HomeMy WebLinkAboutZ-7131-C Application 2CHENAL VALLEY COMMERCIAL PROPERTY
ARCHITECTURAL CONTROL GUIDELINES
PURPOSE OF THIS DOCUMENT
Chenal Valley Commercial Properties consists of approximately 600 acres. These properties are
carefully planned parcels within the Land Development Plan of Chenal Valley Commercial Property
which will serve as a transition between residential bordering property.
These architectural guidelines will establish a unified development for all commercial sites in Chenal
Valley unless more restrictive design criteria applies. (i.e.; the Village at Rahling Road) Although
each tot is planned to contain a separate building with its required parking and drives, and is planned
to accommodate separate owner, or lessees the entire tracts are viewed as a total, interrelated
grouping. The developed lots will be parts of a whole composition, and not a collection of individual,
separately arranged parcels.
This design guidelines manual has been created to describe the design criteria and approval process
for the Chenal Valley Commercial Property. It is intended for use by owners, lessees, architects and
contractors to assist in the design and construction of improvements in this development community
and to describe the systematic review process for all projects.
F: HOMMPATRDELTIC1ccp-ca-gdlrkO
1.0 GENERAL GUIDELINES
1.1 Statement of Theme/Philosophy Theme/Philosophyfor Chenal Valle
When the designers began planning the development of Chenal Valley, they realized that the
inherent beauty of this development should be preserved to make this new community a very
special place. The development derives its beauty from its gently rolling topography, mature
hardwood forests, lakes, ponds and the championship Chenal Golf Course and Country Club.
The challenge to the development team was to develop a unique planned community which
would preserve to the greatest extent possible the natural environment of this site. To that
end, many innovative land planning and engineering techniques were employed at Chenal
Valley. The street system in Chenal Valley was designed around trees and other natural
features, resulting in reduced grading requirements and increased preservation of existing
vegetation. A community -wide storm water management system was developed by creation
of additional lakes on the site, thereby protecting water quality in streams and lakes
downstream from the area. Buffers around natural drainage ways were established to aid
further in storm water runoff control. Development of the Chenal Valley Commercial
Properties continues this philosophy.
1.2 Community Goals and Objectives - The Architectural Control Committee's goal
is to encourage appropriate architectural design that blends with the surroundings of Chenal
Valley and is sensitive to environmental factors. New construction should reinforce this
community's identity and should contribute to the beauty and harmony of the community.
The highest quality in design, materials and workmanship should be evident in all construction
in Chenal Valley.
To preserve the values and character of Chenal Valley, design guidelines have been
established. The design objectives described in the guidelines will support the community
goal of maintaining a unique and environmentally sensitive community. This philosophy will
support the creation of a homogeneous commercial community in a natural setting free from
discordant architectural styles and obtrusive colors. The guidelines require that each building
be treated not as a carefully planned addition to the community setting but as a piece to the
plan. To preserve the overall character of the community, the architectural controls for
Chenal Valley extend beyond the building walls to include the entire site.
1.3 Amendments - From time to time, amendments to the design guidelines may be
deemed necessary by the Chenal Valley Architectural Control Committee. Such amendments,
if approved by the Committee, will not affect covenanted standards for lots previously
recorded. Suggestions and recommendations for amendments from all sources are welcome,
and each suggestion will be given appropriate consideration by the Architectural Control
Committee.
F:U{OMEIPATRDELTIG\cCp-oa -gd1rks3 2
2.0 ARCHITECTURAL CONTROL COMMITTEE
2.1 1"Limose - The purpose of the Chenal Valley Architectural Control Committee is to
review and approve plans for new construction, alterations, landscaping, additions and
demolitions. Committee approval of plans is based on aesthetic consideration and
compatibility with the environment, the community, and this development.
2.2 Members - The Architectural Control Committee consists of at least three members
appointed pursuant to the provisions of the Declaration of Covenants and Restrictions of
Chenal Valley filed November 22, 1989 in the Office of the Circuit Clerk of Pulaski County,
Arkansas as Instrument Number 89-61706 and any and all amendments thereto.
Members eligible for appointment to the Committee may include members ofthe development
team, homeowners and business men or women. Current members are:
1. Bill Gaskin
2. Tom Russell
3. Joe White, Sr.
4. Jack McCray
Members are appointed by Deltic Timber Corporation, Inc., the owner and developer, and
serve a term of one year.
2.3 Committee Meetin s - The Architectural Control Committee holds regular meetings
twice monthly on the first and third Wednesdays at 12:00 noon at the offices of Chenal
Properties, Inc. Such meetings may be canceled or rescheduled by the Committee Chairman.
Should the time and place of the regularly scheduled meetings change, all those with
applications pending will be notified accordingly by telephone or in writing at least five
working days before the regular meeting date.
