HomeMy WebLinkAboutZ-7092 Staff AnalysisOctober 4, 2001
ITEM NO.: 7.1
FILE NO.: Z-7092
NAME: Wilbert Vault of Little Rock - Short -Form PD -I
LOCATION: 12705 Alexander Road
DEVELOPER: ENGINEER:
Cathy Graves Troy Laha
12705 Alexander Road 6602 Baseline Road, Suite E
Alexander, AR 72022 Little Rock, AR 72209
AREA: 4.95± acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING:
Current: R-2
Proposed: PD -I
ALLOWED USES: Nonconforming burial vault manufacturer
PROPOSED USE: Expansion of existing use
VARIANCES/WAIVERS REQUESTED:
Alexander Road
BACKGROUND:
Waiver of street improvements to
The R-2 zoned property located at 12705 Alexander Road is
occupied by a nonconforming concrete burial vault manufacturing
and sales company. The business had been in operation some
years prior to this area being annexed into the City in
December, 1979. The property contains two, large metal
buildings and a single -wide manufactured home which is occupied
by an employee for on-site security. Areas of outdoor storage
of raw materials and finished products are located behind the
buildings. A gravel, employee and customer parking lot is
located on the front of the property. A gravel, parking and
storage area is located behind the buildings.
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.)
A. PROPOSAL/REQUEST:
FILE NO.: Z-7092
Wilbert Burial Vault Company proposes to add an
approximately 6,000 square foot addition onto the rear of
the production facility located at 12705 Alexander Road.
The expansion will allow for the addition of a new
automated concrete mixing system. Additional storage space
will allow for the reduction in outside storage of finished
product. The existing, gravel parking lot at the front of
the site will be paved and landscaping will be upgraded. A
smaller, office expansion is proposed for the west side of
the building. An existing, single -wide manufactured home
that is used for security purposes will be relocated on the
site to accommodate the office expansion. The applicant is
requesting a waiver of required street improvements.
B. EXISTING CONDITIONS:
This nonconforming manufacturing facility consists of two
large metal buildings, gravel parking, areas of outdoor
storage and a manufactured home for on-site security. The
property is located in a rural part of the City. Uses
around the site are primarily undeveloped tracts and a few
single family homes on large tracts. Large areas of
undeveloped, wooded I-2 and R-2 zoned properties extend to
the north, south and west. One single family is located
north of the site and one is located to the east.
C. NEIGHBORHOOD COMMENTS:
All owners of property located within 200 feet of the site,
all residents within 300 feet who could be identified and
the Alexander Road, Quail Run and SWLR UP Neighborhood
Associations were notified of the request. As of this
writing, staff has received no comments.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Alexander Road is classified on the Master Street Plan as
a minor arterial. A dedication of right-of-way 45 feet
from centerline will be required.
2. Provide design of street conforming to "MSP" (Master
Street Plan). Construct one-half street improvement to
these streets including 5 -foot sidewalks with planned
development.
3. Driveways shall conform to Sec. 31-210 or Ordinance
18,031.
2
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.
FILE NO.: Z-7092
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
5.Stormwater detention ordinance applies to this property.
6. Easements shown for proposed storm drainage are required.
7. A Sketch Grading and Drainage Plan will be required per
Sec. 29-186(e) .
8. A Grading Permit will be required per Sec. 29-186(c)
and (d) .
E. UTILITIES AND FIRE DEPARTMENT/ COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No Comments.
ARKLA: No Comments.
Southwestern Bell: No Comments.
Water: No objection.
Fire Department: Place fire hydrants per code.
County Plannin No Comment.
CATA: Project site is not located on a dedicated bus
route and has no effect on bus radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is located in the Otter Creek Planning
District. The Land Use Plan shows Mixed Office and
Commercial for this property. The applicant has applied
for a Planned Development -Industrial for new building
additions. The property is currently zoned R-2 Single
Family.
A land use plan amendment for a change to Mixed Commercial
and Industrial is a separate item on this agenda.
