HomeMy WebLinkAboutZ-6720 Staff AnalysisAugust 19, 1999
ITEM NO.: 7
FILE NO.: Z-6720
NAME: Chenal Acura - Long -Form PD -C and Preliminary Plat
LOCATION: Northeast corner of Chenal Parkway and Kirk Road
DEVELOPER: ENGINEER:
The Winrock Group, Inc. The Mehlburger Firm
1590 Union National Plaza 201 S. Izard Street
P. O. Box 1280 Little Rock, AR 72201
Little Rock, AR 72203
11.85 acres NUMBER OF LOTS: 5 FT. NEW STREET: 0
ZONING: MF -18/0-2/C-3 ALLOWED USES:
PROPOSED USE
Multifamily, Office,
Commercial
Auto dealership (Lot 1)
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant proposes to subdivide 11.85 acres at the
northeast corner of Chenal Parkway and Kirk Road into five
(5) lots. The property is currently zoned MF -18/0-2/C-3.
The applicant proposes an interior private drive to serve
Lots 1 and 2. The lots will be final platted one at a time
as they are sold, beginning with Lot 1, at the east end of
the property. The proposed lots range in size from .79
acre to 5.3 acres.
The applicant is also proposing to rezone Lot 1 from MF -
18/0 -2 to PD -C to allow for the development of an auto
dealership. The applicant proposes to construct two (2)
buildings on the site, within the southern one-half of the
property. The easternmost building is proposed to be
12,700 square feet in area, with the building to its west
August 19, 1999
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z-6720
being 6,600 square feet. The proposed height of the
buildings is 28 feet. The site plan shows a garden plaza
area between the two buildings, part of which will be used
for vehicle display.
The applicant is proposing a very limited amount of vehicle
display between the buildings and Chenal Parkway. The bulk
of the vehicular display will be to the north of and behind
the proposed buildings. The applicant has also noted
customer, employee and service parking on the site plan.
One access point from Chenal Parkway is proposed to serve
the auto dealership. The access consists of a private
shared drive along the lot line of Lots 1 and 2 as shown on
the attached site plan and plat. One (1) monument sign
location, dumpster location and landscape/buffer areas are
also noted on the attached site plan.
The following hours of operation are proposed:
7:30 a.m. - 6:00 p.m., Monday -Friday
8:30 a.m. - 6:00 p.m., Saturday
At the present time, the dealership has no plan to be open
on Sunday, however, the company would like to reserve the
right to adjust the hours of operation to meet future
customer needs.
B. EXISTING CONDITIONS:
The site contains several vacant buildings of various sizes
which will be removed with construction of the individual
lots. There are commercial uses to the south across Chenal
Parkway and west across Kirk Road. There is a church
immediately east of the site, with undeveloped multifamily
and office zoned property to the north. There is a mini -
warehouse complex and an office building currently under
construction to the northeast.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has
neighborhood. The St. Charles
Neighborhood Associations were
hearing.
VA
received no comment from the
and Parkway Place
notified of the public
August 19, 1999
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z-6720
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Existing median opening for Kroger Shopping Center is
scheduled to be closed per Master Street Plan with Phase
III of Shopping Center Development.
2. Kirk Road is listed on the Master Street Plan as a
collector street. Dedicate right-of-way to 30 feet from
centerline.
3. A 20 feet radial dedication of right-of-way is required
at the corner of Kirk Road and Chenal Parkway.
4. Provide design of streets conforming to " MSP" (Master
Street Plan and Chenal plan). Construct one-half street
improvements to these streets including 5 -foot sidewalks
with planned development.
5. Plans of all work in right-of-way shall be submitted for
approval prior to start work.
6. Stormwater detention ordinance applies to this property.
7. Driveway spacing shall comply with Ordinance #18,031 and
Chenal Parkway Plan.
8. Existing topographic information at maximum five-foot
contour interval 10 feet base flood elevation.
9. A Sketch Grading and Drainage Plan per Sec. 29-186(e) is
required.
10. A Grading Permit per Secs. 29-186(c) and (d) is
required.
11. Contact the ADPC&E for approval prior to start of work.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements
to serve property.
AP&L: No Comment received.
Arkla: No Comment.
Southwestern Bell: No Comment received.
Water: There is a 50' wide right-of-way strip crossing
this property to which we have a deed. The Water Works
is in the process of working out the details of an
agreement regarding protection of the raw water main that
crosses this site.
