a six (6) foot wood fence for screening of this area
but the screen will not deflect the potential sound. Staff would recommend any
outdoor activity end by 10:00 pm and that there be no outdoor music allowed.
The applicant has indicted dumpster locations on the site plan and indicated the
screening requirements of at least two feet above the top of the dumpster. The
81
FILE NO.: Z-7421 Cont.
applicant has also indicated the dumpsters will be serviced from 7:00 am to 6:00
pm. Staff feels the hours of service are acceptable hours. With the limiting to the
day light hours, this should limit the impact on the remaining single-family homes
in the area.
The applicant has indicated storm water detention on the proposed site plan in
two locations. The areas are adjacent to "C" Street near the University Avenue
intersection. The applicant has also indicated they will verify downstream storm
water facilities to prove adequacy.
The applicant has indicated two pylon signs to be located near the northern and
southern boundaries of the property along University Avenue. The sign area will
be the maximum allowed in commercial zones or maximum of 36 -feet in height
and 160 square feet in area. Staff is supportive of the requested signage.
The applicant is proposing 49,030 square feet of commercial space in four
buildings with a maximum building height of thirty-five feet. There are 255
parking spaces proposed as a part of the development. The typical minimum
parking demand for a commercial center of this size would be 217 parking
spaces or one space per two hundred and twenty-five square feet of gross floor
area. The proposed parking is sufficient to meet the typical minimum parking
demand. If more than one restaurant were to locate on the site then staff would
have concerns with the proposed parking since a restaurant requires additional
parking (one space per one -hundred square feet of gross floor area). The
development is touting itself to be a neighborhood based development allowing
residents to walk to the area for services. If this proves to be the case then the
proposed parking would be sufficient to meet the minimum parking demand.
The applicant has indicated screening along the eastern property line as
requested by Staff. The applicant has also indicated a six foot wood fence will be
placed in this area to screen the adjoining single-family homes. The existing site
plan indicates a street buffer along University Avenue. Public Works has
requested additional right-of-way in this area. The existing right-of-way along the
property frontage is 40 -feet from centerline and the Master Street Plan requires
55 -feet of right-of-way in this area. If the applicant is required to dedicate the
additional right-of-way the street buffer will be somewhat reduced along
University Avenue.
The applicant has requested a waiver of the requirement for dedication of right-
of-way to 55 -feet from centerline for University Avenue as required by the Master
Street Plan. Staff feels with the current roadway widths south of West Markham
Street and the proposed construction on South University Avenue south of 12th
Street the full 55 -foot right-of-way is required. If at any point in the future the City
intends to connect the two sections of University Avenue without the right-of-way
dedication this would be difficult if not impossible.
7
FILE NO.: Z-7421 Cont.
The site plan indicates an out -parcel along "A" Street. There is an existing
single-family home located on the property and the developer has indicated the
owner does not wish to participate in the development. The applicant has
indicated screening as required between commercial and single-family. The
applicant has indicated the area as a future parking lot should the homeowner
decide to sell and become willing to participate. Staff has some concerns with
this situation should the homeowner decide to continue to reside at this location.
There are dumpsters located on both property lines of the existing single-family
home and the home will be surrounded by commercial uses and parking lots.
This will not make for a comfortable living situation for the residents of the house.
The proposed development lies in an area covered by the Urban Land Institute
(ULI) Study. The study calls for the parcel to contain lifestyle retail, together with
multi -family and single-family homes. The study also indicates the
Hillcrest/Lifestyle parcel should be the first to develop in the study area. The
panel also recommended the parcel be large enough to stand on its own.
The ULI panel recommended a small park built along University Avenue with
about 40,000 square feet of retail space around it. The panel recommended
well -landscaped streets with surface parking, both at the curb and in small lots, to
satisfy the needs of the retailers. Some high- and some low-density housing
would fill out the block and provide an attractive and appealing urban setting.
Although staff has some reservations about the development with regard to the
right-of-way dedication and the areas available for street buffers, and the
remaining out -parcel contained within the development, staff is supportive of the
development as a whole. The Phase II portion of the development will include
the additional commercial/office and residential component of the development
as recommended by the ULI panel. In addition the developer has provided
elevations and design schemes which staff feels will blend well with the Hillcrest
Neighborhood.
1. STAFF RECOMMENDATION:
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
Staff recommends the applicant dedicate right-of-way 55 -feet from the centerline
along University Avenue.
Staff recommends approval of the request to abandon a portion of "A" Street, a
portion of "B" Street and a portion of "C" Street.
E:j
FILE NO.: Z-7421
PLANNING COMMISSION ACTION: (JUNE 26, 2003)
Mr. Ron Tabor and Mr. Joe White were present representing the application. There
were objectors present. Staff presented the item with a recommendation of approval.
Staff noted Public Works comments had been revised to decrease the requested right-
of-way along University Avenue. Staff stated the applicant would dedicate an additional
nine (9) feet of right-of-way along the roadway and decrease the median size to
increase the width of the travel lanes.
Staff also noted they were supportive of the request to abandon portions of "A" and "B"
Streets located within the development and the portion of "C" Street which would remain
after the realignment with the intersection of the Park Plaza Drive.
Ms. Ruth Bell addressed the Commission with concerns. She questioned how the
proposed development related to the Urban Land Institute Study (ULI). She also stated
the Mid -Town Group was currently considering design standards for the area. Ms. Bell
stated the group was using the ULI Study as a Bible for design standards. Ms. Bell
stated the proposed development was the first redevelopment in the areas and
questioned how the proposed development would relate to the overall character of the
Hillcrest Neighborhood.
Ms. Bell stated the proposed design did not offer mode of transportation other than
automobile. She stated accessibility by all modes of transportation, walking, biking etc.
were important.
Ms. Bell also stated the traffic signal proposed to align "C" Street and the Park Plaza
entrance should be timed to allow pedestrian ample time to cross without danger to life
or limb.
Ms. Valerie Wingert addressed the Commission with concerns. She stated the traffic on
"C" Street would increase as a result of the development. She stated she would like to
see "C" Street terminate with a cul-de-sac. Ms. Wingert stated she also had concerns
with late night businesses locating on the site and patrons driving through the
neighborhood.
Mr. Don Bonner addressed the Commission in opposition of the closing of "B" Street.
He stated he had lived in his home for 40+ years and "B" Street was his access to
University Avenue. He stated driving along West Markham and entering from Pierce
Street was not an easy option due to the grade at University and Markham Streets.
Ms. Betty Burnette addressed the Commission indicating Pierce Street was not
sufficient to handle the traffic in the area. She stated customers trying to access the site
would travel Pierce Street, which currently had open ditches for drainage and was a
very narrow roadway.
N
FILE NO.: Z-742 Cant.
