HomeMy WebLinkAboutZ-6594-A Staff AnalysisFebruary 22, 1999
Item No.: 1
File No.:
Owner:
Address:
Description:
Zoned:
Variance Requested:
Justification:
Present Use of Propert :
Proposed Use of Property:
Staff Report:
A. Public Works Issues:
Z -6594-A
Kaufman Lumber Company
2601 West 7th Street
Kaufman Addition, Lot 2
I-2
Variances are requested from the
area regulations of Section 36-320,
the building line provisions of
Section 31-12 and the parking
requirements of Section 36-502.
The new building is to replace an
older building which stood in the
same location. There is adequate
space to accommodate the site's
parking needs.
Lumber storage and warehouse
Office/showroom/assembly/
warehouse/lumber storage
Public Works comments on preliminary plat for this property.
Kaufman Addition (File No. 5-1081-A)
Seventh Street is a collector street on the Master Street
Plan, dedication of an additional five foot sidewalk and
utility easement beyond the present right-of-way is
acceptable with staff. A 42 foot asphalt curb and gutter
street exists which exceeds current standards for this
collector street and there does exist a five foot sidewalk
on Seventh Street. Jones Street is a 27 foot chipseal
February 22, 1999
Item No.: 1 (Cont.
street with an open ditch, on the east side. It has a ten
foot turn out radius at Seventh Street. Staff is
recommending improvements to Jones Street, and would
recommend that commercial street improvements to 18 feet for
centerline with the sidewalk as a part of this two lot
commercial subdivision. Any construction due to the nature
of the regulatory floodway and flood plain on these lots
will need to have development permits, minimum floor
elevations, etc. any substantial reconstruction of any these
building would also require development permits. 1992 ADT
for 7th Street was 3,180 been moved back from the street to
provide a front yard setback of 22 feet.
B. Staff Analvsis:
The I-2 zoned property located at 2601 West 7th Street was
previously occupied by Monarch Mills and Lumber. For
several years, the property was vacant except for lumber
storage. Several dilapidated buildings and a portion of the
main building have been razed and removed. The property was
recently divided into two lots; Lots 1 and 2, Kaufman
Addition. Lot 1 has been sold and is proposed for
development as an office showroom/warehouse. On November
30, 1998, the Board approved variances to allow Kaufman
Lumber Company to redevelop Lot 2 with the addition of 4 new
lumber storage buildings. One of the proposed new buildings
was approved to be built across a platted 40 foot building
line adjacent to West 7th Street and was to have a front
yard setback of 8 feet.
The applicant has submitted a revised application with the
following changes:
1. The number of lumber storage buildings has been reduced
from 4 to 3.
2. The northern lumber storage building has been moved back
from the street to provide a front yard setback of 22
feet.
3. An existing storage building has been expanded by the
addition of 17,100 square feet of warehouse space.
The issues before the Board are similar to those from
November, 1998. The lumber storage building nearest 7th
2
February 22, 1999
Item No.: 1 (Cont.
Street is proposed to have a front yard setback of 22 feet
and is built across a platted 40 foot building line. The
code requires a front yard setback of 50 feet in the I-2
district. The addition of 17,100 square feet of warehouse
space creates the second variance. The total development;
including 1,764 square feet of office, 6,886 square feet of
assembly and 17,100 square feet of warehouse requires 23 on-
site parking spaces. There are 9 marked parking spaces on
the plan. The new warehouse addition is being constructed
in an area previously indicated as employee parking. There
is additional room on the property to accommodate 10-12 more
parking spaces, potentially leaving the development 2-3
spaces short.
Staff is supportive of both the requested setback and
parking variances. The proposed lumber storage building is
being located in the same area occupied by buildings during
the many years Monarch occupied the property. The property
itself is elevated several feet above West 7th Street which
is lowered to pass under the adjacent Union Pacific Railroad
line. Concrete walls are located on both sides of West 7th
Street which almost give it a " tunnel" appearance as it
passes by this site. The lumber storage building is closed
in on the side visible from West 7th Street which will help
to screen the activities on the site. The parking variance
is minor and should have no effect on adjacent properties.
The new 17,100 square foot warehouse is for lumber storage
and the applicant states that the 8 required parking spaces
for this area exceed the real need.
Should the Board approve the building line variance, the
applicant will have to do a one lot replat reflecting the
change in the building line. The applicant should review
the filing procedure with the Circuit Clerk's office to
determine if the replat requires a revised Bill of
Assurance.
C. Staff Recommendation:
Staff recommends approval of the requested setback, building
and parking variances subject to compliance with the
following conditions:
3
February 22, 1999
Item No.: 1 (Cont.)
1. Compliance with the City's Landscape and Buffer
Ordinances
2. The sides and rear of the northern lumber storage
building are to be enclosed so as to provide screening
for activities on the site.
3. Compliance with Public Works Comments
BOARD OF ADJUSTMENT:
(FEBRUARY 22, 1999)
The applicant was present. There were no objectors present.
Staff presented the item and a recommendation of approval subject
to compliance with the following conditions:
1. Compliance with the City's Landscape and Buffer Ordinances
2. The sides and rear of the northern lumber storage building are
to be enclosed so as to provide screening for activities on
the site.
3. Compliance with Public Works Comments
4. A one -lot replat reflecting the change in the building line as
approved by the Board.
Staff informed the Board that the applicant had submitted a
revised site plan providing 23 on-site parking spaces and,
consequently, no parking variance was needed.
The applicant offered no additional comments.
The item was placed on the Consent Agenda and approved as
recommended by staff. The vote was 3 ayes, 0 noes, 1 absent and
1 open position.
4