2.4 Fees - An application fee of $100.00 will be assessed.
FAHOMEXPATRDELTIC1ccp-oonuol-OnO 3
3.0 REVIEW PROCEDURES
3.1 Preliminary Conference - Prior to formal submission of plans to the Architectural
Control Committee, it is strongly recommended that applicants request a preliminary
conference with a member or members of the Committee. Such conferences, which may be
arranged by contacting any committee member, will provide prospective applicants an
opportunity to present their project concepts and objectives and receive comments from the
Architectural Control Committee prior to pursuing final design.
3.2 Formal Submission and Approval - Two sets of plans shall be submitted along with
the application for approval of construction (Appendix A). Applicants' plans and application
must be delivered to the Chenal Properties, Inc. Marketing Office at least five working days
before the next scheduled Architectural Control Committee meeting. The plans and
application will be reviewed at the next regular meeting of the Committee. If these
documents are approved, the applicant will receive written notification of the approval along
with one set of plans bearing the Committee's seal. One set of approved plans will be
retained in the files of the Architectural Control Committee. If the applicant's plans are not
approved, written notice indicating the reason for denial will be given. If the Architectural
Control Committee shall fail to approve or disapprove any plans within thirty (30) days after
submittal, such plans shall be deemed approved. If an application is denied, the applicant may
request a meeting to discuss design changes that may lead to Committee approval. These
requests shall be submitted to the Committee's chairman at Chenal Properties, Inc. During
the active development period all applicants will be notified ofthe Committee's action no later
than five working days after the Committee's meeting date. All applications and plans
approved by the Architectural Control Committee are valid for 24 months.
3.3 Submission Requirements - All plans submitted to the Architectural Control
Committee for review must include the following information.
3.3.a. A site plan at a scale of 1" equals 50' or larger showing:
m topography
streets
wooded areas
■ proposed building location
i building footprint
0 driveways
A walls and screens
Y terraces and decks
6 parking areas
e walks
■ any other accessory uses
o property lines
FAHOMETAMDELTIOmp-caiunl-gdlnA 4
a utility easements
grading plan
s site lighting
■ existing trees 12" in diameter (measured 4' above grade)
3.3.b. A floor plan showing major dimensions and openings at a scale of
1/8" equals 1'-0" or larger.
3.3.c. Elevation drawings of the proposed building indicating mass,
shape and major exterior materials and colors. Elevations are required for
all sides. All utilitarian (such as electrical elements, waste storage areas,
loading docks and the like) areas must be screened and indicated on plans.
3.3.d. Elevation and detail drawings of screen walls, railings and site
structures.
3.3.e. Landscape plans showing all planting areas at a scale of 1" equals
20' or larger showing:
• plant materials (size, quantity and type)
• bed areas
• screening
• buffer strips
• irrigation limits
• detention ponds
■ walkways
The purpose of the formal submission of the Architectural Control Committee is to allow for
the evaluation of the submission for compliance with the overall community philosophy and
with these guidelines. Applicants should look to existing buildings and the landscape
surrounding a site for direction about approximate materials, form, color and style.
Additionally, applicants must meet the requirements of the City of Little Rock, including
landscape and excavation ordinances, to secure a building permit from the City.
Note that issuance of building permit does not imply approval by the Chenal Valley
Architectural Control Committee.
3.4 Changes After Approval by the Architectural Control Committee - If changes
to an approved plan become necessary before or during construction, a request indicating the
change or changes shall be submitted to the Architectural Control Committee. The review
process for changes will be the same as that for initial plan approvals. The applicant will be
F:\IiOME\PATP�DELTIC\ccp-control-gdlrts3 5
notified of the Committee's decision within five working days after the Committee meeting
date.
Minor changes may be approved by the chairperson of the Architectural Control Committee
rather than a meeting of the full Committee. The Chairperson shall determine if a change is
minor and shall notify the applicant of the approval or disapproval of the change within five
working days after meeting with the applicant.
FAHOMMPATMDFLTIGIccpca -gdW 6
4.0 ENFORCEMENT
4.1 Authority of the Architectural Control Committee - The Architectural Control
Committee is authorized by the Developer - Deltic Timber Corporation to approve or
disapprove all plans for new construction, alterations, landscaping, remodeling or additions
in Chenal Valley. The Committee reserves the right to disapprove a plan for purely aesthetic
reasons.
4.2 Enforcement Procedures - The design guidelines and covenants are administered to
accommodate individual tastes and to encourage design flexibility. However, in the event of
construction which, in the opinion of the Architectural Control Committee, abuses the
standards or covenants, the Committee will recommend legal enforcement. The Architectural
Control Committee shall have the right to enforce, by any legal means, all restrictions,
conditions, reservations and requirements imposed by the provisions of these architectural
guidelines.
F: W OM E\PATPUDELTIGIaptowel-6dlns3 7
5.0 GENERAL REQUIREMENTS
5.1 Temporary Facilities - During construction, temporary offices, storage sheds,
portable toilets, trailers, parking areas, access roads, fences, etc. may be located as
inconspicuously as possible on the lots. Temporary construction facilities shall be removed
promptly when they are no longer required.
5.2 Maintenance - Each owner, or lessee, contractor and/or occupant of a site shall
maintain buildings, improvements, landscaping and grounds in a safe, clean, orderly condition,
free of any accumulation of rubbish, trash or litter. Waste containers are required on all sites.
