HomeMy WebLinkAboutZ-6829-D Staff AnalysisFILE NO.: Z -6829-D
NAME: 1700 Kirk Road Revised Long -form POD
LOCATION: Located at 1700 Kirk Road
DEVELOPER:
1700 Kirk, LLC
1701 Centerview Drive, Suite 102
Little Rock, AR 72211
ENGINEER:
Development Consultants, Inc.
2200 North Rodney Parham Road, Suite 220
Little Rock, AR 72212
AREA: 11.42 acres
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING:
NUMBER OF LOTS: 3
OI
FT. NEW STREET: 0 LF
0-2, Office and Institutional District Uses
Revised POD
PROPOSED USE: 0-2, Office and Institutional District Uses and the allowance of the
accessory uses as identified in the 0-2, Office and Institutional Zoning District
VARIANCEMAIVERS:
1. The developer is requesting a variance from the City's Land Alteration Ordinance to
allow for an excavation permit for the entire site area in advance of a building permit.
2. The developer is requesting a variance from Section 30-43 and 31-210 to allow the
drives nearer the property lines than typically allowed.
3. The developer is requesting a variance to allow buildings to be placed as close as
15 -feet horizontally from the maximum ponding area at the 564.00 contour. All
buildings will have a minimum finish floor elevation of 567.00 or greater.
4. A variance to allow the placement of the sidewalk on one side of the southern
entrance drive.
LE NO.- Z -6829-D (Cont.
5. A variance from Section 30-43 and Section 31-210 to allow for driveways nearer the
intersection than typically allowed.
BACKGROUND:
Ordinance No. 20,907 adopted by the Little Rock Board of Directors on July 15, 2014,
rezoned the property from MF -18 to 0-2, Office and Institutional District. The property
contained 11.42 acres and was proposed for a future office development. As a
separate item the Board of Directors adopted Ordinance No. 20,905, also adopted by
the Board of Directors on July 15, 2014, allowed a revision to the City Future Land Use
Plan changing the future land use designation from Residential High Density to Office.
Ordinance No. 20,927 adopted by the Little Rock Board of Directors on
September 2, 2014, rezoned the property from 0-2, Office and Institutional District to
POD. The approval allowed the development of multiple buildings on this 11.42 -acre
site. The approved uses included the uses allowed within the 0-2, Office and
Institutional Zoning District.
There were variances associated with the request. The approval allowed a variance
from the City's Land Alteration Ordinance to allow for an excavation permit for the entire
site area in advance of a building permit, a variance from Section 30-43 and 31-210 to
allow the drives nearer the property lines than typically allowed by ordinance and a
variance to allow buildings to be placed as close as 15 -feet horizontally from the
maximum ponding area at the 564.00 contour. All buildings were to have a minimum
finish floor elevation of 567.00, or greater.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting a revision to the previously approved Planned Office
Development (POD) to create two (2) additional tracts at the south end of the
property. The tracts are planned to be transferred to the adjacent owners to the
west and south, respectively at some point in the future. Additionally the
requested revision includes a small increase in the allowable building square
footage for the southern -most building.
In addition to the previously approved variances the applicant is requesting a
variance to reduce the requirement for the placement of a sidewalk on both sides
of the proposed private drive/street. The applicant is requesting the variance to
allow the placement of the sidewalk on one side only. There is also a variance
from Sections 30-43 and 31-210 to allow for the internal driveway accessing the
office development nearer the intersection with Kirk Road than typically allowed.
The variance request is in addition to the three (3) variances that were approved
in the previous POD approval.
2
FI
C
NO.: Z -6829-D (Cont.
EXISTING CONDITIONS:
The property is currently undeveloped and grass covered. Undeveloped C-1,
Neighborhood Commercial zoned property is located to the north and northeast
along Rahling Road. Also to the northeast and northwest of this site are
multi -family developments. 0-2, Office and Institutional District and 0-3, General
Office District zoned property is located to the south and southwest of this site.
Fellowship Bible Church is located to the southeast of this property on the east
side of Kirk Road. An undeveloped POD zoned property is located to the east of
this site at the northeast corner of Wellington Village and Kirk Roads.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents.
