HomeMy WebLinkAboutZ-6886-C Staff AnalysisFILE NO.:
NAME: Bowman Pointe Long -form PD -R
LOCATION: Located on the Northeast corner of South Bowman Road and
West 36th Street
DEVELOPER:
Richardson Properties, LLC
9800 Maumelle Boulevard
Maumelle, AR 72113
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 31.08 acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
-M
Multi -family
FT. NEW STREET: 0 LF
VARIANCE/WAIVERS: A variance from the City's Land Alteration Ordinance to allow
grading of the entire site with the construction of the first phase of the development.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The request is to allow a rezoning of 31.07 -acres from R-2, Single-family to
PD -R. The approval will allow the development of 609 -units of multi -family
housing. The apartments are proposed with 287 1 -bedroom units and
322 2 -bedroom units. The buildings are proposed 2 and 3 -story. The maximum
building height proposed is 35 -feet.
FILE NO.: 2-6886-C Cont.
The development is proposed with 234,919 square feet of building coverage
(17.36% of the site), 443,724 square feet of pavement coverage (32.78% of the
site) and 674,901 square feet of landscape/common area (49.86% of the site).
The plan indicates covered and uncovered parking. 36 -garage parking spaces
are proposed. A maximum of 201 -carport spaces will be provided and 904 -open
parking spaces. A total of 1,150 parking spaces are indicated on the site plan.
The buildings are proposed in 3 phases. Buildings F, G, H, I and J are proposed
in Phase 1. Buildings A, B, C, D and E in Phase 2 and Buildings K, L, M, N and
O are proposed in the third phase.
The applicant has indicated an area of floodway located south of this site will be
dedicated as open space and is proposed as a part of the overall development
plan for this site. The floodway/open space contains 6.89 -acres to be included
within the land area for this development for an overall development total
acreage of 37.97 acres.
B. EXISTING CONDITIONS:
C
The property is densely wooded sloping upward from West 36" Street. Adjacent
to the site South Bowman Road is unimproved with open ditches for drainage.
To the north are single-family homes in the Sandpiper Neighborhood. There is a
nursing home located on South Bowman Road along this property's northern
boundary. Across South Bowman Road there are a number of single-family
homes located on acreage and a large apartment development. East of the site
is the Church at Rock. South of the site along West 36th Street are single-family
homes located on acreage. There is also an office building located on the south
side of West 36th Street. West 36th Street is an unimproved street with open
ditches for drainage with the exception of the frontage of the Church at Rock
Creek. Improvements were put in place for the church's property with the
construction of the sanctuary.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All owners of property located within 200 -feet of the site along with the
John Barrow Neighborhood Association and the Sandpiper Neighborhood
Association were notified of the public hearing. The John Barrow Neighborhood
Association voted to support the request at their August Neighborhood
Association meeting.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS.
1, South Bowman Road is classified on the Master Street Plan as a minor
arterial. A dedication of right-of-way 45 -feet from centerline will be required.
K
FILE NO.: Z -6886-C Cont.
2, West 36th Street is classified on the Master Street Plan as a minor arterial.
A dedication of right-of-way 45 -feet from centerline will be required. Where
a minor arterial intersects another minor arterial, the applicant shall dedicate
an additional 10 -feet of right-of-way measured from the centerline of the
right-of-way for a right turn lane. The additional right-of-way shall normally
be 250 feet in length measured from the intersecting right-of-way. At such
intersections, the intersecting right-of-way lines shall normally have a radius
of 75 to 100 feet.
3. The proposed plan should show the public street north off West 36th Street.
The right-of-way should be a width of 60 feet.
4. If the proposed street is to be public, it should be located within a 60 foot
right-of-way and additional right-of-way dedicated to connect to the existing
right-of-way north off West 36th Street.
5. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to South
Bowman Road including 5 -foot sidewalks with the planned development.
The new back of curb should be located 29.5 -feet from centerline. Striping
should be provided for a left turn lane. Portions of the proposed right-of-way
are not in the possession of the applicant. All street improvements should
be made per AASHTO standards.
6. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to West 36th
Street including 5 -foot sidewalks with the planned development. The new
back of curb should be located 29.5 -feet from centerline. West 36th Street
should be widened where the public street from the north intersects West
36th Street at the time the apartments take access and/or the street from
South Bowman Road is constructed. At the South Bowman intersection,
improvements should be made per the Arterial Intersection design in the
MSP and AASHTO standards with sufficient width for a left turn lane, 2-thru
lanes, and 1 -right turn lane with channelization islands.
7. Street Improvement plans shall include signage and striping. Public Works
must approve completed plans prior to construction.
8. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed
prior to platting/certificate of occupancy. Contact Traffic Engineering
501.379.1813, Greg Simmons, for more information.
9. The proposed public street should be constructed no closer than 600 -feet
from the South Bowman Road/West 36th Street intersection (arterial/arterial
intersection) due to vehicle stacking and tapers for left turn lanes. The
right-of-way should be within a 60 -foot right-of-way. It is believed a future
street will be desired to the west.
10. Stormwater detention ordinance applies to this property. A regional
detention pond is proposed. What covenants and agreements are in place
concerning enlargement of the facility, maintenance of the facility, shared
3
FILE NO.: Z -6886-C
ownership of the facility, etc.? The detention ponds should be placed in a
private drainage easement.
11. Provide a letter prepared by a registered engineer certifying the sight
distance at the proposed driveway and street intersections comply with
2004 AASHTO Green Book standards. Superelevation of South Bowman
Road should be considered.
12. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby construction site
shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
13. Hammerheads should be designed to be at least 80 feet in length and the
same width as the street at the end of Brook Forest Drive.
14. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. The applicant
proposes to grade the entire property with construction of Phase 1. An
advanced grading variance is required to be requested.
15. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
16. Stormwater detention ordinance applies to this property. A regional
detention pond is proposed. What covenants and agreements are in place
concerning enlargement of the facility, maintenance of the facility, shared
ownership of the facility, etc.? The detention pond should be placed within
a private easement.
17. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
18. Alteration of the water course will require approval from the Little Rock
District of the US Army Corps of Engineers prior to start of work.
19. The owner and/or manager of each multi -family residence of 100 or more
dwelling units shall provide recycling and encourage participation by the
tenants, renters, or owners of each unit. Contact Melinda Glasgow at
501.371.4646 for more information.
E. UTILITIES AND FIRE DEPARTMENTICOUNTY PLANNING:
Wastewater: Sewer main extension required, with easements, if sewer service
is required for this project. Contact Little Rock Wastewater Utility for additional
information.
Enter : Entergy has a 3-phase power line running along the eastern side of
South Bowman Road and northern side of West 36th Street. There are no lines
on the preliminary plat. Contact Entergy in advance for service requirements,
4
FILE NO.: Z -6886-C Cont.
line location and easement needs. If existing power lines need to be adjusted to
accommodate road work or driveways, please communicate with Entergy early in
the process.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas W
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
3. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the
hydrant(s) and contact Central Arkansas Water regarding procedures for
installation of the hydrant(s).
6. A capital investment charge based on the size of meter connection(s) will
apply to this project in addition to normal charges.
Fire Department: 26 -foot drive lanes required, fire hydrants within 100 -feet of
FDC, 2 -ways to enter and exit development, fire hydrants per code, no
obstruction between fire hydrant, FDC and fire apparatus. Gates must be 20 -feet
wide. Contact Little Rock Department for additional information.
County Planning: No comment.
CATA: CATA has reviewed the plans submitted by your office on the above
referenced area. The area is currently served by CATA at West 36th Street and
South Shackleford Road approximately six (6) blocks away. The development
consists of 609 apartment units. CATA has this corridor in mind for future
expanded transit utilizing South Bowman Road and West 36th Street as corridors
to serve the growing population. CATA requests consideration of pullouts and
61
FILE NO.: Z -6886-C (Cont.
sidewalks on South Bowman Road and West 36th Street near the entrance to the
complex.
Parks and Recreation: No comment received.
F. ISSUESITECHNICAL/DESIGN:
Building Code: Apartment complex shall meet Accessibility requirements
including designated parking, building access and accessible dwelling units. For
information on submittal requirements and the review process, contact a
commercial plans examiner: Curtis Richey at 501.371.4724;
crichey@littlerock.org or Mark Alderfer at 501.371.4875; malderfer littlerock.or .
Planning Division: This request is located in the 1-430 Planning District. The
Land Use Plan shows Mixed Use (MX) for this property. This category provides
for a mixture of residential, office and commercial uses to occur. A Planned
Zoning District is required if the use is entirely office or commercial or if the use is
a mixture of the three (3). The applicant has applied for a rezoning from R-2
(Single Family District) to PCD (Planned Commercial District) to allow for
development of an apartment complex (at approximately 12-units/acre) and a
commercial center on this site.
Master Street Plan: South Bowman Road and West 36th Street are Minor
Arterials on the Master Street Plans, A Minor Arterial provides connections to
and through an urban area and their primary function is to provide short distance
travel within the urbanized area. Entrances and exits should be limited to
minimize negative effects of traffic and pedestrians on West 36th Street and
South Bowman Road. These streets may require dedication of right-of-way and
may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along South Bowman Road. Bike
Lanes provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (1/2) the full width requirement
but in no case less than nine (9) feet. Easements cannot count toward
fulfilling this requirement. The plantings, existing and purposed, shall be
provided within the City's Landscape Ordinance requirements.
