HomeMy WebLinkAboutZ-7008-B Staff AnalysisLE NO.: Z -7008-B
NAME: Kanis Office Park Short -form POD
LOCATION: Located at 18425 Kanis Road
DEVELOPER:
Engineering Systems Group LLC
18425 Kanis Road
Little Rock, AR 72223
FNC-,INFFR:
White Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 2.804 acres NUMBER OF LOTS: 1 zoning lot FT. NEW STREET: 0 LF
CURRENT ZONING: POD and R-2, Single-family
ALLOWED USES: General and Professional Office and Single-family
PROPOSED ZONING: POD
PROPOSED USE: General and Professional Office — 3 lot subdivision
VARIANCESIWAIVERS REQUESTED:
1. A variance from the Subdivision Ordinance to allow the creation of lots without public
street frontage.
2. A deferral of the required street improvements to Kanis Road for a period of five
years, until Phase II or until adjacent development, whichever occurs first.
BACKGROUND:
A request was to be heard by the Little Rock Planning Commission on May 3, 2001, for
the rezoning of the site from R-2, Single-family to C-1, Neighborhood Commercial. The
applicant withdrew his request prior to the public hearing.
FILE NO.: Z-7008-B(Cont.)
Ordinance No. 18,918 adopted by the Little Rock Board of Directors on August 19,
2003, rezoned the property from R-2, Single-family to POD and established
ESG Short -form POD. The site contained 1.4 acres and located at 18425 Kanis Road.
The approval allowed the placement of three (3) structures on the site in three (3)
Phases. The first phase consisted of the construction of a small office of approximately
1,000 square feet in area. Additional structures would be constructed with Phase II
consisting of a second structure of approximately 1,000 square feet and Phase III a third
building with approximately 3,500 square feet.
The structures were to be aesthetically pleasing; the architectural style was to be more
residential than commercial in design. The approval allowed three (3) employees in the
Phase I building with little traffic to the site since most of the activity took place off site at
the customer's place of business. Phase II and III buildings were to be marketed to
similar type uses. General and professional office users for the buildings were
approved. The hours of operation were from 7:30 am to 5:30 pm Monday through
Friday. The parking would be phased with the building construction. No ground
signage, only wall signage on each of the buildings, was approved.
A deferral of street improvements to Kanis Road until Phase III or ten years was
requested. The right-of-way as required per the Master Street Plan was to be dedicated
at the time of building construction. The proposed site plan also included landscaping
as required by the Landscape Ordinance and the Zoning Buffer Ordinance. At this time,
only the first building has been constructed. Street improvements to Kanis Road have
not been completed.
A. PROPOSAUREQUEST:
The developer is now requesting to revise the previously approved POD by
expanding the site from 1.4 acres to 2.8 acres to allow development of the site
with three (3) lots with immediate plans for buildings on Lots 1 and 3. Lot 2 will
be held for future development. The buildings are proposed constructed with
materials found in typical residential construction. The development is proposed
in two (2) phases. Phase I consists of the existing building as proposed Lot 1
and a second office building as proposed Lot 3. The second phase is
development of Lot 2. Phase II will not be developed until the developer is able
to annex the site into the corporate limits of the City of Little Rock.
The request includes a deferral of the required street improvements for Kanis
Road for a period of five (5)years, until Phase II or until adjacent development
occurs, whichever occurs first.
There does not appear to be a valid Bill of Assurance for the Independence
Farms Subdivision available.
2
FILE NO.: Z -7008-B
B. EXISTING CONDITIONS:
There is an office building constructed on the eastern portion of the site
(proposed Lot 1). The building has a brick facade and was constructed with two
office bays. The area to the south is heavily wooded. The structures on the
western portion proposed for expansion of the development were recently
removed. This section of Kanis Road is primarily residential with homes located
on acreage. West of the site, at the intersection of Kanis and Denny Roads, is a
church and two (2) commercial businesses, a beauty salon and Plant/Plant which
provides plants for commercial businesses.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from the area property
owners. All property owners located within 200 -feet of the site, all residents, who
could be identified, located within 300 feet of the site and the Coalition of West
Little Rock Neighborhoods were notified of the public hearing.
D. ENGINEERING COMMENTS
PUBLIC WORKS CONDITIONS
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Kanis Road
including 5 -foot sidewalks with the planned development. The new back of
curb should be located 29.5 feet from the centerline.