Ms. Catherine Dulling addressed the Commission in opposition of the proposed
development. She stated the area residents had been told the Mid -Town Improvement
District was for the redevelopment of University Mall and would not raise the property
taxes in the area for homeowners. She stated the proposed development was taking
away living space from the area and replacing the space with additional retail.
Ms. Dulling stated the area did not need additional retail space since University Mall
was not currently occupied.
Ms. Janice Baldwin addressed the Commission with concerns. She stated her mother
and farther were the owners of the "out parcel' area. She stated her parents wished to
continue to live on the site. Ms. Baldwin stated her concern was that the development
would allow her parent to continue to live in their house and maintain the currently
quality of life. She questioned if "A" Street would remain open in the area to allow her
parent access to their home.
Staff stated "A" Street would remain open to the west property line of the "out parcel".
Staff also stated "B" Street would be closed to not allow through traffic into the site.
Staff stated this was a request of the City since a large number of parking spaces were
designed to back into the service drive. Staff stated the portion of "C" Street to be
abandoned was the existing street layout and once the street was realigned with the
Park Plaza drive entrance the current right-of-way would no longer be needed.
There was a general discussion concerning Pierce Street and if the City could require
the developer to widen the street. Staff stated this would be off-site improvements,
which the City typically did not require. Staff stated when the Phase II portion of the
development was constructed the developer would be required to widen Pierce Street to
'/2 street widths adjoining the site.
There was a general discussion concerning "C" Street and the request for a cul-de-sac.
Staff stated the primary concern of a cul-de-sac was public transportation and safety.
Staff noted the condition of "C" Street and indicated this alone would discourage cut -
through traffic.
Mr. Ron Tabor addressed the Commission concerning the merits of the application. He
stated the original PCD was for one building. He stated the original PCD included the
realignment of "C" Street in the exact location as was being proposed. Mr. Tabor stated
the only change was the current proposal included four buildings and a larger area as
suggested by the ULI Study.
Mr. Tabor stated the site would be landscaped to meet or exceed ordinance
requirements. He stated the design of the center was that of a village design and would
fit into the overall character of the Hillcrest neighborhood.
A motion was made to approve the application as filed. The motion carried by a vote of
9 ayes, 0 noes and 2 absent.
`ft
June 26, 2003
ITEM NO.: 10
NAME: University Heights PCD
LOCATION: Southeast corner of University Avenue and "C" Street
DEVELOPER:
Strode Property Company
5950 Berkshire Lane #1275
Dallas, TX 75225
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
FILE NO.: Z-7421
AREA: 5.3 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: R-2, R-3, R-4, PCD
ALLOWED USES: Single-family residential uses, Duplex and Commercial
PROPOSED ZONING: PCD — Mixed Uses
PROPOSED USE: Mixed of Commercial, Office and Residential uses.
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
Several zoning actions have taken place in this area from Board of Adjustment building
line variances to actual rezoning action. The most recent was the approval of a PCD
for 219 North University Avenue. That request was approved by the Board of Directors
on July 16, 2002 (Ordinance No. 18,718). The site was zoned 0-3 and the applicant
desired to rezone the site to PCD to allow flexibility in order to provide quality tenants to
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z-7421
serve the neighborhood area, utilizing the existing building. The PCD outlined specific
uses allowed on the site (Z-7233).
A second rezoning request was also for a PCD located between "B" and "C" Streets on
the east side of University Avenue. The Board of Directors approved the request on
August 29, 2000 with Ordinance No. 18,335. The request was to rezone the site from
R -3/R-5 to PCD to allow for the construction of a 25,600 square foot commercial
building along with 74 parking spaces. The applicant also proposed to realign "C"
Street to line up with the Park Plaza access drive on the west side of University Avenue.
The applicant proposed the hours of operation to be from 9:00 am to 9:00 pm Monday
through Saturday and from 10:00 am to 8:00 pm on Sunday.
The Board of Adjustment approved the use of 5909 and 5911 "C" Street as a
commercial parking lot on residentially zoned property on June 17, 1991. The parking
lot serves employees and patients of the Gastroenterology Associates P.A.
A. PROPOSAL/REQUEST:
The applicant is requesting a rezoning from various zoning classifications to PCD
to allow a two phases development located between West Markham Street and
"C" Street and Pierce Street and University Avenue. The development is
proposed as a mixed-use development complete with residential, office and
commercial uses. The current request is the review and rezoning of the Phase I
portion of the development from various zoning classifications to PCD. The
Phase II portion of the development will be reviewed by the Commission as the
development plans become imminent.
Phase I consist of three commercial buildings containing a total of 49,030 square
feet of gross floor space. The development also contains 255 parking spaces
and is located on a total of 5.3 acres.
The applicant is proposing the realignment of "C" Street from the current location
to the south to align with the existing traffic signal on University Avenue at the
access drive to Park Plaza Mall. The applicant is also proposing the
abandonment of portions of "A" Street and "B" Street and the portion of "C"
Street, which will be realigned.
B. EXISTING CONDITIONS:
The area contains existing single-family, multi -family and non-residential uses.
Located in the Phase I boundaries are single-family homes, office/retail uses and
duplex housing. There is a large multi -family complex located on "C" Street just
east of the development and the St. Vincent Day Care facility is located on "A"
Street just east of the development (located in the Future Phase II area).
2
June 26, 2003
SUBDIVISION
ITEM NO.: 10 Cont. FILE NO.: Z-7421
C
Other uses in the area include the Park Plaza Mall, the University Mall, the
I -HOP Restaurant and St. Vincent Hospital.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Hillcrest Residents Neighborhood Association along with all owners of property
located within 200 feet of the site and all residents, who could be identified,
located within 300 feet of the site were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. University Avenue is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way 55 -feet from centerline will be required.
2. Repair or replace any curb, gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
3. Coordinate design of traffic signal upgrade with proposed street
improvements. Plans to be forwarded to Traffic and Civil Engineering for
approval.
4. Provide the direction of flow and all storm water flows (Q) entering and
leaving the property.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction. A demonstration must be made that downstream
storm water facilities will be adequate.
6. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
7. A public cul-de-sac or suitable hammerhead turn -around must be provided on
"A" and "B" Streets.
8. Some of the additional traffic generated by the proposed development will
use Pierce and C Streets for access. These streets have open ditches and
are too narrow to provide safe two-way access to the site.
9. With the plan, B Street will continue to function as a public street. Back -out
parking lining the street creates a traffic hazard. Permanently closing "B"
Street appears to be the best answer.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater Existing sewer mains on site. Relocation of existing sewer mains
will be at the Developer's expense. Sewer service must be retained for all
3
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-7421
existing residences not being removed by this project. Contact the Little Rock
Wastewater Utility at 688-1414 for additional details.
