HomeMy WebLinkAboutZ-7364 Staff AnalysisMarch 20, 2003
ITEM NO.: 10.1
NAME: Bowman Market Place Long -form PCD
LOCATION: Northwest corner of Kanis Road and Bowman Road
DEVELOPER:
Weiner/Schlosser Ventures, IV, Inc.
520 Post Oak Boulevard
Huston, TX 77027
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
FILE NO.: Z-7364
AREA: 20.322 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: C-3, 0-3, R-2, POD
ALLOWED USES: General Commercial, Office and Single-family
PROPOSED ZONING: PCD
PROPOSED USE: General Commercial
VARIAN CESMAIVERS REQUESTED: Variance to the Land Alteration Ordinance to
allow an increase in the maximum height of a cut.
BACKGROUND:
Ordinance No. 15,163 of the City of Little Rock rezoned the POD zoned property within
the proposed development from 0-3 and C-3 to PCD on September 3, 1986. The
applicant proposed the development of a commercial shopping center on the site, which
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
contained approximately 7 acres. The shopping center was proposed as a 63,657
square foot commercial building with approximately 242 parking spaces.
On October 17, 1989 the Board of Directors approved a one-year time extension for the
development of the site.
On September 7, 1999 the Board of Directors approved Ordinance No. 18,095 to
rezone the site from PCD to POD and established McShane — Long -form POD. The
applicant proposed the placement of an assisted senior living center and associated
office buildings. The proposed living center was to be three (3) stories in height with
approximately 120,000 square feet of floor area. The living center would be located
within the northern two-thirds of the property and contain 136 rooms.
The applicant also proposed the placement of an office building adjacent to Kanis Road.
The office building was to be utilized by the living center and medical facilities and other
associated office uses to support the living center
The Board of Directors rezoned the C-3 zoned portion of the site from various zoning
classifications to C-3 on October 20, 1998 (Ordinance No. 17,850). There were
conditions placed on the rezoning request as follows: There was to be no building
constructed in the 150 foot by 150 foot area directly at the southeast corner of the
proposed C-3 zoned property and the property proposed for C-3 zoning was to be
limited to two driveways onto Kanis Road. The eastern drive, located approximately
200 feet west of the Kanis/Bowman intersection, was to be a service entrance/exit only.
A. PROPOSAUREQUEST:
The applicant proposes a three (3) lot plat and to rezone the site from various
zoning classifications to PCD to allow the construction of three commercial
buildings. The building to be place on Lot 1 is an 116,000 square foot Lowe's
store, on Lot 2 a 68,600 square foot retail center and on Lot 3 a 14,000 square
foot retail center.
The applicant also proposes to rework the Wal-Mart entrance onto Bowman
Road along with the traffic signal to allow four exiting lanes with one entrance
lane. The applicant is also proposing the placement of a traffic signal at the new
Lowe's entrance on Bowman Road. The applicant has conducted a traffic study
to determine the need for the addition of the traffic signal.
The existing truck entrance south of "Just for Feet" will be eliminated. The
driveway apron will be reconfigured and used as a right in, right -out for the
retail/restaurant pad.
The applicant is requesting a variance on the west side of Lowe's for the cut
slope. The maximum height of the cut in this area will be approximately 40 feet
2
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont.) FILE NO.: Z-7364
to 45 feet. The applicant is proposing the placement of a segmental block
retaining wall with a maximum of 15 feet in height with 10 foot horizontal between
the walls for plantings. A 40 -foot open space (undisturbed) buffer will be
maintained adjacent to the residential area to the west. The applicant has
indicated other areas of the site will have cuts and fills that will approach 30 feet.
The applicant proposes to utilize the placement of segmental block retaining
walls in these areas as well.
B. EXISTING CONDITIONS:
The site contains a nursery greenhouse, two single-family residences and vacant
tree covered lands. Other uses in the area are a strip retail center located on the
northeast corner of Bowman and Kanis Roads (Creekwood Plaza), a
nonconforming liquor store located on the southeast corner of Bowman and
Kanis Roads and a strip retail center containing neighborhood commercial uses
(drycleaners, sandwich shop) on the southwest corner of Bowman and Kanis
Roads.
Kanis Road in this area has not been improved to Master Street Plan Standards.
Bowman Road adjacent to he site has not been improved but the development
across Kanis Road (Creekwood Plaza) has installed Y2 street improvements.
The intersection of Bowman and Kanis Roads was recently improved and a
traffic signal added.
There is a single-family subdivision located to the west of the site with the homes
backing up to the proposed development. Vacant lands are adjacent to Kanis
Road further west of the site and adjacent to the subdivision.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. The John Barrow and the Timber Ridge/Point West/Gibralter Heights
Neighborhood Associations, all residents who could be identified located within
300 feet of the site and all owners of property located within 200 feet of the site
were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Bowman and Kanis Roads are classified on the Master Street Plan as minor
arterials. A minimum dedication of right-of-way 45 feet from centerline will be
required. Additional right-of-way will be required to accommodate turn lanes.
A 20 feet radial dedication of right-of-way is required at the intersection of the
arterials.
3
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1(Cont.)_FILE NO.: Z-7364
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to these streets including 5 -foot sidewalks with
planned development.
3. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
4. A Sketch Grading and Drainage Plan will be required per Sec. 29-186 (e). At
a minimum, provide cross sections showing maximum cut and fill sections
and stormwater flows entering and leaving the property, and location of
proposed stormwater detention facilities.
5. Contact the ADEQ for approval prior to start of work.
6. The developer proposes construction of a traffic signal at the new Bowman
Road entrance. The design must be provide approved by Traffic Engineering
and provided for coordination of other signals on Bowman. The signal is not
to be activated until traffic warrants are met for this intersection.
7. Comments and discussion concerning the review of the Traffic Study are as
follows:
Due to concerns about how this development might worsen area traffic
congestion, the developer prepared a traffic study that analyzed both the existing
traffic conditions and projected traffic as a result of this development.
The study suggested several improvements along Bowman Road between
Markham and Kanis Streets in the vicinity of the development that would help
mitigate the increased traffic. These improvements included improvements to
the existing Wal-Mart Drive at Hermitage Road, additional lanes along Bowman
Road, and improvements to Kanis Road and the Bowman and Kanis intersection.
Public Works reviewed and agreed with most of the study's findings,
recommendations and conclusions. The one exception Public Works takes to
the study is that it fails to make recommendations to mitigate longer delays from
projected traffic at the most poorly -performing intersections.
