HomeMy WebLinkAboutZ-7417-A Staff AnalysisNovember 13, 2008
ITEM NO.: 5 FILE NO.: Z -7417-A
NAME: The Church at Pinnacle Mountain —
Revised Conditional Use Permit
LOCATION: 7901 Hwy. 300
OWNER/APPLICANT: The Church at Pinnacle Mountain/
Michael Johnston, Trustee
PROPOSAL: A revision to a previously of approved conditional use
permit is requested to allow for use of a modular
classroom building on this existing, R-2 zoned church
site for a period of 5 years.
SITE LOCATION:
The church is located on the west side of Hwy. 300, north of the Pinnacle
Road intersection.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The church has existed at this site since its construction in late 2003. The
area is rural in nature and is characterized primarily by single family
homes on larger tracts and by large areas of undeveloped property. A
small commercial node is located just south of the church, at the Hwy.
300/Pinnacle Road intersection. The use of the modular building is
proposed on a temporary basis and will be removed when the Phase II
educational space is built. The proposed use should be compatible with
the neighborhood.
All owners of properties located within 200 feet of the site, all residents
within 300 feet who could be identified and the Coalition of West Little
Rock Neighborhoods were notified of this proposal.
3. ON SITE DRIVES AND PARKING:
The 280 -seat sanctuary and 113 paved parking spaces were constructed
with Phase I. An additional 52 spaces will be built with construction of the
Phase II education building. The church is required to have 70 parking
spaces based on one space for every 4 seats in the sanctuary. No future
expansion of the sanctuary is proposed. A small, gravel parking lot and
driveway are proposed to provide access to the modular building. Use of
November 13, 2008
ITEM NO.: 5 (Cont.
FILE NO.: Z -7417-A
the gravel is proposed to correspond to the 5 -year period the modular
building is in use.
4. SCREENING AND BUFFERS:
Development of the site must comply with previously approved plans for
landscape, buffers and screening.
5. PUBLIC WORKS COMMENTS:
Staff recommends the continuance of the approved ten (10) year
boundary street deferral until 2013 as previously approved. No
boundary improvements are required until the end of the deferral
period.
6. UTILITY, FIRE DEPT. AND CATA COMMENTS:
Wastewater: Outside service boundary, no comment.
Entergy: No comments received.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
Water: This is located in an area served by Maumelle Water Corp.
Water is not available from Central Arkansas Water.
Fire Department: Outside service area. Provide statement from local
Volunteer Fire Department indicating approval, ability to provide
service and any conditions prior to placement of the modular building.
County Planning: Approved as submitted.
CATA: Outside service area.
SUBDIVISION COMMITTEE COMMENTS: (OCTOBER 23, 2008)
Mike Johnston was present, representing the application. Staff briefly described
the proposal, noting that information on the design of the modular classroom
building was needed. Mr. Johnston provided photos of the building to the
Committee.
2
November 13, 2008
ITEM NO.: 5 (Cont.
FILE NO.: Z -7417-A
Vince Floriani, of Public Works, explained the recommended continuance of
the previously approved ten (10) year boundary street deferral. He noted that
the deferral would extend to 2013.
There being no further issues for discussion, the Committee forwarded the
application to the full Commission for final action.
STAFF ANALYSIS:
The Church at Pinnacle Valley is located on the R-2 zoned, 6.93 -acre tract at
7901 Hwy. 300. On June 26, 2003, the Commission approved a conditional use
permit to allow the phased construction of the church. Phase I was the
construction of a single building containing a 280 -seat sanctuary and typical
support space such as classrooms, offices and meeting rooms. Phase I also
contained a single driveway off of Hwy. 300 and a paved and landscaped
113 -space parking lot. Phase I has been completed. Phase II is to consist of an
education space addition to the north side of the sanctuary building and the
construction of an additional 52 paved and landscaped parking spaces. Phase
III, to occur at some unspecified point in the future, is to consist of a fellowship
hall/activity center building, a pavilion and a playground. No sanctuary
expansion is proposed. At the time of initial approval, required right-of-way for
Hwy. 300 was dedicated. A deferral of improvements to the road were deferred
for 10 years or until construction of the Phase II education building addition,
whichever occurs first.
The church is requesting a revision to the approved C.U.P. to allow for temporary
use of a modular classroom building and a small, gravel parking lot/driveway.
