HomeMy WebLinkAboutZ-7022 Staff AnalysisFILE NO.: Z-7022
NAME: Cantrell Loops Subdivision (Lot 1) - Short -Form PD -C
LOCATION: North side of Cantrell Road at Taylor Loop Road
(east leg)
DEVELOPER: ENGINEER:
CLP I -III
c/o Tom Cole
900 S. Shackleford Road
Little Rock, AR 72211
McGetrick and McGetrick
319 E. Markham St., Suite 202
Little Rock, AR 72201
AREA: 2.275 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R -2/C-3
ALLOWED USES:
Single Family Residential/
Commercial
PROPOSED USE: Commercial
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/PROQUEST:
The applicant proposes to rezone the proposed Lot 1,
Cantrell Loops Subdivision from R -2/C-3 to PD -C for a
Walgreens Drug Store development. The proposed site plan
shows a single building near the center of the lot, with a
total of 14,490 square feet. The building will have a
height of approximately 20 feet.
The proposed development will have two (2) access points,
one (1) from a shared drive between Lots 1 and 2, Cantrell
Loops Subdivision and one (1) from a drive along the Lot 1
frontage approximately 300 feet to the west. The shared
drive between Lots 1 and 2 will align with Taylor Loop
Road.
A total of 68 parking spaces is proposed to serve the drug
store development. A drive-thru window for the pharmacy is
proposed on the north side of the building.
FILE NO.: Z-7022 (Cont.)
B_
C.
M
The proposed site plan also shows a ground -mounted sign
near the southeast corner of the parking area. The
applicant notes that the sign will comply with the Highway
10 Design Overlay District.
The applicant notes that the proposed Walgreens Store will
be open 24 hours a day. The applicant is also requesting
C-3 permitted uses as alternate uses for the site should
Walgreens ever vacate the building.
EXISTING CONDITIONS:
There are two (2) abandoned single family residences
located within the southern portion of the property along
Cantrell Road. The northern portion of the property is
mostly wooded.
There is a commercial development located to the east, with
single family residences to the west. There are commercial
uses at the southwest corner of Cantrell Road and Taylor
Loop Road, with a single family residence at the southeast
corner. The property to the north is undeveloped and zoned
R-2.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several phone calls
(as a result of the posted sign) from persons requesting
information on the application. The Westchester/Heatherbrae,
Secluded Hills and Westbury Neighborhood Associations were
notified of the public hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Cantrell Road is classified on the Master Street Plan as
a principal arterial. Dedication of right-of-way to 55
feet from centerline will be required.
2. Provide design of street conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
this street including 5 -foot sidewalk with planned
development.
3. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
4. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
5. Construct southbound through -lane in addition to the
proposed left and right -turn lanes (100 -ft. taper and
150 -ft, storage length for turn lanes).
FILE NO.: Z-7022 (Cont.
6. Access easement must,accommoaate street and dual
sidewalks.
7. Stormwater detention ordinance applies to this property.
8. Easements for proposed stormwater detention facilities
are required.
9. Verify sight distance for driveway on Cantrell Road.
10. Obtain permits for improvements within State Highway
right-of-way from AHTD, District VI.
11. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
12. Grading permit will be required on this development by
Ordinance 18,361.
13. NPDES and grading permits are required prior to
construction, site grading, and drainage plan will need
to be submitted and approved.
14. A sketch grading and drainage plan, a special flood
hazard permit, and a special grading permit for flood
hazard areas are required. ADEQ and NPDES permit is
also required.
15. The minimum Finish Floor elevation of 291 feet (msl) is
required to be shown on plat and grading plans.
16. Maximum driveway width is 36 feet.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements to
serve property.
Entergy: A 30 foot easement is requested along the west
property line for all three-phase overhead extensions, no
exceptions. Contact utility for details.
ARKLA: No Comments received.
Southwestern Bell: No Comment received.
Water: An acreage charge in the amount of $300 per acre
applies to this property and a development fee based on the
size of connection will apply for connections larger than
4" to Lot 1 in addition to normal charges. On-site fire
protection may be required.
Fire Department: Place fire hydrants per City Code. Contact
Dennis Free at 918-3752 for details.
County Planning: No Comment received.
CATA: Project site is not located on a dedicated bus
route and has no effect on bus radius, turnout and route.
3
FILE NO.: Z-7022 (Cont.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is located in the River Mountain Planning
District. The Land Use Plan shows Commercial for this
property. The applicant has applied for a Planned
Development - Commercial for a drug store. The property is
currently zoned R-2 Single Family and C-3 General
Commercial. A land use plan amendment is not required.
