Loading...
HomeMy WebLinkAboutZ-6909 Map 8� S - MOC. CAP: pRiGK CDL• 4 -OI - ergN 9 a -° THE LEY TNWVOCABLE , UST CITY APPROVED f_Lc�lAlalo�I e91G�N, 9m.356 ' OVERFLOW DRAIN !gip"�_ f.'! t SWALE GRATE -. war. gwilor 89' 10" 49' 11' 62 4' " 2 l 274 FUTURE PARKING LISH T _ 'D T o---- uk — �r 10 SPACES 18 SPAC S, 280 8° M 189'-2" 281 N-0"32'0., .s» 30' o.. 4' o• R„ RaA SITEWORK NOTES O'd" S sl I0 o' Q 24'-0" 69 8" 8 28 60.0„ 3� i PAVEMENT RECOMMENDATION '.6 S C b i N The following pavement thickness recommendation was derived in accordance with the design y guidelines of the asphalt institute. Thickness recommendations are presented for regular duty b. pavement. 6'-0' IDE CO RETII p'.fl ti� Several alternate base types have been considered to be utilized beneath the planned asphaltic WA B 283 4'y , 0' WIDE - 28 �Q. 57 concrete AC surface. Regardless of which type base is utilized (other than AC base); it is 83 recommended that the AC be applied in two rifts, including a surface course and a binder course. 281 W E �011 282 N apo b: 282 o L Main drive pavements (trash truck route) shall conform to recommendations in the Geotechnical o- N 284 Report provided in the specifications- Base Type qC furface AC Binder Base Course 284 Asphaltic Concrete 2„ 6" 83 Cement Treated 1-1 /2 6 FF High QualitGranular 1" 1-1/2 B r UR ."'"":.. B' 0" WIDE UT FINISH FLOOR CONCRETE s GENERAL NOTES 2$5,34 =_, , - W The General Contractor shall maintain the integrity of building(s) security at all times and shall take - .. care to keep the building(s) sealed off when not in use. N ENTRY APRO 282 C, , «� ♦..i.e �`.: All removal and coordination of existing storm drainage components, building. components, and �> _ - site improvements to facilitate a complete project shall be the responsibility of the General a Contractor and his specific Sub-Contredorls) and will be part (labor and material} of this Contract. 4 ne Genera' contrac,cr i .o renxwe ensrng sce aeons, including out nor fmaec ro concrete ^_ 283 - objects (walks, pads, and steps), tell housings, and asphalt paving. The site shall be made free of _� - 11 3 Lei debris as necessary for construction or as directed by Owner / Architect. a a 8'-0" WIDE 2 L CONCRETE If during grading and foundation excavation, weak, sour, or poor pockets of soil are encountered, 283 n� U Contractor will review this with Owner and Architect prior to continuing with construction. The 282 b.. WALK 2 1 01 C Contractor shall be required to provide the Owner with a "unit basis cost' per cubic yard of CONCRET 'Ah material prior to commencement of the work for Owner's acceptance or rejection. - Ra -0" WIVi E 2 S A 2 2 7 APRON 0„ N R TE After completion of building, Contractor shall fine grade areas at perimeters of the building and WALK 200'-0" 1 284 24'-0' 19'-6 0 provide new Sod or Seeded Grass in areas designated to be grassed. He shall provide necessary " landscaping by Owner under separate contract. Note: In field adjustments shall be made if R4.-0' 2$3 0 required to satisfy the Owner and Architect so that storm water drainage will in all cases drain in a CR 4'8' positive manner away from building perimeter and building foundations. 285 DUMPSTER o �, S C SI . PAD g' 0„ N,00+ar.. Sidewalks to slope for positive drainage at 1:50 maximum. Steps and ADA ramps to be provided` R4' 0 283 411110. 't M where necessary - submit shop drgwings to Architect for approval 22 25'-0" 32' dipow I 6'° Paving at Handicap parking and ADA accessible routes over asphalt paving to slope at 1:50 r - maximum, for a distance of 6'-0" outside route lanes. b I o 284 10S CE 18 SPACES Concrete paving to be machine formed where possible with 1/2" radius at edges - typical. 286 V L — — — L — — -- — — — — — �r FUTURE PARKING 4 49' 11 162'-4, 260" 59 � ��. " AN -�'j`i� 169 SPACES TP W ADD _ 71 FUTURE �, 1 : N_ f 6 HC SPACES SITE GRAD Cni DIM?` i� 9A t T[ fT A l a.�s? 1 1 50. 0„ tZa,If"� -ati DETENTION CALCULATIONS C„=.20 C,=.65 Slope = 1.5% L = 700' Poor Grass t,=30min. ru=4.5hithr DESIGN DISCHARGE Q = (0.20)(4.5)(6.90) = 6.21 cfs - L=180' overland L = 580' gutter � » t, = 16 min r = 6.0 irAff DIFFERENTIAL RUNOFF RATE R (065)(60) (0.20)(45) 3.0 Taal volume ofdetentton V=(3.0)(6.9)(16)(60)= 19,872 W SAY NEED TOTAL STORAGE OF 20,000 IV BY ORIFICE CALCULATION, 18" PIPE WILL GIVE AN "yam INLET HEAD OF -0.3011 FOR 6.21crs (DESIGN DISCHARGE). DAYLIGHT iii 18" PI 77 186'- ' DETENTION 1 b 21,645 27 78 o CUBIC FEET o' 276. _ ib # , ti �Q0 In Z n z a w¢ �o im 0 � a i =y U U a Z W O W W <UZ ce Imm UJ O W�a Z O O Q C) Z � O N W Q n to Q U OZ N "' Y I/f a Q Q Q W J ad as �oP —11 00 J to U Z N _ LU LU S2 (V CD o 0 1-0 APR 17 2001 g� T SHEET NUMBER: -1 REVISED: 16 APRIL 2001 DATE: 5 MARCH 2001