The study analyzed level of service ratings for various traffic movements at area
intersections. Level of service rating is a measure of the delay drivers will
experience at an intersection, which is further, an indicator of discomfort,
frustration, fuel consumption and lost travel time.
Several intersection movements were found at current traffic levels to operate at
the lowest level of service F (delay of greater than 80 seconds) and the study
projected the intersections would remain at that same level of service with the
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
additional traffic. When this occurred, the study recommended no improvements
under the reasoning that the intersection is already level of service F and would
remain so under projected traffic conditions.
Public Works believes such an analysis is faulty because it fails to recognize the
additional driver discomfort that will result solely because of increase traffic from
this development. For example, the north bound left turn movement at the
Chenal and Bowman intersection currently operates at level of service F because
there is a 136 second delay per vehicle. Under projected traffic conditions the
movement will continue to operate at level of service F but the corresponding
delay increases to 188 seconds. Public Works believes that the development
should not proceed if it results in additional delays.
The following table lists Public Works' assessment of additional improvements
needed to moderate traffic congestion in the area within the study area. Without
these improvements, the development will result in additional traffic delays.
Intersection
Needed
Improvement
Construct an
Reasons
Projected left -turn
Chenal
Pkwy. —
additional NB
volume of 301 during
Bowman Rd.
left -turn bay
PM peak hour cannot
(250ft in
be accommodated
length,
using one left -turn
considering
bay. This movement
future growth)
already operates at
Level of Service F.
Adding more volume
will increase the
delay from 136 sec.
to 188 sec. per
vehicle. With the
proposed dual -left
turn lane, the
intersection LOS will
improve from F to D.
0
Problems if not improved
Without dual left -turn lanes, the
queue in the left -turn bay will
extend to the thru lane during
every cycle of the peak hour,
thereby shutting down one of
the thru lanes completely and
reducing the adjacent lane
capacity by as much as 50%.
This has the same effect as that
of a lane closure during
construction work. When the
thru lane is blocked, vehicles
that are going straight will try to
switch lanes, which causes
sideswipe accidents. Longer
queues will develop in thru
lanes, which creates gridlock by
blockin og ther intersections.
• March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
Intersection Needed Reasons Problems if not improved
Improvement
Chenal Construct NB Intersection capacity With the present geometry,
Pkwy. — right -turn lane will improve when even though right -turn -on -red is
Bowman Rd. (150 ft.) vehicles waiting to allowed, it just takes 5 cars in
turn are separated the thru lane to block this
from thru lanes. The movement. When this happens,
advantage is even delay for the NB right -turn
more in the case of movement as well as the total
Kanis Rd. -
Bowman Rd.
Bowman Rd.
— Wal-Mart
Dr.
Construct an
additional SB
left -turn bay
(250 ft. length,
considering
future growth)
Extend length
of EB left -turn
lanes to 250
ft. length
right -turn lanes
intersection delay is increased.
because the vehicles
can turn right on red.
Presently, there is no
exclusive right -turn
lane.
Projected left -turn
Without dual left -turn lanes, the
volume of 291 during
queue in the left -turn bay will
PM peak hour cannot
extend to the thru lane every
be accommodated
cycle during peak hour, thereby
using one left -turn
shutting down one of the thru
bay. This movement
lanes completely. This reduces
already operates at
the capacity of Bowman Rd.
Level of Service F.
significantly. When the thru lane
Adding more volume
is blocked, vehicles that are
will increase the
going straight will try to switch
delay from 204 sec.
lanes, which causes sideswipe
to 338 sec. per
accidents. Longer queues will
vehicle. With the
develop in thru lanes, which
proposed
creates gridlock by blocking
improvements, the
other intersections.
intersection LOS will
from D to C.
_improve
Projected traffic
Shorter turn lanes block thru
volume of 290 cannot
traffic because the queue in turn
be accommodated
lanes extends to thru-lanes.
with 100 ft. long turn
When there are vehicles waiting
lanes.
in the thru lanes, the
N
intersection capacity is reduced
significantly because the thru-
lane is blocked.
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.)
Intersection Needed
Improvement
Chenal Extend length
Pkwy — of WB left -
Autumn Rd. turn bay.
Kanis Rd. Complete
(West of street
Bowman) improvements
to city
standards
both sides
adjacent to
proposed
project.
FILE NO.: Z-7364
Reasons
Problems if not improved
Projected left -turn
Without a long left -turn lane, the
volume of 325 is too
queue in the left -turn bay will
high for the existing
extend to the thru lane during
140 ft. long left -turn
every cycle of the peak hour,
bay. Due to geometry
thereby shutting down one of
restrictions, an
the thru lanes completely and
additional left -turn
reducing the adjacent lane
bay cannot be built.
capacity by as much as 50%.
However, extending
This has the same effect as that
the length to 300 ft.
of a lane closure during
will help solve some
construction work. When the
of the problems.
thru lane is blocked, vehicles
that are going straight will try to
switch lanes, which causes
sideswipe accidents. Longer
queues will develop in thru
lanes, which creates gridlock by
blocking other intersections.
The current two-lane
If the street is not improved,
section is inadequate
there will be long queues at .the
to handle the
intersection and the traffic will
expected traffic
back up beyond driveways
volume. Both sides of
resulting in congestion.
the street need to be
built to city
standards.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Existing sewer mains on site. Easements must be retained or sewer
mains relocated to serve all lots. Contact Little Rock Wastewater at 688-1414
for additional information.
Enter : Approved as submitted.
Center -Point Energy: No comment received.
SBC: No comment received.
7
. March 20, 2003
SUBDIVISION
ITEM NO.: 10.1(Cont.)FILE NO.: Z-7364
Central Arkansas Water: The facilities on-site will be private. When meters are
planned off private lines, private facilities shall be installed to Central Arkansas
Water's material and construction specifications and an engineer, licensed to
practice in the State of Arkansas, will inspect installation. Execution of
Customer Owner Line Agreement is required. A Capital Investment Charge
based on the size of connection(s) will apply to this project in addition to normal
charges. This fee will apply to all connections including metered connections off
the private fire system. Please submit two copies of the plans for the private fire
line to Central Arkansas Water regarding procedures for installation of private
fire line. Approval of plans by the Arkansas Department of Health Engineering
Division and the Little Rock Fire Department is required. This development will
have minor impact on existing water distribution systems. Proposed water
facilities will be sized to provide adequate pressure and fire protection.