3. Stormwater detention ordinance applies to this property.
4. All driveways shall be concrete aprons per City Ordinance.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
6. On site striping and signage plans should be forwarded to Public Works,
Traffic Engineering for approval with the site development package.
7. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering 379-1813
(Steve Philpott) for more information.
8. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
3
FILE NO.: Z -7008-B Cont.
9. The proposed driveway should intersect Kanis Road at a 90 degree angle.
The three (3) existing driveways should be removed.
10. In accordance with Section 31-210 (h)(12), access driveways running
parallel to the street shall not create a four-way intersection within 75 feet of
the future curb line of the street. The north portion of the site should be
redesigned to move the intersection at least 75 feet from the intersection.
11. When the property is annexed, a grading permit in accordance with Section
29-186 (c) and (d) will be required prior to any land clearing or grading
activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of
construction.
E. UTILITIES AND FIRE DEPARTMENTICOUNTY PLANNING:
Wastewater: Outside the service boundary. Annexation to the City of Little Rock
is required to receive sanitary sewer service. Contact Little Rock Wastewater
Utility for additional information.
Entergy: No comment received.
Center -Point Enerav: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This fee will apply to all meter connections including any
metered connections off the private fire system. Additional fire hydrant(s) may be
required. Contact the Little Rock Fire Department to obtain information regarding
the required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s). This project is within
Water Improvement District 349 and there may be charges assessed by the
Improvement District in conjunction with water service to this property. This
development will have minor impact on the existing water distribution system.
Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation of
water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and Little Rock Fire Department is
required.
Fire Department: Fire hydrants will be required. Contact the Little Rock Fire
Department for additional information.
0
FILE NO.: Z -7008-B Cont.
County Planning: The site is located outside the City limits of the City of Little
Rock. Contact Pulaski County Planning for information concerning the required
development.
CATA: The site is not located on a dedicated CATA Bus Route.
F. I SS U ESITECH N ICAL/DESIGN :
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Residential Low Density for this property. The
applicant has applied for a revised Short -form POD. This site was previously
approved for a Planned Office Development in 2003, but the land use plan was
not amended at that time. This area of Kanis Road was studied by staff recently
and the consensus at that time was to keep the south side of Kanis Road rural in
character. Residential and non-residential uses to the north are proposed to be
higher density and more suburban or urban. Densification is proposed on the
Plan. While to the south large -lot low intensity uses are recommended, with
large -lot residential subdivisions along Longwood Road, Edswood Road and
Longway Drive. There have not been any significant changes in the area since
this Land Use review.
Master Street Plan: Kanis Road is a Minor Arterial. A Minor Arterial provides
connections to and through an urban area and their primary function is to provide
short distance travel within the urbanized area. Entrances and exits should be
limited to minimize negative effects of traffic on pedestrians. These streets may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: A Class Ill is shown along Kanis Road. A Class III bikeway is a
signed route on a street shared with traffic. No additional paving or right-of-way
is required. Class III bicycle route signage may be required.
Neighborhood Action Plan: This area is not covered by a Neighborhood Action
Plan.
Land sca e:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. The zoning buffer ordinance requires an average twenty-seven foot (27')
street buffer along Kanis Road and in no case to be less than half. Currently,
the site is deficient on this minimal requirement.
3. A fifteen foot (15') wide land use buffer is required to separate this proposed
development from the residential property on the eastern and western
perimeters of the site. Seventy percent (70%) of these buffers are to remain
undisturbed.
5
FILE NO.: Z-7008-8 Cont.
4. The property to the east and the west is zoned residential, therefore, a six (6)
foot high opaque screen, either a wooden fence with its face side directed
outward, a wall, or dense evergreen plantings, is required along both the
eastern and western perimeters of the site.
5. An automatic irrigation system to water landscaped areas will be required.
6. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
7. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this tree covered site. Credit toward fulfilling Landscape
Ordinance requirements can be given when preserving trees of six (6) inch
caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (November 12, 2009)
The applicant was not present. Staff presented the item stating there were a
number of issues related to the site which were in need of addressing prior to the
Commission acting on the request. Staff stated the development was proposed
in two (2) phases with the construction of an office building in the first phase
served by a septic system and development of the second phase upon
annexation to the City of Little Rock. Staff noted the site was not contiguous to
allow annexation in the near future.
