Loading...
HomeMy WebLinkAboutZ-6886 Map 198 i MIIUN � 75 74 j 73 I ,p 5gq S 8 :1 1'16_ 1 IP (5)I CM (f) 100' 12 CP -N -f SANDPIPER CREEK,�PPITION PHASE FOUR, PROPOSED MASTER PLAN 0 ?> 510 100 'tk� TOTAL SITE: PARKING: 1,750 CARS NOTE: EXIS11NG MATURE TREES TO BE PRESERVED IN AS MUCH OF THE PROPERTY AS FEASIBLE. DATE: 6-24-2000 PROJECT NO: 2022 DRAWN BY: MCMORRAN REVISION: 7-19-2000 8-2-2000 OF FOUR i J I 2 PHASE FOUR, PROPOSED MASTER PLAN 0 ?> 510 100 'tk� TOTAL SITE: PARKING: 1,750 CARS NOTE: EXIS11NG MATURE TREES TO BE PRESERVED IN AS MUCH OF THE PROPERTY AS FEASIBLE. DATE: 6-24-2000 PROJECT NO: 2022 DRAWN BY: MCMORRAN REVISION: 7-19-2000 8-2-2000 OF FOUR