City Recognized Neighborhood Action Plan:
The applicant's property lies in the area covered by the
River Mountain Neighborhood Action Plan. The Sustainable
Natural Environment goal listed one action statement
relevant to this case. The action statement calls for the
preservation of the Highway 10 Design Overlay District.
Landscape Issues:
The plan submitted does not allow for the 8 percent
interior landscape islands required within the on-site
paved area. Additionally, a 3 -foot wide building landscape
area is required between the public parking area and
building. Considerable flexibility is allowed with the
building landscaping requirement.
An irrigation system to water landscaped areas is required.
A 6 -foot high opaque screen, either a wooden fence with its
face side directed outward or dense evergreen plantings, is
required along the northern and western site perimeters.
A minimum of 705 of the northern and western land use
buffers must remain undisturbed.
G. SUBDIVISION COMMITTEE COMMENT: (MAY 10, 2001)
Pat McGetrick and Tom Cole were present, representing the
application. Staff briefly described the proposed PCD,
noting that some additional project information was needed.
The Public Works requirements were briefly discussed. It
was noted that the access easement between Lots 1 and 2,
Cantrell Loops Subdivision needed to be increased to 60
4
FILE NO.: Z-7022 (Cont.)
feet wide. Public Works noted, that the proposed drive
locations were acceptable.
The need for a traffic signal at the intersection of
Cantrell Road and Taylor Loop Road was discussed.
Mr. McGetrick noted that the applicant wished to make a
contribution toward the future traffic signal installation.
The landscape requirements were briefly discussed. Bob
Brown, of the Planning Staff, noted that some additional
interior landscaping would be required. Mr. McGetrick
stated that the additional landscaping would be provided.
After the discussion, the Committee forwarded the PD -C to
the full Commission for resolution.
H. ANALYSIS:
The applicant submitted a revised site plan to staff on
May 16, 2001. The revised plan addresses the issues as
raised by staff and the Subdivision Committee. The
dumpster area, screening fence, building height and
additional interior landscaping have been shown on the
revised plan.
The revised plan provides a total of 68 parking spaces.
Thirteen parking spaces have been removed from the
originally submitted plan to allow for additional interior
landscaping. The typical minimum parking requirement for a
commercial use of this size is 52 spaces. Staff supports
the parking plan as proposed.
Public Works has reviewed the revised site plan and notes
that all issues have been resolved. The access easement
between Lots 1 and 2 has been increased to a 60 foot width
and a sidewalk has been shown on each side of this access
drive as required. The required sidewalk along Cantrell
Road has also been shown.
The proposed site plan shows a ground -mounted sign near the
southeast corner of the parking area. The applicant notes
that this sign will comply with the Highway 10 DOD
requirements. The sign must be monument -type, with a
maximum height of six (6) feet and a maximum area of 100
square feet.
To staff's knowledge, there are no issues left to be
resolved, as the applicant has done a good job in
5
FILE NO.: Z-7022 (Cont.)
addressing the issues as Raised by staff and the
Subdivision Committee. Staff feels that the proposed
development will have no adverse impact on the general
area, as the site plan conforms to the Highway 10 DOD with
respect to building setbacks, sign details and landscape
and buffer areas.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the PD -C zoning subject to the
following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The proposed ground -mounted sign must conform to the
Highway 10 DOD standards as noted in paragraph H. of this
report.
3. Any site lighting must be low-level and directed away
from adjacent property.
4. The dumpster area must be screened on three (3) sides
with an 8 foot high opaque fence or wall.
5. Staff recommends C-3 permitted uses as alternate uses for
the property.
PLANNING COMMISSION ACTION: (MAY 31, 2001)
Item 4 and 4.1 were discussed simultaneously by the Planning
Commission.
Pat McGetrick and Tom Cole were present, representing the
application. Staff briefly described the preliminary plat and
PD -C rezoning with recommendation of approval subject to the
conditions noted. There were two (2) persons present with
concerns.
Pat McGetrick briefly explained the project. He noted that the
site lighting would be low-level. He also noted that the
Walgreens Store would be a 24-hour operation. The hours of
operation were briefly discussed. Mr. McGetrick noted that if
the 24-hour operation is not feasible, the hours will be
shortened.
Commissioner Muse asked about the C-3 permitted uses as
alternate uses for the property. Staff explained that if
Walgreens vacates the building, another C-3 permitted use could
occupy the structure.
6
FILE NO.: Z-7022 (Cont.)
