Loading...
HomeMy WebLinkAboutZ-6880 Map 6S �37 3 S I I I I I I W V Q N I'n m O z BOC= --571 '-02-' 5 el e__� TE IEL.= r - SITE GRADING PLAN SCAL s I- = 30' A S,5 ° GRATE EL.= moo_ STORM DRAIN R£: SU -1 r 3 - EL.= 302. ci = Tnp o , r- r o ^ 0 7\ z - e 107.1 j- - j- - 4--- N - - - - - --- -- -- --- 4---- - - - - I I I I I I I I I I I I I UPPER B DING CONCRE SLAB BOC= 307. ELEVATION - 308.00 I LOWER BUID=NIII G06C0 E III AB TION3 -ELEVA 4-.-.-.-. -.-.-_4.-.-_--- - ----- 306.8 II -----L — �� — -j------- -----� — — — J-------- — — —I o 30 _ 306.9 I I I - s� I I I 00 BOC Oq: z--" ,_- 4-y -1 _ / _ - It- SITE GRADING NOTES 1. SITE TOPOGRAPHIC SURVEY WAS PROVIDED BY WHITE -DATE] CONTRACTOR SHALL FIELD VERIFY ALL GRADES PRIOR TO VSTRUCTION. 2. NEW FINISHED CONTOURS SHOWN ARE TOP OF PAVING IN AREAS TO RECEIVE PAVEMENT AND TOP OF TOPSOIL IN AFS TO BE LANDSCAPED. 3, DESIGN BASED ON INFORMATION PROVIDED IN THE GEOTECFAL INVESTIGATION PREPARED BY ANDERSON ENGINEERING CONSANTS, INC. DATED JUNE 21, 2000. CONTRACTOR SHALL REVIEW AIADHERE TO AS PART OF THIS CONTRACT. 4. A QUALIFIED SOILS LABORATORY SHALL BE ON SITE DURIN EXCAVATION TO DETERMINE THE SUITABILITY OF THE EXIS, SUB -GRADE AND EXISTING ON SITE MATERIAL PRIOR TO BINING ANY FILLING OPERATION. S. GRADING CONTRACTOR TO COMPLY WITH ALL STATE AND 'AL SEDIMENT CONTROL AND AIR POLUTION ORDINANCES OR R6. REFERENCE SHEET EC-IFOR EROSION CONTROL MEASURES. 6. UNUSABLE EXCAVATED MATERIALS AND ALL WASTE SHALL DISPOSED OF OFF-SITE BY CONTRACTOR AT NO ADDITIONJ COST TO OWNER. IMPORT SUFFICIENT MATERIAL TO COMPE WORK AT NO ADDITIONAL COST IN THE EVENT OF A SHORE OF STRUCTURAL FILL. �30 7. GRADING CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE, BEFORE DISTURBING, ALTERING. REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. CONTRACTOR SHALL RAISE OR LOWER TOPS OF EXISTING MANHOLES AS REOUIRED TO MATCH NEW GRADES. B. IT IS THE INTENT OF THIS PROJECT FOR CONTRACTOR TO VERIFY AND MATCH EXISTING CONDITIONS UNLESS NOTED OTHERWISE. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY ITEMS THAT DO NOT EXIST AS SHOWN. 9. STRIPPED TOPSOIL AND RECOVERED LANDSCAPE MATERIAL SHALL BE STOCKPILED FOR REUSE. 10. REFERENCE SITE ELECTRICAL PLANS FOR POWER, SITE LIGHTING, AND TELEPHONE REQUIREMENTS. H. REFERENCE SHEET SU-IFOR STORM. WATER, SANITARY SEWER, AND GAS REOUIREMENTS. 12. REFERENCE SITE LANDSCAPING PLANS. 8 / SE4" 0 5 2p00 a a + LEGEND NEW SANITARY SEWER 8'D.I. SS MANHOL E L NEW FIRE HYDRANT ►� NEW GATE VALVE T.O.R. NEW WATER LINE FITTINGS B.O.C. NEW DUCTILE IRON C 2 � WATER LINE to CC_ = tm NEW STORM DRAINAGE ' ` CATCH BASIN SE4" 0 5 2p00 a a + NEW STORM DRAINAGE MANHOLE 8'D.I. SS NEW DUCTILE IRON L SANITARY SEWER LINE INV. INVERT T.O.R. TOP OF RIM B.O.C. BOTTOM OF CUA SE4" 0 5 2p00 a a + o a L a m cc ca V Ca di N O CO c o C 2 � N � w to CC_ = tm J ' ` C 0 LV JQ a a `c 0 W U) .. z Lu LL i Q O O I- w 0 LV J y � J II/StaTE�p�; �� AR AN AS 11111 111 REGISTERE PROFE � G E \ 1 1 �Na.1 _( 0263�/1111 +b�0Il 06-26-001 Job No. 00161 task 300 Date JUNE 2000 Revisions No. Date 1591E FOR NDS S REVED 08-28-00 Sheet SG -1 SITE GRADING PLAN