5.3 Erosion and Sedimentation Control - Prior to grading on any lot, the necessary
sedimentation and erosion control measures shall be in place. Silt fence is required around
all graded areas on the down slope side of the lot. Local sedimentation and erosion control
codes shall be followed throughout the construction period.
5.4 Utilities - No permanent water, sewer, gas, electric, telephone, cable TV or other
service line shall be constructed, placed or maintained within the Chenal Valley community
unless it is placed in underground conduits or cables and buried or otherwise concealed. All
gutters and downspouts must be connected to a sub -surface drainage system. No facilities
for alternative sources of energy (solar, wind, bio -mass or other) or TV or other signal
reception device (antenna, dish) shall be erected without the consent of the Architectural
Control Committee. All utility construction must meet State and local codes.
5.5 Signs - The sign system for the entrance, amenity areas and streetscape in Chenal
Valley has been carefully coordinated. The developers have designed a sign system that
allows for safe, efficient movement throughout the community without intruding on the
natural beauty of the site. Therefore, no signs may be erected on any lot, common area, or
building without approval of the Architectural Control Committee. All commercial
development must submit signage design for approval. This restriction includes project signs,
lot number signs, real estate sales signs and builder/contractor identification signs.
The individual buildings shall be identified by their owners or lessees with monument signs.
Tenant logo may be used if approved by the Architectural Control Committee. (The signs are
intended to be integrated into the street landscape.)
Tenants of multiple -tenant buildings will be identified on interior building directories in the
case of buildings with lobbies.
Tenants of multiple -tenant buildings which do not have common entry lobbies are to be
identified by wall mounted signs adjacent to doors. These signs will be of standard type,
style, size and color, as determined by the Architectural Control Committee.
F:ViOME\PATP\DELTIGNccp-control-gdlns3 8
'a L
Directional signs Will be permitted on a case-by-case basis by the Architectural Control
Committee.
SignTvne
1. Monument
2. Wall Mount
F3uildiil�t"1'N pg
Individual
Multiple -Tenant
Building Sq. Fc.
Under 5,000 Sq. Ft.
Over 5,000
Under 5,000 Sq. Ft.
Over 5,000 Sq. Ft.
Sign Area
(Includes all Sides)
50 Sq. Ft.
80 Sq. Ft.
(1 Sided Only)
10 Sq. Ft.
Inside Directory
Required
5.6 Trash Collection - Dumpsters enclosures with operable gates will be required.
Design is subject to the approval of the Architectural Control Committee.
F:UHOME\PATMELT[Cccpco mnl-gdltu3 9
6.0 SPECIFIC LOT REQUIREMENTS
6.1 Clearing and Gradin -To preserve the natural beauty of Chenal Valley, excessive
clearing and grading should not be performed on any lot. Deep cuts and excessive fill areas
are discouraged. Debris from clearing and grubbing operations shall be removed promptly
from the site. On-site burning in clearing and grubbing operations is prohibited. Grading
should be accomplished in a manner which will prevent ponding or soil erosion on the site or
on adjacent property.
6.2 Tree Preservation - To maintain the natural beauty of Chenal Valley, existing
vegetation must be preserved as much as possible. No trees shall be removed or destroyed
on any lot prior to approval of construction plans by the Architectural Control Committee.
Trees which are preserved shall be protected to the greatest extent practical from damage
during building construction. Barricades or fencing are strongly recommended to prevent
root compaction. Placement of dirt stockpiles or construction materials under the tree canopy
is discouraged. Trees which do become damaged during building construction should be
treated as soon as possible.
6.3 Landscaping - In keeping with the Chenal Valley development goal to preserve the
natural character of the area, all installed plant materials and other landscape elements should
harmonize with the existing natural setting. Landscape plans should provide screening for
parking areas, and other service area visible from the street or adjacent lots. All new trees
shall be guaranteed by the contractor or landscape contractor to remain healthy for a period
of 12 months from date of planning. A landscape plan must be submitted with the initial
application for construction plan approval. An irrigation system will be required with all
landscaping plans. Zoysia turf is required between buildings and frontage roads. Forty
percent of trees shall be 3" minimum caliper and forty percent of shrubs shall be 24" in height
at planting. A 6' wide planting strip is required around all buildings. Driveway entrances
shall be planted with a minimum of 300 sq. ft. of beds with 30 sq. ft. of seasonal color
included. The bed or beds must be located along the driveway where it connects to the access
street. The beds may be integrated in with the adjacent beds. Plans shall exceed the
requirements of the City of Little Rock Landscape Ordinance.
6.4 Exterior Accesso Ey Structures - All exterior structures such as dumpster enclosures,
mechanical equipment screening' decks, arbors and lights must be approved by the
Architectural Control Committee. For new construction, these structures must be shown on
the applicant's construction plans. For additions or renovations, applications and plans shall
be submitted to the Architectural Control Committee according to the same process used for
new construction approval.