Entergy: No comment received.
Center -Point Energy: Center -Point Energy has existing facilities on "A", "B" and
"C" Streets from Pierce Street to University AvellUe. Cost associated with the
termination of lines at the east edge of the property will be 100 percent
responsibility of the developer. Contact Center -Point Entergy at 377-4539 for
additional details.
SBC: A ten foot easement is required along the east, west and north property
lines. A five foot easement is required along the south property line. Contact
SBC at 373-5112 for additional details.
Central Arkansas Water: A water main extension and on-site fire protection
installed at the Developer's expense will be required in order to provide
service to this property. The Little Rock Fire Department needs to evaluate
this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed
at the Developer's expense. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would also be
done at the expense of the developer. All Central Arkansas Water
requirements in effect at the time of request for water service must be met.
This development will have minor impact on existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection. Contact Central Arkansas Water at 992-2438 for
additional details.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division: This request is located in the Heights - Hillcrest Planning
District. The Land Use Plan shows that the majority of the site is shown as
Mixed Use. The applicant has applied for a Planned Commercial Development
for a retail development.
Since more than 50% of the site is shown as Mixed Use, a commercial
development with a Planned Zoning District does not require a change to the
Land Use Plan.
0
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-7421
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Hillcrest Neighborhood Plan a "Blueprint" of our Community.
The list of supplemental issues listed a land use objective of encouraging new
buildings to relate to the architecture of the neighborhood and a community
development objective stating that commercial uses should not be open later
than midnight.
Landscape: A perimeter landscaping strip will be required between new
property lines where vehicular use areas exist unless the area(s) are platted as
access easement(s).
The proposed land use buffer along the eastern perimeter drops below the
average twenty-four (24) foot width requirement. Also, it drops below the six (6)
foot seven (7) inch minimum width allowed at any given point by both the zoning
and landscape ordinances.
The proposed street buffers along "C" Street and along University Avenue drop
below the twenty-four (24) foot average width requirement and below the twelve
(12) foot width minimum at any given point.
Interior landscape islands must be at least 225 square feet in area and 5.6 feet
in width to count toward fulfilling interior landscaping requirements of the
landscape ordinance.
All of the landscape and buffer requirements take into account the reductions
allowed within the designated mature area of the City.
A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall or dense evergreen plantings is required along the
eastern perimeter where adjacent to residential properties.
An irrigation system to water landscaped areas will be required. Prior to
obtaining a building permit, it will be necessary to provide approved landscape
plans stamped with the seal of a Registered Landscape Architect. Compliance
wit the City's Landscape and Buffer Ordinances is requested.
Building Codes: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (June 5, 2003)
The applicant was present representing the request. Staff introduced the
proposed development indicating there were additional items needed on the
proposed site plan. Staff questioned if there would be any outdoor activities
and/or dining located on the site and the measures the applicant would take to
5
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z-7421
screen the adjoining property owners from noise of the outdoor activities and/or
dining.
Staff also questioned the proposed signage requesting the details of any signage
that would be located on the site.
Public Works comments were addressed. Staff stated there were concerns with
the closure of "A" Street and the remaining single-family home not being a part of
the development. Staff also stated the street could not be closed before their
property line. Staff also stated some form of turn -around was needed at the end
of "A" and "B" Streets. The applicant questioned if the turn -around could be in
the parking lot. Staff stated if the area was dedicated as public through a cross
access easement then this would be satisfactory.
Staff stated University Avenue would require a dedication of right-of-way. Staff
stated currently there was 40 feet of right-of-way and the Master Street Plan
required 55 -feet from the centerline. The applicant stated he would work with
Public Works on this issue.
Landscaping comments were addressed. Staff stated the eastern land use
buffer fell below the minimum allowed under both the zoning and landscape
ordinance. Staff stated the strip should average 24 feet and be a minimum of
6.7 feet.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the June 5, 2003 Subdivision Committee meeting. The applicant has
indicated "A" Street will remain open to a point on the west property line of the
indicated out -parcel; a single-family home which is not participating in the
development. The applicant has indicated a hammer -head turn around on "A"
Street as requested by the Public Works Department. The applicant has also
indicated "B" Street will terminate into the parking lot. The applicant has broken
the street and installed a four -foot walking trail in this area to connect the
residences to the shopping center. The area adjoining the parking lot will be
dedicated as a service easement allowing the city service vehicles a way to
turn -around after accessing the homes on "B" Street.
The applicant has also verified the operational hours to be from 5:00 am to 1:00
am seven days per week. The applicant has indicated there are possible
activities taking place outside in the northern building adjacent to the single-
family homes. Staff has concerns with the use of this area as an outdoor dining
0
June 26, 2003
SUBDIVISIO
ITEM NO.: 10 (Cont.) FILE NO.: Z-7421
area and the noise from customers affecting to the near -by homes at a late hour.
The applicant has indicated a six (6) foot wood fence for screening of this area
but the screen will not deflect the potential sound. Staff would recommend any
outdoor activity end by 10:00 pm and that there be no outdoor music allowed.
The applicant has indicted dumpster locations on the site plan and indicated the
screening requirements of at least two feet above the top of the dumpster. The
applicant has also indicated the dumpsters will be serviced from 7:00 am to 6:00
pm. Staff feels the hours of service are acceptable hours. With the limiting to
the day light hours, this should limit the impact on the remaining single-family
homes in the area.
The applicant has indicated storm water detention on the proposed site plan in
two locations. The areas are adjacent to "C" Street near the University Avenue
intersection. The applicant has also indicated they will verify downstream storm
water facilities to prove adequacy.
The applicant has indicated two pylon signs to be located near the northern and
southern boundaries of the property along University Avenue. The sign area will
be the maximum allowed in commercial zones or maximum of 36 -feet in height
and 160 square feet in area. Staff is supportive of the requested signage.
The applicant is proposing 49,030 square feet of commercial space in four
buildings with a maximum building height of thirty-five feet. There are 255
parking spaces proposed as a part of the development. The typical minimum
parking demand for a commercial center of this size would be 217 parking
spaces or one space per two hundred and twenty-five square feet of gross floor
area. The proposed parking is sufficient to meet the typical minimum parking
demand. If more than one restaurant were to locate on the site then staff would
have concerns with the proposed parking since a restaurant requires additional
parking (one space per one -hundred square feet of gross floor area). The
development is touting itself to be a neighborhood based development allowing
residents to walk to the area for services. If this proves to be the case then the
proposed parking would be sufficient to meet the minimum parking demand.
