HomeMy WebLinkAboutZ-7253-B Staff AnalysisMarch 25, 2004
ITEM NO.: 18 FILE NO.: Z -7253-B
NAME: Central High School Baseball Field —
Revised Conditional Use Permit
LOCATION: 1500 South Park Street
OWNERIAPPLICANT: Little Rock School District/Melanie Gibson
PROPOSAL: A revision to a previously approved conditional use
permit is requested to allow for the installation of
lighting to the baseball field on this R-4 zoned, 20t
acre high school campus.
1. SITE LOCATION:
The Central High School Campus is located between Daisy L. Gatson
Bates Drive, West 16th Street, Park Street and Jones Street.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The campus has been a part of this neighborhood for many years. The
baseball field is located mid -campus, between the main school building
and the football field. This area has been used for years for athletic
activities. The baseball field is in close proximity to the football field which
regularly has evening and night events that require lighting. Allowing
lighting of the baseball field, which typically should not extend past 10:00
p.m., should not affect the school's continued compatibility with the
neighborhood.
All owners of property located within 200 feet of the northern and southern
boundary of the campus in the vicinity of the baseball field, all residents
within 300 feet of the campus who could be identified and the Central
High Neighborhood Associations were notified of this request.
3. ON SITE DRIVES AND PARKING:
No new parking lots or driveways are proposed through this action.
Existing on and off campus parking lots will be utilized. Since most
games occur after school hours, adequate parking should be available
near the ball field.
4. SCREENING AND BUFFERS:
No Comments.
March 25, 2004
ITEM NO.: 18 Cont. FILE NO.: Z -7253-B
5. PUBLIC WORKS COMMENTS:
1. No Comments. Public frontage improvements are underway. Call `
Public Works for final inspection when all work has been completed.
6. UTILITY FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available, not adversely affected.
Entergy: No Comments received.
CenterPoint Energy: No Comments received.
Southwestern Bell: No Comments received.
Water: No objection.
Fire Department: Approved as submitted.
Counly Planning: No Comments.
CATH: A CATA Bus Route is located adjacent to the site, along West 13th
Street.
SUBDIVISION COMMITTEE COMMENT: (MARCH 4, 2004)
Melanie Gibson, the applicant, and Doug Eaton, of the LRSD, were present.
Staff presented the item and noted that a copy of the bill of assurance needed to
be provided. Staff also asked that written approval be provided from the
National Park Service. Mr. Eaton responded that the Park Service's boundary
stopped behind the main building, east of the ball field, but he would provide a
statement from them. Staff asked if it would be appropriate to have the applicant
notify, via certified mail, the property owners located north and south of the
campus, in the area of the ball field, rather than around the entire campus. Staff
stated notices would be sent by the City to the neighborhood association and to
all residents who could be identified within 300 feet of the campus perimeter.
The Committee determined that doing the notices in that manner would be
sufficient.
The applicant was advised to respond to staff issues by March 10, 2004. The
Committee forwarded the item to the full Commission.
K
March 25, 2004
ITEM NO.: 18 Cont. FILE NO.: Z -7253-B
STAFF ANALYSIS:
The Central High School campus is located on a 20+ acre site bounded by Park,
Jones, Daisy Bates and West 16th Streets. The school buildings occupy the
eastern third of the campus. The western third of the campus is occupied by the
football field and stands. The middle third of the campus contains a parking lot
and a baseball field and stands. The area where the baseball field is located
was previously used for athletic events including football practice. Staff
approved the construction of a baseball field in this area with the understanding
that any lighting of the field would have to be approved by the Planning
Commission. Staff felt that day time use of the area for baseball was consistent
with the historic use of this part of the campus. Allowing lighting for nighttime
practice and games would be enough of a change that it would not be approved
at staff level. The baseball field has been constructed and dedication
ceremonies occurred earlier in March 2004. The Little Rock School District has
filed this conditional use permit application requesting permission to install
lighting on the baseball field.
The lights are to be installed on seven poles strategically placed around the
perimeter of the field by a professional lighting company. Two light standards on
the adjacent football field will be used. The lights will be mounted at 70 feet.
The high school baseball season runs from late February through the end of
April. The team beings practice on the field in November. The lights will be in
use once daylight savings time ends until 6:00 or 6:30 during the week. During
the season, baseball games begin between 4:30 and 5:30 in the afternoon. Two
games (varsity and junior varsity) are scheduled some nights. Games last
approximately 1.5 hours each.
Staff is supportive of the request. Allowing the lighting of the ball field should not
affect the school's continued compatibility with the neighborhood. During
practice season, the lighting will normally only be on until 6:00 — 6:30 in the
evening. As a general rule, during the baseball season, the lighting should not
be on past 9:00 —10:00 at night. The adjacent football field has had lighting for
many years and is used by LRSD Schools other than Central High. There is not
a bill of assurance issue. Since a portion of the Central High School Campus is
a national historic site, written approval should be submitted by the Parks
Service prior to installation of the lighting.
STAFF RECOMMENDATION:
Staff recommends approval of the requested conditional use permit subject to
compliance with the following conditions:
3
March 25, 2004
ITEM NO.: 18 Cont. FILE NO.: Z -7253-B
1. Use of the lighting is to be as submitted by the applicant and described in the
"Staff Analysis" above.
2. A statement of approval from the National Parks Service must be submitted
prior to installation of the lighting.
PLANNING COMMISSION ACTION: (MARCH 25, 2004)
The applicant was present. There were no objectors present. Staff presented
the item and a recommendation of approval subject to compliance with the
conditions outlined in the "Staff Recommendation" above. There was no further
discussion.
The item was placed on the Consent Agenda and approved as recommended by
staff. The vote was 10 ayes, 0 noes and 1 absent.