Fire Department: Fire hydrant may be required. Contact
Dennis Free at 918-3752 for details.
3
August 19, 1999
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z-6720
County Planning: No Comment received.
CATA: Site is not currently served by CATA, approved.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is in the Chenal Planning District and is
shown as Commercial with a PZD required on the Land Use
Plan. Concerns include access easements to Kirk Road;
location of the sign(s); and the buffering to the less
intense uses to the north and east.
City Recognized Neighborhood Action Plan: This request is
located in the Rock Creek Neighborhood Area Plan. That
plan states to "Aggressively use Planned Zoning Districts
(PZD's) to influence more neighborhood friendly and better
quality developments."
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements.
The City Beautiful Commission recommends preserving as many
trees as feasible. Extra credit toward fulfilling
Landscape Ordinance requirements can be given when
preserving trees of six inch caliper or larger.
G. ANALYSIS:
The applicant submitted a revised preliminary plat and site
plan to staff on August 5, 1999. The revised plat
addresses most of the issues raised by the Subdivision
Committee. There are still several items which need to be
noted on a revised plat drawing and are as follows:
1. Address of landowner and source of title
2. Dimensions along all lot lines
3. All driveway locations
4. Platted building lines
5. Names of all abutting property owners
6. Location of PAGIS Monuments
7. Street widths
4
August 19, 1999
SUBDIVISION
ITEM NO.: 7 (Cont.)
FILE NO.: Z-6720
The revised site plan also addresses the issues raised by
staff and the Subdivision Committee. The revised plan
notes the area and height of each building, sign location,
dumpster location and designated vehicle display areas.
The revised plan also notes that several trees along the
east and south property lines will be saved.
The property is located within the Chenal/Financial Center
Design Overlay District. The following DOD ordinance
requirements will apply to this development:
1. Ground -mounted sign(s) must be monument type with a
maximum area of 100 square feet and a maximum height of 8
feet.
2. All lighting must be directed to the parking areas and
not reflected onto adjacent parcels.
3. No overhead utilities within 100 feet of Chenal Parkway
right-of-way.
4. All lighting and utilities located in front of the rear
line of the building must be underground.
Otherwise, to staff's knowledge, there are no outstanding
issues associated with this application. Staff feels that
the proposed development of this property will have no
adverse effect on the general area.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat and PD -C
rezoning subject to the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2.A revised preliminary plat must be submitted with the
additional items noted as outlined in paragraph G.
3. The development must conform to the Chenal/Financial
Center Design Overlay District regulations, also noted in
paragraph G.
4. The existing trees along the east and south property
lines must be preserved as offered by the applicant.
5. No unloading of vehicles in the public right-of-way. If
the private access easement is ever continued through to
Kirk Road, vehicles must be unloaded on the dealership
property and not within the access easement area.
6. An overall final plat will be required when the last lot
within this proposed subdivision is final platted.
5
August 19, 1999
SUBDIVISION
ITEM NO.: 7 (Cont.) FILE NO.: Z-6720
SUBDIVISION COMMITTEE COMMENT: (JULY 29, 1999)
Frank Riggins was present, representing the application. Staff
gave a brief description of the preliminary plat and PD -C site
plan. Staff noted several items which needed to be shown on a
revised preliminary plat drawing. Staff also noted that
signage, site lighting and utilities must conform to the Chenal
Design Overlay District Ordinance.
There was a brief discussion relating to the number of parking
spaces/vehicular display area shown on the site plan. Mr.
Riggins noted that the amount of vehicular display area shown
was required by the specific auto dealers which would occupy the
property and was typical of their other dealerships. He also
noted that a portion of the "Garden Plaza" area would be used
for vehicular display.
In response to a question from staff, Mr. Riggins noted that
vehicles would be initially unloaded along the private drive
along the west property line. He stated that if the private
drive is connected to Kirk Road, the vehicles would be unloaded
within the site.
The Public Works requirements were briefly discussed. Mr.
Riggins noted that all the requirements would be complied with.
After the discussion, the Committee forwarded the preliminary
plat and PD -C to the full Commission for resolution.
PLANNING COMMISSION ACTION: (AUGUST 19, 1999)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
Bob Turner, of Public Works, addressed the Commission. He noted
for the record that if the joint access drive from Chenal
Parkway is ever extended to Kirk Road, the drive will need to
meet the Master Street Plan standards for a service drive.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 6 ayes, 0 nays and 5 absent.
