HomeMy WebLinkAboutZ-7142 Staff AnalysisFILE NO.: Z-7142
NAME: Lindsey Short -form PD -O
LOCATION: 1201 West 10th Street
DEVELOPER: ENGINEER:
Marceliers Hewett
1919 West 10th Street
Little Rock, AR 72202
AREA: .16 Acres
CURRENT ZONING:
Laha Engineers
P.O. Box 190251
Little Rock, AR 72219
NUMBER OF LOTS: 1
R-4, two-family
PROPOSED ZONING: PD -O
CURRENT ALLOWED USES: Residential
FT. NEW STREET: 0
PROPOSED USE: Office, Bail Bonds
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant is in the process of establishing a Bail
Bonding Business and as a part of their plan, they would
like to use the family property located at 1201 West loth
Street as the central office. The applicant has stated
the bail bonding business is conducted off-site and very
little traffic is anticipated on the site. The applicant
proposes some renovations and improvements to the
property, but does not intend to change the character of
the site with the exception of the addition of three
parking spaces, a privacy fence to buffer the parking
FILE NO.: Z-7142 (Cont.)
spaces and a small 24" x 24" wall mounted sign along the
front of the house facing West 10th Street.
B. EXISTING CONDITIONS:
The site contains an existing single story single-family
structure with residential structures located to the south
and west of the site. The Mt. Zion Church is located
across West 10th Street along with a large surface parking
lot and the Cultural Arts Center is located across South
Cross Street. For the most part the area south of West
10th Street consists of residential uses in the form of
single-family or duplex structures. There are several
structures "boarded -up" on South Pulaski Street between
West 10th and West 11th Streets as is one side of a duplex
on West 11th Street, east of South Cross Street. Other
uses in the area include the Martin Luther King Elementary
School, the 9th Street City Park, two office uses located
in converted residential structures located to the
northeast and a commercial use (Bromley Parts and Service)
located along South Ringo Street one block to the east.
C. NEIGHBORHOOD COMMENTS:
All property owners within' 200 feet of the site, all
residents within 300 feet of the site who could be
identified and the Downtown Neighborhood Association were
notified of the public hearing. As of this writing staff
has received two informational phone calls from the
neighborhood.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Redesign parking lot to meet City ordinances, to prevent
backing out into street.
2. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
3. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of'work.
S. All driveways shall be concrete aprons per City
Ordinance. Increased width recommended.
K
FILE NO.: Z-7142 (Cont.)
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer is available, not adversely affected.
Enter Approved as submitted.
ARKLA: No comment received.
Southwestern Bell: Approved as submitted.
Water: No objection.
Fire Department: Approved as submitted.
CountV Planning: No comment received.
CATA: Site is on Bus Route #14 and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
The request is located in the Central City Planning
District and is shown on the Future Land Use Plan as
Single -Family. A Future Land Use Plan amendment is
required (a change from Single -Family to Office) and is a
separate item on this agenda (Item No. 6 File No. LU02-08-
02) .
City Recognized Neighborhood Action Plan:
The proposed application lies in the area covered by the
Downtown Neighborhood's Plan for the Future Neighborhood
Action Plan. The Plan contains several statements under
the housing goal for promotion of downtown living and
increasing home ownership and occupancy.
Landscape Issues:
A minimum 6.7 foot wide landscape buffer is required
north, south and west of the proposed parking area by both
the zoning and landscape ordinances. This requirement
will have to be taken into consideration with the redesign
of the parking area.
FILE NO.: Z-7142 (Cont.
A 6 -foot high opaque screen, either a wooden fence with
its face side directed outward or evergreens shrubs, are
required to help screen this property from the residential
properties to the south and west.
Building Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT: (January 24, 2002)
The applicant was present representing the application.
Staff presented the item and noted additional information
which was needed on the site plan, dumpster location,
additional site lighting, fencing materials. Staff also
stated the present design of the parking area would not
allow for proper maneuvering and should be redesigned.
Public Works comments were also presented and staff
indicated these items would be required at the time of
issuance of the building permit.