Public Works comments were briefly discusses. Staff noted right of way
dedications and street construction would be required. Staff stated the design of
the existing drive did not meet the current ordinance requirements. Staff stated
they would work through this issue with the applicant.
Landscaping comments were discussed. Staff stated all landscape and buffer
ordinance standards would apply to the future development of the site. Staff
stated a landscape plan would be required at the time of development.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
K ANALYSIS:
The applicant submitted a revised site plan identifying a number of the issues
outlined for the November 12, 2009, Subdivision Committee meeting. The
revised plan has removed the three (3) existing drives and located a shared drive
on the lot line between Lots 1 and 3.
The revised site plan identifies Lot 2, the rear lot, for future development and
proposing new construction on the lot abutting Kanis Road (Lot 3). The
lei
FILE NO.: Z -7008-B Co
development is proposed in two (2) phases. The first Phase consists of the
existing office building located on proposed Lot 1 and construction of a new office
building on proposed Lot 3. The existing building contains 2,326 square feet
with a 13.2 percent building coverage and Lot 3 is proposed with a new office
building containing 3,825 square feet and a 19.4 percent building coverage. All
lots are proposed with general and professional office uses as allowable uses.
The request includes a deferral of the required street improvements for Kanis
Road for a period of five (5) years, until the development of Phase ll or until
adjacent development occurs, whichever occurs first. Staff is supportive of the
deferral request.
Staff has concerns with the potential future development of Lot 2 with
non-residential uses. The previous approval allowed the placement of three (3)
structures on the eastern portion of the site in three Phases containing
approximately 5,500 square feet. The first phase allowed the construction of a
small office building containing approximately 1,000 square feet which has been
built along Kanis Road, Phase II allowed a second building of approximately
1,000 square feet located immediately south of the existing structure and Phase
III allowed a third building with approximately 3,500 square feet also located
south of the existing structure. The structures were to be an architectural style
of more residential than commercial. Staff has concerns with committing to
potential future office development for the Lot 2 and feels the approval of office
uses on Lot 2 is premature. The property is located outside the City limits and is
not contiguous to allow for annexation. Staff feels moving the future
development of the office on the eastern portion of the development to the Kanis
Road frontage allows for the rear portion of the site to act as a buffer in the
short-term for the adjacent residentially zoned property. Although the proposed
use of the property is not consistent with the City's Future Land Use Plan again
staff feels by moving the previously approved office square footage away from
the rear of the site to the street side allows for more protection of the adjoining
properties to the south and east.
The previous approval allowed office hours of operation were from 7:30 am to
5:30 pm Monday through Friday. The applicant has not requested a
modification to the hours of operation for the new office building.
The site plan indicates ten (10) parking spaces to serve the existing office use
and fourteen (14) spaces to serve the new office building. The ordinance would
typically require the placement of five (5) spaces to serve the existing office
building and nine (9) spaces to serve the new office use.
No ground signage was approved with the original request only wall signage on
each of the buildings. The current request does not include ground signage.
Wall signage is proposed as typically allowed in office zones or a maximum of
ten percent of the facade area abutting the public street.
7
FILE NO.: Z -7008-B (Co
According to Traffic Engineering the center of the 4 -way intersection of the
driveway and parking lots should be located 75 feet from the future back of curb.
As proposed, it takes only two (2) cars to block access to one (1) of the parking
areas. Also only one (1) entry lane should be provided into the development
from Kanis Road. Two (2) exits lanes onto Kanis Road can be provided if
desired.
Staff is generally supportive of the development but has concerns with the
development of the Lot 2 portion of the site with office uses. Staff also has
concerns with the driveway entering the parking lot. Staff cannot support the
application as filed.
STAFF RECOMMENDATION:
Staff recommends denial of the request as filed.
PLANNING COMMISSION ACTION: (DECEMBER 3, 2009)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had submitted a request dated December 1,
2009 requesting a deferral of the item to the January 14, 2010, public hearing. Staff
stated the deferral request would require a waiver of the Commission's By-laws with
regard to the late deferral request. Staff stated they were supportive of the deferral
request.
There was no further discussion of the item. The chair entertained a motion for
approval of the By-law waiver with regard to the late deferral request. The motion
carried by a vote of 9 ayes, 0 noes, 0 absent and 2 open positions. The chair
entertained a motion for approval of the item as presented by staff. The motion carried
by a vote of 9 ayes, 0 noes, 0 absent and 2 open positions.
