Loading...
HomeMy WebLinkAboutZ-6975 Staff AnalysisFebruary 8, 2001 ITEM NO.: 13 FILE NO.:- Z-6975 NAME: The Bible Church of Little Rock - Conditional Use Permit LOCATION: 19,100 Highway 10 OWNER/APPLICANT: The Bible Church of Little Rock PROPOSAL: To obtain a conditional use permit for a new church site on this property zoned R-2, Single Family Residential, located at 19,100 Highway 10. ORDINANCE DESIGN STANDARDS: 1. SITE LOCATION: The proposed 18.9 acre site is located on the south side of Highway 10, approximately 1500 feet east of the intersection of Highway 10 and Chenal Parkway. 2. COMPATIBILITY WITH NEIGHBORHOOD: The proposed site is zoned R-2, Single Family Residential, and is surrounded by R-2 zoning. A 250 foot easement for a primary power transmission line abuts the site along the west side. Beyond that to the west the zoning is C-3, General Commercial, but is currently vacant. There is a single family house on the property now which would be removed. To the south and southeast is a single family housing subdivision. To the north directly across Highway 10, and to the east a few hundred feet, are large tracts of land with single family houses on them. Walnut Valley Christian Academy lies across Highway 10 to the northeast. Staff believes the proposed use would have little adverse impact on the area and is a reasonable use of this site. The Johnson Ranch and Aberdeen Court Neighborhood Associations, all property owners within 200 feet, and February 8, 2001 ITEM NO.: 13 (Cont. FILE NO.: 6975 all residents within 300 feet that could be identified, were notified of the public hearing. 3. ON SITE DRIVES AND PARKING: The proposed plan includes two access drives from Highway 10 with 1 `in' and 2 `out' lanes in each. Driveways would encircle the entire church building and branch out into surrounding parking areas. Parking requirements for a church are based on one space for every four seats in the main sanctuary. Phase 1 for the church would include 1000 seats, requiring 250 parking spaces including 7 handicapped accessible; 344 parking spaces are shown. Future expansion is planned for eventually 2500 seats, which would require 625 parking spaces including 12 handi.capped,accessible; 696 parking spaces including 12 handicapped accessible spaces are shown on the proposed site plan. 4. SCREENING AND BUFFERS: Areas set aside for buffers and landscaping meet with ordinance requirements as submitted. A utility easement may not be counted as part of the land use buffer. The eastern and western land use buffers must average a width of 40 feet and at no point be less than 9 feet. The southern land use buffer must average 50 feet in width and at no point be less than 9 feet. At least 70 percent of the land use buffers must remain undisturbed. A 6 foot high opaque screen, either a wooden fence with its face side directed or dense evergreen plantings, is required along the southern, eastern and western site perimeters adjacent to residential properties. An irrigation system to water landscaped areas is required. Prior to a building permit being issued, it will be necessary to provide an approved landscape plan stamped with the seal of a Registered Landscape Architect. 2 February 8, 2001 ITEM NO.: 13 (Cont.) FILE NO.: 6975 5. PUBLIC WORKS COMMENTS: a. Cantrell Road is classified on the Master Street Plan as a principal arterial; dedication of right- of-way to 55 feet from centerline will be required. b. Provide design of street conforming to "MSP" (Master Street Plan). Construct one-half street improvement to these streets including 5 -foot sidewalks with planned development. Construction should include a continuous left turn lane and a right hand deceleration lane into the site. c. Plans of all work in right-of-way shall be submitted for approval prior to start of work. d.Stormwater detention ordinance applies to this property. e. Grading permit will be required on this development, if it is regulated by -Ordinance 18,361. f.Contact the ADEQ for approval prior to start of work. g.A Sketch Grading and Drainage Plan per Sec. 29- 186(e) will be required. h.Easements for proposed stormwater detention facilities are required. i. Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. j. Show proposed turning movements at driveways clearly. k. Sidewalks shall be shown conforming to Sec. 31-175 and the "MSP". 6. UTILITY, FIRE DEPT. AND CATA COMMENTS: Water: No objection. Wastewater: Sewer available, not adversely affected. Southwestern Bell: No comments received. ARKLA: Approved as submitted. Entergy: Requests a 30 foot easement around the entire perimeter of the proposed site. Fire Department: Approved as submitted. 3 February 8, 2001 ITEM NO.: 13 (Cont.) FILE NO.: 6975 CATA: Site is located on Express bus route #25 and has no effect on bus radius, turnout and route. 7. STAFF ANALYSIS: The applicant has requested a conditional use permit for a new church to be constructed through a four phased master plan on the proposed site including accompanying parking. The church will be moving entirely from its current location on Breckenridge Drive. The plan includes one main church structure with parking areas surrounding it on all sides. Informal playground areas are proposed for the northwest and southeast corners. The northwest playground area would be an open field for older children to have room for ball sports, but no organized events or stadium type facilities would be built. The southeast area would be for younger children and contain some playground equipment. There is no plan for a school or day care on site. These two playground areas would be for church activities and use by church members, not competition events. All setback and landscape buffer requirements based on the Highway 10 Overlay District are met or exceeded by the proposed plan. The applicant is meeting the southern buffer and screening