6
FILE NO.: Z-6720
NAME: Chenal Acura - Long -Form PD -C and Preliminary Plat
LOCATION: Northeast corner of Chenal Parkway and Kirk Road
DEVELOPER: ENGINEER:
The Winrock Group, Inc. The Mehlburger Firm
1590 Union National Plaza 201 S. Izard Street
P. O. Box 1280 Little Rock, AR 72201
Little Rock, AR 72203
AREA: 11.85 acres NUMBER OF LOTS: 5 FT. NEW STREET: 0
ZONING: MF -18/0-2/C-3 ALLOWED USES:
PROPOSED USE:
Multifamily, Office,
Commercial
Auto dealership (Lot 1)
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant proposes to subdivide 11.85 acres at the
northeast corner of Chenal Parkway and Kirk Road into five
(5) lots. The property is currently zoned MF -18/0-2/C-3.
The applicant proposes an interior private drive to serve
Lots 1 and 2. The lots will be final platted one at a time
as they are sold, beginning with Lot 1, at the east end of
the property. The proposed lots range in size from .79
acre to 5.3 acres.
The applicant is also proposing to rezone Lot 1 from MF -
18/0 -2 to PD -C to allow for the development of an auto
dealership. The applicant proposes to construct two (2)
buildings on the site, within the southern one-half of the
property. The easternmost building is proposed to be
12,700 square feet in area, with the building to its west
FILE NO.: Z-6720 (Cbnt.
B.
being 6,600 square feet. The proposed height of the
buildings is 28 feet. The site plan shows a garden plaza
area between the two buildings, part of which will be used
for vehicle display.
The applicant is proposing a very limited amount of vehicle
display between the buildings and Chenal Parkway. The bulk
of the vehicular display will be to the north of and behind
the proposed buildings. The applicant has also noted
customer, employee and service parking on the site plan.
One access point from Chenal Parkway is proposed to serve
the auto dealership. The access consists of a private
shared drive along the lot line of Lots 1 and 2 as shown on
the attached site plan and plat. One (1) monument sign
location, dumpster location and landscape/buffer areas are
also noted on the attached site plan.
The following hours of operation are proposed:
7:30 a.m. - 6:00 p.m., Monday -Friday
8:30 a.m. - 6:00 p.m., Saturday
At the present time, the dealership has no plan to be open
on Sunday, however, the company would like to reserve the
right to adjust the hours of operation to meet future
customer needs.
EXISTING CONDITIONS:
The site contains several vacant buildings of various sizes
which will be removed with construction of the individual
lots. There are commercial uses to the south across Chenal
Parkway and west across Kirk Road. There is a church
immediately east of the site, with undeveloped multifamily
and office zoned property to the north. There is a mini -
warehouse complex and an office building currently under
construction to the northeast.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received no comment from the
neighborhood. The St. Charles and Parkway Place
Neighborhood Associations were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Existing median opening for Kroger Shopping Center is
scheduled to be closed per Master Street Plan with Phase
III of Shopping Center Development.
K
FILE NO.: Z-6720 (Cont.
2. Kirk Road is listed on the Master Street Plan as a
collector street. Dedicate right-of-way to 30 feet from
centerline.
3. A 20 feet radial dedication of right-of-way is required
at the corner of Kirk Road and Chenal Parkway.
4. Provide design of streets conforming to "MSP" (Master
Street Plan and Chenal plan). Construct one-half street
improvements to these streets including 5 -foot sidewalks
with planned development.
5. Plans of all work in right-of-way shall be submitted for
approval prior to start work.
6. Stormwater detention ordinance applies to this property.
7. Driveway spacing shall comply with Ordinance #18,031 and
Chenal Parkway Plan.
8. Existing topographic information at maximum five-foot
contour interval 10 feet base flood elevation.
9. A Sketch Grading and Drainage Plan per Sec. 29-186(e) is
required.
10. A Grading Permit per Secs. 29-186(c) and (d) is
required.
11. Contact the ADPC&E for approval prior to start of work.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements
to serve property.
AP&L: No Comment received.
Arkla: No Comment.
Southwestern Bell: No Comment received.
Water: There is a 50' wide right-of-way strip crossing
this property to which we have a deed. The Water Works
is in the process of working out the details of an
agreement regarding protection of the raw water main that
crosses this site.