Fire Department- Contact the Little Rock Fire Department (918-3752) and Central
Arkansas Water Department (992-2438) concerning the placement of fire
hydrants.
County Planning: No comment received.
CATA: Site is not located on a dedicated bus route and has no effect on bus
radius, turnout and route.
F. ISSU ESITEC H N ICALJDES I G N:
Planning Division: This request is located in the Ellis Mountain Planning
District. The Land Use Plan shows Mixed Office Commercial for this property.
The applicant has applied for a Planned Commercial Development for a new
retail development.
A Land Use Plan amendment for a change to Commercial is a separate item on
this agenda (LU03-18-01).
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Rock Creek Neighborhood Action Plan. The Office and
Commercial Development Goal calls for the preservation of existing topography,
trees and green space as possible. The plan also contains objectives that
supports the adoption of a plan for Kanis Road, and encourages all commercial
and office development in the community to be subject to neighborhood input
prior to City approval. An Action Statement under the Office and Commercial
Development Goal recommends the aggressive use of Planned Zoning Districts
to influence more neighborhood -friendly and better quality development.
. March 20, 2003
SUBDIVISION
NO.: 10.1 Cont. FILE NO.: Z-7364
Landscape: The proposed western perimeter landscape strip of Lot 3 width
drops below the six feet and nine inch minimum allowed by the Landscape
ordinance. A variance of this requirement would require City Beautiful
Commission approval.
Interior landscaping must comprise at least eight percent of the interior of the on-
site vehicular use area. Interior islands must be at least 7'h feet in width and
150 square feet in area to count toward fulfilling interior landscaping
requirements.
An irrigation system to water landscaped areas will be required.
Building Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT
Mr. Dickson Flake, Mr. Joe White and Mr.
application. Staff stated the proposed
northwest corner of Bowman and Kanis
commercial and office uses and shown
Future Land Use Plan.
(February 27, 2003)
Weiner were present representing the
development was located on the
Road on a site currently zoned for
as Mixed Office Commercial on the
Staff stated there were additional items necessary to complete the review
process. Staff requested the days and hours of operation of the new businesses.
Staff also requested the location of the dumpster or trash compactor and the
hours of compacting. Staff stated the proposed parking more than exceeded the
typical minimum parking requirements for a development of this type with the
exception of the proposed Lot 3. Staff stated if Lot 3 were developed as a
restaurant use, the typical required parking would be approximately 30 spaces
short. Staff stated they did not see a problem with the reduced number of
spaces since there was sufficient parking in other areas and the site most likely
would not be entirely developed as a restaurant use.
Landscaping comments were addressed. Staff stated the area set aside for Lot
3 dropped below the minimum allowed by the Landscape Ordinance. Staff
stated all interior landscaping must comprise at least eight percent of the interior
of the on-site vehicular use area. Staff stated landscape islands must be at least
7 'h feet in width and 150 square feet in area to count toward fulfilling interior
landscaping requirements.
Public Works comments had not been completed and were not discussed in
detail.
9
. ,March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (C
FILE NO.: Z-7364
Staff stated the nearby residents were a very important consideration. Staff also
stated the site was not shown on the Future Land Use Plan as a pure
commercial site. Staff stated the site was reviewed not so long ago for a
furniture store to locate on the site. Staff stated that use was acceptable
because a furniture store was considered commercial but not an intensive
commercial use.
After the discussion, the Committee then forwarded the item to the full
Commission for final action.
K ANALYSIS:
The applicant submitted a revised plan to Staff addressing most of the issues
raised at the Subdivision Committee meeting. The applicant has also addressed
several of Public Works concerns, which were given to the applicant after the
Subdivision Committee meeting.
The applicant has indicated the Lowe's Store will use a trash compactor. The
compactor has been located in the rear of the building. The applicant is currently
performing sound checks to determine if noise will be ars issue. The applicant
has stated the hours of garbage callection will be from 7:00 am to 6:00 pm. Staff
would suggest these hours be placed on the compacting as well. Staff has some
concerns of the noise level of the compactor and the interference with the quality
of life of the abutting the single-family neighborhood to the west.
The applicant has indicated dumpster locations on the two other lots as well. On
Lot 2, the dumpster will be located near Bowman Road. The applicant has
indicated screening will be installed per the current ordinance requirement- or
screened on three sides at least two (2) feet above the finished level of the
dumpster. The third dumpster will be located on Lot 3 near western property line
and just south of the "Just for Feet" store. The applicant has also indicated
screening per the current city ordinance.
The applicant has also indicated any site lighting will be low level and directional,
directed away from residentially zoned properties. The applicant has also
indicated the site will sit approximately 30 -feet below the adjoining subdivision to
the west. The applicant has also indicated the site will be built up at the
intersection of Bowman and Kanis Roads. The applicant has stated there will be
minimal spill over of lighting from the site to the adjoining properties.
The applicant has indicated the hours of operation for the Lowe's will be 24 -hours
per day seven (7) days per week. The retaillrestaurant hours are proposed from
5:00 am to 1:00 am also seven days per week. Staff has concerns with the late
hour of operation. Staff would question if the site will experience customer traffic
10
- March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.
FILE NO.: Z -
to the site 24 -hours per day or if there will be stocking taking place during the
nontraditional business hours. If stocking is the case then staff would also have
concerns with noise from the site with employees moving items with a forklift and
the banging of pallets. Although the Wal-Mart store is a 24-hour store staff does
not believe it appropriate to add an additional 24-hour store to the area. The
hours of operation for the shopping center to the east were recently revised to
allow for a 12:00 am closing time. Staff feels this more appropriate for the area.
The applicant has addressed most of the landscaping issues raised by Staff.
The applicant is also proposing the placement of a 40 -foot buffer along the
western perimeter of the site adjoining the single-family subdivision. Currently
there is a 40 -foot buffer located behind the Wal-Mart and Sam's stores. This
buffer Would be a continuation of the existing. The applicant has stated the
buffer will be maintained as an undisturbed natural buffer.
Although the applicant has tried to meet the concerns of Staff raised from a
technical aspect Staff has some major concerns with the use of the site. The
Future Land Use Plan designates this site as Mixed Office Commercial. The
Kanis Corridor Committee reviewed this section of the roadway and made a
recommendation for the Future Land Use Plan of Mixed Office Commercial as
the desired development pattern at this intersection less than five (5) years ago.