The applicant has indicated screening along the eastern property line as
requested by Staff. The applicant has also indicated a six foot wood fence will
be placed in this area to screen the adjoining single-family homes. The existing
site plan indicates a street buffer along University Avenue. Public Works has
requested additional right-of-way in this area. The existing right-of-way along the
property frontage is 40 -feet from centerline and the Master Street Plan requires
55 -feet of right-of-way in this area. If the applicant is required to dedicate the
additional right-of-way the street buffer will be somewhat reduced along
University Avenue.
FI
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-7421
The applicant has requested a waiver of the requirement for dedication of right-
of-way to 55 -feet from centerline for University Avenue as required by the Master
Street Plan. Staff feels with the current roadway widths south of West
Markham Street and the proposed construction on South University Avenue
south of 12th Street the full 55 -foot right-of-way is required. If at any point in the
future the City intends to connect the two sections of University Avenue without
the right-of-way dedication this would be difficult if not impossible.
The site plan indicates an out -parcel along "A" Street. There is an existing
single-family home located on the property and the developer has indicated the
owner does not wish to participate in the development. The applicant has
indicated screening as required between commercial and single-family. The
applicant has indicated the area as a future parking lot should the homeowner
decide to sell and become willing to participate. Staff has some concerns with
this situation should the homeowner decide to continue to reside at this location.
There are dumpsters located on both property lines of the existing single-family
home and the home will be surrounded by commercial uses and parking lots.
This will not make for a comfortable living situation for the residents of the house.
The proposed development lies in an area covered by the Urban Land Institute
(ULI) Study. The study calls for the parcel to contain lifestyle retail, together with
multi -family and single-family homes. The study also indicates the
Hillcrest/Lifestyle parcel should be the first to develop in the study area. The
panel also recommended the parcel be large enough to stand on its own.
The ULI panel recommended a small park built along University Avenue with
about 40,000 square feet of retail space around it. The panel recommended
well -landscaped streets with surface parking, both at the curb and in small lots,
to satisfy the needs of the retailers. Some high- and some low-density housing
would fill out the block and provide an attractive and appealing urban setting.
Although staff has some reservations about the development with regard to the
right-of-way dedication and the areas available for street buffers, and the
remaining out -parcel contained within the development, staff is supportive of the
development as a whole. The Phase II portion of the development will include
the additional commercial/office and residential component of the development
as recommended by the ULI panel. In addition the developer has provided
elevations and design schemes which staff feels will blend well with the Hillcrest
Neighborhood.
STAFF RECOMMENDATION
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
0
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z-7421
Staff recommends the applicant dedicate right-of-way 55 -feet from the centerline
along University Avenue.
Staff recommends approval of the request to abandon a portion of "A" Street, a
portion of "B" Street and a portion of "C" Street.
PLANNING COMMISSION ACTION: (JUNE 26, 2003)
Mr. Ron Tabor and Mr. Joe White were present representing the application. There
were objectors present. Staff presented the item with a recommendation of approval.
Staff noted Public Works comments had been revised to decrease the requested right-
of-way along University Avenue. Staff stated the applicant would dedicate an additional
nine (9) feet of right-of-way along the roadway and decrease the median size to
increase the width of the travel lanes.
Staff also noted they were supportive of the request to abandon portions of "A" and "B"
Streets located within the development and the portion of "C" Street which would
remain after the realignment with the intersection of the Park Plaza Drive.
Ms. Ruth Bell addressed the Commission with concerns. She questioned how the
proposed development related to the Urban Land Institute Study (ULI). She also stated
the Mid -Town Group was currently considering design standards for the area. Ms. Bell
stated the group was using the ULI Study as a Bible for design standards. Ms. Bell
stated the proposed development was the first redevelopment in the areas and
questioned how the proposed development would relate to the overall character of the
Hillcrest Neighborhood.
Ms. Bell stated the proposed design did not offer mode of transportation other than
automobile. She stated accessibility by all modes of transportation, walking, biking etc.
were important.
Ms. Bell also stated the traffic signal proposed to align "C" Street and the Park Plaza
entrance should be timed to allow pedestrian ample time to cross without danger to life
or limb.
Ms. Valerie Wingert addressed the Commission with concerns. She stated the traffic
on "C" Street would increase as a result of the development. She stated she would like
to see "C" Street terminate with a cul-de-sac. Ms. Wingert stated she also had
concerns with late night businesses locating on the site and patrons driving through the
neighborhood.
June 26, 2003
SUBDIVISION
M NO.: 10 (Cont.
FILE NO.: Z-7421
Mr. Don Bonner addressed the Commission in opposition of the closing of "B" Street.
He stated he had lived in his home for 40+ years and "B" Street was his access to
University Avenue. He stated driving along West Markham and entering from Pierce
Street was not an easy option due to the grade at University and Markham Streets.
Ms. Betty Burnette addressed the Commission indicating Pierce Street was not
sufficient to handle the traffic in the area. She stated customers trying to access the
site would travel Pierce Street, which currently had open ditches for drainage and was a
very narrow roadway.
Ms. Catherine Dulling addressed the Commission in opposition of the proposed
development. She stated the area residents had been told the Mid -Town Improvement
District was for the redevelopment of University Mall and would not raise the property
taxes in the area for homeowners. She stated the proposed development was taking
away living space from the area and replacing the space with additional retail. Ms.
Dulling stated the area did not need additional retail.space since University Mall was not
currently occupied.
Ms. Janice Baldwin addressed the Commission with concerns. She stated her mother
and farther were the owners of the "out parcel" area. She stated her parents wished to
continue to live on the site. Ms. Baldwin stated her concern was that the development
would allow her parent to continue to live in their house and maintain the currently
quality of life. She questioned if "A" Street would remain open in the area to allow her
parent access to their home.
Staff stated "A" Street would remain open to the west property line of the "out parcel".
Staff also stated "B" Street would be closed to not allow through traffic into the site.
Staff stated this was a request of the City since a large number of parking spaces were
designed to back into the service drive. Staff stated the portion of "C" Street to be
abandoned was the existing street layout and once the street was realigned with the
Park Plaza drive entrance the current right-of-way would no longer be needed.
There was a general discussion concerning Pierce Street and if the City could require
the developer to widen the street. Staff stated this would be off-site improvements,
which the City typically did not require. Staff stated when the Phase II portion of the
development was constructed the developer would be required to widen Pierce Street
to 1/2 street widths adjoining the site.
There was a general discussion concerning "C" Street and the request for a cul-de-sac.
Staff stated the primary concern of a cul-de-sac was public transportation and safety.
Staff noted the condition of "C" Street and indicated this alone would discourage cut -
through traffic.
10
June 26, 2003
SUBDIVISION
NO.: 10 (Cont.) FILE NO.: Z-7421
Mr. Ron Tabor addressed the Commission concerning the merits of the application. He
stated the original PCD was for one building. He stated the original PCD included the
realignment of "C" Street in the exact location as was being proposed. Mr. Tabor stated
the only change was the current proposal included four buildings and a larger area as
suggested by the ULI Study.
