HomeMy WebLinkAboutZ-6696-A Staff AnalysisSeptember 22, 2011
ITEM NO.: A FILE NO.. Z -5696-A
NAME: Macedonia Baptist Church — Revised Conditional
Use Permit
LOCATION: 1723 East 3rd Street
OWNER/APPLICANT: Macedonia Baptist Church/Ron Woods, Architect
PROPOSAL: A conditional use permit is requested to allow for
construction of a fellowship hall and classroom
building on this existing, R-4 zoned church site.
SITE LOCATION:
The existing church is located at the southwest corner of East 3rd and
Bender Streets. The new building is to be located south of the existing
church, at the northwest corner of East 4th and Bender Streets.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The church has been at this site for many years. The neighborhood
around the site has been losing population and there has been a reduction
in the number of homes. The area does contain a mixture of residential,
institutional and industrial uses. Allowing the addition of the proposed
fellowship hall and classroom building will not affect the church's
compatibility with the neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site, all residents within 300 feet who could be
identified and the East Little Rock Neighborhood Association.
3. ON SITE DRIVES AND PARKING:
For churches built prior to 1988, the parking requirement is one space for
every five (5) seats in the main worship area. This church seats 200
persons. There is no on-site parking. Parking occurs along Bender; East
3rd and East 4th Streets as well as on a small parking lot located across
Bender Street. No increase in parking is required since no change in the
sanctuary or its seating is proposed. A small, paved drop-off area is
located at the front of the church, bisecting the corner of the property from
East 3rd to Bender Streets.
September 22, 2011
ITEM NO.: A Cont. FILE NO.: Z -6696-A
4. SCREENING AND BUFFERS:
Site plan must comply with the City's landscape and buffer ordinance
requirements.
No new parking is being proposed with this addition; therefore, no
additional landscaping is required at this time.
Street trees are both highly encouraged and appreciated.
The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when properly preserving trees of six (6) inch
caliper or larger.
5. PUBLIC WORKS COMMENTS:
1. A twenty (20) foot radial dedication of right-of-way is required at the
intersection of E. 3`d Street and Bender Street.
2. A twenty (20) foot radial dedication of right-of-way is required at the
intersection of E. 4th Street and Bender Street.
3. Obtain a franchise agreement from Public Works (Bennie Nicolo,
371-4818) for the private improvements located in the right-of-way.
6. UTILITY. FIRE DEPT. AND CATA COMMENTS:
Wastewater: Sewer available to this project.
Entergy: Approved as submitted.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met.
The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
E
September 22, 2011
ITEM NO.: A (Cont._) FILE NO.: Z -5695-A
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by
the Arkansas Department of Health Engineering Division and Little Rock
Fire Department is required.
Contact Central Arkansas Water regarding the size and location of the
water meter.
Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW) requires that upon
installation of the PRZA, successful tests of the assembly must be
completed by a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW. The test results must be sent to CAW's
Cross Connection Section within ten (10) days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project.
Fire Department: Maintain at least twenty (20) foot wide access. Contact
Fire Marshall at 490-1594 with any questions.
County Planning: No Comments.
CATA: The site is not located on a CATA bus route.
SUBDIVISION COMMITTEE COMMENT: (JULY 21, 2011)
Ron Woods and Rev. Thornton were present, representing the application. Staff
briefly described the proposed church expansion project. Staff noted that some
additional information was needed on the project. The existing parking situation
was discussed. Rev. Thornton explained that the church owned other lots in the
area where church members parked. He also noted that on -street parking was
utilized. The applicant noted that all additional information would be submitted to
staff.
The Public Works requirements were discussed. It was noted that a 20 -foot
radial dedication of right-of-way was required at the northeast and southeast
corners of the property.
Staff noted that no additional landscaping was required with the proposed
project, but the planting of street trees was encouraged.
3
September 22, 2011
ITEM NO.: A Cont. FILE NO.. Z -6696-A
After the discussion, the Committee forwarded the application to the full
Commission for final action.
STAFF ANALYSIS:
Macedonia Baptist Church is located on the R-4 zoned property at 1723 East 3rd
Street. The church's property consists of six lots located west of Bender Street,
from East 3rd to East 4th Streets. The existing sanctuary is located at the
southwest corner of 3rd and Bender. The remainder of the property is vacant. In
1999, a C.U.P. was approved to allow for construction of a new sanctuary and a
parking lot. That development never occurred and the C.U.P. has expired. The
church is now requesting approval of a C.U.P. to allow for construction of a
fellowship hall and classroom building to be located south of the church building.
The new building will face onto East 4th Street. No change is proposed to the
existing sanctuary building.
