HomeMy WebLinkAboutZ-7349 Staff AnalysisFILE NO.: Z-7349
NAME: FC Partnership Short -form POD
LOCATION: 13616 Kanis Road
DEVELOPER: ENGINEER:
FC Partnership Donald Brooks
1 Pinehurst Circle 20820 Arch Street Pike
Little Rock, AR 72212 Hensley, AR 72065
AREA: 2.369 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: R-2, Single-family
ALLOWED USES: Single-family Residential
PROPOSED ZONING: POD
PROPOSED USE: Office — General and Professional
VARIANCESIWAIVERS REQUESTED: None requested.
A. PROP OSALIREQUEST:
The applicant proposes to convert this existing single-family structure into an
office use. The applicant proposes the site to be used as an office use to
conduct their real estate development and property management services
company. The applicant has indicated the site will not be used for storage of
building material or any other activity related to that type of function. The
applicant has indicated the company is currently comprised of three (3)
employees and the normal business hours of operation are from 7:00 am to 6:00
pm Monday through Saturday.
The applicant has indicated there will be no exterior modifications to the existing
structure or the building footprint. The applicant has indicated all work to the
FILE NO.: Z-7349 (Cont.
structure will be cosmetic by painting, replacing windows and updating the
interior. In addition, the applicant has indicated a parking pad will be added to
the east side of the structure with parking for eight (8) vehicles. The surface will
be a hard surface parking pad as required by the Zoning Ordinance.
The applicant has indicated landscaping to be installed as required by the
Landscape Ordinance to the front of the structure. The applicant has also
indicated the rear 100 -feet of the property will remain undisturbed green space.
The applicant is requesting alternative uses for the site of both professional and
general office uses.
B. EXISTING CONDITIONS:
The site contains an existing single-family structure which is currently vacant.
There is a PD -0 located east of the site and two (2) single-family homes located
west of the site. South of the site there are single-family homes scattered along
Kanis Road. Southwest of the site is PRD zoning which was not rezoned when
the former Brodie Creek rezoning took place (now called Woodlands Edge).
The site contains an existing circular driveway, which appears to cross over the
adjoining property before exiting to Kanis Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Parkway Place Property Owners Association and the Gibralter Height/Point
West/Timber Ridge Property Owners Association were notified of the Public
Hearing along with all property owners within 200 -feet of the site and all
residents, who could be identified, located within 300 -feet of the site.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 -feet from centerline will be required.
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to the street including 5 -foot sidewalk with planned
development. The project would qualify for a contribution in -lieu of
construction.
3. Driveway locations do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Only single driveway access
would be allowed that is located near the center of the property frontage.
4. Plans of all work in the right-of-way shall be submitted for approval prior to
start of work. Obtain barricade permits prior to doing any work in the right-of-
way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
5. Stormwater Detention Ordinance applies to this property.
2
FILE NO.: Z-7349 Cont.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if service is
required for the project. Contact Little Rock Wastewater at 688-1414 for
additional details.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: No objection. Contact Central Arkansas Water at 992-
2438 for additional water meter(s) are required.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUESITECHNICAL/DESIGN:
Planninq Division: This request is located in the Ellis Mountain Planning
District. The Land Use Plan shows Suburban Office for this property. The
applicant has applied for a POD for an office development. The request is
consistent with the Land Use of Suburban Office.
City Recognized Neighborhood Action Plan: The applicant's property lies in
the area covered by the Rock Creek Neighborhood Action Plan. The Office and
Commercial Development Goal supports the promotion of commercial and office
development that enhances the primarily residential character of the community.
The Goal of enhancing the residential character of the area is supported by an
Action Statement that recommends the aggressive use of Planned Zoning
District's (PZD's) to influence more neighborhood friendly development.
Landscape Issues: The proposed parking area should be moved southward in
order to preserve the trees located immediately north of the proposed parking lot.
Buiidina Codes: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (January 16, 2003)
The applicant was present representing the application. Staff presented an
overview of the item indicating there were additional items needed on the
proposed site plan. Staff requested the parking area to the east of the building
3
FILE NO.: Z-7349 (Cont.
be relocated to the south enough to save the existing tree. Staff also requested
the parking spaces be indicated on the proposed site plan.
Public Works comments were addressed. Staff requested the applicant dedicate
right-of-way on Kanis Road and stated they would support a 15 -percent in -lieu
contribution for street construction to the roadway. Staff also requested the
eastern -most driveway be removed. Staff stated only a single driveway access
near the center of the property would be allowed on the site.