Mr. Tabor stated the site would be landscaped to meet or exceed ordinance
requirements. He stated the design of the center was that of a village design and would
fit into the overall character of the Hillcrest neighborhood.
A motion was made to approve the application as filed. The motion carried by a vote of
9 ayes, 0 noes and 2 absent.
11
June 26, 2003
ITEM NO.: 10 FILE NO.: Z-7421
NAME: University Heights PCD
LOCATION: Southeast corner of University Avenue and "C" Street
DEVELOPER:
Strode Property Company
5950 Berkshire Lane #1275
Dallas, TX 75225
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 5.3 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: R-2, R-3, R-4, PCD
ALLOWED USES: Single-family residential uses, Duplex and Commercial
PROPOSED ZONING: PCD — Mixed Uses
PROPOSED USE: Mixed of Commercial, Office and Residential uses.
VARIANCESJVVAIVERS REQUESTED: None requested.
BACKGROUND:
Several zoning actions have taken place in this area from Board of Adjustment building
line variances to actual rezoning action. The most recent was the approval of a PCD
for 219 North University Avenue. That request was approved by the Board of Directors
on July 16, 2002 (Ordinance No. 18,718). The site was zoned 0-3 and the applicant
desired to rezone the site to PCD to allow flexibility in order to provide quality tenants to
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont,- FILE NO.: Z-7421
serve the neighborhood area, utilizing the existing building. The PCD outlined specific
uses allowed on the site (Z-7233).
A second rezoning request was also for a PCD located between "B" and "C" Streets on
the east side of University Avenue. The Board of Directors approved the request on
August 29, 2000 with Ordinance No. 18,335. The request was to rezone the site from
R -3/R-5 to PCD to allow for the construction of a 25,600 square foot commercial
building along with 74 parking spaces. The applicant also proposed to realign "C"
Street to line up with the Park Plaza access drive on the west side of University Avenue.
The applicant proposed the hours of operation to be from 9:00 am to 9:00 pm Monday
through Saturday and from 10:00 am to 8:00 pm on Sunday.
The Board of Adjustment approved the use of 5909 and 5911 "C" Street as a
commercial parking lot on residentially zoned property on June 17, 1991. The parking
lot serves employees and patients of the Gastroenterology Associates P.A.
A. PROPOSAL/REQUEST
The applicant is requesting a rezoning from various zoning classifications to PCD
to allow a two phases development located between West Markham Street and
"C" Street and Pierce Street and University Avenue. The development is
proposed as a mixed-use development complete with residential, office and
commercial uses. The current request is the review and rezoning of the Phase I
portion of the development from various zoning classifications to PCD. The
Phase II portion of the development will be reviewed by the Commission as the
development plans become imminent.
Phase I consist of three commercial buildings containing a total of 49,030 square
feet of gross floor space. The development also contains 255 parking spaces
and is located on a total of 5.3 acres.
The applicant is proposing the realignment of "C" Street from the current location
to the south to align with the existing traffic signal on University Avenue at the
access drive to Park Plaza Mall. The applicant is also proposing the
abandonment of portions of "A" Street and "B" Street and the portion of "C"
Street, which will be realigned.
B. EXISTING CONDITIONS:
The area contains existing single-family, multi -family and non-residential uses.
Located in the Phase I boundaries are single-family homes, office/retail uses and
duplex housing. There is a large multi -family complex located on "C" Street just
east of the development and the St. Vincent Day Care facility is located on "A"
Street just east of the development (located in the Future Phase II area).
2
June 26, 2003
SUBDIVISION
ITEM NO.: _10 Cont.) FILE NO.: Z-7421
Other uses in the area include the Park Plaza Mall, the University Mall, the
I -HOP Restaurant and St. Vincent Hospital.
C_ NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Hillcrest Residents Neighborhood Association along with all owners of property
located within 200 feet of the site and all residents, who could be identified,
located within 300 feet of the site were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. University Avenue is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way 55 -feet from centerline will be required.
2. Repair or replace any curb, gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy.
3. Coordinate design of traffic signal upgrade with proposed street
improvements. Plans to be forwarded to Traffic and Civil Engineering for
approval.
4. Provide the direction of flow and all storm water flows (Q) entering and
leaving the property.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
the start of construction. A demonstration must be made that downstream
storm water facilities will be adequate.
6. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
7. A public cul-de-sac or suitable hammerhead turn -around must be provided on
"A" and "B" Streets.
8. Some of the additional traffic generated by the proposed development will
use Pierce and C Streets for access. These streets have open ditches and
are too narrow to provide safe two-way access to the site.
9. With the plan, B Street will continue to function as a public street. Back -out
parking lining the street creates a traffic hazard. Permanently closing "B"
Street appears to be the best answer.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater Existing sewer mains on site. Relocation of existing sewer mains
will be at the Developer's expense. Sewer service must be retained for all
3
June 26, 2003
SUBDIVISION
M NO.: 10 {Cont.
FILE NO.: Z-7421
existing residences not being removed by this project. Contact the Little Rock
Wastewater Utility at 688-1414 for additional details.
Enter : No comment received.
Center -Point Ene_gy: Center -Point Energy has existing facilities on "A", "B" and
"C" Streets from Pierce Street to University Avenue. Cost associated with the
termination of lines at the east edge of the property will be 100 percent
responsibility of the developer. Contact Center -Point Entergy at 377-4539 for
additional details.
SBC: A ten foot easement is required along the east, west and north property
lines. A five foot easement is required along the south property line. Contact
SBC at 373-5112 for additional details.
Central Arkansas Water: A water main extension and on-site fire protection
installed at the Developer's expense will be required in order to provide
service to this property. The Little Rock Fire Department needs to evaluate
this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed
at the Developer's expense. If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas Water. That work would also be
done at the expense of the developer. All Central Arkansas Water
requirements in effect at the time of request for water service must be met.
This development will have minor impact on existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection. Contact Central Arkansas Water at 992-2438 for
additional details.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Heights - Hillcrest Planning
District. The Land Use Plan shows that the majority of the site is shown as
Mixed Use. The applicant has applied for a Planned Commercial Development
for a retail development.
Since more than 50% of the site is shown as Mixed Use, a commercial
development with a Planned Zoning District does not require a change to the
Land Use Plan.
El
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-7421
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Hillcrest Neighborhood Plan a "Blueprint" of our Community.
The list of supplemental issues listed a land use objective of encouraging new
buildings to relate to the architecture of the neighborhood and a community
development objective stating that commercial uses should not be open later
than midnight.