After a brief discussion the Committee determined there
were no outstanding issues associated with the proposed
rezoning. The Committee then forwarded the issue to the
full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff on
January 31, 2002 addressing most of the issues raised by
staff and the Subdivision Committee. The applicant
indicated there would not be a dumpster located on the
site. The applicant also indicated any additional site
lighting would be low level and directed away from
residentially zoned property.
The applicant revised the parking area to minimize the
concerns of turning movements within the parking area.
The applicant proposes four parking spaces in the rear of
the structure, one of which will need to be eliminated due
to the limited turning movement. With the elimination of
one space, leaving three spaces, the proposed parking is
well within typical ordinance parking requirement for a
structure this size. (The structure is approximately 1000
square feet - typical ordinance parking requirement for an
office use is 1 per space per 400 square feet or 2
spaces.)
FILE NO.: Z-7142 (Cont.)
The applicant is proposing a six-foot wooden fence
adjacent to the south property line, running from the back
edge of the house to the property line then turning north
on the west property line and running north to the edge of
the parking lot. The applicant then proposes a four -foot
wooden fence to the street right-of-way. The proposal
also includes the placement of evergreen shrubs on the
north, south and west property line. This proposal for
screening is adequate to meet the buffering requirement.
The applicant will be required to direct the face side
outward.
The applicant proposes the day and hours of operation to
be Monday through Saturday from 8:00 am to 5:00 pm. The
applicant proposes the maximum number of employees to. be
four with only two employees present at the site on most
occasions.
Staff is not supportive of the application. Staff feels
the development would intrude into a relatively fragile
neighborhood. The area contains a large number of vacant
lots and boarded up houses. Although the area to the
north of the site is non-residential, the site is a
church. This use has historically been considered a
neighborhood activity. The church has acquired a half
block to the east of the sanctuary and placed a parking
lot on the site. With the construction of the parking lot
the congregation is no longer parking within the
neighborhood thus minimizing the negative impact even
more. There are other office uses in the area, which are
on the portion of West 10th Street, which was abandoned by
the I-630 interchange construction.
I. STAFF RECOMMENDATION:
Staff recommends denial of the application as filed.
PLANNING COMMISSION ACTION: (FEBRUARY 14, 2002)
Mr. Carl Lindsey was present representing the application.
There were several objectors present. Staff presented the
application with a recommendation of denial.
Mr. Carl Lindsey stated he was representing the Lindsey family
and the request for a usage change for the property located at
1201 West 10th Street. He stated having lived in the area for
5
FILE NO.: Z-7142 (Cont.)
15 years he was concerned about the future of the neighborhood.
Mr. Lindsey stated the proposed use would enhance the
neighborhood. He stated the application included landscaping
and screening which would resemble residential. He stated the
business would be a low volume traffic generator since most of
the business activity would take place off site. He stated the
location was to house files and be a central location to work
from. Mr. Lindsey stated the business would have a sign. He
stated State Law required bail bonding companies to place a
sign on the exterior of the structure. Mr. Lindsey stated the
office hours would be from 8:00 am to 5:00 pm Monday through
Saturday.
Mr. Lindsey stated he had spoken to the most of the neighbors
within the 200 -foot required notification area and most had
general information questions. He stated the Commission had
received three letters of support for the project from
neighbors adjoining the property. Mr. Lindsey stated he had
spoken to the Pastor of the Mt. Zion Church and requested
support and also had offered to meet with the members to
explain the project.
Mr. Lindsey stated the Pastor had indicated the concern of the
church members was not the Lindsey business but the rezoning of
the property to allow a non-residential use and what could be
located on the site in the future. Mr. Lindsey stated he was
willing to not allow any use on the property other than his
family business in the future and take what ever action
necessary to confirm this commitment.
Commissioner Floyd questioned if another bail bonding business
could located on the site if the Lindsey's moved their
operation.
Mr. Steven Giles, City Attorney's Office, stated as long as the
new tenants did not alter the structure they could in fact move
in and open for business.