There were no further issues for discussion. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised by Staff and the Subdivision Committee. The applicant has indicated on
the site plan the proposed parking pad with eight (8) parking spaces. The
applicant has also indicated the large tree located on the east of the building will
be maintained. The revised site plan only includes one driveway location, the
existing western most drive. The applicant has indicated the eastern drive will
be removed prior to occupancy.
The applicant is not proposing any signage as a part of the development. Staff
supports allowing office standard signage. The applicant is also not proposing
any new fencing on the site. The applicant is however proposing the addition of
landscaping in the front yard area and a 100 -foot natural undisturbed area
located on the rear of the structure. Staff is supportive of the request. Staff feels
the area should remain residential in character while allowing limited non-
residential development to occur.
The applicant proposes the hours of operation to be from 7:00 am to 6:00 pm
Monday through Saturday. There will be three (3) employees reporting to the
site, which would yield a limited amount of traffic. The site will be used as a
corporate office for the FC Enterprises, Inc. a residential contractor firm. The
applicant has also requested alternative uses for the site to include general and
professional office uses.
The site is shown as Suburban Office on the Future Land Use Plan and the
proposed development is consistent with this classification. Staff is unaware of
any outstanding issues associated with the proposed development. Staff
recommends approval of the rezoning request to rezone the site to POD.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the Staff report.
4
FILE NO.: Z-7349
Staff recommends approval of the request to allow an in -lieu contribution for
street construction to Kanis Road.
Staff recommends signage be limited to that allowed in office zones.
PLANNING COMMISSION ACTION: (FEBRUARY 6, 2003)
The applicant was present. There were no objectors present. Staff presented the item
with a recommendation of approval of the POD zoning request subject to compliance
with the conditions outlined in paragraphs D, E and F of the above report.
Staff also recommended approval of the applicant's request to allow an in -lieu
contribution for street construction to Kanis Road.
Staff presented a recommendation that any development signage be limited to that
allowed in office zones.
There was no further discussion of the item. The item was placed on the Consent
Agenda for approval. The motion carried by a vote of 10 ayes, 0 noes and 1 absent.
5
February 6, 2003
ITEM NO.: 14
NAME: FC Partnership Short -form POD
LOCATION: 13616 Kanis Road
DEVELOPER:
FC Partnership
1 Pinehurst Circle
Little Rock, AR 72212
AREA: 2.369 Acres NUMBER OF LOTS: 1
CURRENT ZONING: R-2, Single-family
ALLOWED USES: Single-family Residential
PROPOSED ZONING: POD
FILE NO.: Z-7349
ENGINEER:
Donald Brooks
20820 Arch Street Pike
Hensley, AR 72065
FT. NEW STREET: 0
PROPOSED USE: Office — General and Professional
VARIANCESNVAIVERS REQUESTED: None requested.
A. PROPOSAUREQUEST:
The applicant proposes to convert this existing single-family structure into an
office use. The applicant proposes the site to be used as an office use to
conduct their real estate development and property management services
company. The applicant has indicated the site will not be used for storage of
building material or any other activity related to that type of function. The
applicant has indicated the company is currently comprised of three (3)
employees and the normal business hours of operation are from 7:00 am to 6:00
pm Monday through Saturday.
The applicant has indicated there will be no exterior modifications to the existing
structure or the building footprint. The applicant has indicated all work to the
February 6, 2003
SUBDIVISION
ITEM NO.: 14
FILE NO.: Z-7349
structure will be cosmetic by painting, replacing windows and updating the
interior. In addition, the applicant has indicated a parking pad will be added to
the east side of the structure with parking for eight (8) vehicles. The surface will
be a hard surface parking pad as required by the Zoning Ordinance.
The applicant has indicated landscaping to be installed as required by the
Landscape Ordinance to the front of the structure. The applicant has also
indicated the rear 100 -feet of the property will remain undisturbed green space.
The applicant is requesting alternative uses for the site of both professional and
general office uses.
B. EXISTING CONDITIONS:
The site contains an existing single-family structure which is currently vacant.
There is a PD -0 located east of the site and two (2) single-family homes located
west of the site. South of the site there are single-family homes scattered along
Kanis Road. Southwest of the site is PRD zoning which was not rezoned when
the former Brodie Creek rezoning took place (now called Woodlands Edge).