Keith Wingfield addressed the Commission and noted that he
represented Linda Converse, an abutting property owner. He
spoke in favor of the application. He noted that he would like
the record to reflect that the Walgreens property is partially
zoned R-2 and is being rezoned to commercial.
Nathan Culp, president of the Westbury Neighborhood Association,
addressed the Commission with concerns. He noted support of
Walgreens putting a traffic signal at the intersection of Taylor
Loop and Cantrell Roads. He noted concerns with C-3 permitted
uses being alternate uses for the commercial building.
Virginia Strohmeyer-Miles, secretary of the Westbury
Neighborhood Association, concurred with the remarks made by Mr.
Culp. She noted concern that Cantrell Road would not support
additional commercial traffic. She stated that she was
concerned with additional commercial zoning in the area.
Commissioner Adcock asked about a traffic signal at the
intersection of Taylor Loop and Cantrell Roads and if the
developer agreed to pay for and construct the signal. Tad
Borkowski, of Public Works, noted that a signal was warranted
for this intersection. In response to Commissioner Adcock's
question, Pat McGetrick stated that the applicant would commit
to installing a traffic signal at this intersection as part of
the PD -C development. He stated that the traffic signal would
be installed and operational when the commercial building opens
for business.
Cindy Dawson, City Attorney, stated that this PD -C rezoning had
no bearing on whether the adjacent property owned by Linda
Converse could be rezoned.
There was additional discussion about having C-3 permitted uses
as alternate uses for the development. Jim Lawson, Director of
Planning and Development, explained that if Walgreens vacated
the commercial building, another C-3 permitted use could occupy
the building without further Planning Commission review. He
noted that the site plan could not be significantly altered
without Planning Commission review.
There was a motion to approve the PD -C rezoning subject to the
conditions as recommended by staff and the condition that the
traffic signal be in place and operational prior to a business
opening at this location (intersection of Cantrell Road and the
east leg of Taylor Loop Road). The motion passed by a vote of
6 ayes, 0 nays, 3 absent, 1 abstention (Rector) and 1 open
position.
VA
FILE NO.: Z-7022 (Cont.
There was a second motion to approve the preliminary plat as
recommended by staff. The motion passed by a vote of 6 ayes,
0 nays, 3 absent, 1 abstention (Rector) and 1 open position.
8
May 31, 2001
ITEM NO.: 4.1
FILE NO.: Z-7022
NAME: Cantrell Loops Subdivision (Lot 1) - Short -Form PD -C
LOCATION: North side of Cantrell Road at Taylor Loop Road
(east leg)
n7VELOPER: ENGINEER:
CLP I -III McGetrick and McGetrick
c/o Tom Cole 319 E. Markham St., Suite 202
900 S. Shackleford Road Little Rock, AR 72201
Little Rock, AR 72211
AREA: 2.275 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R -2/C-3 ALLOWED USES: Single Family Residential/
Commercial
PROPOSED USE: Commercial
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/PRO42EST:
The applicant proposes to rezone the proposed Lot 1,
Cantrell Loops Subdivision from R -2/C-3 to PD -C for a
Walgreens Drug Store development. The proposed site plan
shows a single building near the center of the lot, with a
total of 14,490 square feet. The building will have a
height of approximately 20 feet.
The proposed development will have two (2) access points,
one (1) from a shared drive between Lots I and 2, Cantrell
Loops Subdivision and one (1) from a drive along the Lot 1
frontage approximately 300 feet to the west. The shared
drive between Lots I and 2 will align with Taylor Loop
Road.
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1 (dont.)
FILE NO.: Z-7022
A total of 68 parking spaces is proposed to serve the drug
store development. A drive-thru window for the pharmacy is
proposed on the north side of the building.
The proposed site plan also shows a ground -mounted sign
near the southeast corner of the parking area. The
applicant notes that the sign will comply with the Highway
10 Design Overlay District.
The applicant notes that the proposed Walgreens Store will
be open 24 hours a day. The applicant is also requesting
C-3 permitted uses as alternate uses for the site should
Walgreens ever vacate the building.
B. EXISTING CONDITIONS:
There are two (2) abandoned single family residences
located within the southern portion of the property along
Cantrell Road. The northern portion of the property is
mostly wooded.
There is a commercial development located to the east, with
single family residences to the west. There are commercial
uses at the southwest corner of Cantrell Road and Taylor
Loop Road, with a single family residence at the southeast
corner. The property to the north is undeveloped and zoned
R-2.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several phone calls
(as a result of the posted sign) from persons requesting
information on the application. The Westchester/Heatherhrae,
Secluded Hills and Westbury Neighborhood Associations were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Cantrell Road is classified on the Master Street Plan as
a principal arterial. Dedication of right-of-way to 55
feet from centerline will be required.