STAFF UPDATE:
The applicant and staff are continuing to work to address concerns raised by staff
regarding the proposed driveway location on the site plan. Staff will provide the
Commission with an update at the January 14, 2010, public hearing concerning this
request and their recommendation.
PLANNING COMMISSION ACTION: (JANUARY 14, 2010)
Mr. Joe White of White-Daters and Associates was present representing the request.
There were no registered objectors present. Staff presented the item stating they and
the applicant had met and discussed various options for driveway placement to the site.
Staff stated they and the applicant had come to an agreement to allow a full service
0
FILE NO.: Z-7008-B(Cont.
drive located along the eastern perimeter of the site and allow an exit only drive along
the western perimeter. Staff stated based on the revision to the driveway locations they
were now supportive of the request. Staff stated the driveways would require a
variance from the Master Street Plan to allow a reduction in the typical spacing
requirment. Staff presented a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented a recommendation of approval to allow a
variance from the Master Street Plan concerning the spacing criteria for the drive. Staff
presented a recommendation of approval of the applicant's request for a deferral of the
required street improvements to Kanis Road for a period of five years, until Phase II or
until abutting development occurred, which ever occurred first.
There was no further discussion of the item. The chair entertained a motion of approval
of the item as presented by staff. The motion carried by a vote of 11 ayes, 0 noes and
0 absent.
9
January 14, 2010
ITEM NO.: C
NAME: Kanis Office Park Short -form POD
LOCATION: Located at 18425 Kanis Road
DEVELOPER:
Engineering Systems Group LLC
18425 Kanis Road
Little Rock, AR 72223
ENGINEER:
White Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
LE NO.: Z -7008-B
AREA: 2.804 acres NUMBER OF LOTS: 1 zoning lot FT. NEW STREET: 0 LF
CURRENT ZONING: POD and R-2, Single-family
ALLOWED USES: General and Professional Office and Single-family
PROPOSED ZONING: POD
PROPOSED USE: General and Professional Office — 3 lot subdivision
VARIANCESMAIVERS REQUESTED:
1. A variance from the Subdivision Ordinance to allow the creation of lots without public
street frontage.
2. A deferral of the required street improvements to Kanis Road for a period of five
years, until Phase II or until adjacent development, whichever occurs first.
BACKGROUND:
A request was to be heard by the Little Rock Planning Commission on May 3, 2001, for
the rezoning of the site from R-2, Single-family to C-1, Neighborhood Commercial. The
applicant withdrew his request prior to the public hearing.
January 14, 2010
SUBDIVISION
ITEM NO.: C (Cont.
FILE NO.: Z -7008-B
Ordinance No. 18,918 adopted by the Little Rock Board of Directors on August 19,
2003, rezoned the property from R-2, Single-family to POD and established
ESG Short -form POD. The site contained 1.4 acres and located at 18425 Kanis Road.
The approval allowed the placement of three (3) structures on the site in three (3)
Phases. The first phase consisted of the construction of a small office of approximately
1,000 square feet in area. Additional structures would be constructed with Phase II
consisting of a second structure of approximately 1,000 square feet and Phase III a third
building with approximately 3,500 square feet.
The structures were to be aesthetically pleasing; the architectural style was to be more
residential than commercial in design. The approval allowed three (3) employees in the
Phase I building with little traffic to the site since most of the activity took place off site at
the customer's place of business. Phase II and III buildings were to be marketed to
similar type uses. General and professional office users for the buildings were
approved. The hours of operation were from 7:30 am to 5:30 pm Monday through
Friday. The parking would be phased with the building construction. No ground
signage, only wall signage on each of the buildings, was approved.
A deferral of street improvements to Kanis Road until Phase III or ten years was
requested. The right-of-way as required per the Master Street Plan was to be dedicated
at the time of building construction. The proposed site plan also included landscaping
as required by the Landscape Ordinance and the Zoning Buffer Ordinance. At this time,
only the first building has been constructed. Street improvements to Kanis Road have
not been completed.
A. PRCPOSAUREOUEST:
The developer is now requesting to revise the previously approved POD by
expanding the site from 1.4 acres to 2.8 acres to allow development of the site
with three (3) lots with immediate plans for buildings on Lots 1 and 3. Lot 2 will
be held for future development. The buildings are proposed constructed with
materials found in typical residential construction. The development is proposed
in two (2) phases. Phase I consists of the existing building as proposed Lot 1
and a second office building as proposed Lot 3. The second phase is
development of Lot 2. Phase II will not be developed until the developer is able
to annex the site into the corporate limits of the City of Little Rock.