All property owners located within 200 -feet of the site along with the Villages of
Wellington Property Owners Association were notified of the public hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. All driveways shall be concrete aprons per City Ordinance.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. The applicant is
requesting an advance grading variance for the entire site to be graded with
construction of the first phase.
4. Stormwater detention ordinance applies to this property.
5. Building 2 is proposed to be constructed over the stormwater pipe. The
pipe should be moved from under the building.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
7. On site striping and signage plans should be forwarded to Public Works,
Traffic Engineering for approval with the site development package.
8. Driveway locations do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on an
arterial street is required by ordinance to be 150 -feet from the side property
line and 300 -feet from other driveways and intersections. A variance must
be requested for the northern driveway off Kirk Road.
3
FILE NO.: Z -6829-D (Cont.
E
9. Provide a letter prepared by a registered engineer certifying the sight
distance at the driveway intersection(s) comply with 2004 AASHTO Green
Book standards.
10. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby construction site
shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
11. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After
construction, an as -built certification is required for construction of the
retaining wall.
12. Per the City of Little Rock Drainage Manual, in no case shall the limits of
maximum ponding elevation be closer than 30 -feet horizontally from any
building and less than 1 -foot vertically below the lowest sill or floor elevation.
The previous application was approved showing the building 15 -feet from
the maximum ponding elevation.
13. Per the City of Little Rock Drainage Manual, maximum side slopes for the
fluctuating area of permanent lakes shall be 1 -foot vertical to 3 -feet
horizontal (3:1) unless provisions are included for safety, stability, and ease
of maintenance.
14. Per the Master Street Plan, sidewalks are required to be constructed on
both sides of commercial streets. A variance must be requested to place
sidewalk on one side of the street.
15. Driveway locations do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. Driveway spacing on a
commercial street required by ordinance to be 125 -feet from the side
property line and 250 -feet from other driveways and intersections.
A variance must be requested for the proposed south street off Kirk Road.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available for Lot 1. Sewer main extension required, with
easements, for Tract 1 and 2 if sewer service is required for these tracts.
Contact Little Rock Wastewater Utility for additional information.
Entergy: Entergy does not object to this proposal. Contact Entergy well in
advance to work out service requirements and extension details as the area is all
serviced via underground lines. There are 3-phase lines well to the east, south
and north of this property which might be available as options.
Center -Point Enerqv: No comment received.
AT & T: No comment received.
2
FILE NO.: Z -6829-D (Cont.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A water main extension will be needed to provide water service to this
property.
3. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
4. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
5. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
7. Contact Central Arkansas Water if additional fire protection or metered
water service is required.
8. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226
if you would like to discuss backflow prevention requirements for this
project.
9. The facilities on-site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
5
FILE NO., Z -6829-D (Cont
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line agreement is required.
10. Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
are used, a reduced pressure zone backflow preventer shall be required.
11. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department: Fire hydrants pre code, maintain access per code, entry drives
20 -feet per lane at island are required. Contact the Little Rock Fire Department
for additional information.
County Planning: No comment.
CATA: The area is not currently served by CATA and not currently included in
CATA's long-range plan. While this location is not in the long range plans, it
appears it could concentrate ridership potential in the future. CATA would
request for consideration in ADA accessible sidewalks and a pullout, while they
not may be used by CATA for some time, could help with traffic congestion in the
future.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review approval prior
to issuance of a building permit. For information on submittal requirements and
the review process, contact a commercial plans examiner: Curtis Richey at
501.371.4724; cricheV@Iittlerock.org or Mark Alderfer at 501.371.4875;
malderfer littlerock.or .
Planning Division: This request is located in the Chenal Planning District. The
Land Use Plan shows Office (0) for this property. The office category represents
services provided directly to consumers (e.g., legal, financial, medical) as well as
general offices which support more basic economic activities. The applicant has
applied for a revision to their existing POD (Planned Office District) zoning to
modify the previously approved development by adding two (2) tracts on this site
with no use changes.