The site contains an existing circular driveway, which appears to cross over the
adjoining property before exiting to Kanis Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Parkway Place Property Owners Association and the Gibralter Height/Point
West/Timber Ridge Property Owners Association were notified of the Public
Hearing along with all property owners within 200 -feet of the site and all
residents, who could be identified, located within 300 -feet of the site.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 -feet from centerline will be required.
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to the street including 5 -foot sidewalk with planned
development. The project would qualify for a contribution in -lieu of
construction.
3. Driveway locations do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Only single driveway access
would be allowed that is located near the center of the property frontage.
2
February 6, 2003
SUBDIVISION
ITEM NO.: 14 Cont. FILE NO.: Z-7349
4. Plans of all work in the right-of-way shall be submitted for approval prior to
start of work. Obtain barricade permits prior to doing any work in the right-of-
way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
5. Stormwater Detention Ordinance applies to this property.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if service is
required for the project. Contact Little Rock Wastewater at 688-1414 for
additional details.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: No objection. Contact Central Arkansas Water at 992-
2438 for additional water meter(s) are required.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning
District. The Land Use Plan shows Suburban Office for this property. The
applicant has applied for a POD for an office development. The request is
consistent with the Land Use of Suburban Office.
Ci Reco nixed Nei hborhood Action Plan: The applicant's property lies in
the area covered by the Rock Creek Neighborhood Action Plan. The Office and
Commercial Development Goal supports the promotion of commercial and office
development that enhances the primarily residential character of the community.
The Goal of enhancing the residential character of the area is supported by an
Action Statement that recommends the aggressive use of Planned Zoning
District's (PZD's) to influence more neighborhood friendly development.
Landscape Issues: The proposed parking area should be moved southward in
order to preserve the trees located immediately north of the proposed parking lot.
Building Codes: No comment.
K,
February 6, 2003
SUBDIVISION
ITEM NO.: 14 (Cont.) FILE NO.: Z -
G. SUBDIVISION COMMITTEE COMMENT: (January 16, 2003)
The applicant was present representing the application. Staff presented an
overview of the item indicating there were additional items needed on the
proposed site plan. Staff requested the parking area to the east of the building
be relocated to the south enough to save the existing tree. Staff also requested
the parking spaces be indicated on the proposed site plan.
Public Works comments were addressed. Staff requested the applicant dedicate
right-of-way on Kanis Road and stated they would support a 15 -percent in -lieu
contribution for street construction to the roadway. Staff also requested the
eastern -most driveway be removed. Staff stated only a single driveway access
near the center of the property would be allowed on the site.
There were no further issues for discussion. The Committee then forwarded the
item to the full Commission for final action.
K ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised by Staff and the Subdivision Committee. The applicant has indicated on
the site plan the proposed parking pad with eight (8) parking spaces. The
applicant has also indicated the large tree located on the east of the building will
be maintained. The revised site plan only includes one driveway location, the
existing western most drive. The applicant has indicated the eastern drive will
be removed prior to occupancy.
The applicant is not proposing any signage as a part of the development. Staff
supports allowing office standard signage. The applicant is also not proposing
any new fencing on the site. The applicant is however proposing the addition of
landscaping in the front yard area and a 100 -foot natural undisturbed area
located on the rear of the structure. Staff is supportive of the request. Staff feels
the area should remain residential in character while allowing limited non-
residential development to occur.
The applicant proposes the hours of operation to be from 7:00 am to 6:00 pm
Monday through Saturday. There will be three (3) employees reporting to the
site, which would yield a limited amount of traffic. The site will be used as a
corporate office for the FC Enterprises, Inc. a residential contractor firm. The
applicant has also requested alternative uses for the site to include general and
professional office uses.
The site is shown as Suburban Office on the Future Land Use Plan and the
proposed development is consistent with this classification. Staff is unaware of
4
February 6, 2003
SUBDIVISION
ITEM NO.: 14 (Cont.) FILE NO.: Z-7349
The site is shown as Suburban Office on the Future Land Use Plan and the
proposed development is consistent with this classification. Staff is unaware of
any outstanding issues associated with the proposed development. Staff
recommends approval of the rezoning request to rezone the site to POD.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the Staff report.
Staff recommends approval of the request to allow an in -lieu contribution for
street construction to Kanis Road.
Staff recommends signage be limited to that allowed in office zones.