6.5 Parking Areas - Parking lots and service areas should be screened via landscaping,
berms, or other approved methods from public view. Parking areas are encouraged to be
designed as a series of small bays with landscaped islands separating them.
FAHOMETATPOELTIC1�I-gdlnO 10
L,
Ground mounted mechanical equipment shall be contained in an exterior accessory structure
constructed of the same materials as the buildings exterior surface, or as approved by the
Architectural Control Committee.
In general, fencing will be reviewed on a case-by-case basis and shall be allowed only where
a specific functional or aesthetical purpose is achieved. Woven metal or chain link fencing
is prohibited.
FAHOMETATMDELTIOccp-runuol-Ora3 11
7.0 BUILDING REQUIREMENTS
7.1 Use Regulations - The Chenal Commercial Properties are established to
accommodate office and associated administrative, retail, multi -family, executive and
professional uses.
No other uses will be allowed, Without specific approval from the Architectural Control -
Committee.
7.2 Hei fit Regulations -No building shall exceed three stories in height unless approved
by the Architectural Control Committee. An attic story included under a pitched roof would
be counted as a story.
7.3 T e of Construction - The Standard Building Code classifies all buildings into six
types of construction, based on fire resistance. Buildings may be of any of the classification
types of construction allowed by the currently adopted edition ofthe Standard Building Code
for the corresponding height, area and occupancy limits.
7.4 Basic Building Circulation - Elevators are required for handicapped access between
floors. Elevators may be interior, may be glass backed with exterior exposure, or may be free
standing.
Building exit access maybe by enclosed interior corridors, or individual tenants may open
directly onto exterior covered balconies connected to stairs.
Stairs may be interior or exterior. Exterior stairs must be semi enclosed from grade to the
first landing as a minimum.
7.5 Exterior Building Materials - Prefabricated metal buildings, simulated brick,
unnatural brick and bright aluminum windows and doors will not be permitted unless
specifically approved by the Architectural Control Committee.
All building exteriors must use precast concrete, granite, natural stone, EIFS, or brick.
Approved siding will be allowed on multi -family projects. Facades of cut stone are also
permitted.
Exposed foundation walls must be finished with approved materials. Exposed poured
concrete or concrete block foundation walls are not permitted.
7.5.a. Glaziing - Aluminum, wood or steel glazing systems are permitted. Colored
framings systems may be used if approved by the Architectural Control Committee.
F:ViOME\PATMELTIQccp-c«urol-gd1ns3 12
Divided lite appearance, if used, must be achieved with true divided lite framing or
grilles applied to both sides of the glass.
7.5.b. Balconies - Railings systems of rod iron, brick or metal are encouraged.
Wood railing systems are discouraged.
7.5.e. Roofs - All buildings are encouraged to feature pitched roof elements.
Because of the width of the buildings, the pitched roofs are not required to span the
width ofthe buildings uninterrupted. Combinations oflow slope and pitched elements
will be considered acceptable. Gabled, hipped, pyramidal and vaulted shapes are
allowable. Copings, where used, are encouraged to be cast stone or precast concrete.
All gutters and downspouts must be connected to a sub -surface drainage system. On
low pitched roofs parapet walls will be required. Roofs should project far enough
beyond the building facade to cast a shadow.
Standing seam metal roofs are encouraged. Both natural weathering materials and
prepainted metal roofing is permitted. Flat concrete tiles or clay tiles are permitted.
Slate shingles are permitted. Dimensional or textured composition shingles with
simulated slate appearance are the minimum standard for roof finishes. Examples of
acceptable shingles include:
1. Certain Teed - Grand Manor Shingle
2. Eternit Roof Slates
3. Fibre Cern - Southern Slate or Euro Slate
4. Supradur - Supra Slate II, Heritage Slate
5. Genstar - Architect 80
7.6 Colors and Textures - In keeping with Chenal Valley's community image as a
neighborhood of compatible architectural styles, materials and colors which blend
harmoniously with the natural setting, obtrusive or inappropriate colors and textures which
would draw attention to specific buildings or structures shall not be allowed. Information
regarding colors and textures for all construction is required on the application submitted to
the Architectural Control Committee. The Committee shall determine the appropriateness
of colors and textures for all construction.
7.7 Mechanical Eauipmen -Heating, ventilating and air conditioning equipment located
on the exterior of a building shall be shielded from view. Ground mounted equipment shall
be contained in an Exterior Accessory Structure (See 6.4) constructed of the same materials
as the building's exterior surface. Roof top mounted equipment shall be concealed in a roof
well. Unscreened roof top package units on flat roofs will not be permitted. Perforated or
open slat metal screening will not be permitted. No exterior roof access ladders or apparatus
are permitted.
FAH0ME\PATPUDELTIC=pc«itrol-gdIns3 13
7.8 Paving Materials
7.8.a. Street - Asphalt with concrete curbs and gutters. Concrete pavers (200 sq.
ft. minimum) will be used at the aprons to building access drives.