The request includes a deferral of the required street improvements for Kanis
Road for a period of five (5)years, until Phase II or until adjacent development
occurs, whichever occurs first.
There does not appear to be a valid Bill of Assurance for the Independence
Farms Subdivision available.
0
January 14, 2010
SUBDIVISION
ITEM NO.: C Cont. FILE NO.: Z -7008-B
B. EXISTING CONDITIONS:
There is an office building constructed on the eastern portion of the site
(proposed Lot 1). The building has a brick fagade and was constructed with two
office bays. The area to the south is heavily wooded. The structures on the
western portion proposed for expansion of the development were recently
removed. This section of Kanis Road is primarily residential with homes located
on acreage. West of the site, at the intersection of Kanis and Denny Roads, is a
church and two (2) commercial businesses, a beauty salon and Plant/Plant which
provides plants for commercial businesses.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from the area property
owners. All property owners located within 200 -feet of the site, all residents, who
could be identified, located within 300 feet of the site and the Coalition of West
Little Rock Neighborhoods were notified of the public hearing.
D. ENGINEERING COMMENTS'
PUBLIC WORKS CONDITIONS:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Kanis Road
including 5 -foot sidewalks with the planned development. The new back of
curb should be located 29.5 feet from the centerline.
3. Stormwater detention ordinance applies to this property.
4. All driveways shall be concrete aprons per City Ordinance.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
6. On site striping and signage plans should be forwarded to Public Works,
Traffic Engineering for approval with the site development package.
7. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering 379-1813
(Steve Philpott) for more information.
3
January 14, 2010
SUBDIVISION
EM NO.: C (Cont.
FILE NO.: Z -7008-B
8. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
9. The proposed driveway should intersect Kanis Road at a 90 degree angle.
The three (3) existing driveways should be removed.
10. In accordance with Section 31-210 (h)(12), access driveways running
parallel to the street shall not create a four-way intersection within 75 feet of
the future curb line of the street. The north portion of the site should be
redesigned to move the intersection at least 75 feet from the intersection.
11. When the property is annexed, a grading permit in accordance with Section
29-186 (c) and (d) will be required prior to any land clearing or grading
activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of
construction.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Outside the service boundary. Annexation to the City of Little Rock
is required to receive sanitary sewer service. Contact Little Rock Wastewater
Utility for additional information.
Entergy: No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This fee will apply to all meter connections including any
metered connections off the private fire system. Additional fire hydrant(s) may be
required. Contact the Little Rock Fire Department to obtain information regarding
the required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s). This project is within
Water Improvement District 349 and there may be charges assessed by the
Improvement District in conjunction with water service to this property. This
development will have minor impact on the existing water distribution system.
Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation of
water facilities and/or fire service. Approval of plans by the Arkansas
L!
January 14, 2010
SUBDIVISION
ITEM NO.: C(Cont.)FILE NO.: Z -7008-B
Department of Health Engineering Division and Little Rock Fire Department is
required.
Fire Department: Fire hydrants will be required. Contact the Little Rock Fire
Department for additional information.
_County Planning: The site is located outside the City limits of the City of Little
Rock. Contact Pulaski County Planning for information concerning the required
development.
CATH: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Residential Low Density for this property. The
applicant has applied for a revised Short -form POD. This site was previously
approved for a Planned Office Development in 2003, but the land use plan was
not amended at that time. This area of Kanis Road was studied by staff recently
and the consensus at that time was to keep the south side of Kanis Road rural in
character. Residential and non-residential uses to the north are proposed to be
higher density and more suburban or urban. Densification is proposed on the
Plan. While to the south large -lot low intensity uses are recommended, with
large -lot residential subdivisions along Longwood Road, Edswood Road and
Longway Drive. There have not been any significant changes in the area since
this Land Use review.
Master Street Plan: Kanis Road is a Minor Arterial. A Minor Arterial provides
connections to and through an urban area and their primary function is to provide
short distance travel within the urbanized area. Entrances and exits should .be
limited to minimize negative effects of traffic on pedestrians. These streets may
require dedication of right-of-way and may require street improvements for
entrances and exits to the site.
Bicycle Plan: A Class III is shown along Kanis Road. A Class III bikeway is a
signed route on a street shared with traffic. No additional paving or right-of-way
is required. Class III bicycle route signage may be required.