with a 100 foot undisturbed area. However, the applicant has requested some exceptions to the screening requirements on the east and west sides. They are asking for a waiver of the screening requirement along the west side because the entire west side is bounded by a 250 foot wide utility easement for a primary transmission power line. On the other side of the easement the zoning is C-3 for half of the depth of the Church's property, -and R-2 for the other half. Staff believes this waiver would be reasonable because of the utility easement. The applicant has also asked to defer the east side screening since the Bible Church owns that property as well. Since the church owns that property, and there are no houses or other development currently near this site on the east side, Staff supports that deferral until development of a lesser intensity occurs or up to five years, whichever occurs first. The applicant has 4 February 8, 2001 ITEM NO.: 13 (Cont.) FILE NO.: 6975 agreed to a 25 foot undisturbed landscape buffer on both the east and west sides of the proposed site. Structural height is another area the applicant is asking for variances. The proposed height for the church is 58 feet versus the ordinance allowed maximum of 35 feet. Also, the proposed steeple height is 95 feet versus an ordinance maximum height of 70 feet. Variances would be required for both those heights. Staff supports both variance requests due to the size of the site (almost 19 acres) and the 380 foot distance the structure would be from Highway 10. The applicant has also asked for deferral of street improvements until adjacent development occurs or up to five years, which ever occurs first. Public Works would support deferral of sidewalks, curbs and gutters, but not deferral of a continuous left turn lane, ::or re - striping to accommodate a deceleration lane on the shoulder eastbound to accommodate right turns into the site. Staff believes this is a reasonable use for this property, and should not cause a significant negative impact other than extra traffic at service times. Those times would not correspond with normal high traffic volumes on Highway 10. B. STAFF RECOMMENDATION: Staff recommends approval of the conditional use permit subject to compliance with the following conditions: a. Comply with the City's Landscape and Buffer Ordinances, and provide 25 foot east and west side and 100 foot south side undisturbed buffers. b. Comply with Public Works Comments. C. Contact the Fire Department for required fire hydrants. d. All exterior lighting must be low intensity and directed downward and inward to the property and not towards any residential zoned area. 5 February 8, 2001 ITEM NO.: 13 (Cont.) FILE NO.: 6975 Staff also recommends approval of the following: variance requests for increased height (58 foot church and 95 foot steeple); the deferral of screening along the east property line until development of a lesser intensity occurs or up to five years, whichever occurs first; deferral of street improvements, except for a continuous left turn lane and re -striping to accommodate a deceleration lane on the shoulder eastbound to accommodate right turns into the site, until adjacent development occurs, Phase 3 begins, or up to five years, which ever occurs first; and, the waiver of the screening along the west property line. SUBDIVISION COMMITTEE COMMENTS: (JANUARY 18, 2001) Joe White, project engineer, was present representing the application. Staff gave a brief description of the proposal and briefly reviewed the comments provided to the` -applicant. Mr. White asked Public Works if the street improvements could be deferred for five years or until adjacent development occurs. The response was that Public Works could support deferral of sidewalks, curbs and gutters, but not deferral of turn lanes. Mr. White produced a letter from Entergy confirming that the electric utility did not require a 30 foot easement around the entire perimeter of the site as previously requested. They require only a 15 foot easement across the front of the property. Mr. Brown from Staff commented on the buffer, screening and landscaping requirements, and clarified the need for 300 square foot landscape islands in the parking area according to the new landscape ordinance. The applicant stated their intent to request waivers or deferrals of some of the screening requirements and mentioned their justification. Mr. White verified that there was no plan for a school or day care on site, only the church. He also verified that the majority of activity on the site would occur on Sunday mornings and Wednesday nights. Staff asked Mr. White to provide more sign details, a cross section drawing showing how much soil cut would be required, and to explain the two playground areas shown on the site plan. February 8; 2001 ITEM NO.: 13 (Cont.) There being no further issues, proposal and forwarded the item final action. PLANNING COMMISSION ACTION: FILE NO.: 6975 the Committee accepted the to the full Commission for (FEBRUARY 8, 2001) Joe White, project engineer, was present representing the application. There were no registered objectors present. Staff presented the item with a recommendation for approval subject to compliance with the conditions and variances listed under "Staff Recommendation," paragraph 8 above. There was no discussion, or questions raised or addressed in the hearing. One citizen's question about buffering around the site had already been answered and she stated that she had no further questions and did not wish to speak. A motion was made to approve the application as submitted to include staff comments and recommendations, and the variance for height, the deferral of east side screening and north side street improvements, and the waiver of west side screening as detailed above. The motion passed by a vote of 9 ayes, 0 nays and 2 absent. 7