7.8.b. Parking - Parking and driveway placement, design and paving material are
subject to the approval of the Architectural Control Committee. Asphalt or concrete
parking and drives with concrete curbs and gutters are required.
7.8.c. Walks - Pavers are encouraged to be used for walkways to buildings.
Sidewalks should be set back from the curb at a minimum of 4' to allow for a green
buffer for landscaping.
F:\HOME\PATP\DELT[C\ccp-c�-gdlru3 14
8.0 EXTERIOR LIGHTING PLAN
Parking lot lighting shall be required for all commercial development. Cobra type features will not
be permitted. Round wooden poles are not allowed. Fixture height not to exceed 20"-0".
Facades of the individual buildings may be illuminated, subject to the approval of the Architectural
Control Committee. A common color of light is to be used throughout, and obtrusive lighting color
or schemes which would draw attention to specific buildings or structures shall not be allowed.
8.1 Paving Materials - Parking and lighting levels - Lighting should be designed to be
as even as possible. An average of 016 f.c. for commercial developments is suggested.
Fixtures must not allow light to cast light on neighboring properties.
8.2 Landscape Lightin - Lighting for enhancing trees and ornamental plantings shall
be designed with H.I.D. fixtures. Fixtures should be inconspicous and blend with architecture
of building.
8.3 Sign Lighting - Lights should be low profile and only illuminate the sign. H.I.D.
fixtures are recommended.
8.4 Bollards - Lights should compliment architecture of buildings. Coordinate light type
with parking lighting.
9.0� Rahling Road Overlay- Attached hereto as page 16.
F:UiOME\PATRDELTIG\ccp-c u-gclns3 15
WIMY-"L'--JaATMW a A990CMT= ITC.
CML E RING, LAND PUNNING !c DEVELOPMENT, SURVEYING
401 VIC._ STREET LRTLE ROCK, ARKMSAS 72201
9.0
RAHLING ROAD OVERLAY
125' BLDG SETBACK W/ DOUBLE BAY OF PARKING
in
N
Ln
rn
95' BLDG SETBACK W/ SINGLE BAY OF PARKING
50' BLDG SETBACK W/ NO PARKING
0
X35' LANDSCAPE BUFFER
RIGHT-OF-WAY LINE
RAHLING ROAD
BUILDING SETBACK LINES & LANDSCAPE BUFFER
FOR RAHLING ROAD
16
NAME
PLANNING COMMISSION REVIEW
CENTRAL ARKANSAS WATER
07 March 2012
TYPEISSUE
LOTS 1A & 16, THE SHOPPES PCD Z -3371 -MM
AT COL. GLENN; NWC OF COL.
GELNN PLAZA DR & COL GLENN
RD
COMMENTS
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
NAME
CHENAL KANIS SLEF STORAGE;
15575 KANIS RD
TYPE ISSUE COMMENTS
PCD Z-8752 All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
Fa
3.
NAME TYPE ISSUE COMMENTS
VALLON PDR; PATIO HOMES / PDR Z-7131 -C THE EXISTING 8 -INCH WATER MAIN
16500 CHENAL VALLEY DR RUNNING TO 100 VALLON CT IS
PRIVATE; CAW WILL HAVE TO
EVALUATE THE USE OF THIS MAIN FOR
THE DEVELOPMENT AS WELL AS
POSSIBLY CONVERTING IT TO A PUBLIC
MAIN. All Central Arkansas Water
requirements in effect at the time of request
for water service must be met.
A water main extension will be needed to
provide water service to this property.
Please submit plans for water facilities to
Central Arkansas Water for review. Plan
revisions may be required after additional
review. Contact Central Arkansas Water
regarding procedures for installation of water
facilities. Approval of plans by Central
Arkansas Water, the Arkansas Department
of Health Engineering Division and Little
Rock Fire Department is required.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to
obtain information regarding the required
placement of the hydrant(s) and contact
Central Arkansas Water regarding
procedures for installation of the hydrant(s).
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges.
4.
NAME
PHILLIPS SHORT FORM PDR;
SEC RAYMOND SAVAGE DR
(41ST ST) & LUDWIG ST.
TYPE ISSUE
PDR Z-8753
COMMENTS
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Contact Central Arkansas Water if additional
fire protection or metered water service is
required.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backf]ow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
4
NAME
TYPE ISSUE COMMENTS
5. KINGRIDGE ENTERPRISES POD; POD Z -1870-A
2501 S. BROADWAY
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
Contact Central Arkansas Water regarding
the size and location of the water meter.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Contact Central Arkansas Water if additional
fire protection or metered water service is
required.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public andlDr private fire hydrant(s)
will be required. If additional fire hydrants)
are required, they will be installed at the
Developer's expense.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
5
91
NAME TYPE ISSUE COMMENTS
PLEASANT TREE REVISED PD- PRD Z -6848-A Contact the Water Works regarding
R; 1500 PICKERING DR extension of water service to this
development.
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
A water main extension will be needed to
provide water service to this property.