Mr. Dan Favors spoke in support of the application. He stated
he was a partner in the business and the desire was to enhance
the neighborhood. He stated with enterprise zones, urban
renewal projects, revitalization efforts in every city in this
country a redevelopment effort by investors should be a welcome
site. He stated he agreed with staff's comment that the area
was a fragile neighborhood. He stated the area was teetering
on urban decay and complete aberration. He stated there were
several boarded up homes in the area, which were otherwise
6
FILE NO.: Z-7142 (Cont.)
known as crack houses. He stated his company was looking to
invest in downtown Little Rock. He stated the business would
employ family members, who also wanted to see the area
revitalized. Mr. Favors stated the business would be held to a
higher standard than other single-family in the area.
Mr. Flavor stated the business was making an investment in the
area with labor, capital and to provide an outreach. He stated
the business would work with the youth in the area to provide
education on how the criminal justice system worked.
Commissioner Allen questioned if the applicant was willing to
only use the facility for an office use only and not allow
clients to visit the site.
Mr. Flavor stated this was the intent. He stated State Law
requires a bail bonding business to have a physical location to
house all files. He stated with the nature of the business
most if not all of the activity would take place off site and
at area jails.
Ms. Rita Carpenter -White spoke in opposition to the project.
She stated she was an area resident and a life-long member of
the Mt. Zion Church. She stated Mt. Zion was over 100 years
old and had been at its present location for over 80 years.
Ms. White stated Mt. Zion had been a viable part of the
community. She stated the Dr. Martin Luther King Elementary
School was one block from the site and a city park was in the
immediate area. She stated she felt a bail bonding business
would create an atmosphere detrimental to the church and church
activities. Ms. White stated Mt. Zion Church was active in
youth programs as well as senior citizen activities. She
stated the church membership should not have to look over their
shoulders or be afraid to worship because of a business in the
neighborhood. She stated the bail bonding business was not
appropriate for the area. She requested the Commission not
allow such an element into the neighborhood, which was not
sanctioned by the Mt. Zion Church.
Ms. Ellen Carpenter spoke in opposition to the application.
She stated she too was a life long member of Mt. Zion Church.
Ms. Carpenter read to the Commission a letter issued by the
Church stating opposition of the rezoning request. She stated
the church had grown over the previous 100 years. She stated
the Church buildings now encompass a 16� block area. She stated
the connotation of a bail bonding business would not create
"good vibes" for the area. Ms. Carpenter requested the
7
FILE NO.: Z-7142 (Cont.
Commission deny the request and keep things the way they were
currently, residential.
Ms. Rose Cook spoke in opposition to the rezoning request.
Ms. Cook stated she had been a member of Mt. Zion Church for
52 -years. She stated the food pantry was located on the corner
across from the site. She stated the proposed business would
create a negative connotation on Church activities. Ms. Cook
stated the Church frequently held activities (Monday through
Saturday) on the site and many of the activities took place in
the Church parking lot (if weather permitted). She stated the
business would be located directly across the street from the
Church parking lot. Ms. Cook requested the Commission deny the
request for rezoning and maintain the residential integrity of
the area.
Mr. Earnest Fingers spoke in opposition to the proposed
rezoning request. Mr. Fingers stated he was the Chairman of
the Trustee Board of the Mt. Zion Baptist Church. He stated
the Church wanted to keep property values at the current
levels. He stated the Church had concern that once a bonding
company left what might located on the site. Mr. Fingers
requested the Commission deny the request for rezoning and keep
the area residential.
Mr. Thomas Baskins spoke in opposition to the proposed rezoning
request. He stated he was a member of the Church and, was
instrumental in helping the Church with placement on the
National Register of Historic Places. He stated he was
notified as a part of the 200 -foot required notification
process. He stated upon receipt of the notice he immediately
took the notice to the Trustee Board. He stated the Trustee
Board voted to not support the proposed rezoning request. The
letter and vote were then taken to the Church Council, which
voted to also oppose the proposed rezoning request.
Commissioner Lowry questioned if the concern was the proposed
business or the proposed future business which could locate on
the site if the property were rezoned.
Mr. Baskins stated both. He state
create negative connotations for
business were to leave and a new
the Church could not be sure of
business would be.
8
d the proposed business could
area residents but if the
business locate on the site
what type neighbor the new
FILE NO.: Z-7142 _(Cont.)
