HomeMy WebLinkAboutZ-7299 Staff AnalysisFILE NO-� Z-7299
NAME: U -Pull -It Long -form PID
LOCATION: 10312 West Baseline Road
DEVELOPER� ENGINEER,
Gary Johnson McGetrick and McGetrick Engineers
U -Pull -It Auto Parts, Inc. 319 President Clinton Avenue, Suite 202
Little Rock, AR 72209 Little Rock, AR 72201
AREA: 26.14 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING: R-2, Single-family (non -conforming)
ALLOWED USES
Single-family Residential (non -conforming auto salvage)
PROPOSED ZONING- PID
PROPOSED USE: Auto Salvage
VARIAN CESNVAIVERS REQUESTED: 15% In -lieu contribution for road improvements
to West Baseline Road.
Three (3) year deferral of the hard surface parking area.
A. PROPOSAL/R.EQUEST:
The present use consists of 21.4 acres, zoned R-2 with a non -conforming use.
The owner plans to expand the project by five acres and is requesting PID zoning
for the entire project.
U -Pull -It Auto parts is a parts operation whereby the owner buys cars, sets them
on blocks and removes the tires and all fluids. Once all saleable parts are
removed, the vehicles are crushed in an on-site machine and shipped out. The
site is totally fenced and screened from public view.
FILE NO.: Z-7299
The owner proposes to dedicate any required right-of-way for West Baseline
Road, but requests to be allowed to make a 15% in -lieu contribution of
development cost for roadway improvements to West Baseline Road. The
applicant has justified this request on the basis of the uncertainty of any pending
highway construction in connection with the 1-30 widening project currently under
construction.
The applicant has requested a three (3) year deferral of the hard surface parking
area. A portion of the public parking will be located in the right-of-way. The
applicant is requesting to be allowed to franchise the parking spaces located in
the right-of-way.
B. EXISTING CONDITIONS:
The site is an auto salvage yard with a 6 -foot wooden fence adjoining West
Baseline Road and a corrugate I d tin screening fence along the east and west
property lines. The area in which the applicant has requested expansion has
been cleared and lies adjacent to a tributary of the Fourche Creek. It appears
there has been filling within the floodway of the creek.
Other uses in the area include two churches on the south side of West Baseline
Road; one to the east and one to the west. The areas immediately to the north,
south, east and west are heavily wooded with a recent rezoning and landuse
plan amendment directly south of the site. A Planned Industrial Development
was approved to the southwest of the site on the corner of West Baseline Road
and Sibley Hole Road earlier this year.
The site is currently shown on the Future Land Use Plan as STD (Service Trades
District), which allows for a selection of office, warehousing and industrial park
activities. The development requires a Planned Development if the development
is not wholly office. The applicant has met these criteria by filing for a Planned
Industrial Development.
C. NEIGHBORHOOD COMMENTS:
Southwest Little Rock United for Progress, all property owners within 200 feet and all
residents, who could be identified, within 300 feet of the site were notified of the
Public Hearing. As of this writing, Staff has not received any comment from area
residents.
D_ ENGINEERING COMMENTS. -
PUBLIC WORKS CONDITIONS:
1. This is a Public Works enforcement action of the land alteration ordinance
and flood plain ordinance. A stop work order was issued for clearing and
2
FILE NO.: Z-7299 (Cont.
grading without a permit in a regulated floodplain. If the proposed re -zoning
is not approved, restore the land in accordance with the land alteration
ordinance and the floodplain ordinance.
2. Delineate the floodplain and floodway boundary on the site.
3. With building permit: -
Baseline Road is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way 55 feet from the centerline will be
required.
4. Provide design of street conforming to the Master Street Plan. Construct half -
street improvements to the street including 5 -foot sidewalk with planned
development. These improvements would also qualify for contribution in -lieu
of construction per City Ordinance.
5. A grading permit for Special Flood Hazard Area will be required per Section
8-283.
6. Stormwater detention ordinance applies to this property.
7. An NPDES permit will be required for this project. Contact the Arkansas
Department of Environmental Quality for approval prior to the start of work.
8. Contact the US Army Corp of Engineers for approval prior to start of work,
regarding regulated wetlands.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNIN&
Wastewater: Sewer available, not adversely affected -
Entergy: No comment received.
ARKLA: No comment received.
Southwestern Bell: No comment received -
Water: No objection.
Fire Department: Approved as submitted,
County Planning: No comment received-
CATA: Site is located on Bus Route #15 and has no effect on bus radius,
turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Otter Creek Planning District.
The Land Use Plan shows Service Trades District for this property. The
applicant has applied for a Plarihed Industrial Development for expansion of an
existing non -conforming auto salvage business.