Staff feels the site should develop as shown and an overabundance of
commercial uses Should not be located in this area. Currently the infrastructure
is not in place, namely the roadways, for a development of this magnitude to take
place. As indicated in Public Works Traffic comments there are several
intersections in the area, which operate at a Level of Service of D and F. These
being the two (2) worst ratings possible. Staff does not feel comfortable adding
to this already bad situation of traffic delays and congestion with the development
of this 20+ acre site as a pure commercial development.
STAFF RECOMMENDATION:
Staff recommends denial of the proposed application as filed.
PLANNING COMMISSION ACTION: (MARCH 20, 2003)
Mr. Dickson Flake, Mr. Andy Weiner, Mr. Joe White and Mr. Ernie Peters were present
representing the application. There were objectors present. Staff presented the item
with a recommendation of denial.
Staff stated the applicant had performed a traffic study of the area and congestion was
a big concern. Staff stated the traffic impact in the area would cause significant delays
for motorist. Staff stated the traffic study indicated a level of service F currently existed
11
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.) FILE NO.: Z-7364
and as a result of the project the Level of Service would remain an F. Staff stated they
would like to clarify by saying once an intersection reached the F rating there was no
further down to go. Staff stated the delays at some intersections would result in an
additional one (1) minute for motorist.
Staff stated the applicant had agreed to site improvements on the roads adjoining their
property but had also agreed to some off site improvements. Staff stated the
Commission could request but not demand off site improvements with the development.
Mr. Dickson Flake addressed the Commission on behalf of the applicant. He stated the
development only proposed one entrance to the site from Kanis Road and the second
drive was to be a service drive. He stated the applicant had agreed to a 40 -foot buffer
along the rear of the property to protect the residents to the west. Mr. Flake stated the
site would require a large cut and movement of a large amount of dirt on the site.
Mr. Flake stated the applicant was requesting a variance to the Land Alteration
Ordinance to allow two 15 -foot walls and with a 10 -foot shelf for plantings. Mr. Flake
stated there would also be an eight (8) foot opaque fence at the top of the wall.
Mr. Flake stated the elevation of Lowe's would be somewhat lower than the residences
to the west. He stated the top of the building including the parapet would be below the
homes by 15 -feet. He stated the development would offer visual separation from the
adjoining neighborhoods.
Mr. Flake stated the landscaping would comply with the ordinance requirements except
in one place. He stated in the section along Kanis the landscaping would exceed the
ordinance requirements.
Mr. Flake stated the use was consistent with other land uses in the area. He stated
there were commercial uses on the three other corners of Kanis and Bowman Roads.
He stated Wal-Mart and Sam's were located to the north of the site.
Mr. Flake stated the applicant had contracted with an acoustical engineer. He stated
the study had determined there would not be a significant increase in noise level. He
stated the applicant had restricted the dumpster hours and the door type for the facility.
He stated the overhead door would be constructed of vinyl clad insulated door.
Mr. Flake stated the two intersections that failed were located away from the site. He
stated the intersections failed at AM and PM times. He stated the construction of a
Lowe's would not add to the AM traffic and very little to the PM traffic.
Mr. Flake stated the development would employ 300 persons and generate
approximately 45 to 50 million in sales. He stated Lowe's was known nationally for their
community involvement and.
12
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.
FILE NO.: Z-7364
Ms. Ellen Yehlinic spoke in opposition of the proposed development. She stated Lowe's
would be in her back yard. She stated traffic was a primary concern of the
neighborhood. She stated her child had to cross Kanis Road for the school bus stop
and the child had waited for five to six light changes to be able to cross because of the
traffic. She stated dumpster collection on Saturday morning was also a concern.
Ms. Yehlinic stated her primary reason for moving to the neighborhood was the
uniqueness of the area. She stated there was a connection through Point West from
Kanis Road to Chenal Parkway if the traveler knew how to make the connection.
Ms. Jennifer Wilson spoke in opposition to the proposed development. She stated her
concern was the development of land with regard to the change in the topography and
drainage in the area. She stated the development would increase traffic on Kanis Road
and Bowman Road and the developer had agreed to expand the road to four (4) lanes.
She stated not only volume but speed and the lack of the existing infrastructure was a
reason for denial.
Ms. Wilson stated the developer had indicated there would not be a noise problem. She
questioned if there was a problem what recourse did the neighborhood have to resolve
the problem. She stated the deliveries would be made in the rear of the buildings and
trucks delivering merchandise would be noise.
Ms. Wilson stated the developer was unable to tell her what would happen to the
existing detention basin. She stated the basin was currently a sanctuary for wildlife in
the area.
Ms. Wilson stated if the development was approved the developer should be required to
hold quarterly meetings to provide updates on the progress of the development with
regard to traffic to the site and how construction trash will be handled.
Ms. Ruth Bell spoke in opposition of the proposed development. She stated the intent
was to keep the heavy commercial along Chenal Parkway and to step down along
Kanis Road. She stated there were no funds for infrastructure in the area and the
existing infrastructure could not carry the development. She stated the development
was not good land use. Ms. Bell also questioned the results of the acoustical study.
Commissioner Rector questioned the status of the improvements district, which was to
be formed from Shackelford Road to Bowman Road. Mr. Lawson stated the district was
not active. Commissioner Rector stated he was currently serving on a task force
looking at the infrastructure needs in the city and suggesting ways to raise funds to
correct the problems.
Mr. Ernie Peters spoke on behalf of the applicant with regard to the traffic study. He
stated the delay at Chenal Parkway and Bowman Road would increase as a result of
13
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.) FILE NO.: Z-7364
the development. He stated the applicant had indicated improvements would be made
to Kanis Road on the south side of Kanis Road, which would be a catalyst for a five (5)
lane section from Bowman Road to Chenal Parkway. He stated the service drive in the
rear from Kanis Road would be a one-way drive and would require trucks exiting to
leave from the new traffic light at Bowman Road.
There was a general discussion concerning the noise from the outdoor paging system
and the 24-hour access to the site. The applicant stated there would be no outdoor
paging on the site but he would like the option of the 24-hour access. There was also a
discussion concerning outdoor display. The applicant indicted there would not be any
outdoor display.
There was a general question as to how the road would be constructed to avoid the
ending of the five lane section at the applicants property line. Mr. Joe White stated the
ending would be handled with striping to a taper with paint to indicate the lane ending.
A motion was made to approve the land use amendment as filed. The motion failed by
a vote of 5 ayes, 4 noes and 2 absent.