Landscape: A perimeter landscaping strip will be required between new
property lines where vehicular use areas exist unless the area(s) are platted as
access easement(s).
The proposed land use buffer along the eastern perimeter drops below the
average twenty-four (24) foot width requirement. Also, it drops below the six (6)
foot seven (7) inch minimum width allowed at any given point by both the zoning
and landscape ordinances.
The proposed street buffers along "C" Street and along University Avenue drop
below the twenty-four (24) foot average width requirement and below the twelve
(12) foot width minimum at any given point.
Interior landscape islands must be at least 225 square feet in area and 5.6 feet
in width to count toward fulfilling interior landscaping requirements of the
landscape ordinance.
All of the landscape and buffer requirements take into account the reductions
allowed within the designated mature area of the City.
A six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall or dense evergreen plantings is required along the
eastern perimeter where adjacent to residential properties.
An irrigation system to water landscaped areas will be required. Prior to
obtaining a building permit, it will be necessary to provide approved landscape
plans stamped with the seal of a Registered Landscape Architect. Compliance
wit the City's Landscape and Buffer Ordinances is requested.
Building Codes: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (June 5, 2003)
The applicant was present representing the request. Staff introduced the
proposed development indicating there were additional items needed on the
proposed site plan. Staff questioned if there would be any outdoor activities
and/or dining located on the site and the measures the applicant would take to
5
June 26, 2003
SUBDIVISION
NO.: 10 (Cont.
FILE NO.: Z-7421
screen the adjoining property owners from noise of the outdoor activities and/or
dining.
Staff also questioned the proposed signage requesting the details of any signage
that would be located on the site.
Public Works comments were addressed. Staff stated there were concerns with
the closure of "A" Street and the remaining single-family home not being a part of
the development. Staff also stated the street could not be closed before their
property line. Staff also stated some form of turn -around was needed at the end
of "A" and "B" Streets. The applicant questioned if the turn -around could be in
the parking lot. Staff stated if the area was dedicated as public through a cross
access easement then this would be satisfactory.
Staff stated University Avenue would require a dedication of right-of-way. Staff
stated currently there was 40 feet of right-of-way and the Master Street Plan
required 55 -feet from the centerline. The applicant stated he would work with
Public Works on this issue.
Landscaping comments were addressed. Staff stated the eastern land use
buffer fell below the minimum allowed under both the zoning and landscape
ordinance. Staff stated the strip should average 24 feet and be a minimum of
6.7 feet.
There being no further items for discussion, the Committee then forwarded the
item to the full Commission for final action.
K ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the June 5, 2003 Subdivision Committee meeting. The applicant has
indicated "A" Street will remain open to a point on the west property line of the
indicated out -parcel; a single-family home which is not participating in the
development. The applicant has indicated a hammer -head turn around on "A"
Street as requested by the Public Works Department. The applicant has also
indicated "B" Street will terminate into the parking lot. The applicant has broken
the street and installed a four -foot walking trail in this area to connect the
residences to the shopping center. The area adjoining the parking lot will be
dedicated as a service easement allowing the city service vehicles a way to
turn -around after accessing the homes on "B" Street.
The applicant has also verified the operational hours to be from 5:00 am to 1:00
am seven days per week. The applicant has indicated there are possible
activities taking place outside in the northern building adjacent to the single-
family homes. Staff has concerns with the use of this area as an outdoor dining
R
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-7421
area and the noise from customers affecting to the near -by homes at a late hour.
The applicant has indicated a six (6) foot wood fence for screening of this area
but the screen will not deflect the potential sound. Staff would recommend any
outdoor activity end by 10:00 pm and that there be no outdoor music allowed.
The applicant has indicted dumpster locations on the site plan and indicated the
screening requirements of at least two feet above the top of the dumpster. The
applicant has also indicated the dumpsters will be serviced from 7:00 am to 6:00
pm. Staff feels the hours of service are acceptable hours. With the limiting to
the day light hours, this should limit the impact on the remaining single-family
homes in the area.
The applicant has indicated storm water detention on the proposed site plan in
two locations. The areas are adjacent to "C" Street near the University Avenue
intersection. The applicant has also indicated they will verify downstream storm
water facilities to prove adequacy.
The applicant has indicated two pylon signs to be located near the northern and
southern boundaries of the property along University Avenue. The sign area will
be the maximum allowed in commercial zones or maximum of 36 -feet in height
and 160 square feet in area. Staff is supportive of the requested signage.
The applicant is proposing 49,030 square feet of commercial space in four
buildings with a maximum building height of thirty-five feet. There are 255
parking spaces proposed as a part of the development. The typical minimum
parking demand for a commercial center of this size would be 217 parking
spaces or one space per two hundred and twenty-five square feet of gross floor
area. The proposed parking is sufficient to meet the typical minimum parking
demand. If more than one restaurant were to locate on the site then staff would
have concerns with the proposed parking since a restaurant requires additional
parking (one space per one -hundred square feet of gross floor area). The
development is touting itself to be a neighborhood based development allowing
residents to walk to the area for services. If this proves to be the case then the
proposed parking would be sufficient to meet the minimum parking demand.
The applicant has indicated screening along the eastern property line as
requested by Staff. The applicant has also indicated a six foot wood fence will
be placed in this area to screen the adjoining single-family homes. The existing
site plan indicates a street buffer along University Avenue. Public Works has
requested additional right-of-way in this area. The existing right-of-way along the
property frontage is 40 -feet from centerline and the Master Street Plan requires
55 -feet of right-of-way in this area. If the applicant is required to dedicate the
additional right-of-way the street buffer will be somewhat reduced along
University Avenue.
rl
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z-7421
The applicant has requested a waiver of the requirement for dedication of right-
of-way to 55 -feet from centerline for University Avenue as required by the Master
Street Plan. Staff feels with the current roadway widths south of West
Markham Street and the proposed construction on SOLfth University Avenue
south of 12th Street the full 55 -foot right-of-way is required. If at any point in the
future the City intends to connect the two sections of University Avenue without
the right-of-way dedication this would be difficult if not impossible.
The site plan indicates an out -parcel along "A" Street. There is an existing
single-family home located on the property and the developer has indicated the
owner does not wish to participate in the development. The applicant has
indicated screening as required between commercial and single-family. The
applicant has indicated the area as a future parking lot should the homeowner
decide to sell and become willing to participate. Staff has some concerns with
this situation should the homeowner decide to continue to reside at this location.
There are dumpsters located on both property lines of the existing single-family
home and the home will be surrounded by commercial uses and parking lots.
This will not make for a comfortable living situation for the residents of the house.
The proposed development lies in an area covered by the Urban Land Institute
(ULI) Study. The study calls for the parcel to contain lifestyle retail, together with
multi -family and single-family homes. The study also indicates the
Hillcrest/Lifestyle parcel should be the first to develop in the study area. The
panel also recommended the parcel be large enough to stand on its own.
