Loading...
HomeMy WebLinkAboutZ-7079 Map 3M R 7 1/4" u APPROACH LENGTH AS REQUIRED 3/4" - 70'-3" OPENING - 70'-1 1/2" DECK LENGTH 3/4' IMPORTANT! If your scale is equipped with access ways, such as manholes, it is the users responsibility to provide proper • protection such as barriers, during the time they ore open or removed. _Im SHOWN WITH NESS PLATE REI Generated by Cordinol/Detecto Computer -Aided Drafting System 1/4" 11 3/4- 3/4* 13'-0" 18'-0 1/4" d 0 NOTES: 1. CAUTION: DO NOT WELD ON THE SCALE WHILE THE LOAD CELLS ARE IN PLACE 2. REFER TO DRAWING 3502 -C435 -GS FOR PROPER ELECTRICAL GROUNDING SPECIFICATIONS. 3. THE WEIGHBRIDGE IS SUPPLIED IN TWO MODULES. MAXIMUM LIFT PER MODULE IS 4,000 POUNDS. 4. PLACE MODULES ON LOAD CELL STANDS. ADJUST STAND SO THAT LINKS ARE PLUMB, LATERALLY AND TRANSVERSLY. 5. ADJUST BUMPER BOLTS TO 1/4" CLEARANCE, 6. THE WEIGHT INDICATOR IS SHOWN ON A SEPARATE DRAWING. 7, SAFETY BARRIERS ARE A USER/OWNER RESPONSIBILITY TO PREVENT VEHICLES FROM RUNNING OFF THE SIDES OF THE SCALE. FOR THE SAFETY OF VEHICLES USING THIS SCALE, SIDE RAILS AND/OR PROTECTIVE POSTS ARE AVAILABLE AS OPTIONAL EQUIPMENT. 8. THE 9 5/16" MINIMUM CLEARANCE UNDER THE SCALE MUST BE MAINTAINED THE FULL LENGTH OF THE SCALE EXCEPT AT THE LOAD CELL PIER AREAS. 9. SHIM UNDER LOAD CELL BEARING IF NECESSARY TO OBTAIN PROPER DEAD LOAD. 10. CARDINAL SCALE MFG. CO. RECOMMENDS THAT THE CUSTOMER INSTALL PROTECTIVE CONDUIT/COVER FOR THE LOAD CELL CABLES WHENEVER THE CONDITION IS PRESENT THAT CAN RESULT IN DAMAGE OR ABRASION TO THE LOAD CELL CABLES. 11. COIL EXCESS LOAD CELL CABLES IN SPACES PROVIDED BEHIND J -BOXES. 12. CONCRETE IS NOT SUPPLIED BY CARDINAL SCALE MFG. CO. 13. CONCRETE SHALL BE A MINIMUM OF 4500 PSI AT 28 DAYS. 14. THE SCALE SHOULD NOT BE LOADED FOR 28 DAYS TO ALLOW REQUIRED CONCRETE CURE TIME. 15. APPROXIMATELY 17,2 CUBIC YARDS OF CONCRETE IS REQUIRED FOR THE SCALE DECKS. 16, REFER TO SPECIFICATION FOR CONCRETE SCALE DECKS, SPEC A 0104-AO20-ES FOR CONCRETE PLACEMENT, THIS IS FOUND IN THE EPR. EPR -C & EPR -LF MANUAL 8525-M241-01, DEVIATIONS FROM THE SPECIFICATIONS WILL VOID ALL WARRANTIES. NOTE: THE BRIDGES MUST BE SUPPORTED AT MIDSPAN DURING THE CONCRETE CURING TIME. b 1/4" SEE BRIDGE CONNECTION DETAIL 18'-11 1/2" HOOK PIN RECEIVER BRACKET MODEL WATT SCALE EPR NOMINAL CAPACITY 100 TONS I U.S.