Neighborhood Action Plan: This area is not covered by a Neighborhood Action
Plan.
5
January 14, 2010
SUBDIVISION
ITEM NO.: C (Cont.) FILE NO.: Z -7008-B
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. The zoning buffer ordinance requires an average twenty-seven foot (27')
street buffer along Kanis Road and in no case to be less than half. Currently,
the site is deficient on this minimal requirement.
3. A fifteen foot (15') wide land use buffer is required to separate this proposed
development from the residential property on the eastern and western
perimeters of the site. Seventy percent (70%) of these buffers are to remain
undisturbed.
4. The property to the east and the west is zoned residential, therefore, a six (6)
foot high opaque screen, either a wooden fence with its face side directed
outward, a wall, or dense evergreen plantings, is required along both the
eastern and western perimeters of the site.
5. An automatic irrigation system to water landscaped areas will be required.
6. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
7. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this tree covered site. Credit toward fulfilling Landscape
Ordinance requirements can be given when preserving trees of six (6) inch
caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (November 12, 2009)
The applicant was not present. Staff presented the item stating there were a
number of issues related to the site which were in need of addressing prior to the
Commission acting on the request. Staff stated the development was proposed
in two (2) phases with the construction of an office building in the first phase
served by a septic system and development of the second phase upon
annexation to the City of Little Rock. Staff noted the site was not contiguous to
allow annexation in the near future.
Public Works comments were briefly discusses. Staff noted right of way
dedications and street construction would be required. Staff stated the design of
the existing drive did not meet the current ordinance requirements. Staff stated
they would work through this issue with the applicant.
January 14, 2010
SUBDIVISION
ITEM NO.: C
FILE NO.: Z -7008-B
Landscaping comments were discussed. Staff stated all landscape and buffer
ordinance standards would apply to the future development of the site. Staff
stated a landscape plan would be required at the time of development.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan identifying a number of the issues
outlined for the November 12, 2009, Subdivision Committee meeting. The
revised plan has removed the three (3) existing drives and located a shared drive
on the lot line between Lots 1 and 3.
The revised site plan identifies Lot 2, the rear lot, for future development and
proposing new construction on the lot abutting Kanis Road (Lot 3). The
development is proposed in two (2) phases. The first Phase consists of the
existing office building located on proposed Lot 1 and construction of a new office
building on proposed Lot 3. The existing building contains 2,326 square feet
with a 13.2 percent building coverage and Lot 3 is proposed with a new office
building containing 3,825 square feet and a 19.4 percent building coverage. All
lots are proposed with general and professional office uses as allowable uses.
The request includes a deferral of the required street improvements for Kanis
Road for a period of five (5) years, until the development of Phase II or until
adjacent development occurs, whichever occurs first. Staff is supportive of the
deferral request.
Staff has concerns with the potential future development of Lot 2 with
non-residential uses. The previous approval allowed the placement of three (3)
structures on the eastern portion of the site in three Phases containing
approximately 5,500 square feet. The first phase allowed the construction of a
small office building containing approximately 1,000 square feet which has been
built along Kanis Road. Phase II allowed a second building of approximately
1,000 square feet located immediately south of the existing structure and Phase
III allowed a third building with approximately 3,500 square feet also located
south of the existing structure. The structures were to be an architectural style
of more residential than commercial. Staff has concerns with committing to
potential future office development for the Lot 2 and feels the approval of office
uses on Lot 2 is premature. The property is located outside the City limits and is
not contiguous to allow for annexation. Staff feels moving the future
development of the office on the eastern portion of the development to the Kanis
7
January 14, 2010
SUBDIVISION
ITEM NO.: C (Cont.) FILE NO.: Z -7008-B
Road frontage allows for the rear portion of the site to act as a buffer in the
short-term for the adjacent residentially zoned property. Although the proposed
use of the property is not consistent with the City's Future Land Use Plan again
staff feels by moving the previously approved office square footage away from
the rear of the site to the street side allows for more protection of the adjoining
properties to the south and east.
The previous approval allowed office hours of operation were from 7:30 am to
5:30 pm Monday through Friday. The applicant has not requested a
modification to the hours of operation for the new office building.'
The site plan indicates ten (10) parking spaces to serve the existing office use
and fourteen (14) spaces to serve the new office building. The ordinance would
typically require the placement of five (5) spaces to serve the existing office
building and nine (9) spaces to serve the new office use.