Commissioner Nunnley asked what the position of the Church was
with regard to a bail bonding business.
Mr. Baskins stated when the Church voted they were unaware the
business was a bail bonding business. He stated the Church
opposed any non-residential use on the site.
Mr. Lindsey stated a letter was sent to the Church several
months ago. He stated he had spoken to the Pastor and
requested a meeting to answer questions and concerns of Church
Members. He stated he was not sure why the letter did not get
to the Trustees. Mr. Lindsey stated the Pastor had indicated
the concern was not the business but what may locate on the
site in the future if the bail bonding business were to move.
Mr. Lindsey stated the request before the Commission was a
request for a usage change. He stated if the bail bonding
business were to move the owners would not allow another
business to locate on the site.
Mr. Jim Lawson, Director of Planning and Development, stated if
a new applicant came in with a request to locate on the site
the applicant would recommend a usage change based on the
previous use. The new applicant would not say this was a
residential use and we want to use this as an office. The
applicant would say this was an office use and I would like to
use the site for another type office use.
Commissioner Berry stated the Commission had approved Planned
Developments and Conditional Use Permits in the heart of
neighborhoods before. He stated the Commission had the job of
looking at the area and determining what the area would be used
for. Commissioner Berry stated the role of the Commission was
to determine if an area was good for residential uses or for
non-residential uses. He stated the role of the Commission was
to determine if areas were viable housing for the future.
Commissioner Berry stated he drove the area and in his opinion
the structure was not viable housing for the future. He stated
quiet office use was not uncommon in residential neighborhoods
throughout the city.
Commissioner Nunnley stated preservation of neighborhoods was
important. He stated if the residential character of a
neighborhood was changed the neighborhood was changed as well.
Commissioner Nunnley stated Philander Smith College and Mt.
Zion Church were trying to preserve the neighborhood and bring
the area back.
FILE NO.: Z-7142 {Cont.
A motion was made to approve the Planned Development for an
office. The motion failed 3 ayes, 8 noes and 0 absent.
10
February 14, 2002
ITEM NO.: 6.1
NAME: Lindsey Short -form PD -O
T.ncATION: 1201 West 10th Street
nVMPMOPER: ENGINEER:
Marceliers Hewett
1919 West 10th Street
Little Rock, AR 72202
AREA: .16 Acres
CURRENT ZONING:
PROPOSED ZONING:
FILE NO.: Z-7142
Laha Engineers
P.O. Box 190251
Little Rock, AR 72219
NUMBER OF LOTS: 1
R-41 two-family
PD -O
CURRENT ALLOWED USES: Residential
PROPOSED USE: Office, Bail Bonds
FT. NEW STREET: 0
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant is in the process of establishing a Bail
Bonding Business and as a part of their plan, they would
like to use the family property located at 1201 West 10"-h
Street as the central office. The applicant has stated
the bail bonding business is conducted off-site and very
little traffic is anticipated on the site. The applicant
proposes some renovations and improvements to the
property, but does not intend to change the character of
the site with the exception of the addition of three
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.
FILE NO.: Z-7142
parking spaces, a privacy fence to buffer the parking
spaces and a small 24" x 24" wall mounted sign along the
front of the house facing West 10th Street.
B. EXISTING CONDITIONS:
The site contains an existing single story single-family
structure with residential structures located to the south
and west of the site. The Mt. Zion Church is located
across West 10th Street along with a large surface parking
lot and the Cultural Arts Center is located across South
Cross Street. For the most part the area south of West
10th Street consists of residential uses in the form of
single-family or duplex structures. There are several
structures "boarded -up" on South Pulaski Street between
West 10th and West 11th Streets as is one side of a duplex
on West 11th Street, east of South Cross Street. Other
uses in the area include the Martin Luther King Elementary
School, the 9th Street City Park, two office uses located
in converted residential structures located to the
northeast and a commercial use (Bromley Parts and Service)
located along South Ringo Street one block to the east.