--CONCENTRATED LOAD CAPACITY 30 TONS CANADA --SECTIONAL CAPACITY CANADA--S.WA. NO. SERIAL NUMBER "SALES ORDER NUMBER' NOMINAL CAPACITY IS THE GROSS CAPACITY AS ASSIGNED BY THE MANUFACTURER. CONCENTRATED LOAD CAPACITY (CLC) AS ASSIGNED BY THE MANUFACTURER, IS THE LOAD WHICH CAN BE PLACED ANYWHERE ON THE PLATFORM IN THE PRESCRIBED TEST PATTERN. SECTIONAL CAPACITY IS THE MAXIMUM LOADING FOR EACH PAIR OF LOAD CELLS AS ADJACENT PLATFORMS (SPANS) ARE LOADED. L� # ! �- 7 1/4" — — — — — — — — — — — — — • _Im SHOWN WITH NESS PLATE REI Generated by Cordinol/Detecto Computer -Aided Drafting System 1/4" 11 3/4- 3/4* 13'-0" 18'-0 1/4" d 0 NOTES: 1. CAUTION: DO NOT WELD ON THE SCALE WHILE THE LOAD CELLS ARE IN PLACE 2. REFER TO DRAWING 3502 -C435 -GS FOR PROPER ELECTRICAL GROUNDING SPECIFICATIONS. 3. THE WEIGHBRIDGE IS SUPPLIED IN TWO MODULES. MAXIMUM LIFT PER MODULE IS 4,000 POUNDS. 4. PLACE MODULES ON LOAD CELL STANDS. ADJUST STAND SO THAT LINKS ARE PLUMB, LATERALLY AND TRANSVERSLY. 5. ADJUST BUMPER BOLTS TO 1/4" CLEARANCE, 6. THE WEIGHT INDICATOR IS SHOWN ON A SEPARATE DRAWING. 7, SAFETY BARRIERS ARE A USER/OWNER RESPONSIBILITY TO PREVENT VEHICLES FROM RUNNING OFF THE SIDES OF THE SCALE. FOR THE SAFETY OF VEHICLES USING THIS SCALE, SIDE RAILS AND/OR PROTECTIVE POSTS ARE AVAILABLE AS OPTIONAL EQUIPMENT. 8. THE 9 5/16" MINIMUM CLEARANCE UNDER THE SCALE MUST BE MAINTAINED THE FULL LENGTH OF THE SCALE EXCEPT AT THE LOAD CELL PIER AREAS. 9. SHIM UNDER LOAD CELL BEARING IF NECESSARY TO OBTAIN PROPER DEAD LOAD. 10. CARDINAL SCALE MFG. CO. RECOMMENDS THAT THE CUSTOMER INSTALL PROTECTIVE CONDUIT/COVER FOR THE LOAD CELL CABLES WHENEVER THE CONDITION IS PRESENT THAT CAN RESULT IN DAMAGE OR ABRASION TO THE LOAD CELL CABLES. 11. COIL EXCESS LOAD CELL CABLES IN SPACES PROVIDED BEHIND J -BOXES. 12. CONCRETE IS NOT SUPPLIED BY CARDINAL SCALE MFG. CO. 13. CONCRETE SHALL BE A MINIMUM OF 4500 PSI AT 28 DAYS. 14. THE SCALE SHOULD NOT BE LOADED FOR 28 DAYS TO ALLOW REQUIRED CONCRETE CURE TIME. 15. APPROXIMATELY 17,2 CUBIC YARDS OF CONCRETE IS REQUIRED FOR THE SCALE DECKS. 16, REFER TO SPECIFICATION FOR CONCRETE SCALE DECKS, SPEC A 0104-AO20-ES FOR CONCRETE PLACEMENT, THIS IS FOUND IN THE EPR. EPR -C & EPR -LF MANUAL 8525-M241-01, DEVIATIONS FROM THE SPECIFICATIONS WILL VOID ALL WARRANTIES. NOTE: THE BRIDGES MUST BE SUPPORTED AT MIDSPAN DURING THE CONCRETE CURING TIME. b 1/4" SEE BRIDGE CONNECTION DETAIL 18'-11 1/2" HOOK PIN RECEIVER BRACKET MODEL WATT SCALE EPR NOMINAL CAPACITY 100 TONS I U.S.--CONCENTRATED LOAD CAPACITY 30 TONS CANADA --SECTIONAL CAPACITY CANADA--S.WA. NO. SERIAL NUMBER "SALES ORDER NUMBER' NOMINAL CAPACITY IS THE GROSS CAPACITY AS ASSIGNED BY THE MANUFACTURER. CONCENTRATED LOAD CAPACITY (CLC) AS ASSIGNED BY THE MANUFACTURER, IS THE LOAD WHICH CAN BE PLACED ANYWHERE ON THE PLATFORM IN THE PRESCRIBED TEST PATTERN. SECTIONAL CAPACITY IS THE MAXIMUM LOADING FOR EACH PAIR OF LOAD CELLS AS ADJACENT PLATFORMS (SPANS) ARE LOADED. L� # ! �- 7 1/4"