3
FILE NO.: Z-7299 (Cont.)
As stated, this is an existing use and the buildings associated with the use are a
small consequence in any redevelopment of the site for a future use. Since the
request is to legitimatize an existing business and allow a small expansion
through the Planned Development process, it is consistent with previous City
actions to make the review without modifying the Land Use Plan.
City Recocinized Neighborhood Action Plan- The applicant's property lies in an
area not covered by a city recognized neighborhood action plan.
Landscape Issues: Land use and street buffers are not shown on the plan
submitted. The zoning ordinance requires a fifty (50) foot wide street buffer
along Baseline Road and a fifty (50) foot wide land use buffer along the northern
perimeter of the site. Additionally, a forty (40) foot wide land use buffer is
required along the eastern perimeter of the site. Unless otherwise provided for,
trees and shrubs are required within the street and land use buffer areas. If the
existing facility were to be brought into current ordinance compliance, then it
would also need to provide a fifty (50) foot wide street buffer along Baseline
Road and along the northern perimeter and a forty (40) foot wide land use buffer
along the western perimeter of the site.
An eight (8) foot tall, opaque wall or fence is required to screen all sides of the
salvage yard. This fence or wall must be constructed of wood (with its face side
directed outward) or metal. I'n addition to this requirement, the maximum
stacking height of vehicle bodies is fifteen (15) feet.
Landscaped areas must be irrigated.
Prior to obtaining a building permit, it will be necessary to provide an approved
Landscape Plan stamped with the seal of a Registered Landscape Architect.
Buildtg Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT- (October 10, 2002)
Mr. Pat McGetrick of McGetrick an McGetrick Engineers and Mr. Gary Johnson, the
applicant, were present represenfing the application. Staff presented the application
to the Committee indicating additional information requested on the site plan. Staff
stated the site plan indicated a g.Favel parking area and the area was to be
constructed with a hard surface. Staff also stated the site plan did not indicate the
proposed fencing material. The applicant indicated he was requesting a three (3)
year deferral of resurfacing the parking area.
Landscaping comments were discussed. The applicant was informed the fencing
must be eight (8) feet in height and the maximum stacking of automobiles was 15 -
feet. Staff stated the street buffer and land use buffers were not shown on the plan
1E
FILE NO.: Z-7299 (Cont.
submitted. Staff requested thes6 items be identified on the revised plan. Staff also
stated a forty (40) foot wide land use buffer would be required along the eastern
perimeter of the site.
Public Works comments were addressed. Staff stated right-of-way dedication would
be required. Staff also stated an in -lieu contribution for street construction would be
acceptable, Staff stated the applicant would be required to submit plans to
Environmental Quality to obtain a NPDES permit and contact the US Army Corp of
Engineers prior to starting work, regarding regulated wetlands.
After the discussion, the Committee then forwarded the item to the full Commission
for final action.
H. ANALYSIS:
The applicant submitted revis ' ed plans to Staff addressing most of the issues
raised by Staff and the Subdivision Committee. The applicant has located the
crushing area and the dumpster location, both of which, are located to the rear of
the property. The applicant has also indicated the floodplain and floodway lines
on the proposed plan. The applicant has shown a 40 -foot landscape strip
adjacent to the floodway on the southeastern boundary of the property adjacent
to the street. The applicant has also indicated a 75 -foot undisturbed buffer in the
expanded area located at the rear of the site.
The applicant has indicated an eight (8) foot chain link fence with metal slats to
act as the screening to the east. Staff is not supportive of the request. The
ordinance requires a fence used to screen a salvage yard to be a wooden fence
with its face side directed outward or metal. In addition, the ordinance prohibits
the use of plastic or metal slats woven into a chain link fence.
The applicant has requested a three-year deferral of paving the public parking
area. Staff is not supportive of this request. Staff feels the applicant should bring
the existing parking area into compliance with city code. The business is an
existing business, which wishes to expand, not a start up business operating on
limited capital.
Overall Staff is supportive of the development plan and the mitigation of the
floodway issues associated with the proposed development. Staff feels the use
is compatible to the area. The site is shown as Service Trades District on the
Future Land Use Plan, which with a Planned Development the site would meet
the spirit of the Plan.
Staff is not however supportive of the request to allow the chain link fencing with
the metal slats as the eastern screening or the request for the three year deferral
of the hard surface parking area.
5
FILE NO.: Z-7299 (Cont.
STAFF RECOMMENDATION,
Staff recommends approval of the proposed development subject to compliance
with the conditions outlined in Paragraphs D, E and IF of this report.
Staff recommends denial of the proposed request for a three (3) year deferral of
the hard surface parking area.
