Loading...
HomeMy WebLinkAboutZ-7380 Map 9390 W W 0 390 Z ti 0�1 MASTER SITr= PLAN O I"=50' Hospice Home Care, Inc. 1501 N. University Avenue Prospect Building, Suite 150 Little Rock, Arkansas 72207 501.666.9697 Phone 501.666.4616 Fax .. �W"W ro149.c TOTAL ACREAGE CURRENTLY ZONED Building & Parking Requirements Hospice Home Care, Inc. Bowman Road Little Rock, Arkansas Facility Hours of Operation Building Height Classification 12.8 ACRES R-2 Occupancy Load Parking Ratios Parking Required Hospice 24/7 32 feet I-2 36 Beds 1 per bed 36 Required 25,700 SF 45 Provided plus 2 Handicap spaces Business Office 7am-6pm 24 feet Group B 15,400 SF mon-fri Education 7am-12pm 24 feet Assembly A-3 Center mon-fri 1,760 SF Kaleidoscope 6am-9pm 24 feet Group E Center mon-fri 4,500 SF Bungalows 24/7 24 feet (10 units) 1,500 SF each mon-fri 1 per 400 SF/GFA 36.575 Required 37 Provided plus 2 Handicap spaces 1 per 100 SF/GFA 17.5 Required 21 Provided plus 1 Handicap space 20 Children 1 per 10 children 12 Required 10 Employees 1 per employee 13 pick-up spaces provided plus 1 Handicap space 1 Required at each unit 2 provided at each unit Wei NDPIPER BDIVISION W:. 70 Phasing Plan Phase 1 - Hospice Complete 2004 Phase 2 - Admin./Education Complete 2006 Phase 3 - Kaleidoscope Center Complete 2008 Phase 4 - Duplex Bungalow Complete 2010 oa1p,,8SOCf I"', p�PVGORPC) fo 9r .�p'E'�J�•RPOl� Tp�'c+'; r o �6 . G� ATF • yGq - i9�3 : moo - ■ Z w W cc aC V � E W 3 �M Oo N WN V 0■ U) O z C a MW e IR V O cc J TITLE MASTER SITE PLAN DATE 24 March 03 REVISION DATE PROJECT NO. 2003-5 SHEET NO. 2.2 370 z n z agC3 U? 6 Cn LU u.i U Project Sign a c a a Cl W 0 The proposed sign will sit on the right side of the driveway at the front - U of the property. It will rise from the ground no mae than 6 feet and al a will be made of natural materials such as stone. Phasing Plan Phase 1 - Hospice Complete 2004 Phase 2 - Admin./Education Complete 2006 Phase 3 - Kaleidoscope Center Complete 2008 Phase 4 - Duplex Bungalow Complete 2010 oa1p,,8SOCf I"', p�PVGORPC) fo 9r .�p'E'�J�•RPOl� Tp�'c+'; r o �6 . G� ATF • yGq - i9�3 : moo - ■ Z w W cc aC V � E W 3 �M Oo N WN V 0■ U) O z C a MW e IR V O cc J TITLE MASTER SITE PLAN DATE 24 March 03 REVISION DATE PROJECT NO. 2003-5 SHEET NO. 2.2