No ground signage was approved with the original request only wall signage on
each of the buildings. The current request does not include ground signage.
Wall signage is proposed as typically allowed in office zones or a maximum of
ten percent of the fagade area abutting the public street.
According to Traffic Engineering the center of the 4 -way intersection of the
driveway and parking lots should be located 75 feet from the future back of curb.
As proposed, it takes only two (2) cars to block access to one (1) of the parking
areas. Also only one (1) entry lane should be provided into the development
from Kanis Road. Two (2) exits lanes onto Kanis Road can be provided if
desired.
Staff is generally supportive of the development but has concerns with the
development of the Lot 2 portion of the site with office uses. Staff also has
concerns with the driveway entering the parking lot. Staff cannot support the
application as filed.
STAFF RECOMMENDATION:
Staff recommends denial of the request as filed.
PLANNING COMMISSION ACTION: (DECEMBER 3, 2009)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had submitted a request dated December 1,
2009 requesting a deferral of the item to the January 14, 2010, public hearing. Staff
0
January 14, 2010
SUBDIVISION
ITEM NO.: C Cont. FILE NO.' Z -7008-B
stated the deferral request would require a waiver of the Commission's By-laws with
regard to the late deferral request. Staff stated they were supportive of the deferral
request.
There was no further discussion of the item. The chair entertained a motion for
approval of the By-law waiver with regard to the late deferral request. The motion
carried by a vote of 9 ayes, 0 noes, 0 absent and 2 open positions. The chair
entertained a motion for approval of the item as presented by staff. The motion carried
by a vote of 9 ayes, 0 noes, 0 absent and 2 open positions.
STAFF UPDATE:
The applicant and staff are continuing to work to address concerns raised by staff
regarding the proposed driveway location on the site plan. Staff will provide the
Commission with an update at the January 14, 2010, public hearing concerning this
request and their recommendation.
PLANNING COMMISSION ACTION: (JANUARY 14, 2010)
Mr. Joe White of White-Daters and Associates was present representing the request.
There were no registered objectors present. Staff presented the item stating they and
the applicant had met and discussed various options for driveway placement to the site.
Staff stated they and the applicant had come to an agreement to allow a full service
drive located along the eastern perimeter of the site and allow an exit only drive along
the western perimeter. Staff stated based on the revision to the driveway locations they
were now supportive of the request. Staff stated the driveways would require a
variance from the Master Street Plan to allow a reduction in the typical spacing
requirrnent. Staff presented a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented a recommendation of approval to allow a
variance from the Master Street Plan concerning the spacing criteria for the drive. Staff
presented a recommendation of approval of the applicant's request for a deferral of the
required street improvements to Kanis Road for a period of five years, until Phase II or
until abutting development occurred, which ever occurred first.
There was no further discussion of the item. The chair entertained a motion of approval
of the item as presented by staff. The motion carried by a vote of 11 ayes, 0 noes and
0 absent.
9
ITEM NO.: 12. Z -7008-B
NAME: Kanis Office Park Short -form POD
LOCATION: located at 18425 Kanis Road
Planninq Staff Comments:
1. Provide notification of all property owners located within 200 -feet of the site,
complete with the certified abstract list, notice form with affidavit executed and proof
of mailing. The notice must be mailed no later than November 19, 2009. The Office
of Planning and Development must receive the proof of notice no later than
November 25, 2009.
2. The site plan indicates phase I will be developed with the remainder of the area
developed when the property is annexed into the City to receive wastewater
treatment from the City. How will the wastewater be handled for the new building
prior to annexation? Provide approval from the Pulaski County Health Department
concerning the proposed wastewater disposal.
3. The site is located out side the City limits and will not receive City of Little Rock Fire
Protection. Provide a letter from the area volunteer fire department stating their
knowledge of the project and their ability to serve the development.
4. General note 14 indicates City garbage collection.
5. General note 13 indicates a maximum building height of the C-3 zoning district or
45 -feet. Staff feels this a bit excessive.
6. Are the uses limited to General and Professional Office users?
7. Contact Pulaski County Planning concerning the proposed development since the
phase I portion of the development will occur while the property is under the County
jurisdiction.
Variance/Waivers: None requested.
Public Works Conditions:
1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication
of right-of-way 45 feet from centerline will be required.
2. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Kanis Road including 5 -foot
sidewalks with the planned development. The new back of curb should be located
29.5 feet from the centerline.
3. Stormwater detention ordinance applies to this property.
4. All driveways shall be concrete aprons per City Ordinance.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
6. On site striping and signage plans should be forwarded to Public Works, Traffic
Engineering for approval with the site development package.
7. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
Item # 12.
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve
Philpott) for more information.
8. Plans of all work in right-of-way shall be submitted for approval prior to start of work.
Obtain barricade permit prior to doing any work in the right-of-way from Traffic
Engineering at (501) 379-1805 (Travis Herbner).
9. The proposed driveway should intersect Kanis Road at a 90 degree angle. The
three (3) existing driveways should be removed.
10. In accordance with Section 31-210 (h)(12), access driveways running parallel to the
street shall not create a four-way intersection within 75 feet of the future curb line of
the street. The north portion of the site should be redesigned to move the
intersection at least 75 feet from the intersection.
11. When the property is annexed, a grading permit in accordance with Section 29-186
(c) and (d) will be required prior to any land clearing or grading activities at the site.
Other than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction.
Utilities and Fire Department/County Planning:
Wastewater: Outside the service boundary. Annexation to the City of Little Rock is
required to receive sanitary sewer service. Contact Little Rock Wastewater Utility for
additional information.
Entergy: No comment received.
Center -Paint Ener : no comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the
size of the meter connection(s) will apply to this project in addition to normal charges.
This fee will apply to all meter connections including any metered connections off the
private fire system. Additional fire hydrant(s) may be required. Contact the Little Rock
Fire Department to obtain information regarding the required placement of the
hydrant(s) and contact Central Arkansas Water regarding procedures for installation of
the hydrant(s). This project is within Water Improvement District 349 and there may be
charges assessed by the Improvement District in conjunction with water service to this
property. This development will have minor impact on the existing water distribution
system. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water facilities
and/or fire service. Approval of plans by the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
Fire Department: Fire Hydrants will be required. Contact the Little Rock Fire
Department for additional information.
Item # 12.
County Planning: The site is located outside the City limits of the City of Little Rock.
Contact Pulaski County Planning for information concerning the required development.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Residential Low Density for this property. The applicant has
applied for a revised Short -form POD. This site was previously approved for a Planned
Office Development in 2003, but the land use plan was not amended at that time. This
rezoning is in conflict with the Future Land Use Plan and is therefore not appropriate.
This area of Kanis Road was studied by staff recently and the consensus at that time
was to keep the south side of Kanis Road rural in character. Residential and non-
residential uses to the north are proposed to be higher density and more suburban or
urban. Densification is proposed on the Plan. While to the south large -lot low intensity
uses are recommended, with large -lot residential subdivisions along Longwood Road,
Edswood Road and Longway Drive. There have not been any significant changes in
the area since this Land Use review.
Master Street Plan: Kanis Road is a
connections to and through an urban area
distance travel within the urbanized area
minimize negative effects of traffic on
dedication of right-of-way and may require
to the site.
Minor Arterial. A Minor Arterial provides
and their primary function is to provide short
Entrances and exits should be limited to
pedestrians. These streets may require
street improvements for entrances and exits
Bicycle Plan: A Class III is shown along Kanis Road. A Class III bikeway is a signed
route on a street shared with traffic. No additional paving or right-of-way is required.
Class III bicycle route signage may be required.
Neighborhood Action Plan: This area is not covered by a Neighborhood Action Plan.
Landscape:
1. Site plan must comply with the City's minimal landscape and buffer ordinance
requirements.
2. The zoning buffer ordinance requires an average twenty-seven foot (27') street
buffer along Kanis Road and in no case to be less than half. Currently, the site is
deficient on this minimal requirement.
3. A fifteen foot (15') wide land use buffer is required to separate this proposed
development from the residential property on the eastern and western perimeters of
the site. Seventy percent (70%) of these buffers are to remain undisturbed.
4. The property to the east and the west is zoned residential, therefore, a six (6) foot
high opaque screen, either a wooden fence with its face side directed outward, a
wall, or dense evergreen plantings, is required along both the eastern and western
perimeters of the site.
5. An automatic irrigation system to water landscaped areas will be required.
6. Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a Registered Landscape Architect.
Item # 12.
7. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this tree covered site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or larger.
Revised lat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, November 19, 2009.
Item # 12.