The new, one-story, 5,705 square feet building will contain church offices,
classrooms, restrooms, a kitchen and a fellowship hall. An awning will cover the
ramp connecting the two buildings. The building will have an exterior of brick and
EIFS with a pitched, standing seam metal roof. Building height will be 14 feet to
the eave line; 28 feet to the ridge. Signage will consist of wall signage on the
front (south) facade of the new building. Lighting will be building -mounted
lighting only. No new fencing is proposed. The dumpster and screening have
been located adjacent to the existing church. A new, concrete driveway will
provide access to the dumpster. No other use such as day care or private school
is proposed.
To staff's knowledge, there are no outstanding issues. No bill of assurance for
Garland's Addition was found. It is likely that the bill of assurance does not
address use issues, based on the age of the subdivision. The new building is to
maintain the existing side yard setback of 5 feet along Bender Street. Due to the
width of the church property, the 5 -foot setback is a variance from the zoning
ordinance requirement of 8 feet. Staff supports the proposed variance. Since no
change is being made to the seating capacity of the sanctuary, no new parking is
required. Staff would encourage the church to pursue construction of on-site
parking at some point.
STAFF RECOMMENDATION:
Staff recommends approval of the requested C.U.P. subject to compliance with
the comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff
report.
.19
September 22, 2011
ITEM NO.: A Cont. FILE NO.: Z -6695-A
Staff recommends approval of a setback variance to allow a 5 -foot side yard
setback on the Bender Street side.
PLANNING COMMISSION ACTION: (AUGUST 11, 2011)
The applicant was present. There were no objectors present. Staff informed the
Commission that the applicant had not correctly followed the notification
procedure and the item needed to be deferred to the September 22, 2011
meeting. There was no further discussion. The item was placed on the consent
agenda and deferred to September 22, 2011 by a vote of 9 ayes, 0 noes and
2 absent.
PLANNING COMMISSION ACTION: (SEPTEMBER 22, 2011)
The applicant was present. There were no objectors present. Staff presented
the item and a recommendation of approval as outlined in the "staff
recommendation" above. There was no further discussion. The item was placed
on the consent agenda and approved as recommended by staff, including all
staff comments and conditions. The vote was 9 ayes, 0 noes and 2 absent.
5
SUBDIVISION COMNUTTEE COMMENTS
JULY 21, 2011
ITEM NO.: 4. MACEDONIA BAPTIST CHURCH REVISED CONDITIONAL USE PERMIT
1723 EAST 3"0 STREET 2-6696-A
Planning Staff Comments:
1. Provide copy of Bill of Assurance for Garland Addition.
2. Provide information on building; materials, roof, building height, etc...
3. Provide fencing plan.
4. Provide signage plan.
5. Is any other use proposed; such as day care or private school?
6. Is the walkway between structures covered?
7. Explain parking.
8. Provide lighting plan; should be low-level and directional, aimed downward and into the site.
9. Will there be any architectural element on the building, such as a steeple? If so, provide description and
height.
10. Locate dumpster/trash collection area and required screening.
Variance/Waivers:
• Setback Variance
• Parking
Public Works:
1. A twenty (20) foot radial dedication of right-of-way is required at the intersection of E. 3`d Street and
Bender Street.
2. A twenty (20) foot radial dedication of right-of-way is required at the intersection of E. 4`'' Street and
Bender Street.
3. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the private improvements
located in the right-of-way.
Utilities and Fire D artment/County Planning:
Wastewater: Sewer available to this project.
Entergy: No comments received.
Centerpoint Energy: No comments received.
AT&T (SBC): No comments received.
Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met.
The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or
private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at
the Developer's expense.
Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review.
Plan revisions may be required after additional review. Contact Central Arkansas Water regarding
procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and Little Rock Fire Department is required.
Contact Central Arkansas Water regarding the size and location of the water meter.
ITEM NO.: 4. CON'T - Z -6696-A
Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer
assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW) requires that upon installation of the PRZA, successful tests
of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and
approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten (10) days
of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like
to discuss backflow prevention requirements for this project.
Fire Department: Maintain at least twenty (20) foot wide access. Contact Fire Marshall at 490-1594 with any
questions.
County Planning: No Comments.
LATA: The site is not located on a CATA bus route.
Planning Division: No Comments.
Landscape' Site plan must comply with the City's landscape and buffer ordinance requirements.
No new parking is being proposed with this addition; therefore, no additional landscaping is required at this time.
Street trees are both highly encouraged and appreciated
The City Beautiful Commission recommends preserving as many existing trees as feasible on this site. Credit
toward fulfilling Landscape Ordinance requirements can be given when properly preserving trees of six (6) inch
caliper or larger.
Other: Submit responses to staff comments and four (4) copies of revised site plan, (if required), no later than
Wednesday July 27, 2011. Required notices are to be sena via certified mail no later than Wednesday July 27, 2011
and proof of notice returned to staff by Friday August 5, 2011.