Loading...
HomeMy WebLinkAboutZ-7106 MapI �— Northwest corner 0 SECTION 3 +Ar 'L I IV L'k)AIJ }T -1-S, R -13-W M o L CONSTRUCT 1 2 a- DEVELOPER STREET - - - \ IMPPROVEMENTS AS REQUIRED BY MASTER STREET PLAN \I 25.00' �_ _ _ _ _ _ _ _ - _ S88°08'44"E. 392.50' 1 �ti 5' SIDEWALK 5' SIDEWALK GPP� S GROUND MOUNTED SIGN - Na P�1 20' RADIAL ROW DEDICATION � Q�G MAX HEIGHT AND SIZE (� ALLOWED BY CITY ORDINANCE 0 0 + �O. (DEVELOPER 0 DEDICATE,'ROW REQUIRED BY MASTER TREET PLAN U) CPP 1 L I i I DEVELOPER TO DEDICATE �OW REQUIRED' BY MASTER STREET PLAN I I I I 151, 1A��Q0 4 60' PROP WAREHOUSE �D 3600 S F PROPOSED DUMPSTER -0 D W/ 8' HIGHOPAQUE FENCE OR IWALL ON SIDES EQUIPMENT 'AF N88°14'59"W 391.83' r7 rn 0 O v- r - O d - O (n —r-- — LO h 00 Co •.' �ry�ST..... ••. •• STATE OF "%. ARKANSAS NO. V ��•� �ATU%r, n4. J, f /-lL LA... 20 0 20 60 Scale 1" — 20 ft GENERAL NOTES: Average size lot 3.61 Acres Number of lots 1 Existing Covenants None Water --CAW Sanitary Sewer--LRWWU All Construction Shown will be complete in 2002. Normal Operating Hours: Monday - Friday, 8 am - 5 pm Emergency Operating Hours: 7 Days a Week, 24 Hours a day Public Works Notes: 1. NPDES and grading permits are required prior to construction, site grading and drainage plan will need to be submitted and approved. 2. Stormwater detention ordinance applies to this property. 3. Plans of all work in right-of-way sholl be submitted for aproval prior to start of work. 4. Provide stripping and signage plans as per ordinance for the development, for Traffic Engineering approval. 5. Prior to construction obtain barricade permit for work done within right-of-way. 6. Average Lot Slope = 6% 7. Floodway/Floodplain - N/A 8. Any site lighting must be directed to the parking areas and away from from the adjacent property. 9. There shall be no grading or site work prior to obtaining an excavation permit. 10. Building Height not to exceed 30 ft. SYNOPSIS: BLDG 7,600 SF PARKING PROVIDED 36 SPACES LEGAL DESCRIPTION PART OF THE NW1/4 NW1/4 OF SECTION 3, T -1-S, R -13-W, PULASKI COUNTY, ARKANSAS, MORE PARTICULARYLY DESCRIBED AS: COMMENCING AT THE NORTHWEST CORNER OF THE NW1/4 NW1/4 OF SECTION 3; THENCE SOUTH ALONG THE WEST LINE THEREOF, 40.02 FT. TO THE SOUTH RIGHT- OF-WAY LINE OF BASELINE ROAD; THENCE S88'08'44"E ALONG SAID SOUTH RIGHT-OF-WAY LINE, 25.00 FT. TO THE POINT OF BEGINNING; THENCE S88'08'44"E CONTINUING ALONG SAID SOUTH RIGHT-OF-WAY LINE, 392.50 FT.; THENCE 501.45'01"W, 400.93 Fr.; THENCE N88.14'59"W, 391.83 FT. TO A POINT ON THE EAST RIGHT-OF-WAY LINE OF SIBLEY HOLE ROAD; THENCE N01.39'15"E ALONG SAID EAST RIGHT-OF-WAY LINE, 401.64 FT. TO THE POINT OF BEGINNING, CONTAINING 3.6127 ACRES MORE OR LESS. ALL TOPOGRAPHIC INFORMATION WAS PROVIDED BY THE CITY OF LITTLE ROCK'S P.A.G.I.S I HEREBY CERTIFY THAT I HAVE SURVEYED THE PROPERTY SHOWN AND DESCRIBED HEREON. PROPERTY LINES ARE LOCATED IN ACCORDANCE WITH ESTABLISHED PROPERTY LINES. THERE ARE NO APPARENT ENCROACHMENTS EXCEPT AS SHOWN. NO PORTION OF THIS PROPERTY IS LOCATED WITHIN THE 100 YEAR FLOOD BOUNDARY AS SHOWN ON THE FLOODWAY, FLOOD BOUNDARY AND FLOOD INSURANCE WORK MAP FOR PULASKI COUNTY, ARKANSAS. LITTLE ROCK PLANNING COMMISSION APPROVED, SUBJECT TO THE CONDITIONS AS NOTED IN THE PLANNING COMMISSION - /y ----_--_A MIND RECORD DATED N I J 1 S o f Paul M. White, PLS #1281 Ark BY:—� DATE_ I ILIO PLANNED INDUSTRIAL DEVELOPMENT 1 11-6-01 Revised 10-31-0' SEA INC. PID RFr,�:.��r Date 10-8-01 CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING NOV 0 2001 Seale Hor. Vet. 401 VICTORY STREET LITTLE ROCK, ARKANSAS 72201 1 1*'2D BY: t`' Sheet of Survey By: Drawn Dr. Checked By: Approved By: LJTIFLE ROCK, ARKANSAS Job Ho. 01-0572 -z•'11o(e