HomeMy WebLinkAboutZ-6596-A Staff AnalysisDECEMBER 19, 2005
ITEM NO
File No.: Z -6596-A
Owner: Dixie Development, LLC
Applicant: Scott Richburg
Address: 1509 Green Mountain Drive
Description: Tract C-1, Rainwood Forest Addition
Zoned: O-3
Variance Requested: Variances are requested from the area provisions of Section
36-281 and the easement provisions of Section 36-11 to allow a building addition with a
reduced rear setback and which encroaches into a utility easement.
Justification: The applicant's justification is presented in an attached letter.
Present Use of Property: Office
Proposed Use of Property: Office
STAFF REPORT
A. Public Works Issues:
Driveway locations do not meet the traffic access and circulation
requirements of Section 30-43 and 31-210. The property must have a
single driveway access. Since the circle driveway exists, it can remain as
is or be removed if new driveway location is desired. The width of
driveway must not exceed 36 feet and be constructed of concrete. The
existing south access location on the circle drive extends beyond the
property line in the right-of-way.
2. Site grading and drainage plan should provide sufficient drainage for
stormwater from the adjacent property to the north.
DECEMBER 19, 2005
ITEM NO.: 1 CON'T.
B. LANDSCAPE AND BUFFER ISSUES:
The proposal does not allow for the minimal 9 foot wide landscape buffer distance
along the northern perimeter of the site. This is a requirement of both the
landscape ordinance and the buffer ordinance; therefore, Board of Adjustment
approval and the City Beautiful Commission approval are required. This approval
must be obtained prior to the issuance of a building permit. Easement cannot count
toward this requirement.
The proposal does not allow for the minimal landscape strip along the eastern
perimeter of the site. The proposed parking backout area is too large. This area
can be reduced to 5 foot allowing for the minimum 9 foot wide strip to be
installed. A variance from this minimum requirement would require the approval
from the City Beautiful Commission prior to the issuance of a building permit.
C_ UTILITY ISSUES:
All of the public utility companies consent to the proposed easement
encroachment.
D. STAFF ANALYSIS:
The 0-3 zoned property at 1509 Green Mountain Drive is occupied by a one-
story frame office building. The property is located on the east side of Green
Mountain Drive, just north of Huron Drive. There is a circular concrete
driveway from Green Mountain Drive which serves as access. The north
portion of the property is being used as a gravel parking area.
The applicant proposes to construct a 42 foot by 43 foot two-story building
addition on the rear of the existing office building, at its northeast corner, as
noted on the attached site plan. The proposed addition will be located 10 feet
from the rear (east) property line. A metal frame stair structure, which will be
removable, will be located on the rear of the proposed addition. The stair
structure will be located five (5) feet back from the rear property line, extending
five (5) feet into a utility easement which runs along the rear property line.
As part of the property's redevelopment plan, the applicant proposes to
remove the existing circular driveway from Green Mountain Drive and
construct a new 24 foot wide driveway near the northwest corner of the
property. The drive will serve a proposed new paved parking area on the north
side of the office building.
Section 36-281(d)(3) of the City's Zoning Ordinance requires a minimum rear
setback of 15 feet for 0-3 zoned property. Section 36-11(f) requires that
encroachments into utility or drainage easements be reviewed and approved
DECEMBER 19, 2005
ITEM NO.: 1 (CON'T.
by the Board of Adjustment. Therefore, the applicant is requesting variances
to allow the building addition, including steps, with a reduced rear setback and
the steps to encroach into a utility easement. All other setbacks associated
with the proposed addition conform to ordinance standards.
Staff is supportive of the requested variances. Staff views the request as
reasonable. This office zoned property backs up to C-3 zoned properties
which contain a mini warehouse development and a commercial retail
development. Staff believes the reduced rear setback will have no negative
impact on these commercial properties. Additionally, the addition will be on
the rear corner of the existing office building, away from the nearest residential
properties to the south and southwest. As noted earlier, none of the public
utility companies have a problem with the step structure encroaching into the
utility easement along the rear property line. The applicant has submitted a
revised plan conforming with the Landscape/Buffer and Public Works
requirements as noted in paragraphs A and B of this report. Staff believes the
applicant is proposing a quality redevelopment plan for the property which will
have no adverse impact on the adjacent properties or the general area.
E. STAFF RECOMMENDATION:
Staff recommends approval of the requested variances, subject to the
following conditions:
1. Compliance with Public Works and Landscape/Buffer requirements as
noted in paragraphs A and B of the staff report.
2. The metal step structure on the rear of the proposed building addition must
be maintained as a removable structure.
BOARD OF ADJUSTMENT: (DECEMBER 19, 2005)
The applicant was present. There were no objectors present. Staff presented the item
and a recommendation of approval.
The applicant offered no additional comments.
The item was placed on the Consent Agenda and approved as recommended by staff
by a vote of 5 ayes and 0 nays.