A motion was made to approve the rezoning request as amended to include no outdoor
paging. The motion carried by a vote of 8 ayes, 1 no and 2 absent.
14
March 20, 2003
ITEM NO.: 10.1 FILE NO.: Z-7364
NAME: Bowman Market Place Long -form PCD
LOCATION: Northwest corner of Kanis Road and Bowman Road
DEVELOPER:
Weiner/Schlosser Ventures, IV, Inc.
520 Post Oak Boulevard
Huston, TX 77027
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 20.322 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: C-3, 0-3, R-2, POD
ALLOWED USES: General Commercial, Office and Single-family
PROPOSED ZONING: PCD
PROPOSED USE: General Commercial
VARIANCES/WAIVERS REQUESTED: Variance to the Land Alteration Ordinance to
allow an increase in the maximum height of a cut.
BACKGROUND:
Ordinance No. 15,163 of the City of Little Rock rezoned the POD zoned property within
the proposed development from 0-3 and C-3 to PCD on September 3, 1986. The
applicant proposed the development of a commercial shopping center on the site, which
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
contained approximately 7 acres. The shopping center was proposed as a 63,657
square foot commercial building with approximately 242 parking spaces.
On October 17, 1989 the Board of Directors approved a one-year time extension for the
development of the site.
On September 7, 1999 the Board of Directors approved Ordinance No. 18,095 to
rezone the site from PCD to POD and established McShane — Long -form POD. The
applicant proposed the placement of an assisted senior living center and associated
office buildings. The proposed living center was to be three (3) stories in height with
approximately 120,000 square feet of floor area. The living center would be located
within the northern two-thirds of the property and contain 136 rooms.
The applicant also proposed the placement of an office building adjacent to Kanis Road.
The office building was to be utilized by the living center and medical facilities and other
associated office uses to support the living center
The Board of Directors rezoned the C-3 zoned portion of the site from various zoning
classifications to C-3 on October 20, 1998 (Ordinance No. 17,850). There were
conditions placed on the rezoning request as follows: There was to be no building
constructed in the 150 foot by 150 foot area directly at the southeast corner of the
proposed C-3 zoned property and the property proposed for C-3 zoning was to be
limited to two driveways onto Kanis Road. The eastern drive, located approximately
200 feet west of the Kanis/Bowman intersection, was to be a service entrance/exit only.
A. PROPOSAL/REQUEST:
The applicant proposes a three (3) lot plat and to rezone the site from various
zoning classifications to PCD to allow the construction of three commercial
buildings. The building to be place on Lot 1 is an 116,000 square foot Lowe's
store, on Lot 2 a 68,600 square foot retail center and on Lot 3 a 14,000 square
foot retail center.
The applicant also proposes to rework the Wal-Mart entrance onto Bowman
Road along with the traffic signal to allow four exiting lanes with one entrance
lane. The applicant is also proposing the placement of a traffic signal at the new
Lowe's entrance on Bowman Road. The applicant has conducted a traffic study
to determine the need for the addition of the traffic signal.
The existing truck entrance south of "Just for Feet" will be eliminated. The
driveway apron will be reconfigured and used as a right in, right -out for the
retail/restaurant pad.
The applicant is requesting a variance on the west side of Lowe's for the cut
slope. The maximum height of the cut in this area will be approximately 40 feet
2
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: 7.7364
to 45 feet. The applicant is proposing the placement of a segmental block
retaining wall with a maximum of 15 feet in height with 10 foot horizontal between
the walls for plantings. A 40 -foot open space (undisturbed) buffer will be
maintained adjacent to the residential area to the west. The applicant has
indicated other areas of the site will have cuts and fills that will approach 30 feet.
The applicant proposes to utilize the placement of segmental block retaining
walls in these areas as well.
B. EXISTING CONDITIONS:
The site contains a nursery greenhouse, two single-family residences and vacant
tree covered lands. Other uses in the area are a strip retail center located on the
northeast corner of Bowman and Kanis Roads (Creekwood Plaza), a
nonconforming liquor store located on the southeast corner of Bowman and
Kanis Roads and a strip retail center containing neighborhood commercial uses
(drycleaners, sandwich shop) on the southwest corner of Bowman and Kanis
Roads.
Kanis Road in this area has not been improved to Master Street Plan Standards.
Bowman Road adjacent to he site has not been improved but the development
across Kanis Road (Creekwood Plaza) has installed 1/2 street improvements.
The intersection of Bowman and Kanis Roads was recently improved and a
traffic signal added.
There is a single-family subdivision located to the west of the site with the homes
backing up to the proposed development. Vacant lands are adjacent to Kanis
Road further west of the site and adjacent to the subdivision.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. The John Barrow and the Timber Ridge/Point West/Gibralter Heights
Neighborhood Associations, all residents who could be identified located within
300 feet of the site and all owners of property located within 200 feet of the site
were notified of the Public Hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Bowman and Kanis Roads are classified on the Master Street Plan as minor
arterials. A minimum dedication of right-of-way 45 feet from centerline will be
required. Additional right-of-way will be required to accommodate turn lanes.
A 20 feet radial dedication of right-of-way is required at the intersection of the
arterials.
K3
March 20, 2003
SUBDIVISION
ITEM NO.- 10.1 (Cont.
FILE NO.: Z-
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to these streets including 5 -foot sidewalks with
planned development.
3. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
4. A Sketch Grading and Drainage Plan will be required per Sec. 29-186 (e). At
a minimum, provide cross sections showing maximum cut and fill sections
and stormwater flows entering and leaving the property, and location of
proposed stormwater detention facilities.
5. Contact the ADEQ for approval prior to start of work.
6. The developer proposes construction of a traffic signal at the new Bowman
Road entrance. The design must be provide approved by Traffic Engineering
and provided for coordination of other signals on Bowman. The signal is not
to be activated until traffic warrants are met for this intersection.
7. Comments and discussion concerning the review of the Traffic Study are as
follows:
Due to concerns about how this development might worsen area traffic
congestion, the developer prepared a traffic study that analyzed both the existing
traffic conditions and projected traffic as a result of this development.
The study suggested several improvements along Bowman Road between
Markham and Kanis Streets in the vicinity of the development that would help
mitigate the increased traffic. These improvements included improvements to
the existing Wal-Mart Drive at Hermitage Road, additional lanes along Bowman
Road, and improvements to Kanis Road and the Bowman and Kanis intersection.