Master Street Plan: Kirk Road is shown as a Minor Arterial on the Master Street
Plan. A Minor Arterial provides connections to and through an urban area and
their primary function is to provide short distance travel within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Kirk Road. This street may require dedication of right-of-way and
may require street improvements for entrances and exits to the site.
FILE NO.: Z -6829-D [Cont.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (Y2) the full width requirement
but in no case less than nine (9) feet. Easements cannot count toward
fulfilling this requirement. The plantings, existing and purposed, shall be
provided within the City's landscape ordinance requirements.
3. A perimeter planting strip is required along any side of a vehicular use area
that abuts adjoining property. This strip shall be at least nine (9) feet wide.
Provide trees with an average linear spacing of not less than thirty (30) feet
within the perimeter planting strip. Provide three (3) shrubs or vines for every
thirty (30) linear feet of perimeter planting strip.
4. Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-ways. Provide screening shrubs with an average
linear spacing of not less at three (3) feet within the required landscape area.
Provide trees with an average linear spacing of not less than thirty (30) feet
5. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be
three hundred (300) square feet for developments with more than one
hundred fifty (150) parking spaces. Interior islands must be a minimum of
seven and one half (7 1/2) feet in width. Trees shall be included in the interior
landscape areas at the rate of one (1) tree for every twelve (12) parking
spaces.
6. The development of two (2) acres or more requires an approved landscape
plan stamped with the seal of a registered landscape architect prior to the
issuance of a building permit.
7. A landscape irrigation system shall be required for developments of
one (1) acre or larger.
8. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (October 8, 2014)
The applicant was present. Staff presented an overview of the development
stating there were few outstanding technical issues associated with the request.
Staff stated the Commission had previously approved a POD zoning for this site
rl
ENO.: Z -6829-D (Cont.
and the only modifications were to allow the creation of two (2) additional tracts
and to allow a slightly larger building footprint for one (1) of the buildings. Staff
stated one (1) of the tracts would be transferred to an adjacent property to allow
their ownership to have access to Kirk Road. Staff stated the second tract would
most likely also be transferred to an adjacent property owner in the future.
Public Works comments were discussed. Staff stated in addition to the
previously approved variances the development was creating a variance to allow
the driveway accessing the site from the newly created drive entering the
adjacent property to be located nearer the intersection than typically allowed.
Staff stated the second was to allow the placement of sidewalk along
one (1) side of the drive in -lieu of on both sides of the driveway.
Staff noted the comments from the various other agencies stating there were few
if any changes to the previously approved development. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing the issues raised
at the October 8, 2014, Subdivision Committee meeting. The revised plan notes
two (2) additional variances being requested from the original approval. The
revised plan indicates Building 1 containing 33,534 square feet as opposed to the
previously approved 27,000 square feet. The applicant is seeking approval of
uses as allowed within the 0-2, Office and Institutional Zoning District as well as
the accessory uses as allowed within the 0-2, Office and Institutional Zoning
District.
The buildings will be constructed as one and two-story structures with a
maximum building height of 45 -feet. The building construction will be completed
in three (3) phases. Phase 1A includes the construction of Building 1 and the
associated parking and drive isles. Phase 1 B will include the construction of
Building 2 and the associated parking and drive isles. Phase 2 will include the
construction of Building 3. The final phase consists of the construction of
Building 4 and completion of the parking areas. There will be a common access
and parking agreement to allow cross connecting drives and parking through the
development.
Building 1 is proposed as a two (2) story building containing a maximum of
33,550 square feet with a maximum building height of 48 -feet. Building 2 is
proposed as a 1 -story building containing a maximum of 11,250 square feet and
a maximum building height of 25 -feet. Building 3 is proposed as a 2 -story
building containing a maximum of 27,000 square feet and a maximum building
height of 48 -feet. Building 4 is proposed with a maximum building height of
48 -feet and a maximum building area of 33,000 square feet. The total square
footage on the site plan includes 104,784 square feet and 11.66 -percent building
LE NO.: Z -6829-D (Cont
coverage. The floor area ratio for the site is 21.06 -percent. The interior
landscape area is 11.83 -percent and the total number of parking spaces provided
is 424 spaces for a parking ratio of 4.046 to 1,000.