C. NEIGHBORHOOD COMMENTS:
All property owners within 200 feet of the site, all
residents within 300 feet of the site who could be
identified and the Downtown Neighborhood Association were
notified of the public hearing. As of this writing staff
has received two informational phone calls from the
neighborhood.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Redesign parking lot to meet City ordinances, to prevent
backing out into street.
2. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
3. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
2
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.
FILE NO.: Z-7142
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
S. All driveways shall be concrete aprons per City
Ordinance. Increased width recommended.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer is available, not adversely affected.
Enter Approved as submitted.
ARKLA: No comment received.
Southwestern Bell: Approved as submitted.
Water: No objection.
Fire Department: Approved as submitted.
County Plannin : No comment received.
LATA: Site is on Bus Route. #14 and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
The request is located in the Central City Planning
District and is shown on the Future Land Use Plan as
Single -Family. A Future Land Use Plan amendment is
required (a change from Single -Family to Office) and is a
separate item on this agenda (Item No. 6 File No. LU02-08-
02) .
City Recognized Neighborhood Action Plan:
The proposed application lies in the area covered by the
Downtown Neighborhood's Plan for the Future Neighborhood
Action Plan. The Plan contains several statements under
the housing goal for promotion of downtown living and
increasing home ownership and occupancy.
3
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.)
Landscape Issues:
FILE NO.: Z-7142
A minimum 6.7 foot wide landscape buffer is required
north, south and west of the proposed parking area by both
the zoning and landscape ordinances. This requirement
will have to be taken into consideration with the redesign
of the parking area.
A 6 -foot high opaque screen, either a wooden fence with
its face side directed outward or evergreens shrubs, are
required to help screen this property from the residential
properties to the south and west.
Building Codes: No comment received.
G. SUBDIVISION COMMITTEE COMMENT: (January 24, 2002)
The applicant was present representing the application.
Staff presented the item and noted additional information
which was needed on the site plan, dumpster location,
additional site lighting, fencing materials. Staff also
stated the present design of the parking area would not
allow for proper maneuvering and should be redesigned.
Public Works comments were also presented and staff
indicated these items would be required at the time of
issuance of the building permit.
After a brief discussion the Committee determined there
were no outstanding issues associated with the proposed
rezoning. The Committee then forwarded the issue to the
full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff on
January 31, 2002 addressing most of the issues raised by
staff and the Subdivision Committee. The applicant
indicated there would not be a dumpster located on the
site. The applicant also indicated any additional site
lighting would be low level and directed away from
residentially zoned property.
4
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.
FILE NO.: Z-7142
The applicant revised the parking area to minimize the
concerns of turning movements within the parking area.
The applicant proposes four parking spaces in the rear of
the structure, one of which will need to be eliminated due
to the limited turning movement. With the elimination of
one space, leaving three spaces, the proposed parking is
well within typical ordinance parking requirement for a
structure this size. (The structure is approximately 1000
square feet - typical ordinance parking requirement for an
office use is 1 per space per 400 square feet or 2
spaces
The applicant is proposing a six-foot wooden fence
adjacent to the south property line, running from the back
edge of the house to the property line then turning north
on the west property line and running north to the edge of
the parking lot. The applicant then proposes a four -foot
wooden fence to the street right-of-way. The proposal
also includes the placement of evergreen shrubs on the
north, south and west property line. This proposal for
screening is adequate to meet the buffering requirement.
The applicant will be required to direct the face side
outward.
The applicant proposes the day and hours of operation to
be Monday through Saturday from 8:00 am to 5:00 pm. The
applicant proposes the maximum number of employees to be
four with only two employees present at the site on most
occasions.
Staff is not supportive of the application. Staff feels
the development would intrude into a relatively fragile
neighborhood. The area contains a large number of vacant
lots and boarded up houses. Although the area to the
north of the site is non-residential, the site is a
church. This use has historically been considered a
neighborhood activity. The church has acquired a half
block to the east of the sanctuary and placed a parking
lot on the site. With the construction of the parking lot
the congregation is no longer parking within the
neighborhood thus minimizing the negative impact even
5
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.) FILE NO.: Z-7142
more. There are other office uses in the area, which are
on the portion of West 10th Street, which was abandoned by
the I-630 interchange construction.