City Recognized Neighborhood Action Plan:
The applicant's property lies in the area covered by the
Chicot West/I-30 South Neighborhood Action Plan. The
3
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.) FILE NO.: Z-7092
infrastructure Goal lists three objectives relevant to this
case. The three objectives include bringing all streets up
to city standards, identification and correction of
drainage problems in the area, and construction of
sidewalks on major roads.
Landscape Issues:
A landscaping upgrade toward compliance with the Landscape
Ordinance equal to the building expansion proposed will be
required. It is recommended this landscaping upgrade be a
9 -foot wide on-site landscape strip, with its associated
plantings, to be provided along the northern site perimeter
parallel with the street. This is the area where there are
now 10 northern parking spaces.
The applicant has proposed to provide the required upgrade
by landscaping the east, west and south perimeters of the
front parking lot.
G_ SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 13, 2001)
The applicant was not present. Staff noted that additional
information was needed on hours of operation, signage,
dumpster location, outdoor storage and building heights.
Public Works Comments were presented. It was noted that
the proposed plan showed the required right-of-way
dedication. Landscape Comments were noted.
The Committee determined there were no further issues and
forwarded the item to full Commission.
(NOTE: Staff subsequently met with the applicant and
discussed the issues presented to the Subdivision
Committee.)
H. ANALYSIS:
The applicant presented a revised site plan and responses
to staff inquiries on September 18, 2001. Landscaping is
shown on the west, east and south perimeters of the front
parking lot, which is to be paved. Existing areas of
outdoor storage of raw materials and finished product are
shown. A privacy fence will be erected between the two
metal buildings, providing screening from Alexander Road.
Hours of operation are 6:00 a.m. - 5:30 p.m.; Monday
4
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.
FILE NO.: Z-7092
through Friday; Saturday 8:00 a.m. to 5:00 p.m.; Sunday
noon to 5:00 p.m. The proposed single -use PD -I is for
Wilbert Vault only. There will be no change in signage.
The business has one existing, 6 feet X 3 feet, 10 foot
tall ground mounted sign. A roll -off, 20 yard refuse
container is located behind the large building. It is
exchanged monthly. A forklift or tractor most have access
all around the container to put damaged product (1,500 -
3,000 pounds) down into it. The applicant is requesting
not to have to put screening around the dumpster. The
request seems reasonable to staff, considering the location
of the container within the 4 -acre tract. The existing
buildings vary from 10 to 20 feet in height at the eave.
The new building will be 20 feet tall at the eave. The
storage/truck maneuvering area behind the buildings will
continue to be gravel.
Staff believes that allowing the proposed, single -use PD -I
for the expansion of this nonconforming use is an
appropriate use of the property. The upgrade in
landscaping and screening combined with the paving of the
front parking lot should create a better appearance from
the street which is of some benefit to the neighborhood.
The addition is at the rear of the large building and is
centered within this 4+ acre site. Allowing the addition
should have no greater impact on the surrounding
neighborhood.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the requested single -use PD -I
for Wilbert Burial Vault Company, subject to compliance
with the requirements outlined in paragraphs D, E and F of
this report.
Staff does not recommend approval of the requested waiver
of street improvements to Alexander Road.
PLANNING COMMISSION ACTION: (OCTOBER 4, 2001)
The applicant was present. There were several objectors
present. Two letters had been received. This item was
discussed concurrently with item no. 7, LU01-16-02, a Land Use
Plan Amendment.
5
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.
FILE NO.: Z-7092
Staff presented the proposed Plan Amendment. Staff then
presented the proposed PZD and recommended approval subject to
compliance with the conditions outlined in the "Staff
Recommendation" above.
Cathy Graves stated Wilbert Vault had been in business in Little
Rock since 1948 and had been at this location since 1964. She
stated hers was a small business with 20 employees. She asked
for approval of the rezoning.
Elaine Crouse, president of the Alexander Road Neighborhood
Association, spoke in opposition. She passed out a packet of
information which included a copy of a site plan which had been
presented by Troy Laha at the August meeting of the association.
Ms. Crouse commented that the plan presented by Mr. Laha
differed greatly from the one before the Commission in that much
more landscaping and buffering was shown on the previous plan.