3. Street buffer at Parcel B and Bowman Road should have an average of
thirty-five (35) feet.
4. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
N.
FILE NO.; Z -6886-C (Cont.
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (August 27, 2014)
Mr. Keith Richardson and Mr. Tim Daters were present representing the request.
Staff presented an overview of the development stating this item and the
previous item (The Church at Rock Creek Revised Long -form POD) were closely
related and would be discussed together. Staff requested addition information
concerning the request for the Church at Rock Creek. Staff stated there was
also a preliminary plat which included two (2) tracts south of West 36th Street of
which 6.89 -acres of open space was being proposed to be included with the
overall acreage of this development. Staff requested additional information
concerning the construction materials of the proposed new multi -family units (the
Pointe at Brodie Creek), the building heights and building elevations.
Staff noted on the site plan for the Church at Rock Creek there was a note
indicating advanced grading. Mr. Daters stated the Church was proposing to
grade an area on their site with the grading of this site. He stated this
development was proposing to grade their entire site with the construction of the
first phase of the multi -family.
Public Works comments were addressed. Staff questioned the proposed street
construction to South Bowman Road and if the street construction would be
phased. Mr. Richardson stated the improvements would be phased and stated
the revised site plan would include the proposed phasing plan. There was a
general discussion concerning the proposed public street and if the street met
the intent of the Master Street Plan. Staff stated the new location of the
proposed street did not meet the intent of the Master Street Plan and should the
developments be approved a revision to the Master Street Plan would be
required. Staff questioned the proposed stormwater detention plan.
Mr. Richardson stated agreements would be in place between the two (2)
property owners, the apartment development and the church, related to the
capacity of the detention facility and maintenance of the facility.
Landscaping comments were addressed. Staff stated the development plans
were to include landscaping to comply with the typical standards of the City's
Landscape and Buffer Ordinances. Mr. Daters stated part of the request was to
eliminate the previously required 50 -foot land use buffer on the Church's western
perimeter. He stated all other buffers would remain as previously approved.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
7
FILE NO.: Z -6886-C Cont.
H. ANALYSIS:
The applicant submitted a revised site plan and cover letter to staff addressing a
number of the issues raised at the August 27, 2014, Subdivision Committee
meeting. This item is related to a proposed revision to the adjacent property, the
Church at Rock Creek Revised Long -form POD (Z -6556-B) in that several
improvements proposed for this development will be completed in conjunction
with grading and clearing on the church's property.
This request is to allow a rezoning of 31.07 -acres from R-2, Single-family to
PD -R to allow the development with multi -family housing. The approval will allow
the development of 609 -units contained within 15 -buildings. Within the
development there will be 287 1 -bedroom units and 322 2 -bedroom units. The
buildings are proposed 2 and 3 -stories in height. The maximum building height
proposed is 35 -feet.
The development is proposed with 234,919 square feet of building coverage
(17.36% of the site), 443,724 square feet of pavement coverage (32.78% of the
site) and 674,901 square feet of landscape/common area (49.86% of the site).
There is also 6.89 -acre located within a floodway located south of West 36th
Street which will be maintained as open space to be included with this
development.
The plan indicates a total of 1,150 parking spaces both covered and uncovered.
36 -garage parking spaces are proposed and a maximum of 201 -carport spaces
are proposed. There will be 904 -open parking spaces. Parking for a multi -family
development is typically calculated at one and one-half (1 1/z) parking spaces per
unit. For a development containing 609 -units 913 -parking spaces would typically
be required.
The buildings are proposed in 3 phases. Buildings F, G, H, I and J are proposed
in Phase 1. Buildings A, B, C, D and E in Phase 2 and Buildings K, L, M, N and
O are proposed in the third phase. The site plan includes a secondary access
which will be constructed as a construction/emergency access during the first
phase. At the completion of the final phase the access will be converted to an
exit only access for the residents of the development.
The site plan indicates the placement of a development sign at the main entrance
to the complex along South Bowman Road. The sign is proposed with a
maximum sign height of six (6) feet and a maximum sign area of 72 square feet.
Signage typically allowed in multi -family zones is six (6) feet in height and
24 -square feet in area. The signage proposed is consistent with signage
approved in similar type developments.
