Loading...
HomeMy WebLinkAboutZ-7246 Map 4SECTION I SPLICE ISECT. P/N ASSEMBLY LEVEL k WEIGHT DWG. NO. 70' If n IT IT yo N II It II it m ---m — m ---m—_ a r N B C -IF ---IT B R u a 4 u n It if If If u uIf l u FUTURE LOW PROFILE PLATFORM O 50' EL 30' n N ^ HARDENED STEELY Z o n FLATWASHERS 1 1 LL n � 4 FINISH GRADE ELEVATION VIEW DRAIN -SPOT PVC PIPE DRAINAGE SLOT MUST BE KEPT OPEN WAVEGUID TIDE PORT ... C ..... ..... .. CELLU.LAR PLATFORM ACCESS HATCH (LOCATED ON PLATFORM FACE). ANTENNA INSTALLATION CHART ANTENNA TYPE I ELEV. I AZIMUTH OFFSET ANTENNA MOUNT INST. DWG 12 ALP9212 70' I N/A N/A I FP -12 -PLT SEE NOTE 1 THIS TOWER HAS BEEN DESIGNED FOR THE FOLLOWING ANTENNA LOADING: (12) ALP9212 O 70 FT. W/(1) 1 5/8' COAX EA. (3) D0810 0 70 FT. W/(1) 7/8' COAX EA. (12) ALP9212 0 50 FT. W/(1) 1 5/8' COAX EA. 1/4'0 X 10'-0' LONG 615 GR. 75) ANCHOR BOLTS HEXNUTS EACH PLATE UNC NUT CONCRETE PIER GENERAL NOTES: 1. TONER HEIGHT 70' FT. 2 CONCRETE TOWER BASE FOUNDATION DWG. NO. SF -964D6 _7.4.2 CUBIC YARDS OF CONCRETE 3. REMOVE UPPER ANCHOR BOLT TEMPLATE BEFORE INSTALLING TOWER BASE. 4. GROUNDING REWIRED: O YES IIIIIII NO (BY OTHERS) INSTALL TOP BUS BAR ON PLATFORM PER DWG. NO. FP -89 - INSTALL TWO BOTTOM BUS BARS ON BASE SECTION PER DIG. NO. FP -BB - FINISH -ALL STEEL HOT DIPPED GALVANIZED. PAINT REWIRED: O YES O NO 6. INSTALL I• LOCKWASHERS AND HEMIUTS 1111111 LOCKNUTS (SEE SPECIAL NOTE). 7. SAFETY CLIMB DEVICE REWIRED: I• YES C3 NO INSTALL PER DWG. NO. _FP -SC -1A AND MANUFACTURES INSTRUCTIONS. El. LIGHTNING ROD REQUIRED: IIIIIII YES C-3 NO .INSTALL (3) LIGHTNING RODS PER DWG NO. MI -STV -1 - 9. LIGHTS REOUIRED: M YES M NO 10. ANTENNA INSTALLATION PER CHART THIS DWG. 11. CELLULAR PLATFORM REWIRED: W YES ED NO INSTALL PER DWC, NO. FP -12 -PLT INSTALL 2' IPS X W -O' PIPES (P/N 348018-1) TO PLATFORM HAND RAIL CLIPS WITH 5XO X 3 1/e' C/C U -BOLTS (P/N 348057-11) TO MOUNT ALP9212 ANTENNAS 12. WAVEGUIDE BRIDGE REWIRED: O YES ® NO 13, ICE SHIELDS REWIRED. O YES 1111111 NO 14. INSTALL STEP BOLTS IN ADDITIONAL BRACKETS SURROUNDING EACH SECTION (LOCATED 4' BELOW TOP FLANGES). - 15. REMOVE ALL TRASH AND DEBRIS FROM SITE 16. ORIENT SECTIONS WITH PART NUMBER TAG AT BOTTOM 17. ANY FIELD DAMMAGE OR FIELD MODIFICATIONS NEED TO BE - DOCUMENTED TO ANDREW CORPORATION AND ALL EXPOSED (BARE) METAL SHALL BE GIVEN ONE COAT (MINIMUM) OF ZINC RICH PAINT. 18. INSTALL TOWER NAME PLATE. PART NO. 348070-1. IN OPEN STEP BOLT HOLE AT APPROX. 10'-0 ABOVE GRADE USING 5/8o X 1 1/2 BOLT PROVIDED. N� i Zp .0 UINSAS * 1t PFf01 SS10>tAL R GxiATE R It * It h Na.7GSi7 Fn/y6 DRAWINGS REQUIRED: SF -96406 MI -STV -5 FPA24-4051 MI -SN -1 FP -BB -A FP -BB -C FP -SC -1A FP -NOTES FP -12 -PLT ..FP -ERECT NOTE: IT IS THE ERECTOR'S RESPONSIBILITY TO INSURE THAT ALL PRACTICES AND PROCEDURES UTILIZED DURING ASSEMBLY AND ERECTION WORK REQUIRED ON THE TOWER DO NOT ENDANGER THE SAFETY OF ANY PERSONNEL NOR THE STRUCTURAL INTEGRITY OF THE TOWER. N07P DOLTS SHALL BE TIGHTENED BY THE TURN -OF -NUT TIGHTING METHOD, DOUTS SHALL BE INSTALLED IN ALL HOLES OF CONNECTION AND BROUGHT TO A SNUG -TIGHT CONDITION. THIS MAY BE ATTAINED BY A FEW IMPACTS, OF AN IMPACT WRENCH OR THE FULL EFFORT OF A MAN USING AN ORDINARY SPUD WRENCH. THEN TK:HTEN NUT AN ADDITIONAL 1/2 TURN PASSED SNUG -TIGHT. DESIGN LOAD: EIA/TIA-222-E O B.0 MPH +ILT ICE ANDREW CORPORATION 2701 Mayhli Rood Denton, Tx U.S.A. 78205 Telephone: (817) 566-2400 FAXI (817) 381-8188 " -KEY ASSEMBLY FOR A 70 FT. STEP TAPERED MONOPOLE M ' - . . 9M#01 DOWNTOWN WEST I MAFP-96406