HomeMy WebLinkAboutZ-6849 Staff AnalysisMay 11, 2000
ITEM
NO.: 19
FILE NO.:
Z-6849
NAME:
Harris/Hathaway Office Building
- Zoning Site Plan
Review
LOCATION: Northeast corner of Centerview Drive and Shackleford
West Blvd.
DEVELOPER:
ENGINEER:
Harris/Hathaway J.V., LLC Development Consultants, Inc.
100 Morgan Keegan Dr. 2200 N. Rodney Parham Rd.,
Suite 120 Suite 220
Little Rock, AR 72202 Little Rock, AR 72212
6.92 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: C-2 ALLOWED USES: Commercial
PROPOSED USE: Office
VARIANCES/WAIVERS REQUESTED:
1. Variance from the minimum required driveway spacing standards.
BACKGROUND:
The property at the northeast corner of Centerview Dr. and
Shackleford West Blvd. is zoned C-2, which is one of the City's
Zoning Site Plan Review districts. Any development within this
zoning district requires site plan review and approval by the
Planning Commission.
A. PROPOSAL/REQUEST:
The applicant proposes to construct an office building on
the 6.92 -acre site at the northeast corner of Centerview
Dr. and Shackleford West Blvd. The proposed facility will
house the new Federal Bureau of Investigation (FBI) field
office._ Incorporated into the building are areas for a
basement level parking garage and a maintenance/work area
May 11, 2000
SUBDIVISION
ITEM NO.: 19 (Cont.)
FILE NO.: Z-6849
for operations vehicles, electronics and communication
equipment. The breakdown of building uses are as follows:
• office area - 90,000 square feet
• maintenance area - 16,000 square feet
■ parking garage - 41,500 square feet
The applicant is proposing a total of 227 parking spaces
for the project as follows:
• staff parking (exterior) - 105 spaces
■ visitor parking (exterior) - 20 spaces
• staff and operation parking (parking garage)
- 102 spaces
Two (2) access points are proposed, one (1) from Centerview
Dr. and one (1) from Shackleford West Blvd. The applicant
is requesting a variance from the minimum driveway spacing
standards for each driveway (setback from property lines).
The applicant is proposing a 6 foot high ornamental iron
fence around the perimeter of the property. The fence will
be constructed to a standard which will allow it to
function as a vehicular barrier.
The applicant notes that the main office building will be
approximately 30.5 feet in height, with the maintenance
section of the structure being approximately 19.5 feet
high. The applicant has also noted that specific signage
has not been determined at this time, but any signage
installed on the property will conform to the City's zoning
Ordinance standards.
B. EXISTING CONDITIONS:
The property is undeveloped and mostly wooded. The site is
slightly above the grade of the existing adjacent streets.
There is office zoned property to the south across
Shackleford West Blvd. and to the west across Centerview
Dr. There is additional C-2 zoned property immediately
east, with an office building currently under construction
further east along the south side of Shackleford West Blvd.
There is a mixture of office, residential and undeveloped
property to the north along Kanis Road.
C. NEIGHBORHOOD COMMENTS:
There,Gibralter Heights/Point West/Timber Ridge and
Sandpiper Neighborhood Associations were notified of the
public hearing. As of this writing, staff has received
2
May 11, 2000
SUBDIVISION
ITEM NO.: 19 (Cont.) FILE NO.: Z-6849
one (1) phone call from a person requesting information on
this project.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
2. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
3. Stormwater detention ordinance applies to this property.
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
5. Provide street light design and construct with prior
approval by Traffic Engineering.
6. Redesign employee entrance to accommodate safe turn
around without pulling on the street.
7. A Sketch Grading and Drainage Plan per Sec. 29-186(e)
will be 'required with a building permit.
S. The address assigned for this project is 10900
Shackleford West Blvd.
9. Kanis Road is listed on the Master Street Plan as a
minor arterial. A dedication of right-of-way 45 feet
from centerline is required.