The ULI panel recommended a small park built along University Avenue with
about 40,000 square feet of retail space around it. The panel recommended
well -landscaped streets with surface parking, both at the curb and in small lots,
to satisfy the needs of the retailers. Some high- and some low-density housing
would fill out the block and provide an attractive and appealing urban setting.
Although staff has some reservations about the development with regard to the
right-of-way dedication and the areas available for street buffers, and the
remaining out -parcel contained within the development, staff is supportive of the
development as a whole. The Phase II portion of the development will include
the additional commercial/office and residential component of the development
as recommended by the ULI panel. In addition the developer has provided
elevations and design schemes which staff feels will blend well with the Hillcrest
Neighborhood.
STAFF RECOMMENDATION:
Staff recommends approval of the request as filed subject to compliance with the
conditions outlined in paragraphs D, E and F of this report.
0
June 26, 2003
SUBDIVISION
ITEM NO.: 10 (Cont.
ILE NO.: Z-7
Staff recommends the applicant dedicate right-of-way 55 -feet from the centerline
along University Avenue.
Staff recommends approval of the request to abandon a portion of "A" Street, a
portion of "B" Street and a portion of "C" Street.
9
Subdivision Committee Comments 1 June 5, 2003
ITEM NO.: 10 ,1 u� FILE NO.: Z-7421
NAME: University Heights PCD
LOCATION: East side of University Avenue between "A" Street and "C" Street
Planning Staff Comments:
1. Provide notification of abutting property owners complete with the certified abstract
list, notice form with affidavit executed and proof of mailing.
'N 2. Submit a letter from each of the five public; utility companies stating their approval of
the closure of "A" and "B" Streets, or stating their request for needed easements
including dimensions. Unless otherwise specifically stated by all public utility
companies and Public Works, the area of the abandoned right-of-way will be retained
in its entirety as a utility and drainage easement.
3. Provide a letter from an abstract company or equally reliable source which shall
delineate the reversionary rights in the right-of-way and the source of dedication.
4. The right-of-way on "A" Street cannot be abandoned as requested unless the
property owner of the "Out Parcel' becomes a part of the development. Otherwise,
stop the request to abandon "A" Street at the western edge of their property.
5. The area labeled as existing residential on Plan A and labeled as existing residential
out parcel on Plan B screening requirements will apply for screening residential and
commercial uses.
6. Verify the hours of operation on Plan A. (5 am to 1 pm)
7. Indicate the building orientation on the site plan for each building.
8. Provide elevations of the proposed development. Provide the style, the window
openings, building character with regard to entrances. Provide roof details and
details with regard to roof treatment for screening of mechanical equipment. Provide
details of building materials and colors. Staff encourages the development to blend
with the neighborhood.
9. Provide details with regard to signage (location/height/area).
10. Provide landscaping/screening treatment along the eastern boundary to shield the
car headlights from the adjoining single family homes. p
Variance/Waivers:
1. None requested.
Public Works:
Plan A:
1. University Avenue is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55 -feet from centerline will be required.
2. Repair or replace any curb, gutter or sidewalk that is damaged in the public right-of-
way prior to occupancy.
Subdivision Committee Comments
(Page 2)
ITEM NO.: 10
June 5, 2003
FILE NO.: Z-7421
3. Coordinate design of traffic signal upgrade with proposed street improvements.
Plans to be forwarded to Traffic and Civil Engineering for approval.
4. Provide the direction of flow and all storm water flows (Q) entering and leaving the
property.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction. A
demonstration must be made that downstream storm water facilities will be
adequate.
6. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
7. A public cul-de-sac or suitable hammerhead turn -around must be provided on "A"
and "B" Streets.
8. Some of the additional traffic generated by the proposed development will use Pierce
and C Streets for access. These streets have open ditches and are too narrow to
provide safe two-way access to the site.
Plan B:
1. All comments on "Plan A" apply.
2. With this plan, B Street will continue to function as a as a public street. Back -out
parking lining the street creates a traffic hazard. Permanently closing "B" Street
appears to be the best answer.
Utilities and Fire Department/County Planning:
Wastewater Existing sewer mains on site. Relocation of existing sewer mains will be at
the Developer's expense. Sewer Service must be retained for all existing residences not
being removed by this project. Contact the Little Rock Wastewater Utility at 688-1414
for additional details.
Entergy: No comment received.
Center -Point Energy: Center -Point Energy has existing facilities on "A", "B" and "C"
Streets from Pierce Street to University Avenue. Cost associated with the termination of
lines at the east edge of the property will be 100 percent responsibility of the developer.
Contact Center -Point Entergy at 377-4539 for additional details.
SBC: A ten foot easement is required along the east, west and north property lines. A
five foot easement is required along the south property line. Contact SBC at 373-5112
for additional details.
Subdivision Committee Comments
(Page 3)
ITEM NO.: 10
June 5, 2003
FILE NO.: Z-7421
Central Arkansas Water: A water main extension and on-site fire protection installed
t the Developer's expense will be required in order to provide service to this property.
w" The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense. If there are facilities that
geed to be adjusted and/or relocated, contact Central Arkansas Water. That work would
also be done at the expense of the developer. All Central Arkansas Water requirements
in effect at the time of request for water service must be met. This development will have
minor impact on existing water distribution system. Proposed water facilities will be sized
to provide adequate pressure and fire protection. Contact Central Arkansas Water at
` 992-2438 for additional details.
Fire Department: Approved as submitted.
�. County Planning: No comment received.
CATA: No comment received.
Planning Division: This request is located in the Heights - Hillcrest Planning District.
The Land Use Plan shows that the majority of the site is shown as Mixed Use. The
applicant has applied for a Planned Commercial Development for a retail development.
�C
Since more than 50% of the site is shown as Mixed Use, a commercial development with
a Planned Zoning District does not require a change to the Land Use Plan.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Hillcrest Neighborhood Plan a "Blueprint" of our Community. The list of
supplemental issues listed a land use objective of encouraging new buildings to relate to
the architecture of the neighborhood and a community development objective stating
at commercial uses should not be open later than midnight.
Landscape: A perimeter landscaping strip will be required between new property lines
where vehicular use areas exist unless the area(s) are platted as access easement(s).
The proposed land use buffer along the eastern perimeter drops below the average
twenty-four (24) foot width requirement. Also, it drops below the six (6) foot seven (7)
inch minimum width allowed at any given point by both the zoning and landscape
ordinances.
The proposed street buffers along "C" Street and along University Avenue drop below
the twenty-four (24) foot average width requirement and below the twelve (12) foot width
minimum at any given point.
