HomeMy WebLinkAboutZ-7380 Map 9390
W
W
0
390 Z
ti
0�1 MASTER SITr= PLAN O
I"=50'
Hospice Home Care, Inc.
1501 N. University Avenue
Prospect Building, Suite 150
Little Rock, Arkansas 72207
501.666.9697 Phone
501.666.4616 Fax
.. �W"W ro149.c
TOTAL ACREAGE
CURRENTLY ZONED
Building & Parking Requirements
Hospice Home Care, Inc.
Bowman Road
Little Rock, Arkansas
Facility
Hours of
Operation
Building Height Classification
12.8 ACRES
R-2
Occupancy
Load
Parking
Ratios
Parking
Required
Hospice 24/7 32 feet I-2 36 Beds 1 per bed 36 Required
25,700 SF 45 Provided plus
2 Handicap spaces
Business Office 7am-6pm 24 feet Group B
15,400 SF mon-fri
Education 7am-12pm 24 feet Assembly A-3
Center mon-fri
1,760 SF
Kaleidoscope 6am-9pm 24 feet Group E
Center mon-fri
4,500 SF
Bungalows 24/7 24 feet (10 units)
1,500 SF each mon-fri
1 per 400 SF/GFA 36.575 Required
37 Provided plus
2 Handicap spaces
1 per 100 SF/GFA 17.5 Required
21 Provided plus
1 Handicap space
20 Children 1 per 10 children 12 Required
10 Employees 1 per employee 13 pick-up spaces provided plus
1 Handicap space
1 Required at each unit
2 provided at each unit
Wei
NDPIPER
BDIVISION
W:.
70
Phasing Plan
Phase 1 - Hospice Complete 2004
Phase 2 - Admin./Education Complete 2006
Phase 3 - Kaleidoscope Center Complete 2008
Phase 4 - Duplex Bungalow Complete 2010
oa1p,,8SOCf I"',
p�PVGORPC) fo 9r
.�p'E'�J�•RPOl� Tp�'c+';
r o �6 . G� ATF • yGq
-
i9�3 : moo -
■
Z
w
W
cc
aC
V �
E
W 3
�M
Oo
N
WN
V
0■
U)
O
z
C
a
MW
e
IR
V
O
cc
J
TITLE
MASTER SITE PLAN
DATE 24 March 03
REVISION DATE
PROJECT NO. 2003-5
SHEET NO.
2.2
370
z n z
agC3
U? 6 Cn
LU
u.i
U
Project Sign
a c a
a
Cl W
0
The proposed sign will sit on the right side of the driveway at the front
- U
of the property. It will rise from the ground no mae than 6 feet and
al
a
will be made of natural materials such as stone.
Phasing Plan
Phase 1 - Hospice Complete 2004
Phase 2 - Admin./Education Complete 2006
Phase 3 - Kaleidoscope Center Complete 2008
Phase 4 - Duplex Bungalow Complete 2010
oa1p,,8SOCf I"',
p�PVGORPC) fo 9r
.�p'E'�J�•RPOl� Tp�'c+';
r o �6 . G� ATF • yGq
-
i9�3 : moo -
■
Z
w
W
cc
aC
V �
E
W 3
�M
Oo
N
WN
V
0■
U)
O
z
C
a
MW
e
IR
V
O
cc
J
TITLE
MASTER SITE PLAN
DATE 24 March 03
REVISION DATE
PROJECT NO. 2003-5
SHEET NO.
2.2