10. Provide design of street conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
these streets including 5 -foot sidewalks with planned
development.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
AP&L: A 10 foot easement is requested along the east and
west property lines.
ARKLA: No Comment received.
Southwestern Bell: No Comment received.
Water: An acreage charge of $150 per acre applies in
addition to normal charges. On-site fire protection will
be required.
3
May 11, 2000
SUBDIVISION
ITEM NO.: 19 (Cont.)
FILE NO.: Z-6849
Fire Department: Contact Dennis Free at 918-3752
regarding fire hydrants.
County Planning: No Comment received.
CATA:. No Affect -Not on a dedicated bus route.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division:
No Comment.
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements when averaged out. However, a
portion of the proposed street buffer along Shackleford
West Blvd. drops below the full width requirement of
twenty-seven feet by twelve feet.
The City Beautiful Commission recommends preserving as many
trees as feasible on this tree -covered site. Extra credit
toward fulfilling Landscape Ordinance requirements can be
given when preserving trees of six inch caliper or larger.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
April 26, 2000. The revised plan addresses most of the
issues as raised by staff and the Subdivision Committee.
The applicant has noted that the maximum retaining wall
height will be approximately 15 feet at the north end of
the parking and drive area.
The applicant has also noted the 40 foot OS strip along the
property's north boundary. The barrier fence is located
within this OS strip. The applicant proposes to angle the
fence through this area and to remove no trees, if
possible•. Staff recognizes that a select number of trees
may have to be removed to construct the fence, and that
this number will be vary minimal.
4
May 11, 2000
SUBDIVISION
ITEM NO.: 19 (Cont.)
FILE NO.: Z-6849
The proposed building height and setbacks conforms to the
City's Zoning Ordinance standards. The applicant is
proposing 227 parking spaces for this development. The
ordinance requires a minimum of 191 parking spaces for this
amount of office space. The remaining 36 parking spaces
should be sufficient to serve the maintenance area of the
building.
As noted in paragraph A., the applicant is proposing a
variance from the minimum driveway spacing standards for
each proposed driveway. The ordinance requires that a
driveway have a setback of 125 feet from a property line.
The driveway on Centerview Drive has a setback of 65.5 feet
and the driveway on Shackleford West Drive has a setback of
90 feet. Public Works supports the variance for driveway
spacing, as the drive locations are key components of the
applicant's site plan.
One issue which needs to be resolved is right-of-way
dedication and street improvements to Kanis Road.
According to Public Works, a portion of this property
(northwest corner) has Kanis Road frontage, which would
require right-of-way dedication and street improvements.
Staff will attempt to resolve this issue prior to the
public hearing.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, subject to the
following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The issue relating to Kanis Road right-of-way dedication
and street improvements must be resolved.
3. Any site lighting must be directed away from adjacent
property.
4. The dumpster area must be screened on three (3) sides
with an 8 foot opaque fence or wall.
5. Staff recommends approval of the variance from the
minimum driveway spacing standards as noted in paragraph
G.
6. The 40 foot OS zoned area along the property's north
boundary line must remain undisturbed.
5
May 11, 2000
SUBDIVISION
ITEM NO.: 19 (Cont.
FILE NO.: Z-6849
SUBDIVISION COMMITTEE COMMENT: (APRIL 20, 2000)
Robert Brown and John Kincaid were present, representing the
application. Staff briefly described the site plan, noting that
additional information was needed.
Mr. Brown noted that this development appeared to have no
conflict with the 40 foot OS strip along the south side of Kanis
Road. This area was briefly discussed. The proposed perimeter
fence was also discussed.
The Public Works requirements were briefly discussed. It was
noted that a variance for driveway spacing was requested.
There being no further issues for discussion, the Committee
forwarded the site plan to the full Commission for final action.
PLANNING COMMISSION ACTION: (MAY 11, 2000)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairperson placed the item before the Commission for
inclusion within the Consent Agenda for approval as recommended
by staff. A motion to that effect was made. The motion passed
by a vote of 8 ayes, 0 nays, 2 absent and 1 open position.
C