Please submit plans for water facilities to
Central Arkansas Water for review. Plan
revisions may be required after additional
review. Contact Central Arkansas Water
regarding procedures for installation of water
facilities. Approval of plans by Central
Arkansas Water, the Arkansas Department
of Health Engineering Division and Little
Rock Fire Department is required.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
Additional fire hydrant(s) MAY be required.
Contact the Little Rock Fire Department to
obtain information regarding the required
placement of the hydrant(s) and contact
Central Arkansas Water regarding
procedures for installation of the hydrant(s).
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RP7A,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges.
r:1
Q
NAME TYPE ISSUE
COMMENTS
MULLIGAN PD -R; 3233 OZARK PRD Z-8750
NO OBJECTIONS. All Central Arkansas
ST.
Water requirements in effect at the time of
request for water service must be met.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Contact Central Arkansas Water if additional
fire protection or metered water service is
required.
DALES TIRES; PID, 7919 COL. PID Z -6194-D
All Central Arkansas Water requirements in
GLENN RD.
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
NAME TYPE ISSUE COMMENTS
9. MOSAIC CHURCH OF CENTRAL PCD Z-8751
ARKANSAS; PCD, 6221 COL.
GLENN RD
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public andlor private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be instailed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The fest results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
8
10.
NAME TYPE ISSUE COMMENTS
JAMES MORGAN SUBD, REV, PDR S -1607-C CAW DOESN'T HAVE A WATER MAIN IN
PRELIM. PLAT; 10000 E. BARRETT ROAD; WATER COULD
BARRETT RD POSSIBLE BE OBTAINED FROM
MAUMELLE WATER CORP.
A water main extension will be needed to
provide water service to this property FROM
HWY 10.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
9
EDWARD L. WRIGHT
(190A-1077)
ROBERT S. IANDSSY
(IDIS. 1001)
AI.S'I.ON JENNINGR
(1017.200-1)
OORDON S. RATHER. JR.
JOHN R TISDALE
JOHN WILLIAM SPIVEY III
LEF J. MULDROW
N.M. NORTON
CHARLES T. COLEMAN
EDWIN L, LOWTHER. JR.
GREGORY T. JONES
WALTER MCSPADDEN
JOHN D. DAVIS
JUDY SIMMONS I49NRY
KIMBERLY WOOD TUCKER
RAY P. COX, JR.
TROY A. PRICE
KATHRYN A. PRYOR
J. MARK DAVIS
JERRY J. SALLINOS
WILLIAM STUART JACKSON
MICHAEL D. BARNES
STRPIIEN R. LANCASTER
KYLE R. WILSON
C, TAD BOHANNON
J. CHARLES DOUGHERTY
M. SEAN HATCH
J. ANDREW VINES
JUSTIN T. ALLEN
MICHELLE M. RAFMMERLTNO
SCOTT ANDREW IR'BY
PATRICK D. WILSON
WRIGHT, LINDSEY & JENNINGS LLP
ATTORNEYS AT LAW
200 WEST CAPITOL AVENUE, SUITE 2300
LITTLE ROCK, ARKANSAS 72201-3699
(601) 371-0808 • FAX (601) 376-9442
NORTHWHST ARKANSAS
3338 PINNACLE HILLS PARKWAY, SUITE 610
ROGERS, ARKANSAS 12768.8960
(479) 986-0888 • FAX (479) 966-8932
WWw.wlj.com
Writer'e Direct Dial No. 601-212-1810
jeplveyeDWl).aum
Reply to Little Rack Office
April 26, 2012
Tony Bozynski, Director
Department of Neighborhoods and Planning
City of Little Rock
723 W. Markham
Little Rock, Arkansas 72201
RE: Vallon Long -Form PD -R (Z -7131-C)
Dear Mr. Bozynski:
DAVID P'GLOVER
11RGI NA A. YOUNG
PAUL O MORRIS
KDWARD RIAI. ARMSTRONG
GARY D. MARTS, JR
ERIC SERORR
P. DF.LANNA PADILLA
CA 1.EY R. VO
JOHNATHAN D. HORTON
KATHRYN M IRBY
DAVID L. JONES
WCARSON TUCKER
JI. NF A. KIM
ADRIENNE L. JUNG
KRISTEN S. MOYERS
IIHIN S. DROODON
RICHARD BLAK1CLY GLASGOW
DIANA HONOOGNONI SNYDER
PATRICK M YOUNG
BIANCA M. RUCKER
ANTWAN D. PHILLIPS
DAXTER D. DRENNON
M1011AF], A. THOMPSON
SETH R. ORWELL
HAYDEN W. SIIUROAR
COURTNEY C. RcLANTY
OF C01114891 -
RONALD A. MAY
JOHN G. LILE
ROORR A. GLASOOW
AI.STON JENNINGS, JR,
BRUCE R LINDSFY
JAMES It. VAN DOVER
CIIARLF.S S. BOHANNON
We are attorneys for Deltic Timber Corporation ("Deltic"), the owner of real
property which surrounds the 9.29 acres which is the subject of the above identified
application for rezoning (the "Application"). Deltic was also the grantor under a
Special Warranty Deed (the "Deed") dated as of September 15, 2006, and recorded
in the real property records of Pulaski County, Arkansas and September 18, 2006,
and appears of record as Instrument No. 2006-073765, A copy of this instrument
has previously been delivered to your office, The grantee of the property described
in the Deed was VEP, LLC, which is another entity that appears to be owned or
controlled by the principals of The View at Emerald Pointe, LLC, the owner of the
Property described in the Application. To the best of our knowledge and belief,
some or all of the property described in the Deed is included in the property
described in the Application (the "Property") and all of the Property is subject to the
Bill of Assurance and the Declaration described hereinafter. We write to register
our client's objection to the proposed rezoning and to inform you of concerns which
bear upon the appropriateness of the proposed action as well as what could be the
potential violation of the Bill of Assurance of the Chenal Valley Commercial
Neighborhood and the Declaration of Covenants and Restrictions of Chenal Valley
both of which limit the purposes and uses which may be made of the Property.