Public Works reviewed and agreed with most of the study's findings,
recommendations and conclusions. The one exception Public Works takes to
the study is that it fails to make recommendations to mitigate longer delays from
projected traffic at the most poorly -performing intersections.
The study analyzed level of service ratings for various traffic movements at area
intersections. Level of service rating is a measure of the delay drivers will
experience at an intersection, which is further, an indicator of discomfort,
frustration, fuel consumption and lost travel time.
Several intersection movements were found at current traffic levels to operate at
the lowest level of service F (delay of greater than 80 seconds) and the study
projected the intersections would remain at that same level of service with the
2
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.
FILE NO.: Z-7364
additional traffic. When this occurred, the study recommended no improvements
under the reasoning that the intersection is already level of service F and would
remain so under projected traffic conditions.
Public Works believes such an analysis is faulty because it fails to recognize the
additional driver discomfort that will result solely because of increase traffic from
this development. For example, the north bound left turn movement at the
Chenal and Bowman intersection currently operates at level of service F because
there is a 136 second delay per vehicle. Under projected traffic conditions the
movement will continue to operate at level of service F but the corresponding
delay increases to 188 seconds. Public Works believes that the development
should not proceed if it results in additional delays.
The following table lists Public Works' assessment of additional improvements
needed to moderate traffic congestion in the area within the study area. Without
these improvements, the development will result in additional traffic delays.
Intersection Needed Reasons
Improvement
Chenal
Pkwy. —
Bowman Rd.
Construct an
additional NB
left -turn bay
(250ft in
'ength,
;onsidering
uture growth)
Projected left -turn
volume of 301 during
PM peak hour cannot
be accommodated
using one left -turn
bay. This movement
already operates at
Level of Service F.
Adding more volume
will increase the
delay from 136 sec.
to 188 sec. per
vehicle. With the
proposed dual -left
turn lane, the
intersection LOS will
improve from F to D.
5
Problems if not improved
Without dual left -turn lanes, the
queue in the left -turn bay will
extend to the thru lane during
every cycle of the peak hour,
thereby shutting down one of
the thru lanes completely and
reducing the adjacent lane
capacity by as much as 50%.
This has the same effect as that
of a lane closure during
construction work. When the
thru lane is blocked, vehicles
that are going straight will try to
switch lanes, which causes
sideswipe accidents. Longer
queues will develop in thru
lanes, which creates gridlock by
blocking other intersections.
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
Intersection
Chenal
Pkwy. —
Bowman Rd.
Kanis Rd. -
Bowman Rd.
Bowman Rd.
— Wal-Mart
Dr.
Needed
Improvement
Construct NB
right -turn lane
(150 ft.)
Construct an
additional SB
left -turn bay
(250 ft. length,
considering
future growth)
Extend length
of EB left -turn
lanes to 250
ft. length
Reasons
Intersection capacity
will improve when
vehicles waiting to
turn are separated
from thru lanes. The
advantage is even
more in the case of
right -turn lanes
because the vehicles
can turn right on red.
Presently, there is no
exclusive right -turn
lane.
Projected left -turn
volume of 291 during
PM peak hour cannot
be accommodated
using one left -turn
bay. This movement
already operates at
Level of Service F.
Adding more volume
will increase the
delay from 204 sec.
to 338 sec. per
vehicle. With the
proposed
improvements, the
intersection LOS will
improve from D to C.
Projected traffic
volume of 290 cannot
be accommodated
with 100 ft. long turn
lanes.
A
Problems if not improved
With the present geometry,
even though right -turn -on -red is
allowed, it just takes 5 cars in
the thru lane to block this
movement. When this happens,
delay for the NB right -turn
movement as well as the total
intersection delay is increased.
Without dual left -turn lanes, the
queue in the left -turn bay will
extend to the thru lane every
cycle during peak hour, thereby
shutting down one of the thru
lanes completely. This reduces
the capacity of Bowman Rd.
significantly. When the thru lane
is blocked, vehicles that are
going straight will try to switch
lanes, which causes sideswipe
accidents. Longer queues will
develop in thru lanes, which
creates gridlock by blocking
other intersections.
Shorter turn lanes block thru
traffic because the queue' in turn
lanes extends to thru-lanes.
When there are vehicles waiting
in the thru lanes, the
intersection capacity is reduced
significantly because the thru-
lane is blocked.
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Co
Intersection
Chenal
Pkwy —
Autumn Rd.
Kanis Rd.
(West of
Bowman)
Needed
Improvement
Extend length
of WB left -
turn bay.
Complete
street
improvements
to city
standards
both sides
adjacent to
proposed
project.
Reasons
Projected left -turn
volume of 325 is too
high for the existing
140 ft. long left -turn
bay. Due to geometry
restrictions, an
additional left -turn
bay cannot be built.
However, extending
the length to 300 ft.
will help solve some
of the problems.
The current two-lane
section is inadequate
to handle the
expected traffic
volume. Both sides of
the street need to be
built to city
standards.
FILE NO.: Z-7364
Problems if not improved
Without a long left -turn lane, theI
queue in the left -turn bay will l
extend to the thru lane during
every cycle of the peak hour,
thereby shutting down one of
the thru lanes completely and
reducing the adjacent lane
capacity by as much as 50%.
This has the same effect as that
of a lane closure during
construction work. When the
thru lane is blocked, vehicles
that are going straight will try to
switch lanes, which causes
sideswipe accidents. Longer
queues will develop in thru
lanes, which creates gridlock by
blocking other intersections.
If the street is not improved,
there will be long queues at -.the
intersection and the traffic will
back up beyond driveways
resulting in congestion.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Existing sewer mains on site. Easements must be retained or sewer
mains relocated to serve all lots. Contact Little Rock Wastewater at 688-1414
for additional information.
Entergy: Approved as submitted.
Center -Point Ener : No comment received.
SBC: No comment received.
7
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.
LE NO.: Z-7364
Central Arkansas Water: The facilities on-site will be private. When meters are
planned off private lines, private facilities shall be installed to Central Arkansas
Water's material and construction specifications and an engineer, licensed to
practice in the State of Arkansas, will inspect installation. Execution of
Customer Owner Line Agreement is required. A Capital Investment Charge
based on the size of connection(s) will apply to this project in addition to normal
charges. This fee will apply to all connections including metered connections off
the private fire system. Please submit two copies of the plans for the private fire
line to Central Arkansas Water regarding procedures for installation of private
fire line. Approval of plans by the Arkansas Department of Health Engineering
Division and the Little Rock Fire Department is required. This development will
have minor impact on existing water distribution systems. Proposed water
facilities will be sized to provide adequate pressure and fire protection.