She stated increased landscaping would help to reduce noise and
dust created on the site. Ms. Crouse stated the association was
not opposed to the rezoning for Wilbert Vault but they wanted
more improvements made to the landscaping and buffering.
Jim Conner, representing the ownership of 60 undeveloped acres
adjacent to the south, addressed the Commission. He stated his
concerns were also noise and dust. He stated they had decided
not to oppose the rezoning if the following three conditions
outlined in a package of information he presented to the
Commission were met:
1) Approval is granted to the Wilbert Burial Vault
Co., Inc. of Little Rock subject to the current
Planned Development Industrial (PDI)
requirements for a Single -Use Application. We
understand this requires a single phase
development with all conditions tied to the
building permit.
2) That the "Grass Areas" buffer shown on the
Wilbert development plan in the application, be
secured with an eight foot high solid board
screening fence located across the width of the
property at least one hundred fifty feet from
the rear property line. This would provide a
modest separation between our residential homes
and the industrial use.
6
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont_
FILE NO.: Z-7092
3) And finally with regards to the Land Use Plan,
we support staff's recommendation which is
opposed to change this site to Mixed Industrial
Classification (MIC). Our preference would be
to change it to the same residential
classification which designates out tract and
most of the lands adjacent to Wilbert.
Wood Ussery, of #3 Natchez Lane, also stated that he felt
the neighborhood had been misled by the "switch" in plans
between what had been shown at the neighborhood
association meeting and what had been presented to the
Commission.
B. J. Wyrick, a neighborhood resident and member of the
Little Rock Board of Directors, said she supported the
PD -I but she also had concerns about the alleged change
in the plan.
Janet Berry, president of SWLR UP, spoke in opposition to
the Plan Change. She stated she was supportive of the
business expanding but she wanted an upgrade in
landscaping and no waiver of street improvements.
Cathy Graves responded that she had never seen the plan
which had been submitted by Troy Laha to the neighborhood
association. She stated she had tried to join the
association but had been denied membership because hers
was a business not a residence. She apologized for any
misunderstanding that had been created as a result of Mr.
Laha' s actions.
In response to a question from Commissioner Lowry, Dana
Carney of the Planning Staff commented on the two plans.
He stated that he also had not seen the first plan, only
that plan which had been presented to the Commission. He
commented that the first plan appeared to comply fully
with landscape and screening requirements which would be
required if this were a new development. Mr. Carney
stated that the applicant was required only a percentage
increase in landscaping equal to the percentage increase
in building expansion. He stated it was difficult to
comply with all aspects of the code since the site was
already developed. Mr. Carney reiterated staff's
position of support.
7
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.) FILE NO.: Z-7092
In response to questions from Commissioner Adcock, Ms.
Graves stated the property would be "kept -up".
At the request of Commissioner Berry, Tad Borkowski of
Public Works described the required street improvements.
He restated staff's position of not supporting a waiver
of street improvements. He stated staff would support a
deferral for 5 years or until development occurs on
adjacent tracts that generates street improvements,
whichever occurs first.
Commissioner Lowry asked Ms. Graves if she would consider
deferring the item to meet with staff and the neighbors.
Ms. Graves responded that she would prefer that the
Commission act on the issue. She stated she could not
put landscaping across the front of the site without
loosing an additional row of parking spaces. She noted
she was already loosing one row because of the
requirement to dedicate right-of-way.
Dana Carney suggested planting the required landscaping
in the right-of-way, with a franchise. Public Works
Staff indicated support for such a plan.
Ms. Crouse reiterated her concern about dust on the site.
Chairman Downing commented that there would continue to
be dust on the site if nothing were done at all. He
suggested the parties meet for 15 minutes to see if any
common ground could be found.
The Commission recessed for 15 minutes.
After the break, staff informed the Commission that there
was no agreement on any of the points of concern.
Cathy Graves stated she willingly agreed with staff's
suggestion to place landscaping in the right-of-way
between the parking lot and the street. She stated the
dust issue would be reduced by the proposed paving of the
front parking lot.
In response to a question from Commissioner Floyd, Ms.