Staff recommends denial of the request to allow an eight (8) foot chain link fence
with metal slats to serve as the eastern screening device.
PLANNING COMMISSION ACTION: (OCTOBER 31, 2002)
Mr. Pat McGetrick of McGetrick and McGetrick Engineers was present representing the
application. There were no objectors present. Staff presented the item with a
recommendation of approval of the proposed development subject to compliance with
the conditions outlined in the "Staff Recommendation" above.
Staff stated the applicant had agreed to construct the hard surface parking area and to
construct a wood or metal fence along the eastern property line for the screening
device.
There was no further discussion. The item was placed on the consent agenda for
approval and approved by a vote of 8 ayes, 0 noes, 2 absent and 1 recuse.
I
101
Subdivision Committee Meeting
October 10, 2002
ITEM NO.: 16
7299
NAME: U -Pull -It Long -form PID
-?�
A
LOCATION: 10312 West Baseline Road
DEVELOPER:
Gary Johnson
U -Pull -It Auto Parts, Inc.
Little Rock, AR 72209
ENGINEER
FILE NO.: Z -
R �k_ 0-0
ISV
McGetrick and McGetrick Engineers
319 President Clinton Avenue, Suite 202
Little Rock, AR 72201
AREA: 26.14 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
CURRENT ZONING- R-2, Single-family (non -conforming)
ALLOWED USES: Single-family Residential
�'o
PROPOSED ZONING: PID �11�
PROPOSED USE: Auto Salvage
VARIANCES/WAIVERS REQUESTED: 15%
imVve. t t West Baseline Road
_,_I "
LANNING STAFF COMMENTS:
In -lieu contribution for road
1 . Provide a certified list of property owners within 200 -feet of the site along with
notice form, affidavit executed, and proof of mailing.
2. Provide the proposed fencing material and height. (Section 36-321 (b)(1)(2)).
3. Parking areas are to be hard surface.
4. Provide square footage of buildings existing and proposed.
5. Locate crushing area on the site plan.
6. Locate any proposed signage on the site plan and give details (height/area).
7. Provide days and hours of operation.
8. Dimension building setback from property lines.
9. Will there be a dumpster located on the site? If so indicate with screening.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS,
(No comment received.)
Subdivision Committee Meeting
October 10, 2002
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected -
Entergy:
ARKLA:
Southwestern Bell- Approved as submitted.
Water: No objection,
Fire Department:
County Planning: No comment received.
CATA: Site is located on Bus Route #15 and has no effect on bus radius,
turnout and route.
ISSUES/TECHNICAL/DESIGN:
Planning Div sion: This request is located in the Otter Creek Planning District.
The Land Use Plan shows Service Trades District for this property. The
applicant has applied for a Planned Industrial Development for expansion of
an existing non -conforming auto salvage business.
As stated, this is an existing use and the buildings associated with the use are
a small consequence in any redevelopment of the site for a future use. Since
the request is to legitimatize an exiting business and allow a small expansion
through the Planned Development process, it is consistent with previous City
actions to make the review without modifying the Land Use Plan.
City Recognized Ne �hborhood Action Plan: The applicant's property lies in an
area not covered by a city recognized neighborhood action plan.
Landscape Issues: Land use and street buffers are not shown on the plan
submitted. The zoning ordinance requires a fifty (50) foot wide street buffer
along Baseline Road and a fifty (50) foot wide land use buffer along the
northern perimeter of the site. Additionally, a forty (40) foot wide land use
buffer is required along the eastern perimeter of the site. Unless otherwise
provided for, trees and shrubs are required within the street and land use
buffer areas. If the existing facility were to be brought into current ordinance
compliance, then it would also need to provide a fifty (50) foot wide street
Subdivision Committee Meeting
October 10, 2002
buffer along Baseline Road and along the northern perimeter and a forty (40)
foot wide land use buffer along the western perimeter of the site.
An eight (8) foot tall, opaque wall or fence is required to screen all sides of the
salvage yard. This fence or wall must be constructed of wood (with its face
side directed outward) or metal. In addition to this requirement, the maximum
stacking height of vehicle bodies is fifteen (15) feet.
Landscaped areas must be irrigated.
Prior to obtaining a building permit, it will be necessary to provide an approved
Landscape Plan stamped with the seal of a Registered Landscape Architect.
Building Codes: No comment received
REVISED PLAT/PLAN: SUBMIT FOUR (4) COPIES OF A REVISED SITE PLAN (TO INCLUDE
THE ADDITIONAL INFORMATION AS NOTED ABOVE) TO STAFF NO LATER THAN
NOON ON WEDNESDAY, OCTOBER 16, 2002.