Interior landscape islands must be at least 225 square feet in area and 5.6 feet in width
to count toward fulfilling interior landscaping requirements of the landscape ordinance.
Subdivision Committee Comments
(Page 4)
ITEM NO.: 10
June 5, 2003
FILE NO.: Z-7421
All of the landscape and buffer requirements take into account the reductions allowed
within the designated mature area of the City.
A six (6) foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings is required along the eastern perimeter
where adjacent to residential properties.
An irrigation system to water landscaped areas will be required. Prior to obtaining a
building permit, it will be necessary to provide approved landscape plans stamped with
the seal of a Registered Landscape Architect.
Revised latl lar: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, June 11, 2003.
Subdivision Committee Comments
ITEM NO.: 10
NAME: University Heights PCD
June 5, 2003
FILE NO.: Z-7421
LOCATION: East side of University Avenue between "A" Street and "C" Street
Planning Staff Comments:
1. Provide notification of abutting property owners complete with the certified abstract
list, notice form with affidavit executed and proof of mailing.
2. Submit a letter from each of the five public utility companies stating their approval of
the closure of "A" and "B" Streets, or stating their request for needed easements
including dimensions. Unless otherwise specifically stated by all public utility
companies and Public Works, the area of the abandoned right-of-way will be retained
in its entirety as a utility and drainage easement.
3. Provide a letter from an abstract company or equally reliable source which shall
delineate the reversionary rights in the right-of-way and the source of dedication.
4. The right-of-way on "A" Street cannot be abandoned as requested unless the
property owner of the "Out Parcel' becomes a part of the development. Otherwise,
stop the request to abandon "A" Street at the western edge of their property.
5. The area labeled as existing residential on Plan A and labeled as existing residential
out parcel on Plan B screening requirements will apply for screening residential and
commercial uses.
6. Verify the hours of operation on Plan A. (5 am to 1 pm)
7. Indicate the building orientation on the site plan for each building.
8. Provide elevations of the proposed development. Provide the style, the window
openings, building character with regard to entrances. Provide roof details and
details with regard to roof treatment for screening of mechanical equipment. Provide
details of building materials and colors. Staff encourages the development to blend
with the neighborhood.
9. Provide details with regard to signage (location/height/area).
10. Provide landscaping/screening treatment along the eastern boundary to shield the
car headlights from the adjoining single family homes.
Variance/Waivers:
1. None requested.
Public Works:
Plan A:
1. University Avenue is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way 55 -feet from centerline will be required.
2. Repair or replace any curb, gutter or sidewalk that is damaged in the public right-of-
way prior to occupancy.
Subdivision Committee Comments
(Page 2)
ITEM NO.: 10
June 5, 2003
FILE NO.: Z-7421
3. Coordinate design of traffic signal upgrade with proposed street improvements.
Plans to be forwarded to Traffic and Civil Engineering for approval.
4. Provide the direction of flow and all storm water flows (Q) entering and leaving the
property.
5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction. A
demonstration must be made that downstream storm water facilities will be
adequate.
6. Storm water detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
7. A public cul-de-sac or suitable hammerhead turn -around must be provided on "A"
and "B" Streets.
8. Some of the additional traffic generated by the proposed development will use Pierce
and C Streets for access. These streets have open ditches and are too narrow to
provide safe two-way access to the site.
Plan B:
1. All comments on "Plan A" apply.
2. With this plan, B Street will continue to function as a as a public street. Back -out
parking lining the street creates a traffic hazard. Permanently closing "B" Street
appears to be the best answer.
Utilities and Fire Department/County Planning:
Wastewater Existing sewer mains on site. Relocation of existing sewer mains will be at
the Developer's expense. Sewer Service must be retained for all existing residences not
being removed by this project. Contact the Little Rock Wastewater Utility at 688-1414
for additional details.
Entergy: No comment received.
Center -Point Ener : Center -Point Energy has existing facilities on "A", "B" and "C"
Streets from Pierce Street to University Avenue. Cost associated with the termination of
lines at the east edge of the property will be 100 percent responsibility of the developer.
Contact Center -Point Entergy at 377-4539 for additional details.
SBC: No comment received.
Central Arkansas Water: A water main extension and on-site fire protection installed
at the Developer's expense will be required in order to provide service to this property.
The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense. If there are facilities that
Subdivision Committee Comments
(Page 3)
ITEM NO.: 10
June 5, 2003
FILE NO.: Z-7421
need to be adjusted and/or relocated, contact Central Arkansas Water. That work would
also be done at the expense of the developer. All Central Arkansas Water requirements
in effect at the time of request for water service must be met. This development will have
minor impact on existing water distribution system. Proposed water facilities will be sized
to provide adequate pressure and fire protection. Contact Central Arkansas Water at
992-2438 for additional details.
Fire De ap rtment: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
Planning Division: This request is located in the Heights - Hillcrest Planning District.
The Land Use Plan shows that the majority of the site is shown as Mixed Use. The
applicant has applied for a Planned Commercial Development for a retail development.
Since more than 50% of the site is shown as Mixed Use, a commercial development with
a Planned Zoning District does not require a change to the Land Use Plan.
City Recognized Neighborhood Action Plan: The applicant's property lies in the area
covered by the Hillcrest Neighborhood Plan a "Blueprint" of our Community. The list of
supplemental issues listed a land use objective of encouraging new buildings to relate to
the architecture of the neighborhood and a community development objective stating
that commercial uses should not be open later than midnight.
Landscape: A perimeter landscaping strip will be required between new property lines
where vehicular use areas exist unless the area(s) are platted as access easement(s).
The proposed land use buffer along the eastern perimeter drops below the average
twenty-four (24) foot width requirement. Also, it drops below the six (6) foot seven (7)
inch minimum width allowed at any given point by both the zoning and landscape
ordinances.
The proposed street buffers along "C" Street and along University Avenue drop below
the twenty-four (24) foot average width requirement and below the twelve (12) foot width
minimum at any given point.
Interior landscape islands must be at least 225 square feet in area and 5.6 feet in width
to count toward fulfilling interior landscaping requirements of the landscape ordinance.
All of the landscape and buffer requirements take into account the reductions allowed
within the designated mature area of the City.
Subdivision Committee Comments
(Page 4)
ITEM NO.: 10
June 5, 2003
FILE NO.: Z-7421
A six (6) foot high opaque screen, either a wooden fence with its face side directed
outward, a wall or dense evergreen plantings is required along the eastern perimeter
where adjacent to residential properties.
An irrigation system to water landscaped areas will be required. Prior to obtaining a
building permit, it will be necessary to provide approved landscape plans stamped with
the seal of a Registered Landscape Architect.
Revised plat/plan., Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, June 11, 2003.