Graves stated the proposed new mixer and silo would also
help reduce dust.
8
October 4, 2001
SUBDIVISION
ITEM NO.: 7.1 (Cont.
FILE NO.: Z-7092
Chairman Downing noted that there were only 8
commissioners present. He offered Ms. Graves the
opportunity to defer the item. Ms. Graves asked if any
neighbor would speak for the project. None responded.
Ms. Graves chose not to request deferral.
Ms. Crouse reiterated her desire to see more landscaping
on the site.
Commissioner Faust stated the proposed plan met the
requirements of the new Landscape Ordinance. She stated
she felt Ms. Graves' offer to landscape the right-of-way
was "generous."
At Commissioner Berry's request, Director Wyrick restated
her position. She stated she opposed the plan amendment,
she supported the PD -I and she was not happy with the way
the site was going to look.
A motion was made to approve the Land Use Plan Amendment.
The motion failed by a vote of 0 ayes, 8 noes and 3
absent.
A motion was made to approve the PD -I, subject to
compliance with the conditions proposed by staff and the
applicant's agreement to put the required street
perimeter landscaping in the right-of-way. The motion
was approved by a vote of 6 ayes, 1 noe, 3 absent and 1
abstaining (Adcock).
A motion was made to approve the requested waiver of
street improvements. The motion failed by a vote of
0 ayes, 8 noes and 3 absent.
A motion was made to approve a deferral of street
improvements for 5 years, until adjacent development
or until a public project; whichever occurs first.
The motion was approved by a vote of 7 ayes, 1 noe
and 3 absent.
E
SUBDIVISION COMM VTEE CQMMENTS
SEPTEMBER 13, 2001
ITEM 7.1 WILBERT VAULT OF LITTLE ROCK — SHORT -FORM PD -I (Z-7092)
Planning Staff Comments:
1. Provide hours of operation.
2. Proposed single -use PD -I is for Wilbert Vault only.
3. Provide signage plan.
4. Show dumpster location and required screening.
5. Show areas of outdoor material storage.
6. Is north parking area to be paved?
7. Provide 9 -foot landscape strip across north perimeter; eliminate front row of parking.
8. Show and detail any existing or proposed fencing.
9. Specify use of existing mobile home; to be relocated.
10. Gravel parking -storage area behind buildings to remain.
11. Note building height; existing and proposed.
Variance/Waivers: Waiver of street improvements to Alexander Road.
Public Works:
1. Alexander Road is classified on the Master Street Plan as a minor arterial. A dedication of right-o€way 45
feet from centerline will be required.
2. Provide design of street conforming to "MSP" (Master Street Plan). Construct one-half street improvement to
these streets including 5 -foot sidewalks with planned development.
3. Driveways shall conform to Sec. 31-210 or Ordinance 18,031.
4. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
5. Stormwater detention ordinance applies to this property.
6. Easements shown for proposed storm drainage are required.
7. A Sketch Grading and Drainage Plan will be required per Sec. 29-186(e).
8. A Grading Permit will be required per Sec. 29-186 (c) & (d).
Utilities and Fire De artmem/Coun Plannin :
Wastewater: Sewer available, not adversely affected.
Entergy: No Comments.
ARKLA: No Comments.
Southwestern Bell: No Comments.
Water: No objection.
Fire Department: Place fire hydrants per code.
County Plannin : No Comment.
CATA: Project site is not located on a dedicated bus route and has no effect on bus radius, turnout and route.
Planning Division: Land Use Plan Amendment filed; LU01-16-02.
ITEM 7.1 WILBERT VAULT OF LITTLE ROCK — SHORT -FORM PD -I Z-7092 CONT.
Landscape: A landscaping upgrade toward compliance with the Landscape Ordinance equal to the building
expansion proposed will be required. It is recommended this landscaping upgrade be a 9 -foot wide on-site
landscape strip, with its associated plantings, to be provided along the northern site perimeter parallel with the
street. This is the area where there are now 10 northern parking spaces.
Revised Site Plan: A revised site plan and responses to staff issues are to be submitted no later than Wednesday,
September 19, 2001.