Fire Department: Contact the Little Rock Fire Department (918-3752) and Central
Arkansas Water Department (992-2438) concerning the placement of fire
hydrants.
County Planning: No comment received.
CATA: Site is not located on a dedicated bus route and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning
District. The Land Use Plan shows Mixed Office Commercial for this property.
The applicant has applied for a Planned Commercial Development for a new
retail development.
A Land Use Plan amendment for a change to Commercial is a separate item on
this agenda (LU03-18-01).
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the Rock Creek Neighborhood Action Plan. The Office and
Commercial Development Goal calls for the preservation of existing topography,
trees and green space as possible. The plan also contains objectives that
supports the adoption of a plan for Kanis Road, and encourages all commercial
and office development in the community to be subject to neighborhood input
prior to City approval. An Action Statement under the Office and Commercial
Development Goal recommends the aggressive use of Planned Zoning Districts
to influence more neighborhood -friendly and better quality development.
0
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
Landscape: The proposed western perimeter landscape strip of Lot 3 width
drops below the six feet and nine inch minimum allowed by the Landscape
ordinance. A variance of this requirement would require City Beautiful
Commission approval.
Interior landscaping must comprise at least eight percent of the interior of the on-
site vehicular use area. Interior islands must be at least 7 % feet in width and
150 square feet in area to count toward fulfilling interior landscaping
requirements.
An irrigation system to water landscaped areas will be required.
Building Codes: No comment received.
& SUBDIVISION COMMITTEE COMMENT:
Mr. Dickson Flake, Mr. Joe White and Mr.
application. Staff stated the proposed
northwest corner of Bowman and Kanis
commercial and office uses and shown
Future Land Use Plan.
(February 27, 2003)
Weiner were present representing the
development was located on the
Road on a site currently zoned for
as Mixed Office Commercial'.on 'the
Staff stated there were additional items necessary to complete the review
process. Staff requested the days and hours of operation of the new businesses.
Staff also requested the location of the dumpster or trash compactor and the
hours of compacting. Staff stated the proposed parking more than exceeded the
typical minimum parking requirements for a development of this type with the
exception of the proposed Lot 3. Staff stated if Lot 3 were developed as a
restaurant use, the typical required parking would be approximately 30 spaces
short. Staff stated they did not see a problem with the reduced number of
spaces since there was sufficient parking in other areas and the site most likely
would not be entirely developed as a restaurant use.
Landscaping comments were addressed. Staff stated the area set aside for Lot
3 dropped below the minimum allowed by the Landscape Ordinance. Staff
stated all interior landscaping must comprise at least eight percent of the interior
of the on-site vehicular use area. Staff stated landscape islands must be at least
7 '/ feet in width and 150 square feet in area to count toward fulfilling interior
landscaping requirements.
Public Works comments had not been completed and were not discussed in
detail.
J
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 (Cont.) FILE NO.: Z-7364
Staff stated the nearby residents were a very important consideration. Staff also
stated the site was not shown on the Future Land Use Plan as a pure
commercial site. Staff stated the site was reviewed not so long ago for a
furniture store to locate on the site. Staff stated that use was acceptable
because a furniture store was considered commercial but not an intensive
commercial use.
After the discussion, the Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to Staff addressing most of the issues
raised at the Subdivision Committee meeting. The applicant has also addressed
several of Public Works concerns, which were given to the applicant after the
Subdivision Committee meeting.
The applicant has indicated the Lowe's Store will use a trash compactor. The
compactor has been located in the rear of the building. The applicant is currently
performing sound checks to determine if noise will be an issue. The applicant
has stated the hours of garbage collection will be from 7:00 am to 6:00 pm. Staff
would suggest these hours be placed on the compacting as well. Staff has some
concerns of the noise level of the compactor and the interference with the quality
of life of the abutting the single-family neighborhood to the west.
The applicant has indicated dumpster locations on the two other lots as well. On
Lot 2, the dumpster will be located near Bowman Road. The applicant has
indicated screening will be installed per the current ordinance requirement, or
screened on three sides at least two (2) feet above the finished level of the
dumpster. The third dumpster will be located on Lot 3 near western property line
and just south of the "Just for Feet" store. The applicant has also indicated
screening per the current city ordinance.
The applicant has also indicated any site lighting will be low level and directional,
directed away from residentially zoned properties. The applicant has also
indicated the site will sit approximately 30 -feet below the adjoining subdivision to,
the west. The applicant has also indicated the site will be built up at the
intersection of Bowman and Kanis Roads. The applicant has stated there will be
minimal spill over of lighting from the site to the adjoining properties.
The applicant has indicated the hours of operation for the Lowe's will be 24 -hours
per day seven (7) days per week. The retail/restaurant hours are proposed from
5:00 am to 1:00 am also seven days per week. Staff has concerns with the late
hour of operation. Staff would question if the site will experience customer traffic
10
March 20, 2003
SUBDIVISION
ITEM NO.: 10.1 Cont. FILE NO.: Z-7364
to the site 24 -hours per day or if there will be stocking taking place during the
nontraditional business hours. If stocking is the case then staff would also have
concerns with noise from the site with employees moving items with a forklift and
the banging of pallets. Although the Wal-Mart store is a 24-hour store staff does
not believe it appropriate to add an additional 24-hour store to the area. The
hours of operation for the shopping center to the east were recently revised to
allow for a 12:00 am closing time. Staff feels this more appropriate for the area.
The applicant has addressed most of the landscaping issues raised by Staff.
The applicant is also proposing the placement of a 40 -foot buffer along the
western perimeter of the site adjoining the single-family subdivision. Currently
there is a 40 -foot buffer located behind the Wal-Mart and Sam's stores. This
buffer would be a continuation of the existing. The applicant has stated the
buffer will be maintained as an undisturbed natural buffer.
Although the applicant has tried to meet the concerns of Staff raised from a
technical aspect Staff has some major concerns with the use of the site. The
Future Land Use Plan designates this site as Mixed Office Commercial. The
Kanis Corridor Committee reviewed this section of the roadway and made a
recommendation for the Future Land Use Plan of Mixed Office Commercial as
the desired development pattern at this intersection less than five (5) years ago.