Fire Department: Fire hydrant may be required. Contact
Dennis Free at 918-3752 for details.
County Planning: No Comment received.
CATA: Site is not currently served by CATA, approved.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is in the Chenal Planning District and is
shown as Commercial with a PZD required on the Land Use
Plan. Concerns include access easements to Kirk Road;
3
FILE NO.: Z-6720 (Cont.)
location of the sign(s); and the buffering to the less
intense uses to the north and east.
City Recognized Neighborhood Action Plan: This request is
located in the Rock Creek Neighborhood Area Plan. That
plan states to "Aggressively use Planned Zoning Districts
(PZD's) to influence more neighborhood friendly and better
quality developments."
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements.
The City Beautiful Commission recommends preserving as many
trees as feasible. Extra credit toward fulfilling
Landscape Ordinance requirements can be given when
preserving trees of six inch caliper or larger.
G. ANALYSIS:
The applicant submitted a revised preliminary plat and site
plan to staff on August 5, 1999. The revised plat
addresses most of the issues raised by the Subdivision
Committee. There are still several items which need to be
noted on a revised plat drawing and are as follows:
1. Address of landowner and source of title
2. Dimensions along all lot lines
3. All driveway locations
4. Platted building lines
5. Names of all abutting property owners
6. Location of PAGIS Monuments
7. Street widths
The revised site plan also addresses the issues raised by
staff and the Subdivision Committee. The revised plan
notes the area and height of each building, sign location,
dumpster location and designated vehicle display areas.
The revised plan also notes that several trees along the
east and south property lines will be saved.
The property is located within the Chenal/Financial Center
Design Overlay District. The following DOD ordinance
requirements will apply to this development:
1. Ground -mounted sign(s) must be monument type with a
maximum area of 100 square feet and a maximum height of S
feet.
4
FILE NO.: Z-6720 (Cant.)
2. All lighting must be directed to the parking areas and
not reflected onto adjacent parcels.
3. No overhead utilities within 100 feet of Chenal Parkway
right-of-way.
4. All lighting and utilities located in front of the rear
line of the building must be underground.
Otherwise, to staff's knowledge, there are no outstanding
issues associated with this application. Staff feels that
the proposed development of this property will have no
adverse effect on the general area.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat and PD -C
rezoning subject to the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2.A revised preliminary plat must be submitted with the
additional items noted as outlined in paragraph G.
3. The development must conform to the Chenal/Financial
Center Design Overlay District regulations, also noted in
paragraph G.
4. The existing trees along the east and south property
lines must be preserved as offered by the applicant.
5. No unloading of vehicles in the public right-of-way. If
the private access easement is ever continued through to
Kirk Road, vehicles must be unloaded on the dealership
property and not within the access easement area.
6. An overall final plat will be required when the last lot
within this proposed subdivision is final platted.
SUBDIVISION COMMITTEE COMMENT:
(JULY 29, 1999)
Frank Riggins was present, representing the application. Staff
gave a brief description of the preliminary plat and PD -C site
plan. Staff noted several items which needed to be shown on a
revised preliminary plat drawing. Staff also noted that
signage, site lighting and utilities must conform to the Chenal
Design Overlay District Ordinance.
There was a brief discussion relating to the number of parking
spaces/vehicular display area shown on the site plan. Mr.
Riggins noted that the amount of vehicular display area shown
was required by the specific auto dealers which would occupy the
property and was typical of their other dealerships. He also
noted that a portion of the "Garden Plaza" area would be used
for vehicular display.
�1
FILE NO.: Z-6720 (Cont.
In response to a question from staff, Mr. Riggins noted that
vehicles would be initially unloaded along the private drive
along the west property line. He stated that if the private
drive is connected to Kirk Road, the vehicles would be unloaded
within the site.
The Public Works requirements were briefly discussed. Mr.
Riggins noted that all the requirements would be complied with.
After the discussion, the Committee forwarded the preliminary
plat and PD -C to the full Commission for resolution.
PLANNING COMMISSION ACTION: (AUGUST 19, 1999)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
Bob Turner, of Public Works, addressed the Commission. He noted
for the record that if the joint access drive from Chenal
Parkway is ever extended to Kirk Road, the drive will need to
meet the Master Street Plan standards for a service drive.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 6 ayes, 0 nays and 5 absent.
6