2. Provide design of street conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
this street including 5 -foot sidewalk with planned
development.
3. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
FIA
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1 (Cont.) FILE NO.: Z-7022
4. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
5. Construct southbound through -lane in addition to the
proposed left and right -turn lanes (100 -ft. taper and
150 -ft. storage length for turn lanes).
6. Access easement must accommodate street and dual
sidewalks.
7. Stormwater detention ordinance applies to this property.
8. Easements for proposed stormwater detention facilities
are required.
9. Verify sight distance for driveway on Cantrell Road.
10. Obtain permits for improvements within State Highway
right-of-way from AHTD, District VI.
11. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
12. Grading permit will be required on this development by
Ordinance 18,361.
13. NPDES and grading permits are required prior to
construction, site grading, and drainage plan will need
to be submitted and approved.
14. A sketch grading and drainage plan, a special flood
hazard permit, and a special grading permit for flood
hazard areas are required. ADEQ and NPDES permit is
also required.
15. The minimum Finish Floor elevation of 291 feet (msl) is
required to be shown on plat and grading plans.
16. Maximum driveway width is 36 feet.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with,easements to
serve property.
Entergy: A 30 foot easement is requested along the west
property line for all three-phase overhead extensions, no
exceptions. Contact utility for details.
ARKLA: No Comments received.
Southwestern Bell: No Comment received.
Water: An acreage charge in the amount of $300 per acre
applies to this property and a development fee based on the
size of connection will apply for connections larger than
4" to Lot 1 in addition to normal charges. On-site fire
3
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1 (dont.) FILE NO.: Z-7022
protection may be required.
Fire Department: Place fire hydrants per City Code. Contact
Dennis Free at 918-3752 for details.
county Plannin : No Comment received.
CATA: Project site is not located on a dedicated bus
route and has no effect on bus radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is located in the River Mountain Planning
District. The Land Use Plan shows Commercial for this
property. The applicant has applied for a Planned
Development - Commercial for a drug store. The property is
currently zoned R-2 Single Family and C-3 General
Commercial. A land use plan amendment is not required.
Citv Reco nized Nei hborhood Action Plan:
The applicant's property lies in the area covered by the
River Mountain Neighborhood Action Plan. The Sustainable
Natural Environment goal listed one action statement
relevant to this case. The action statement calls for the
preservation of the Highway 10 Design Overlay District.
Landscape Issues:
The plan submitted does not allow for the 8 percent
interior landscape islands required within the on-site
paved area. Additionally, a 3 -foot wide building landscape
area is required between the public parking area and
building. Considerable flexibility is allowed with the
building landscaping requirement.
An irrigation system to water landscaped areas is required.
A 6 -foot high,opaque screen, either a wooden fence with its
face side directed outward or dense evergreen plantings, is
required along the northern and western site perimeters.
A minimum of 70% of the northern and western land use
buffers must remain undisturbed.
4
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1 (Cont.)
G. SUBDIVISION COMMITTEE COMMENT:
FILE NO.: Z-7022
(MAY 10, 2001)
Pat McGetrick and Tom Cole were present, representing the
application. Staff briefly described the proposed PCD,
noting that some additional project information was needed.
The Public Works requirements were briefly discussed. It
was noted that the access easement between Lots 1 and 2,
Cantrell Loops Subdivision needed to be increased to 60
feet wide. Public Works noted that the proposed drive
locations were acceptable.
The need for a traffic signal at the intersection of
Cantrell Road and Taylor Loop Road was discussed.
Mr. McGetrick noted that the applicant wished to make a
contribution toward the future traffic signal installation.
The landscape requirements were briefly discussed. Bob
Brown, of the Planning Staff, noted that some additional
interior landscaping would be required. Mr. McGetrick
stated that the additional landscaping would be provided.
After the discussion, the Committee forwarded the PD -C to
the full Commission for resolution.
H. ANALYSIS:
The applicant submitted a revised site plan to staff on
May 16, 2001. The revised plan addresses the issues as
raised by staff and the Subdivision Committee. The
dumpster area, screening fence, building height and
additional interior landscaping have been shown on the
revised plan.
The revised plan provides a total of 68 parking spaces.
Thirteen parking spaces have been removed from the
originally submitted plan to allow for additional interior
landscaping. The typical minimum parking requirement for a
commercial use of this size is 52 spaces. Staff supports
the parking plan as proposed.