1107019-V1
April 26, 2012
Page 2
We call to your attention the final paragraph of the Deed which references both the
Bill of Assurance recorded as Instrument No. 96-68199 on September 30, 1996, in
the real property records of Pulaski County, Arkansas (the `Bill of Assurance") and
the Declaration of Covenants and Restrictions of Chenal Valley recorded as
Instrument No. 89-61706 in 1989 (the "Declaration"). The Deed makes clear that
the grantee, VEP, LLC, the predecessor in interest to or an apparent affiliate of the
current owner, The View at Emerald Point, LLC, acknowledges and takes
ownership subject to all restrictions and obligations which are described in the Bill
of Assurance and the Declaration, and all amendments and supplements thereto,
and, further, grantee specifically acknowledges having received a copy of each such
document prior to the delivery of the Deed.
The Bill of Assurance for the Chenal Valley Commercial Neighborhood includes
various provisions which relate to the use and development of property covered
thereunder. In particular, we draw your attention to Section 2 entitled
"Architectural Control." This section reads in pertinent part as follows:
"No improvements shall be constructed or maintained
upon any lot and no alteration or repainting to the
interior of a structure shall be made and no landscaping
performed unless approved by the Architectural Control
Committee as provided for in the Covenants and
Restrictions."
Section 19 of the Bill of Assurance entitled "Division of Lot," provides that:
For a period of thirty (30) years from the date hereof, no
platted lot within the Chenal Valley Commercial
Neighborhood shall be subdivided without the consent of
[Uelticl by written instrument signed and acknowledged
by [Deltic] and recorded in the office of the Circuit Clerk
of Pulaski County, Arkansas. (Emphasis supplied.)
Further on in Section 20 entitled "Right to Enforce" you will find the following
language:
The restrictions herein set forth shall run with the land
and shall bind the present owner, its successors and
assigns... Deltic, its successors and assigns, and also the
owner or owners of any of the lots hereby restricted shall
have the right to sue for and obtain, an injunction,
prohibitive or mandatory, to prevent the breach of or to
1167019-v1
April 26, 2012
Page 3
enforce the observance of the restrictions above set forth,
in addition to ordinary legal action for damages and
failure by any owner or owners of any lot or lots in this
addition to observe any of the restrictions herein.
Architectural control in the Chenal Valley Commercial Neighborhood is vested in
the Chenal Valley Architectural Control Committee (the "ACC") which administers
and enforces, along with Deltic, the Bill of Assurance and Declaration pursuant to
the design guidelines promulgated for that purpose. A copy of the Design
Guidelines has previously been delivered to the City and you have reviewed these
guidelines in connection with previous zoning matters involving properties located
in the Chenal Valley Commercial Neighborhood. Among the various provisions of
the Design Guidelines under the heading "7.0 Building Requirements," you will find
the following express language:
7.1 Use Ite ttlationg — The Chenal Commercial Properties
are established to accommodate office and associated
administrative, retail, multifamily, executive and
professional uses.
No other uses will be allowed without specific a roval
from the Architectural Control Committee. (Emphasis
Supplied)
We believe the language of the various provisions cited above demonstrates that the
Property which is the subject of the Application is subject to the provisions of both
the Bill of Assurance and the Declaration and review and approval by the ACC
which administers the Design Guidelines for the Chenal Valley Commercial
Neighborhood.
Shortly after the filing of the subject Application, I visited with Ms. James of the
City planning staff and brought to her attention the restrictive covenants which
limit and govern the use of the real property which is the subject of the Application.
At that time, I expressed to Ms. James Deltic's continuing concern and hope that
the Applicant would work with Deltic and the Chenal Valley ACC on a "parallel
track" to comply with the necessary restrictive covenants. To this end we have been
in contact and communication with the Applicant throughout the several months
since the original Application was filed with the City. We have consistently advised
the Applicant that while Deltic would not consent to a further subdivision of the
Property which is the subject of the pending Application, it would agree to a
rea,sonable reconfiguration of the existing horizontal property regime subject to
review and approval by the Chenal Valley ACC of all relevant materials and
limon -0
April 26, 2012
Page 4
information necessary to complete the revisions to the existing plan of development.