The buildings will be structural steel frame (steel columns, beams and bar joints)
with concrete foundations and floor slabs. The roofs will be primarily low -slope
single -ply membrane over rigid insulation on metal deck, typically with a parapet
at the perimeter. Some exposed standing seam metal roofing will be used on
limited areas. Exterior facades will be a combination of masonry (brick or stone)
and aluminum and glass storefront with limited areas of insulated composite
metal panels or other accent material. Overhangs, shading devices and other
exterior fenestration will be incorporated into the designs to provide interest and
control solar gain.
The site plan includes the placement of monument signs along Kirk Road and
one interior monument sign for Lot 1. The plan also includes the placement of a
monument sign for Tract 1. Three monument signs will serve Lot 1. All signs
requested will be ten (10) feet high and one hundred (100) square feet in area.
Building signage will be placed as typically allowed in office zones or a maximum
of ten percent of the fagade area abutting a public street.
A note on the site plan states a dense evergreen screening will be provided
along the northwestern portion of the site to provide screening from the adjacent
existing multi -family housing property. No additional fencing is anticipated with
the development. Should fencing be proposed in the future all fencing would
comply with the typical standards for placement and height of fencing allowed in
office zones.
There are variances associated with the request. The developer is requesting a
variance from the City's Land Alteration Ordinance to allow for an excavation
permit for the entire site area in advance of a building permit. The applicant has
stated grading of the entire site with the initial construction allows the site to
balance eliminating the need for hauling material from the site only to bring
material back to the site when a subsequent building is constructed.
The request includes a variance from Section 30-43 and 31-210 to allow the
drives nearer the property lines than typically allowed. The northern most drive
does not comply with the typical requirement of being located 150 -feet from the
property line 37.03 -feet. Staff is supportive of the variance requests. The drive
is proposed as a right-in/right-out driveway. The applicant's engineer has
provided certification stating the sight distance at this location is adequate.
The request includes a variance to allow buildings to be placed as close as
15 -feet horizontally from the maximum ponding area. Per the City of Little Rock
Drainage Manual, in no case shall the limits of maximum ponding elevation be
9
FILE NO,: Z -6829-D _(Cont.
closer than 30 -feet horizontally from any building and less than 1 -foot vertically
below the lowest sill or floor elevation. The variance would allow buildings to be
placed as close as 15 -feet horizontally from the maximum ponding area at the
564.00 contour. All buildings will maintain a minimum finish floor elevation of
567.00 or greater.
In addition to the previously approved variances the applicant is requesting a
variance to reduce the requirement for sidewalk on both sides of the proposed
private drive/street. The applicant is requesting the sidewalk placement be
limited to one (1) side of the private drive/street only.
There is also a variance from Section 30-43 and Section 31-210 to allow for the
internal driveway accessing the office development nearer the intersection with
Kirk Road than typically allowed. The drive is located as far from the intersection
as feasible but continues to require a variance.
Staff is supportive of the request. The applicant is proposing a rezoning from
0-2, Office and Institutional District to POD to allow the development of an office
development with similar development criteria as the 0-2 zoning district. To
staff's knowledge there are no outstanding technical issues associated with the
request. Staff feels the office development as proposed is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the following variances associated with the
request:
a. The variance request from the City's Land Alteration Ordinance to allow
for an excavation permit for the entire site area in advance of a building
permit.
b. The variance request from Section 30-43 and 31-210 to allow the drives
nearer the property lines than typically allowed.
c. The variance request to allow buildings to be placed as close as 15 -feet
horizontally from the maximum ponding area at the 564.00 contour. All
buildings must have a minimum finish floor elevation of 567.00 or greater.
d. The variance to allow the placement of the internal driveway accessing the
office development nearer the intersection with Kirk Road than typically
allowed.
10
ILE NO.: Z -6829-D (Cont.
e. The variance to allow the placement of the sidewalk along the private
drive/street on one side only.
PLANNING COMMISSIDN ACTION: (OCTOBER 30, 2014)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request SUbject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report.