The street construction of South Bowman Road will be phased with the building
phasing of the development. With the first phase of the apartment development
South Bowman Road will be constructed to one-half of a 59 -foot pavement width
1V
FILE NO.: Z -6886-C Cont.
to just south of the entrance drive. The plan includes the placement of a five (5)
foot sidewalk with Phase II of the site development. With the second phase of
the development the developer is proposing to dedicate the required right of way
for South Bowman Road and pay an in -lieu for the construction cost of the street
or if additional right of way is provided on the west side of South Bowman Road,
the developer will provide 36 -feet of pavement to be installed to the intersection
of West 36th Street. With the first phase of the apartment development
improvements to West 36th Street will be completed. The improvements to West
36th Street include a right turn lane constructed with 250 -feet of stack and a
150 -foot taper. The plan includes the placement of a right turn slip lane to
accommodate north bound turning movements. With the Phase III construction
improvements to West 36th Street to include 24 -feet of pavement from centerline
will be constructed along with curb, gutter and sidewalk.
Staff is supportive of the request. The site plan as presented provides for
buffering and screening along the northern perimeter of the property to protect
the adjacent single-family residence. The Master Street Plan indicates the
placement of a collector street through this property. The applicant has indicated
should zoning approval be gained prior to construction of the residential units an
amendment to the Master Street Plan will be requested. To staff's knowledge
there are no outstanding technical issues associated with the request. Staff feels
the development of the site with multi -family is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance request from the City's Land
Alteration ordinance to allow grading of future phases of building construction
with the first phase of construction.
PLANNING COMMISSION ACTION: (SEPTEMBER 18, 2014)
The applicant was present. There were no registered objectors present. Staff
presented the item stating they and the applicant were working to resolve issues raised
at the August 27, 2014, Subdivision Committee meeting. Staff presented a
recommendation of deferral of the item to the October 30, 2014, public hearing.
There was no further discussion. The Chair entertained a motion for approval of the
item as presented by staff. The motion was approved by a vote of 9 ayes, 0 noes and
2 absent.
9
FILE NO.: Z -6886-C Cont.
PLANNING COMMISSION ACTION: (OCTOBER 30, 2014)
The applicant was present. There were a number of registered objectors present. Staff
presented the three items (Item D — Bowman Pointe Preliminary Plat S-1731, Item H —
the Church at Rock Creek Revised Long -form POD Z -6886-B and the Bowman Point
Long -for PD -R Z -6883-C) as a single item for discussion purposes. Staff presented a
recommendation of approval of each of the items along with an associated variance for
advance grading for the Church at Rock Creek and the Brodie Creek Long -form PD -R.
Mr. Tim Daters of White Daters and Associates was present representing the request.
Mr. Daters stated the development included the Church at Rock Creek property,
property owned by Mr. Richardson proposed for multi -family development and a
preliminary plat to allow property owned by Mr. Richardson on the South side of West
36th Street to be subdivided into two (2) tracts. He stated a 7 -acre area of floodway
would be dedicated as open space. Mr. Daters stated the development would include
improvements to South Bowman Road and to West 36th Street. Mr. Daters stated on
West 36th Street additional paving would be added to allow traffic to flow northward on
South Bowman Road during peak times of church dismissal. He stated the multi -family
portion of the development would include areas of green space and courtyards.
Mr. Daters stated improvements to the intersection of South Bowman Road and West
36th Street would not be completed at this time. He stated the exact alignment of the
intersection had not been determined by the City. /He stated the desire was to soften
the curve in South Bowman Road. He stated the current right of way did not allow for
the improvements to be completed. He stated the developer would complete all the
improvements required by the Boundary Street Ordinance with the development of
particular phases.
Ms. Daniel Norwood of Richsmith Development addressed the Commission on the
particulars of the development. She stated the development was proposed on a similar
style as the development across South Bowman Road. She stated the units would be a
little smaller and the amenities would be a little less but the units would still be high end
units. She stated as the units were being leased across the street they found there
were a number of residents that would like to live in the area but did not want to pay as
high a rent as the existing development commanded. She stated this development
would allow those potential residents an option for west Little Rock living. She stated
the development would be constructed in phases. She stated as each phase was
nearing full lease out the next phase would be started.
Ms. Carolyn Bolin addressed the Commission with concerns. She stated her property
was located on West 36th Street and questioned what would happen to their property.
She questioned the street improvements to South Bowman Road and West 36th Street
at this intersection.
Ms. Carolyn Powers addressed the Commission in opposition of the request. She
stated she objected to 609 -apartments behind her house. She stated the area to the
north was a quiet residential neighborhood and the development was too dense for the
area.
10
FILE NO.: Z -6886-C Cont.