This intervening Phase, Phase I -A, would allow use of the temporary building and
parking for 5 years or until construction of the Phase II education building
addition.
The one-story modular building is proposed to be placed behind the sanctuary
building. A gravel driveway will extend off of the existing parking lot to a small,
gravel parking area adjacent to the modular building.
Staff is supportive of the proposed revision to the C.U.P. Allowing temporary use
of the modular building and gravel parking lot/driveway should have no impact on
adjacent properties. There is no bill of assurance for this acreage tract. Staff is
supportive of allowing the deferral of street improvements to continue until 2013
(ten years from the initial approval) or until construction of the Phase II education
addition. To staffs knowledge, there are no outstanding issues.
K,
November 13, 2008
ITEM NO.: 5 (Cont.
'AFF RECOMMENDATION:
FILE NO.: Z -7417-A
Staff recommends approval of the revision to the C.U.P. subject to compliance
with the following conditions:
1. Use of the modular classroom building and gravel parking area/driveway is for
5 years or until construction of the Phase II education addition, whichever
occurs first.
2. Compliance with comments and conditions outlined in Sections 4, 5 and 6 of
the agenda staff report.
Staff recommends approval of the continued deferral of street improvements to
Hwy. 300 until 2013 (10 years from the date of initial approval) or until
construction of the Phase II education addition, whichever occurs first.
PLANNING COMMISSION ACTION:
(NOVEMBER 13, 2008)
The applicants were present. There were no objectors present. Staff presented
the item and noted there were two additional conditions that staff was proposing.
The additional conditions proposed were as follow:
1. All site lighting must be shielded downward and aimed into the site.
2. The entry driveway off of Highway 300 is to be gated when the church
facilities are not in use.
Staff recommended approval of the application and street improvement deferral
subject to compliance with the conditions outlined in the "staff recommendation"
above, including the two additional conditions. There was no further discussion.
The item was placed on the consent agenda and approved as recommended by
staff. The vote was 7 ayes, 0 noes, 2 absent and 2 open positions.
0
SUBDIVISION COMMITTEE COMMENTS
OCTOBER 23, 2008
ITEM NO.: 5. THE CHURCH AT PINNACLE MOUNTAIN REVISED
CONDITIONAL USE PERMIT — 7901 HIGHWAY 300(Z -7417 -Al
Planning Staff Comments:
1. Provide information on building design; height, materials, roof, etc...
2. Information for Commissioners:
a. There is no Bill of Assurance on this acreage tract.
b. Use of the modular classroom building and gravel driveway/parking is for five (5) years or until
construction of the Phase II education space; whichever occurs first.
Variance/Waivers:
• Use of gravel drive and parking for five (5) years.
• Combined deferral of construction of turn lane on Highway 300 until next phase of construction or five (5)
years.
Public Works:
1. Staff recommends the continuance of the approved ten (10) year boundary street deferral until 2013 as
previously approved. No boundary improvements are required until the end of the deferral period.
Utilities and Fire Department/County PlanninL:_
Wastewater: Outside service boundary, no comment.
Entergy: No comments received.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
Water: This is located in an area served by Maumelle Water Corp. Water is not available from Central Arkansas
Water.
Fire Department: Outside service area. Provide statement from local Volunteer Fire Department indicating
approval, ability to provide service and any conditions.
County Planning: Approved as submitted.
CATH: Outside service area.
Planning Division: No Comments,
Landscape: Compliance with previously approved plan is required as additional phases are developed. No
comments on this temporary building and gravel parking lot.
Other: Submit responses to staff issues and four (4) copies of revised site plan (if necessary) to staff no later than
Wednesday October 29, 2008.
Required notification must be completed by October 29, 2008 and proof of notice returned to staff by November 7,
2008.
1TEM #5
SUBDIVISION COMMITTEE COMMENTS: (OCTOBER 23, 2008)
Mike Johnston was present, representing the application. Staff briefly described the
proposal, noting that information on the design of the modular classroom building was
needed. Mr. Johnston provided photos of the building to the Committee.
Vince Floriani, of Public Works, explained the recommended continuance of the
previously approved ten (10) year boundary street deferral. He noted that the deferral
would extend to 2013.
There being no further issues for discussion, the Committee forwarded the application
to the full Commission for final action.