Staff presented a recommendation of approval of the following variances associated
with the request:
a. The variance request from the City's Land Alteration Ordinance to
allow for an excavation permit for the entire site area in advance of a
building permit.
b. The variance request from Section 30-43 and 31-210 to allow the
drives nearer the property lines than typically allowed.
c. The variance request to allow buildings to be placed as close as
15 -feet horizontally from the maximum ponding area at the
564.00 contour. All buildings must have a minimum finish floor
elevation of 567.00 or greater.
d. The variance to allow the placement of the internal driveway
accessing the office development nearer the intersection with
Kirk Road than typically allowed.
e. The variance to allow the placement of the sidewalk along the private
drive/street on one side only.
There was no further discussion of the item. The Chair entertained a motion for
approval of the item, as presented by staff. The motion carried by a vote of 11 ayes
0 noes and 0 absent.
11
ITEM NO.: 8. Z-682
NAME: The Meadow North Long -form POD
LOCATION: located at 1700 Kirk Road
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site including
the certified abstract list, notice form with affidavit executed and proof of mailing.
The notice must be mailed no later than October 15, 2014. The Office of Planning
and Development must receive the proof of notice no later than October 24, 2014.
2. There are no changes to the previously approved POD other than to allow the
creation of two additional tracts, allow a slightly larger building envelope and clarify
the approval allows the 10% accessory uses as allowed in the 0-2, Office and
Institutional Zoning District for the approval.
Variance/Waivers
1. The developer is requesting a variance from the City's Land Alteration Ordinance to
allow for an excavation permit for the entire site area in advance of a building permit.
2. The developer is requesting a variance from Section 30-43 and 31-210 to allow the
drives nearer the property lines than typically allowed.
3. The developer is requesting a variance to allow buildings to be placed as close as
15 -feet horizontally from the maximum ponding area at the 564.00 contour. All
buildings will have a minimum finish floor elevation of 567.00 or greater.
Public Works Conditions:
1. All driveways shall be concrete aprons per City Ordinance.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. The applicant is requesting an advance grading variance
for the entire site to be graded with construction of the first phase.
4. Stormwater detention ordinance applies to this property.
5. Building 2 is proposed to be constructed over the stormwater pipe. The pipe should
be moved from under the building.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
7. On site striping and signage plans should be forwarded to Public Works, Traffic
Engineering for approval with the site development package.
8. Driveway locations do not meet the traffic access and circulation requirements of
Sections 30-43 and 31-210. Driveway spacing on an arterial street is required by
ordinance to be 150 -feet from the side property line and 300 -feet from other
driveways and intersections. A variance must be requested for the northern
driveway off Kirk Road.
9. Provide a letter prepared by a registered engineer certifying the sight distance at the
driveway intersection(s) comply with 2004 AASHTO Green Book standards.
10. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
11. Prior to construction of retaining walls, an engineer's certification of design and plans
must be submitted to Public Works for approval. After construction, an as -built
certification is required for construction of the retaining wall.
12. Per the City of Little Rock Drainage Manual, in no case shall the limits of maximum
ponding elevation be closer than 30 -feet horizontally from any building and less than
1 -foot vertically below the lowest sill or floor elevation. The previous application was
approved showing the building 15 -feet from the maximum ponding elevation.
13. Per the City of Little Rock Drainage Manual, maximum side slopes for the fluctuating
area of permanent lakes shall be 1 -foot vertical to 3 -feet horizontal (3:1) unless
provisions are included for safety, stability, and ease of maintenance. Per the
Master Street Plan, sidewalks are required to be constructed on both sides of
commercial streets. A variance must be requested to place sidewalk on one side of
the street.
14. Driveway locations do not meet the traffic access and circulation requirements of
Sections 30-43 and 31-210. Driveway spacing on a commercial street required by
ordinance to be 125 -feet from the side property line and 250 -feet from other
driveways and intersections. A variance must be requested for the proposed south
street off Kirk Road.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available for Lot 1. Sewer main extension required, with
easements, for Tract 1 and 2 if sewer service is required for these tracts. Contact Little
Rock Wastewater Utility for additional information.