Mr. Brad Adrens addressed the Commission in opposition of the request. He stated his
home was located at 11207 Shady Ridge Drive. He stated he was concerned with the
development. He questioned if the development would take access through the
single-family subdivision. He stated if access was allowed this would change the
character of the single-family subdivision.
Ms. Samantha Wesley addressed the Commission in opposition of the request. She
provided the Commission with a petition from the neighborhood. She stated she did not
speak to everyone in the neighborhood but all the residents she spoke with were
opposed to apartments behind their home. She stated the notice form mailed to the
residents was very misleading and stated the Commission may want to reconsider their
notification requirements. She stated the development was too intense and would
change the character of the neighborhood. She requested the area remain zoned for
single-family and develop the area with single-family homes. She stated the
development would strain the infrastructure, stain the waterways and increase traffic.
Mr. Jaheon Koo addressed the Commission in opposition of the request. He stated the
residents were concerned with the loss of their green belt, the loss of their critters and
were concerned with the potential impacts on their adjacent homes. He stated he felt
the area should develop with single-family homes.
Mr. Daters stated the Land Use Plan indicated the property for MX or Mixed Use.
He stated the development had contained a commercial aspect at the intersection of
South Bowman Road with West 36th Street but was removed when the improvements to
West 36th Street and South Bowman Road could not be settled with the City. He stated
the improvements to South Bowman Road would include reducing the tightness of the
existing curve. He stated additional right of way was necessary to remove the curve but
the curve could be softened with the existing right of way.
Commissioner Nunnley questioned the need for advanced grading of this site as well as
the Church site. Mr. Daters stated the advanced grading was necessary to remove a
hill on the Church's property and allow for a driveway to extend to West 36th Street to
aid in the church members exiting the site during peak times. He stated the apartment
development was asking to advance grade to allow the entire site to balance.
Commissioner Nunnley questioned the time frame for construction of the apartment
buildings. Mr. Daters stated once the building was nearing full lease out, the next
building would be started. He stated the entire development would be completed within
24 -months. Commissioner Nunnley questioned staff of the requirements for the
advanced grading. Staff stated the site was required to be seeded and vegetated and
not allowed to remain as a dirt covered field.
There was a general discussion concerning traffic in the area and if the existing
infrastructure could handle the traffic. Mr. Daters stated South Bowman Road was an
arterial and West 36th Street was a collector street. He stated there were options for the
residents in the area which did not include accessing the intersection of South Bowman
Road and Kanis Road.
11
FILE NO.: Z -6886-C Cont.
Staff stated at the intersection of West 36th Street and South Bowman Road did not
carry a large volume of traffic. Staff stated 7700 vehicles per day were at this
intersection. Staff stated the volume of traffic on Kanis was 17,000 vehicles per day
and on Vimy Ridge Road there were 10's of thousands of vehicles per day. Staff stated
at some point this area would potentially become a public project but at this point the
City was going to put its money were the largest number of cars were located.
The Commission continued a general discussion concerning the condition of the
existing streets and their ability to handle the traffic volumes. The Commission noted
there were no paved shoulders on South Bowman Road and when emergency vehicles
traveled the area there was nowhere for vehicles to move out of the way. Commission
Brock stated he traveled this road frequently and the emergency vehicles maneuvered
as best they could but did not appear to have a problem with the condition of the road.
The Commission discussed providing housing for the residents and providing housing in
areas the residents wanted to live. The Commission stated it was important to provide
diversity in housing types in all areas of the City. The Commission noted they were not
comfortable with the number of units proposed with this development in addition to the
number of units currently being developed across South Bowman Road.
Mr. Daters stated this was the first he had heard of the street condition being a problem.
He stated staff did not raise traffic volumes as an issue during the review process.
He stated if density was a concern he was willing to defer the item to allow a review of
the overall density and determine if the development could still occur with fewer units.
A motion was made to defer the item, at the applicant's request, to the
December 18, 2014, public hearing. The motion carried by a vote of 11 ayes, 0 noes
and 0 absent.
STAFF UPDATE:
The applicant has submitted a revised site plan to staff reducing the number of units
from 609 -units to 500 -units. For the most part the development has not changed
significantly. The following highlights the changes proposed:
The development is proposed in three (3) phases. Phase 1 includes the construction of
the clubhouse, leasing office and 189 -units. Phase 2 consists of the construction of
187 -units and in the final phase 124 -units will be constructed. The applicant has
indicated the buildings will be three (3) story buildings with a maximum building height
of 40 -feet. The site plan includes the placement of covered parking and garages at
various locations throughout the site.