PLANNING COMMISSION ACTION: (FEBRUARY 6, 2003)
The applicant was present. There were no objectors present. Staff presented the item
with a recommendation of approval of the POD zoning request subject to compliance
with the conditions outlined in paragraphs D, E and F of the above report.
Staff also recommended approval of the applicant's request to allow an in -lieu
contribution for street construction to Kanis Road.
Staff presented a recommendation that any development signage be limited to that
allowed in office zones.
There was no further discussion of the item. The item was placed on the Consent
Agenda for approval. The motion carried by a vote of 10 ayes, 0 noes and 1 absent.
5
February 6, 2003
TEM NO.: 14
NAME: FC Partnership Short -form POD
LOCATION: 13616 Kanis Road
DEVELOPER:
FC Partnership
1 Pinehurst Circle
Little Rock, AR 72212
AREA: 2.369 Acres NUMBER OF LOTS: 1
CURRENT ZONING: R-2, Single-family
ALLOWED USES: Single-family Residential
PROPOSED ZONING: POD
FILE NO.: Z-734
ENGINEER:
Donald Brooks
20820 Arch Street Pike
Hensley, AR 72065
FT. NEW STREET: 0
PROPOSED USE: Office — General and Professional
VARIANCESMAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant proposes to convert this existing single-family structure into an
office use. The applicant proposes the site to be used as an office use to
conduct their real estate development and property management services
company. The applicant has indicated the site will not be used for storage of
building material or any other activity related to that type of function. The
applicant has indicated the company is currently comprised of three (3)
employees and the normal business hours of operation are from 7:00 am to 6:00
pm Monday through Saturday.
The applicant has indicated there will be no exterior modifications to the existing
structure or the building footprint. The applicant has indicated all work to the
February 6, 2003
SUBDIVISION
ITEM NO.: 14 Cont. FILE NO.: Z-7349
structure will be cosmetic by painting, replacing windows and updating the
interior. In addition, the applicant has indicated a parking pad will be added to
the east side of the structure with parking for eight (8) vehicles. The surface will
be a hard surface parking pad as required by the Zoning Ordinance.
The applicant has indicated landscaping to be installed as required by the
Landscape Ordinance to the front of the structure. The applicant has also
indicated the rear 100 -feet of the property will remain undisturbed green space.
The applicant is requesting alternative uses for the site of both professional and
general office uses.
B. EXISTING CONDITIONS:
The site contains an existing single-family structure which is currently vacant.
There is a PD -O located east of the site and two (2) single-family homes located
west of the site. South of the site there are single-family homes scattered along
Kanis Road. Southwest of the site is PRD zoning which was not rezoned when
the former Brodie Creek rezoning took place (now called Woodlands Edge).
The site contains an existing circular driveway, which appears to cross over the
adjoining property before exiting to Kanis Road.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. The
Parkway Place Property Owners Association and the Gibralter Height/Point
West/Timber Ridge Property Owners Association were notified of the Public
Hearing along with all property owners within 200 -feet of the site and all
residents, who could be identified, located within 300 -feet of the site.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 -feet from centerline will be required.
2. Provide design of street conforming to the Master Street Plan. Construct one-
half street improvement to the street including 5 -foot sidewalk with planned
development. The project would qualify for a contribution in -lieu of
construction.
3. Driveway locations do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Only single driveway access
would be allowed that is located near the center of the property frontage.
2
February 6, 2003
SUBDIVISION
ITEM NO.: 14 (Cont.) FILE NO.: Z-7349
4. Plans of all work in the right-of-way shall be submitted for approval prior to
start of work. Obtain barricade permits prior to doing any work in the right-of-
way from Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
5. Stormwater Detention Ordinance applies to this property.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if service is
required for the project. Contact Little Rock Wastewater at 688-1414 for
additional details.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: No objection. Contact Central Arkansas Water at 992-
2438 for additional water meter(s) are required.
Fire Department: Approved as submitted.
County Plan : No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning
District. The Land Use Plan shows Suburban Office for this property. The
applicant has applied for a POD for an office development. The request is
consistent with the Land Use of Suburban Office.
City Recognized Neighborhood Action Plan: The applicant's property lies in
the area covered by the Rock Creek Neighborhood Action Plan. The Office and
Commercial Development Goal supports the promotion of commercial and office
development that enhances the primarily residential character of the community.
The Goal of enhancing the residential character of the area is supported by an
Action Statement that recommends the aggressive use of Planned Zoning
District's (PZD's) to influence more neighborhood friendly development.