Entergy: Entergy does not object to this proposal. Contact Entergy well in advance to
work out service requirements and extension details as the area is all serviced via
underground lines. There are 3-phase lines well to the east, south and north of this
property which might be available as options.
Center -Point Enemy: Please be advised that Centerpoint Energy (CNP) owns and
operates natural gas facilities along the western property line of this Planned Office
Development. The proposed "Truck Dock" could be in close vicinity to these existing
CNP facilities. We advise that Arkansas One Call be notified prior to the
commencement of any construction activities. If there are any questions or concerns
please do not hesitate to contact CNP.
ITEM NO.: 8. Z-682
AT & T: No comment received.
ntrai Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. A water main extension will be needed to provide water service to this property.
3. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
4. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
5. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
7. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
8. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project.
9. The facilities on-site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line agreement
is required.
10. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives are used, a
reduced pressure zone backflow preventer shall be required.
Item # 8.
ITEM NO.: 8.
11. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department: Fire hydrants pre code, maintain access per code, entry drives 20 -
feet per lane at island are required. Contact the Little Rock Fire Department for
additional information.
County Plannjag: No comment.
CATA: The area is not currently served by CATA and not currently included in CATA's
long-range plan. While this location is not in the long range plans, it appears it could
concentrate ridership potential in the future. CATA would request for consideration in
ADA accessible sidewalks and a pullout, while they not may be used by CATA for some
time, could help with traffic congestion in the future.
Parks and Recreation;_ No comment received.
Buildin Code: Project is subject to full commercial plan review approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner: Curtis Richey at 501.371.4724;
cricheyp,littlerock.orq or Mark Alderfer at 501.371.4875; malderfer littlerock.or .
Planning Division: This request is located in the Chenal Planning District. The Land
Use Plan shows Office (0) for this property. The office category represents services
provided directly to consumers (e.g., legal, financial, medical) as well as general offices
which support more basic economic activities. The applicant has applied for a revision
to their existing POD (Planned Office District) zoning to modify the previously approved
development by adding two (2) tracts on this site with no use changes.
Master Street Plan: Kirk Road is shown as a Minor Arterial on the Master Street Plan.
A Minor Arterial provides connections to and through an urban area and their primary
function is to provide short distance travel within the urbanized area. Entrances and
exits should be limited to minimize negative effects of traffic and pedestrians on Kirk
Road. This street may require dedication of right-of-way and may require street
improvements for entrances and exits to the site.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements,
Item # 8.
ITEM NO.: 8.
x'$11
2. Street buffers will be required at six (6) percent of the average depth of the lot. The
minimum dimension shall be one-half (1/2) the full width requirement but in no case
less than nine (9) feet. Easements cannot count toward fulfilling this requirement.
The plantings, existing and purposed, shall be provided within the City's landscape
ordinance requirements.
3. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property. This strip shall be at least nine (9) feet wide. Provide trees
with an average linear spacing of not less than thirty (30) feet within the perimeter
planting strip. Provide three (3) shrubs or vines for every thirty (30) linear feet of
perimeter planting strip.
4. Screening requirements will need to be met for the vehicular use areas adjacent to
street right-of-ways. Provide screening shrubs with an average linear spacing of not
less at three (3) feet within the required landscape area. Provide trees with an
average linear spacing of not less than thirty (30) feet
5. Eight percent (8%) of the vehicular use area must be designated for green space;
this green space needs to be evenly distributed throughout the parking area(s). The
minimum size of an interior landscape area shall be three hundred (300) square feet
for developments with more than one hundred fifty (150) parking spaces. Interior
islands must be a minimum of seven and one half (7 1/2) feet in width. Trees shall
be included in the interior landscape areas at the rate of one (1) tree for every twelve
(12) parking spaces.
6. The development of two (2) acres or more requires an approved landscape plan
stamped with the seal of a registered landscape architect prior to the issuance of a
building permit.
7. A landscape irrigation system shall be required for developments of one (1) acre or
larger.
8. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, October 15, 2014.
Item # 8.