The site plan indicates a secondary access to the site to be developed with the first
phase of construction. The access will act as secondary access for emergency
personnel for the first two phases of the development. In the third phase the access will
be converted to a gated entry and exit to the development and allow residents two
access points for entering and departing the site.
12
FILE NO.: Z -6886-C Cont.
The revised plan indicates an 80 -foot undisturbed buffer along the northern perimeter of
the site. In addition the site plan indicates an additional 20 -foot landscape strip.
The street construction of South Bowman Road continues to be as previously proposed.
The construction will be phased with the building phasing of the development. With the
first phase of the apartment development South Bowman Road will be constructed to
one-half of a 59 -foot pavement width to just south of the entrance drive. The plan
includes the placement of a five (5) foot sidewalk with Phase II of the site development.
With the second phase of the development the developer is proposing to dedicate the
required right of way for South Bowman Road and pay an in -lieu for the construction
cost of the street or if additional right of way is provided on the west side of South
Bowman Road, the developer will provide 36 -feet of pavement to be installed to the
intersection of West 36th Street. With the first phase of the apartment development
partial improvements to West 36th Street will be completed. The improvements to West
36th Street include a right turn lane constructed with 250 -feet of stack and a 150 -foot
taper. The plan includes the placement of a right turn slip lane to accommodate north
bound turning movements. With the Phase III construction final improvements to West
36th Street to include 24 -feet of pavement from centerline will be constructed along with
curb, gutter and sidewalk.
Staff continues to support the request. The development is proposed with 500 -units of
multi -family housing constructed on 31.07 -acres. The overall site development includes
17.36 percent of building coverage, 32.78 percent of paved area and 49.86 percent of
landscaped area. The development is proposed containing 16.09 units per acre. Staff
recommends approval of the request subject to compliance with the comments and
conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff
recommends approval of the variance request from the City's Land Alteration Ordinance
to allow advanced grading of the site with the development of the first phase and staff
recommends approval of the applicant's proposed phasing plan for street construction.
PLANNING COMMISSION ACTION: (DECEMBER 18, 2014)
The applicant was present. There were registered objectors present. Staff presented
the item with a recommendation of approval. This item as well as Items C and D,
S-1731 and Z -6886-B were discussed as a single item but three (3) separate votes
were taken on the items.
The discussion of these three items was primarily related to this development of this site
with multi -family housing. Staff presented the item stating the applicant had reduced
the number of units proposed for the development form 600 to 500 units. Staff stated
the developer had also indicated the secondary access located along the southern
portion of the site would be developed as a full access for the development with the
completion of the final phase.
Mr. Keith Richardson addressed the Commission as the developer. He stated his intent
was to develop a Class 'A' project similar to his development across South Bowman
13
FILE NO.: Z -6886-G Cont.
Road. He stated the development would be a gated controlled development. He stated
the rents would range from $820.00 to $1,125.00 per month.
Mr. Tim Daters addressed the Commission on the merits of the request. He stated the
plan indicated the placement of an 80 -foot undisturbed buffer along the northern
perimeter and an additional 20 -foot planted landscape buffer. He stated the developer
had hired Peters and Associates to prepare a traffic study for the site. He stated the
conclusion was the increase in traffic after this development would not significantly
change traffic and congestion in the area. He stated with the traffic analysis the traffic
engineer also looked at the intersection of Kanis and Bowman Roads. He stated the
intersection was not current in the City's funding cycle for improvements. He stated
once the improvements were completed to the Kanis/Bowman Roads intersection traffic
delays in the area would be significantly reduced. He stated the current level of service
for the intersection was a Level of Service D and after full development of the
multi -family units under consideration the level of service at the intersection would
remain a Level of Service D. He stated with the improvements both with and without
the development of the multi -family development the level of service at the intersection
would be increased to a Level of Service C.
Ms. Samantha Wesley addressed the Commission in opposition. She stated the
developers had met with the neighborhood and had provided a number of concessions
to the residents. She stated even with the modifications she did not feel the
development was a fit for the area. She stated she felt the developers and the City
should try to redo the existing multi -family developments and make residents want to
stay in the multi -family developments instead of building new apartment buildings. She
stated she did not want to devastate a neighborhood by the construction of more and
more multi -family units.
Mr. Grover Bolin, Jr. addressed the Commission with concerns. He stated traffic in the
area was already heavy and he questioned the addition of 500 apartments and the
impact of the new development on traffic. He stated getting out of his driveway was
already a difficult task and he felt before any new development occurred the street
infrastructure should be completed.
Ms. Carolyn Bolin addressed the Commission with concerns. She stated West 36th
Street was a narrow street with open ditches for drainage. She stated the street was a
hazard. She stated before any new construction the street should be widened.