Public Works has reviewed the revised site plan and notes
that all issues have been resolved. The access easement
between Lots 1 and 2 has been increased to a 60 foot width
and a sidewalk has been shown on each side of this access
5
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1 (Cont.) FILE NO.: Z-7022
drive as required. The required sidewalk along Cantrell
Road has also been shown.
I.
The proposed site plan shows a ground -mounted sign near the
southeast corner of the parking area. The applicant notes
that this sign will comply with the Highway 10 DOD
requirements. The sign must be monument -type, with a
maximum height of six (6) feet and a maximum area of 100
square feet.
To staff's knowledge, there are no issues left to be
resolved, as the applicant has done a good job in
addressing the issues as raised by staff and the
Subdivision Committee. Staff feels that the proposed
development will have no adverse impact on the general
area, as the site plan conforms to the Highway 10 DOD with
respect to building setbacks, sign details and landscape
and buffer areas.
STAFF RECOMMENDATIONS:
Staff recommends approval of the PD -C zoning subject to the
following conditions:
1.Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The proposed ground -mounted sign must conform to the
Highway 10 DOD standards as noted in paragraph H. of this
report.
3. Any site lighting must be low-level and directed away
from adjacent property.
4. The dumpster area must be screened on three (3) sides
with an 8 foot high opaque fence or wall.
5. Staff recommends C-3 permitted uses as alternate uses for
the property.
PLANNING COMMISSION ACTION: (MAY 31, 2001)
Item 4 and 4.1 were discussed simultaneously by the Planning
Commission.
Pat McGetrick and Tom Cole were present, representing the
application. Staff briefly described the preliminary plat and
PD -C rezoning with recommendation of approval subject to the
6
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1 (Cont.)
FILE NO.: Z-7022
conditions noted. There were two (2) persons present with
concerns.
Pat McGetrick briefly explained the project. He noted that the
site lighting would be low-level. He also noted that the
Walgreens Store would be a 24-hour operation. The hours of
operation were briefly discussed. Mr. McGetrick noted that if
the 24-hour operation is not feasible, the hours will be
shortened.
Commissioner Muse asked about the C-3 permitted uses as
alternate uses for the property. Staff explained that if
Walgreens vacates the building, another C-3 permitted use could
occupy the structure.
Keith Wingfield addressed the Commission and noted that he
represented Linda Converse, an abutting property owner. He
spoke in favor of the application. He noted that he would like
the record to reflect that the Walgreens property is partially
zoned R-2 and is being rezoned to commercial.
Nathan Culp, president of the Westbury Neighborhood Association,
addressed the Commission with concerns. He noted support of
Walgreens putting a traffic signal at the intersection of Taylor
Loop and Cantrell Roads. He noted concerns with C-3 permitted
uses being alternate uses for the commercial building.
Virginia Strohmeyer-Miles, secretary of the Westbury
Neighborhood Association, concurred with the remarks made by Mr.
Culp. She noted concern that Cantrell Road would not support
additional commercial traffic. She stated that she was
concerned with additional commercial zoning in the area.
Commissioner Adcock asked about a traffic signal at the
intersection of Taylor Loop and Cantrell Roads and if the
developer agreed to pay for and construct the signal. Tad
Borkowski, of Public Works, noted that a signal was warranted
for this intersection. In response to Commissioner Adcock's
question, Pat McGetrick stated that the applicant would commit
to installing a traffic signal at this intersection as part of
the PD -C development. He stated that the traffic signal would
be installed and operational when the commercial building opens
for business.
7
May 31, 2001
SUBDIVISION
ITEM NO.: 4.1
Cindy Dawson,
no bearing on
Converse coul
dCont.)
City Attorney, state
whether the adjacent
be rezoned.
FILE NO.: Z-7022
d that this PD -C rezoning had
property owned by Linda
There was additional discussion about having C-3 permitted uses
as alternate uses for the development. Jim Lawson, Director of
Planning and Development, explained that if Walgreens vacated
the commercial building, another C-3 permitted use could occupy
the building without further Planning Commission review. He
noted that the site plan could not be significantly altered
without Planning Commission review.
There was a motion to approve the PD -C rezoning subject to the
conditions as recommended by staff and the condition that the
traffic signal be in place and operational prior to a business
opening at this location (intersection of Cantrell Road and the
east leg of Taylor Loop Road). The motion passed by a vote of
6 ayes, 0 nays, 3 absent, 1 abstention (Rector) and 1 open
position.
There was a second motion to approve the preliminary plat as
recommended by staff. The motion passed by a vote of 6 ayes,
0 nays, 3 absent, 1 abstention (Rector) and 1 open position.
8