Staff feels the site should develop as shown and an overabundance of
commercial uses Should not be located in this area. Currently the infrastructure
is not in place, namely the roadways, for a development of this magnitude to take
place. As indicated in Public Works Traffic comments there are several
intersections in the area, which operate at a Level of Service of D and F. These
being the two (2) worst ratings possible. Staff does not feel comfortable adding
to this already bad situation of traffic delays and congestion with the development
of this 20+ acre site as a pure commercial development.
STAFF RECOMMENDATION'
Staff recommends denial of the proposed application as filed.
11
Subdivision Committee Comments February 27, 2003
ITEM NO.: 10.1 FILE NO.: Z-7364
NAME: Bowman Market Place Long -form PCD
LOCATION: Northwest corner of Kanis Road and Bowman Road
Planning Staff Comments:
1. Provide notification of abutting property owners complete with the certified abstract
list, notice form with affidavit executed and proof of mailing.
2. Provide the days and hours of operation of the new buildings.
3. Any site lighting must be low level and directional, directed away from residentially
zoned property.
4. Provide any proposed fencing on the site plan along with construction materials and
height.
5. Provide the means of garbage collection. Will there be an on-site dumpster? If so
indicate the location along with the required screening.
6. Provide the maximum building height on the proposed site plan for each of the
buildings.
7. Provide the location of any proposed signage along with details, (type/height/area).
8. The proposed parking exceeds the typical minimum requirements for a development
of this type with the exception of the building proposed as retail or restaurant if
developed as a restaurant would be approximately 30 spaces short.
Variance/Waivers:
1. None requested.
Public Works:
Utilities and Fire Department/County Planning:
Wastewater: Existing sewer mains on site. Easements must be retained or Sewer
Mains relocated to serve all lots. Contact Little Rock Wastewater at 688-1414 for
additional information.
Entergy: Approved as submitted.
Center -Point _Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: The facilities on-site will be private. When meters are
planned off private lines, private facilities shall be installed to Central Arkansas
Water's material and construction specifications and installation will be inspected by
an engineer, licensed to practice in the State of Arkansas. Execution of Customer
Owner Line Agreement is required. A Capital Investment Charge based on the size
of connection(s) will apply to this project in addition to normal charges. This fee will
apply to all connections including metered connections off the private fire system.
Please submit two copies of the plans for the private fire line to Central Arkansas
Water regarding procedures for installation of private fire line. Approval of plans by
the Arkansas Department of Health Engineering Division and the Little Rock Fire
Department is required. This development will have minor impact on existing water
distribution systems. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Contact the Little Rock Fire Department (918-3752) and Central
Arkansas Water Department (992-2438) concerning the placement of fire hydrants.
County Planning: No comment received.
CATA: Site is not located on a dedicated bus route and has no effect on bus radius,
turnout and route.
Planning -Division. : This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Mixed Office Commercial for this property. The applicant has
applied for a Planned Commercial Development for a new retail development.
A Land Use Plan amendment for a change to Commercial is a separate item on this
agenda.
Landscape: The proposed western perimeter landscape strip width drops below the six
feet and nine inch minimum allowed by the landscape ordinance. A variance of this
requirement would require City Beautiful Commission approval.
Interior landscaping must comprise at least eight percent of the interior of the on-
site vehicular use area. Interior islands must be at least 7 '/2 feet in width and 150
square feet in area to count toward fulfilling interior landscaping requirements.
An irrigation system to water landscaped areas will be required.
Revised plat/plan: Submit four (4) copies of a revised site plan (to include the
additional information as noted above) to staff on Wednesday, March 5, 2003.
Subdivision Committee Comments February 27, 2003
ITEM NO.: 10.1 FILE NO.: Z-7364
NAME: Bowman Market Place Long -form PCD
LOCATION: Northwest corner of Kanis Road and Bowman Road
Planning Staff Comments -.-
I .
omments:1. Provide notification of abutting property owners complete with the certified abstract
list, notice form with affidavit executed and proof of mailing.
2. Provide the days and hours of operation of the new buildings.
3. Any site lighting must be low level and directional, directed away from residentially
zoned property.
4. Provide any proposed fencing on the site plan along with construction materials and
height.
5. Provide the means of garbage collection. Will there be an on-site dumpster? If so
indicate the location along with the required screening.
6. Provide the maximum building height on the proposed site plan for each of the
buildings.
7. Provide the location of any proposed signage along with details, (type/height/area).
8. The proposed parking exceeds the typical minimum requirements for a development
of this type with the exception of the building proposed as retail or restaurant if
developed as a restaurant would be approximately 30 spaces short.
Variance/Waivers.
1. None requested.
Public Works.
Utilities and Fire Department/County Planning:
Wastewater: Existing sewer mains on site. Easements must be retained or Sewer
Mains relocated to serve all lots. Contact Little Rock Wastewater at 688-1414 for
additional information.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water_: The facilities on-site will be private. When meters are
planned off private lines, private facilities shall be installed to Central Arkansas
Water's material and construction specifications and installation will be inspected by
an engineer, licensed to practice in the State of Arkansas. Execution of Customer
Owner Line Agreement is required. A Capital Investment Charge based on the size
of connection(s) will apply to this project in addition to normal charges. This fee will
apply to all connections including metered connections off the private fire system.
Please submit two copies of the plans for the private fire line to Central Arkansas
Water regarding procedures for installation of private fire line. Approval of plans by
the Arkansas Department of Health Engineering Division and the Little Rock Fire
Department is required. This development will have minor impact on existing water
distribution systems. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Contact the Little Rock Fire Department (918-3752) and Central
Arkansas Water Department (992-2438) concerning the placement of fire hydrants.
County Planning: No comment received.
CATA: Site is not located on a dedicated bus route and has no effect on bus radius,
turnout and route.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Mixed Office Commercial for this property. The applicant has
applied for a Planned Commercial Development for a new retail development.
A Land Use Plan amendment for a change to Commercial is a separate item on this
agenda.
_Landscape: The proposed western perimeter landscape strip idth drops below the six
- feet and nine inch minimum allowed by the landscape ordinance. A variance of this
uirement would require City Beautiful Commission approval.
�; Interior landscaping must comprise at least eight percent of the interior of the on-
site vehicular use area. Interior islands must be at least 7 Y2 feet in width and 150
square feet in area to count toward fulfilling interior landscaping requirements.
L�11V�
An irrigation system to water landscaped areas will be required.
I
Revised plat/plan: Submit four (4) copies of a revised site plan (to include the
additional information as noted above) to staff on Wednesday, March 5, 2003.