Loading...
HomeMy WebLinkAboutZ-6978 Staff AnalysisMarch 22, 2001 ITEM NO.: 3 FILE NO.: Z-6978 Owner: Harold W. and Betty Thomas Applicant: Thomas M. Draper Location: West of 7618 Fluid Drive Request: Rezone from R-2 to C-3 Purpose: Unspecified future development Size: 5.24± acres Existing Use: Undeveloped SURROUNDING LAND USE AND ZONING North - School; zoned R-2 South - Industrial tire recapping and sales business; zoned PID East - Undeveloped and multiple commercial uses; zoned C-3 West - Single -Family; zoned R-2 PUBLIC WORKS COMMENTS 1. Property proposed for rezoning does not have street frontage. Replat or provide access easement. PUBLIC TRANSPORTATION ELEMENT A CATA Bus Route is located on Fourche Dam Pike, just east of this site. PUBLIC NOTIFICATION All owners of property located within 200 feet of the site, all residents within 300 feet who could be identified and the Hermitage Neighborhood Association were notified of the rezoning request. March 22, 2001 ITEM NO.: 3 (Cont.) LAND USE PLAN ELEMENT The site is located in the adopted Land Use Plan reco: The commercial rezoning re Plan. Staff believes it i OS strip along the western adjacent to single family. FILE NO.: Z-6978 Port Planning District. The mends Commercial for the site. uest conforms to the adopted appropriate to place a 50' wide perimeter, where the site is The property is in an area not covered by a neighborhood action plan. No action plan is forecasted for the near future. STAFF ANALYSIS The request before the Commission is to rezone this 5.24± acre tract from "R-2" Single Family to 11C-3" General Commercial. The property is former farmland and has been cleared and mowed for many years. Once the tract is rezoned, it will be combined with the adjacent C-3 zoned tract to the east that fronts onto Fluid Drive. This adjacent tract is also owned by the same. individuals. There are no specific, immediate development plans. The properties to the east, along Fluid Drive and Fourche Dam, are zoned C-3 and contain a variety of commercial uses including two convenience stores, a restaurant and a hotel. An industrial tire recapping and sales business is located on the PID zoned tract adjacent to the south. Badgett Elementary School is located north of the site. The Richland Subdivision is located west of the site. A substantial drainage ditch separates the subject property from the single-family homes in the Richland Subdivision. Some small amount of screening is provided by trees and undergrowth located along the ditch. The C-3 zoning is certainly compatible with the existing commercial and industrial uses and zoning in the area. The site is located far enough from the school building itself that the City's required buffers and landscaping should provide adequate screening and buffering of any commercial development from the school. Staff believes it would be appropriate to require a 50' wide OS Open Space strip along the western perimeter of the subject property to provide 2 March 22, 2001 ITEM NO.: 3 (Cont.) FILE NO.: Z-6978 additional protection for the single family homes in Richland Subdivision. This 50 -foot strip corresponds to the maximum buffer required for a commercial property of this depth and is only slightly larger than the minimum requirement of 39.47 feet. It would be consistent with past actions in the area where a similar sized OS strip has been installed along the southern perimeter of Richland Subdivision and along the southern perimeter of Hermitage Home Sites, located east of Fourche Dam. The C-3 zoning conforms to the adopted Land Use Plan and, with the 50 foot OS strip on the west, should be compatible with uses and zoning in the area. STAFF RECOMMENDATION Staff recommends approval of western 50 feet of the tract serve as a buffer. PLANNING COMMISSION ACTION: the C-3 zoning, with the to be zoned OS, Open Space to (MARCH 22, 2001) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval of the C-3 zoning, with the western 50 feet to be zoned OS. Staff informed the Commission that the applicant had agreed with staff's recommendation. The item was placed on the Consent Agenda and approved as recommended by staff. The vote was 9 ayes, 0 noes and 2 absent. t1