Regrettably, as of the date of this writing, the Applicant has made no application to
the ACC nor has the ACC reviewed any related request including detailed building
plans, specifications, information and proposed uses of the subject Property which
are typically a part of a request for approval by the ACC. Therefore, Deltic is
unable to advise the Planning Commission that the proposed development meets
the requirements for development in the Chenal Valley Commercial Neighborhood.
The Applicants' current position, as we understand it, is that they wish to treat
their development as a "de facto" single family neighborhood such that plans and
specifications will be submitted for an individual building on a case by case basis.
The Applicant's justification for this approach is that this procedure is typical in
single family neighborhoods which have otherwise been developed in the Chenal
Valley Residential Neighborhood. On its face, this position is inconsistent with the
treatment of the subject Property as a multifamily development and is inconsistent
with the procedures which govern the Chenal Valley Commercial Neighborhood.
The Planning Staffs minutes note that there are no "neighborhood associations" in
the immediate area of the Subject Property. This is true because the Property is not
located in a purely residential neighborhood.
There are approximately 600 acres of real property located within the Chenal Valley
Commercial Neighborhood. We can categorically represent to you that there are no
other single family uses located within the Commercial Neighborhood and any
proposed treatment of this property as a single family neighborhood would be
entirely inconsistent with the overall plan contemplated by both the Bill of
Assurance and the Declaration and as implemented through the Design Guidelines.
The situation presented by the Application is not unique. In the past when similar
applications involving approval by the ACC have been presented to the Planning
Commission, the Planning Commission has deferred consideration of the
Application until such time as the Applicant has made an appropriate application to
the ACC and received either approval or comments for modification of its plans. In
the present case, Deltic believes consideration by the Planning Commission of the
current Application is at best premature.
1107019-0
April 26, 2012
Page 5
We would respectfully request that the Planning Commission refrain from any
further consideration of the Application until such time as the Applicant is able to
advise the Planning Commission that it has complied with the Design Guidelines
and is able to advise the Planning Commission that the ACC has, in fact, approved
the proposed plan.
Respectfully submitted,
WRIGHT, LINDSEY & JENNINGS LLP
r�reys
i.i yam Spivey Il
for Deltic Tim or
Corporation
JWS:jIh
ru
1 r
Postage S Gj
Certified Fee 1
d9tLr+ark
��
M Return Receipt Fee 9
C] (Endofsement Required) 7G
Restricted Delivery Fee �� O
M (Endorsement Required)
f
ru Total Postage & Fees
m � _
v
PICKERING_AL.LWINE LLC
C3 28 Germay Ct.
C3
r- Little Rock, AR 72223
Er
r-
rr 7EL DORADO AR 71731
rl
Postage
S
001-7 65;.
a
Certified Fee
mReturn
Receipt Fee
M
O
C3
Return Receipt Fee
(Endorsement Required]
Restricted Delivery Fee
$0.40
r]�1 _k,
M
r3
(Endorsement Required)
so 00
�� F �•�
E3
&Fees
I $4.44/ d
Oa
031 a
ru
Total Postage
/?.YiWt,V�
ru
m
ru
m
—
0
C3
a DELTIC TIMBER CORP
C3 P.O. Box 7200
N El Dorado, AR 71731
a-
ru
r
rr
ATRS Retirement Properties, LLC
r 1400 West Third
Little Rock, AR 72202
SEATTLE WA 98121
rq
Postage Postage
M
m�r=1
a
FLl
Certified Fee
mReturn
Receipt Fee
(Endorsement Required)
C3
M
M
Restricted Delivery Fee
C3
(Endorsement Required)
0
Total Postage & Fees
ru
I $4.44/ d
FT
E:3
C
C3
ATRS Retirement Properties, LLC
r 1400 West Third
Little Rock, AR 72202
SEATTLE WA 98121
rq
Postage $
•
m�r=1
$ $ 5 _ 0017
Certified Fee
rlJ
� Pk
M
rn
Return Receipt Fee
(Endorsement Required)
$4.44
0
O
Restricted Delivery Fee
(Entldrsement Required)
$.
E=1
I $4.44/ d
6
E:3
Total Postage & Fees $
C3
ru
$ 03/ 14/2012
ru
m
—
m
` EMERICHENAL LLC
3131 Elliott Ave./STE 500
Seattle, WA 98121
171
Ln
0
r`
LITTLE ROCK AR, 72223
T -q
Postage
$ $ 5 _ 0017
Certified Fee
� Pk
M
Return Receipt Fee
(Endorsement Required)
Is
$4.40 ^' L�C�j�"
C3
p
Restricted Delivery Fee
(Endorsement Required)
I $4.44/ d
r],�. J
C3
Total Postage & Fees
$ 03/ 14/2012
ru
—
m
C3
CHENAL VALLEY APARTMENTS LP
C/O Capstone Realty Advisor
C3
C3
1423 Euclid Ave. STE 400
Cleveland, OH 44115