Loading...
HomeMy WebLinkAboutZ-6596-A Map 920 10 0 20 40 SCALE STORM WATER DETENTION CALCULATIONS 1. Area of improvment: 0.46 acres 2. Assume minimum time of concentration of 5.0 minutes due to size size and length of improvement. 3. Intensity: 8.5 in./hr. (25 year event) 4. Pre -developed run-off coefficient (C value): 0.53 Post -developed run-off coeffiecient (C value): 0.72 5 I* 7. 8. 9. 10. Pre -developed flows (Q): Q(25): (0.53)(8.5)(0.46) = 2.1 c.f.s. Post -developed flows (Q): Q(25): (0.72)(8.5)(0.46) = 2.8 c.f.s. Total allowable flow (pre -developed, Q25) Undetained Discharge = 0.83 CFS 2.1 c.f.s. Allowable discharge from pond = 2.1 - 0.83 Actual volume of discharge from detention = = 1.27 cfs. 1.25 cfs MAXIMUM CROSS -SLOPE ALONG APRON BETWEEN RAMPS IS 2% 11. A 13" wide opening in the curb will restrict the post developed flow for the 25 year design storm as required to pre -developed flow conditions. The 50 and 100 year events will overtop the curb and flow behind the building into the existing stream channel. LOT 1 REPLAT SOUTHALL SUBDIVISION FIRE HYDRANT HEADWALL LOT 476 PLEASANTREE FIRST ADDITION T 1 RE_PLAT ALL SUBDIVISION CRETE WALL !K FENCE 1.91 5. 423.61 WATER METER GENERAL NOTES 1. THE LOCATION OF THE EXISTING WATER AND GAS UTILITIES ARE BASED ON RECORDS FROM SAID UTILITY COMPANIES AND ARE HORIZONTALLY FIELD LOCATED ONLY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ACTUAL LOCATION. 2. CONTRACTOR TO UNCOVER AND MARK UTILITY LINES BEFORE CONSTRUCTION. 3. CONTRACTOR SHALL BEAR ALL RESPONSIBILITY AND COST OF REPAIR OR REPLACEMENT OF EXISTING UTILITIES, DAMAGED OR INTERRUPTED AS A RESULT OF THIS CONSTRUCTION PROJECT. 4. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE OWNER OF ANY DAMAGED OR INTERRUPTED UTILITIES IMMEDIATELY. 5. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER PRIOR TO BEGINNING WORK. 6. ALL AREAS WITHIN THE PARKING LOT ARE TO RECEIVE A GRAVEL BASE TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 135 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING. 7. ALL AREAS NOT WITHIN THE PARKING LOT ARE TO RECEIVE LOOSE STRAW TO PROVIDE EROSION CONTROL IF WORK IS NOT PROGRESSING IN AN ORDERLY MANNER. A RATE OF 1.5 TONS/ACRE IS TO BE APPLIED WITHIN TWO WEEKS OF FINAL GRADING, 8. CONTRACTOR WILL CONTROL AND PREVENT OFF-SITE TRACKING 0 WATER VALVE OF CONSTRUCTION RUNOFF AND SEDIMENT TO ADJACENT PROPERTY AND PUBLIC ROADS. v MANHOLE 9. CONTRACTOR IS TO PROTECT EXISTING STORM DRAINAGE SYSTEM �Y UTILITY POLE I ACCORDING TO PROTECTION ILLUSTRATIONS PROVIDED. 0 LIGHT POLE ~C GAS METER �- WOOD FENCE ---X-- CHAIN LINK FENCE --3'=--w- EXISTING UTILITY LINE OHE = OVERHEAD ELECTRIC SS = SANT. SEWER PROPERTY DESCRIPTION TRACT C-1, RAINWOOD FOREST, LITTLE ROCK, ARKANSAS AS RECORDED IN PLAT BOOK 36, PAGE 92, IN THE OFFICE OF THE CIRCUIT CLERK OF PULASKI COUNTY, ARKANSAS.