I. STAFF RECOMMENDATION:
Staff recommends denial of the application as filed.
PLANNING COMMISSION ACTION: (FEBRUARY 14, 2002)
Mr. Carl Lindsey was present representing the application.
There were several objectors present. Staff presented the
application with a recommendation of denial.
Mr. Carl Lindsey stated he was representing the Lindsey family
and the request for a usage change for the property located at
1201 West 10th Street. He stated having lived in the area for
15 years he was concerned about the future of the neighborhood.
Mr. Lindsey stated the proposed use would enhance the
neighborhood. He stated the application included landscaping
and screening which would resemble residential. He stated the
business would be a low volume traffic generator since most of
the business activity would take place off site. He stated the
location was to house files and be a central location to work
from. Mr. Lindsey stated the business would have a sign. He
stated State Law required bail bonding companies to place a
sign on the exterior of the structure. Mr. Lindsey stated the
office hours would be from 8:00 am to 5:00 pm Monday through
Saturday.
Mr. Lindsey stated he had spoken to the most of the neighbors
within the 200 -foot required notification area and most had
general information questions. He stated the Commission had
received three letters of support for the project from
neighbors adjoining the property. Mr. Lindsey stated he had
spoken to the Pastor of the Mt. Zion Church and requested
support and also had offered to meet with the members to
explain the project.
Mr. Lindsey stated the Pastor had indicated the concern of the
church members was not the Lindsey business but the rezoning of
the property to allow a non-residential use and what could be
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.) FILE NO.: Z-7142
located on the site in the future. Mr. Lindsey stated he was
willing to not allow any use on the property other than his
family business in the future and take what ever action
necessary to confirm this commitment.
Commissioner Floyd questioned if another bail bonding business
could located on the site if the Lindsey's moved their
operation.
Mr. Steven Giles, City Attorney's Office, stated as long as the
new tenants did not alter the structure they could in fact move
in and open for business.
Mr. Dan Favors spoke in support of the application. He stated
he was a partner in the business and the desire was to enhance
the neighborhood. He stated with enterprise zones, urban
renewal projects, revitalization efforts in every city in this
country a redevelopment effort by investors should be a welcome
site. He stated he agreed with staff's comment that the area
was a fragile neighborhood. He stated the area was teetering
on urban decay and complete aberration. He stated there were
several boarded up homes in the area, which were otherwise
known as crack houses. He stated his company was looking to
invest in downtown Little Rock. He stated the business would
employ family members, who also wanted to see the area
revitalized. Mr. Favors stated the business would be held to a
higher standard than other single-family in the area.
Mr. Flavor stated the business was making an investment in the
area with labor, capital and to provide an outreach. He stated
the business would work with the youth in the area to provide
education on how the criminal justice system worked.
Commissioner Allen questioned if the applicant was willing to
only use the facility for an office use only and not allow
clients to visit the site.
Mr. Flavor stated this was the intent. He stated State Law
requires a bail bonding business to have a physical location to
house all files. He stated with the nature of the business
most if not all of the activity would take place off site and
at area jails.
rJ
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.) FILE NO.: Z-7142
Ms. Rita Carpenter -White spoke in opposition to the project.
She stated she was an area resident and a life-long member of
the Mt. Zion Church. She stated Mt. Zion was over 100 years
old and had been at its present location for over 80 years.
Ms. White stated Mt. Zion had been a viable part of the
community. She stated the Dr. Martin Luther King Elementary
School was one block from the site and a city park was in the
immediate area. She stated she felt a bail bonding business
would create an atmosphere detrimental to the church and church
activities. Ms. White stated Mt. Zion Church was active in
youth programs as well as senior citizen activities. She
stated the church membership should not have to look over their
shoulders or be afraid to worship because of a business in the
neighborhood. She stated the bail bonding business was not
appropriate for the area. She requested the Commission not
allow such an element into the neighborhood, which was not
sanctioned by the Mt. Zion Church.
Ms. Ellen Carpenter spoke in opposition to the application.
She stated she too was a life long member of Mt. Zion Church.