Landscape Issues: The proposed parking area should be moved southward in
order to preserve the trees located immediately north of the proposed parking lot.
Buildina Codes: No comment.
K,
February 6, 2003
SUBDIVISION
ITEM NO.: 14 (Cont.) FILE NO.: Z-7349
G. SUBDIVISION COMMITTEE COMMENT: (January 16, 2003)
The applicant was present representing the application. Staff presented an
overview of the item indicating there were additional items needed ori the
proposed site plan. Staff requested the parking area to the east of the building
be relocated to the south enough to save the existing tree. Staff also requested
the parking spaces be indicated on the proposed site plan.
Public Works comments were addressed. Staff requested the applicant dedicate
right-of-way on Kanis Road and stated they would support a 15 -percent in -lieu
contribution for street construction to the roadway. Staff also requested the
eastern -most driveway be removed. Staff stated only a single driveway access
near the center of the property would be allowed on the site.
There were no further issues for discussion. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the :issues
raised by Staff and the Subdivision Committee. The applicant has indicated on
the site plan the proposed parking pad with eight (8) parking spaces. The
applicant has also indicated the large tree located on the east of the building will
be maintained. The revised site plan only includes one driveway location, the
existing western most drive. The applicant has indicated the eastern drive will
be removed prior to occupancy.
The applicant is not proposing any signage as a part of the development. Staff
supports allowing office standard signage. The applicant is also not proposing
any new fencing on the site. The applicant is however proposing the addition of
landscaping in the front yard area and a 100 -foot natural undisturbed area
located on the rear of the structure. Staff is supportive of the request. Staff feels
the area should remain residential in character while allowing limited non-
residential development to occur.
The applicant proposes the hours of operation to be from 7:00 am to 6:00 pm
Monday through Saturday. There will be three (3) employees reporting to the
site, which would yield a limited amount of traffic. The site will be used as a
corporate office for the FC Enterprises, Inc. a residential contractor firm. The
applicant has also requested alternative uses for the site to include general and
professional office uses.
The site is shown as Suburban Office on the Future Land Use Plan and the
proposed development is consistent with this classification. Staff is unaware of
C!
February 6, 2003
SUBDIVISION
ITEM NO.: 14 Cont. FILE NO.: Z-7349
any outstanding issues associated with the proposed development. Staff
recommends approval of the rezoning request to rezone the site to POD.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the Staff report.
Staff recommends approval of the request to allow an in -lieu contribution for
street construction to Kanis Road.
Staff recommends signage be limited to that allowed in office zones.
Subdivision Committee Comments
Item No. 14
FC Partnership Short -form POD
January 16, 2003
7-7-IdQ
Planning Staff Comments:
1. Any additional site lighting must be low level and directional directed away from
residentially zoned property.
2. Provide signage details (height, area, material, location).
3. The drive and parking area must be constructed of a hard surface unless a waiver is
granted.
4. Relocate the parking pad to the south to maintain the existing mature tree located
near the proposed parking area. Indicate the parking spaces on the proposed
parking pad.
5. Remove the secondary drive, which exits to the eastern property line.
6. Provide any proposed fencing, material and height.
7. Provide notification of property owners located within 200 -feet of the site complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
Variance/Waivers: ) `
Public Works -
1 .
orks:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication
of right-of-way 45 -feet from centerline will be required.
2. Provide design of street conforming to the Master Street Plan. Construct one-half
street improvement to the street including 5 -foot sidewalk with planned development.
The project would qualify for a contribution in -lieu of construction.
3. Driveway locations do not meet the traffic access and circulation requirements of
Sections 30-43 and 31-210. Only single driveway access would be allowed that is
located near the center of the property frontage.
4. Plans of all work in the right-of-way shill be submitted for approval prior to start of
work. Obtain barricade permits prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1817 (Derrick Bergfield).
5. Stormwater Detention Ordinance applies to this property.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required with easements if service is required for
the project. Contact Little Rock Wastewater at 688-1414 for additional details.
Entergy: Approved as submitted.
Center -Point Ener : No comment received.
SBC: No comment received.
Central Arkansas Water: No objection. Contact Central Arkansas Water at 992-2438
for additional water meter(s) are required.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
Planning Division -
Landscape Issues: The proposed parking area should be moved southward in order
to preserve the trees located immediately north of the proposed parking lot.
Revised plat/plan: Submit four (4) copies of a revised site plan (to include the