Mr. Monte Savoy addressed the Commission in support of the request. He stated the
developer had met with the neighborhood and had made a number of concessions. He
stated the increase in the buffer, the decrease in the number of units and the agreement
to not connect to the subdivision were very critical issues to the residents of the
neighborhood. He stated there were still concerns with the development and the
increase in traffic. He stated traffic would always be a challenge based on the current
practices of the City for street construction.
liEl
FILE NO.: Z -6886-C Cont.
Brad Ahrens addressed the Commission in opposition of the request. He stated without
widening the street it was difficult to approve a development of this intensity. He stated
one of the tremendous concerns of the neighborhood was the narrowness of Bowman
Road and a narrow bridge just before entering the subdivision. He stated the bridge
was narrow and was difficult for two cars to pass. He stated there was no pedestrian
access over the bridge when cars were crossing. He stated the intersection of South
Bowman Road and Kanis Road was severely congested and without improvements
adding additional multi -family would only increase congestion in the area.
There was a general discussion of the Commission with Mr. Daters concerning the
traffic analysis and the traffic volumes in the area. Mr. Daters once again stated the
traffic volume with the development would not significantly impact the existing traffic
counts in the area. He stated based on the analysis a number of the residents of the
apartment development would travel south and use West 36th Street and/or Colonel
Glenn Road.
The Commission questioned the time frame for build -out. Mr. Daters stated the full
build -out was expected in two (2) to three (3) years. He stated as each phase was
brought on-line a subsequent phase would begin construction.
Commissioner Berry questioned staff as to the status of the funding for the
improvements at the Kanis Bowman Road intersection. Staff stated the improvements
were not in the current funding cycle. Staff stated in 2015 a project list would be
completed for the 2016, 2017 and 2018 funding cycle. Staff stated this was subject to
Board of Directors approval. The Commission questioned if any State funding was
available for street widening. Staff stated currently there was not.
The Chair entertained a motion for approval of this item as presented by staff, including
the variance request from the City's Land Alteration Ordinance to allow advanced
grading. The motion carried by a vote of 10 ayes, 0 noes and 1 absent.
15
ITEM Nn.: 10.
NAME: Bowman Pointe Long -form PCD
.::.
LOCATION: located East of South Bowman Road, North and South of West 36th
Street, Between 1-430 and South Bowman Road
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site including
the certified abstract list, notice form with affidavit executed and proof of mailing.
The notice must be mailed no later than September 3, 2014. The Office of Planning
and Development must receive the proof of notice no later than September 12,
2014.
2. Provide the proposed construction materials for the buildings including the proposed
roofing material.
3. Provide the proposed building elevations for the proposed structures.
4. Will there be a sign placed to identify the proposed development? If so provide the
location of the sign, the total height and the square footage of sign area proposed.
5. Provide details of any proposed fencing located along the perimeters.
6. Provide the maximum building height and the number of stories of the proposed
structures.
7. A minimum of ten to fifteen percent of the gross planned residential district area shall
be designated as common usable open space and single-family, duplex, zero -lot -line
and townhouse development shall have a minimum of five hundred square feet of
usable private open space per unit. Indicate the total common usable open space
and the total usable private open space provided within the development.
8. Will there be any playground facilities located on the site. Are there any common
recreational areas? If so include the amenities to be offered.
9. Will there be any areas of outdoor storage? Areas for storage of boats, RVs, etc.
Variance/Waivers:
Public Works Conditions:
1. South Bowman Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 -feet from centerline will be required.
2. West 36th Street is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 -feet from centerline will be required. Where a minor
arterial intersects another minor arterial, the applicant shall dedicate an additional
10 -feet of right-of-way measured from the centerline of the right-of-way for a right
turn lane. The additional right-of-way shall normally be 250 feet in length measured
Item # 10.
from the intersecting right-of-way. At such intersections, the intersecting right-of-way
lines shall normally have a radius of 75 to 100 feet.
3. The proposed plan should show the public street north off West 36th Street. The
right-of-way should be a width of 60 feet.
4. If the proposed street is to be public, it should be located within a 60 foot right-of-
way and additional right-of-way dedicated to connect to the existing right-of-way
north off West 36th Street.
5. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to South Bowman Road including 5 -
foot sidewalks with the planned development. The new back of curb should be
located 29.5 -feet from centerline. Striping should be provided for a left turn lane.
Portions of the proposed right-of-way are not in the possession of the applicant. All
street improvements should be made per AASHTO standards.
6. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to West 36th Street including 5 -foot
sidewalks with the planned development. The new back of curb should be located
29.5 -feet from centerline. West 36th Street should be widened where the public
street from the north intersects West 36th Street at the time the apartments take
access and/or the street from South Bowman Road is constructed. At the South
Bowman intersection, improvements should be made per the Arterial Intersection
design in the MSP and AASHTO standards with sufficient width for a left turn lane,
2-thru lanes, and 1 -right turn lane with channelization islands.
7. Street Improvement plans shall include signage and striping. Public Works must
approve completed plans prior to construction.
8. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans
for approval to Traffic Engineering. Streetlights must be installed prior to
platting/certificate of occupancy. Contact Traffic Engineering 501.379.1813, Greg
Simmons, for more information.
9. The proposed public street should be constructed no closer than 600 -feet from the
South Bowman RoadNVest 36th Street intersection (arterial/arterial intersection) due
to vehicle stacking and tapers for left turn lanes. The right-of-way should be within a
60 -foot right-of-way. It is believed a future street will be desired to the west.
10. Stormwater detention ordinance applies to this property. A regional detention pond
is proposed. What covenants and agreements are in place concerning enlargement
of the facility, maintenance of the facility, shared ownership of the facility, etc.? The
detention ponds should be placed in a private drainage easement.
11. Provide a letter prepared by a registered engineer certifying the sight distance at the
proposed driveway and street intersections comply with 2004 AASHTO Green Book
standards. Superelevation of South Bowman Road should be considered.
12. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
13. Hammerheads should be designed to be at least 80 feet in length and the same
width as the street at the end of Brook Forest Drive.
14.A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. The applicant proposes to grade the entire property with
construction of Phase 1. An advanced grading variance is required to be requested.
Item # 10.
15. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
16. Stormwater detention ordinance applies to this property. A regional detention pond
is proposed. What covenants and agreements are in place concerning enlargement
of the facility, maintenance of the facility, shared ownership of the facility, etc.? The
detention pond should be placed within a private easement.
17. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
18.Alteration of the water course will require approval from the Little Rock District of the
US Army Corps of Engineers prior to start of work.
19. The owner and/or manager of each multi -family residence of 100 or more dwelling
units shall provide recycling and encourage participation by the tenants, renters, or
owners of each unit. Contact Melinda Glasgow at 501.371.4646 for more
information.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required, with easements, if sewer service is
required for this project. Contact Little Rock Wastewater Utility for additional
information.
Entergy: Entergy has a 3-phase power line running along the eastern side of South
Bowman Road and northern side of West 36th Street. There are no lines on the
preliminary plat. Contact Entergy in advance for service requirements, line location and
easement needs. If existing power lines need to be adjusted to accommodate road
work or driveways, please communicate with Entergy early in the process.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
3. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
Item # 10.
5. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to
obtain information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
6. A capital investment charge based on the size of meter connection(s) will apply to
this project in addition to normal charges.
Fire Department: 26 -foot drive lanes required, fire hydrants within 100 -feet of FDC, 2 -
ways to enter and exit development, fire hydrants per code, no obstruction between fire
hydrant, FDC and fire apparatus. Gates must be 20 -feet wide.
County Planning: No comment.
CATA:
Parks and Recreation- No comment received
Building Code: Apartment complex shall meet Accessibility requirements including
designated parking, building access and accessible dwelling units. For information on
submittal requirements and the review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey _Iittlerock_orq or Mark Alderfer at 501.371.4875;
malderfer .littlerock.orq.
Planning Division: This request is located in the 1-430 Planning District. The Land Use
Plan shows Mixed Use (MX) for this property. This category provides for a mixture of
residential, office and commercial uses to occur. A Planned Zoning District is required if
the use is entirely office or commercial or if the use is a mixture of the three (3). The
applicant has applied for a rezoning from R-2 (Single Family District) to PCD (Planned
Commercial District) to allow for development of an apartment complex (at
approximately 16 units/acre) and a commercial center on this site.
Master Street Plan: South Bowman Road and West 36th Street are Minor Arterials on
the Master Street Plans. A Minor Arterial provides connections to and through an urban
area and their primary function is to provide short distance travel within the urbanized
area. Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on West 36th Street and South Bowman Road. These streets may require
dedication of right-of-way and may require street improvements for entrances and exits
to the site.
Bicycle Plan: A Class II Bike Lane is shown along South Bowman Road. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
Item # 10.
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half ('/z) the full width requirement but in no case
less than nine (9) feet. Easements cannot count toward fulfilling this requirement.
The plantings, existing and purposed, shall be provided within the City's Landscape
Ordinance requirements.
3. Street buffer at Parcel B and Bowman Road should have an average of thirty-five
(35) feet.
4. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, September 3, 2014.
Item # 10.