Ms. Carpenter read to the Commission a letter issued by the
Church stating opposition of the rezoning request. She stated
the church had grown over the previous 100 years. She stated
the Church buildings now encompass a 16-� block area. She stated
the connotation of a bail bonding business would not create
"good vibes" for the area. Ms. Carpenter requested the
Commission deny the request and keep things the way they were
currently, residential.
Ms. Rose Cook spoke in opposition to the rezoning request.
Ms. Cook stated she had been a member of Mt. Zion Church for
52 -years. She stated the food pantry was located on the corner
across from the site. She stated the proposed business would
create a negative connotation on Church activities. Ms. Cook
stated the Church frequently held activities (Monday through
Saturday) on the site and many of the activities took place in
the Church parking lot (if weather permitted) . She stated the
business would be located directly across the street from the
Church parking lot. Ms. Cook requested the Commission deny the
request for rezoning and maintain the residential integrity of
the area.
8
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.) FILE NO.: Z-7142
Mr. Earnest Fingers spoke in opposition to the proposed
rezoning request. Mr. Fingers stated he was the Chairman of
the Trustee Board of the Mt. Zion Baptist Church. He stated
the Church wanted to keep property values at the current
levels. He stated the Church had concern that once a bonding
company left what might located on the site. Mr. Fingers
requested the Commission deny the request for rezoning and keep
the area residential.
Mr. Thomas Baskins spoke in opposition to the proposed rezoning
request. He stated he was a member of the Church and was
instrumental in helping the Church with placement on the
National Register of Historic Places. He stated he was
notified as a part of the 200 -foot required notification
process. He stated upon receipt of the notice he immediately
took the notice to the Trustee Board. He stated the Trustee
Board voted to not support the proposed rezoning request. The
letter and vote were then taken to the Church Council, which
voted to also oppose the proposed rezoning request.
Commissioner Lowry questioned if- the concern was the proposed
business or the proposed future business which could locate on
the site if the property were rezoned.
Mr. Baskins stated both. He stated the proposed business could
create negative connotations for area residents but if the
business were to leave and a new business locate on the site
the Church could not be sure of what type neighbor the new
business would be.
Commissioner Nunnley asked what the position of the Church was
with regard to a bail bonding business.
Mr. Baskins stated when the Church voted they were unaware the
business was a bail bonding business. He stated the Church
opposed any non-residential use on the site.
Mr. Lindsey stated a letter was sent to the Church several
months ago. He stated he had spoken to the Pastor and
requested a meeting to answer questions and concerns of Church
Members. He stated he was not sure why the letter did not get
to the Trustees. Mr. Lindsey stated the Pastor had indicated
the concern was not the business but what may locate on the
February 14, 2002
SUBDIVISION
ITEM NO.: 6.1 (Cont.) FILE NO.: Z-7142
site in the future if the bail bonding business were to move.
Mr. Lindsey stated the request before the Commission was a
request for a usage change. He stated if the bail bonding
business were to move the owners would not allow another
business to locate on the site.
Mr. Jim Lawson, Director of Planning and Development, stated if
a new applicant came in with a request to locate on the site
the applicant would recommend a usage change based on the
previous use. The new applicant would not say this was a
residential use and we want to use this as an office. The
applicant would say this was an office use and I would like, to
use the site for another type office use.
Commissioner Berry stated the Commission had approved Planned
Developments and Conditional Use Permits in the heart of
neighborhoods before. He stated the Commission had the job of
looking at the area and determining what the area would be used
for. Commissioner Berry stated the role of the Commission was
to determine if an area was good for residential uses or for
non-residential uses. He stated the role of the Commission was
to determine if areas were viable housing for the future.
Commissioner Berry stated he drove the area and in his opinion
the structure was not viable housing for the future. He stated
quiet office use was not uncommon in residential neighborhoods
throughout the city.
Commissioner Nunnley stated preservation of neighborhoods was
important. He stated if the residential character of a
neighborhood was changed the neighborhood was changed as well.
Commissioner Nunnley stated Philander Smith College and Mt.
Zion Church were trying to preserve the neighborhood and bring
the area back.
A motion was made to approve the Planned Development for an
office. The motion failed 3 ayes, 8 noes and 0 absent.
10