HomeMy WebLinkAboutZ-6530-B Map 4ANALYSIS AND DESIGN OF TOWER ANTENNA MOUNTING
AND FOUNDATION BY OTHERS. REFER
TO APPROPRIATE SHEETS FOR MORE INFORMATION.
NO ERECTION OR MODIFICATION OF TOWER
AND FOUNDATION SHALL BE MADE WITHOUT
APPROVAL OF STRUCTURAL ENGINEER
rag
(N) 2 EMU ANTENNA W/1
1/2" FOAM CABLE,
15' BELOW T -MOBILE
ANTENNAS
(N) TRANSMISSION LINE
BRACKET MICROFLECT B2336
WITH SNAP -IN HANGER B1562
OR EQUAL, 6'± APPART (TYP.),
SEE DETAIL 6/C-4.
(N) T -MOBILE COAX RUN—.
Ln
OUTSIDE OF POLE BY
TRANSMISSION LINE BRACKET
1 (N) T -MOBILE NOKIA
C-6 CITYTALK EQUIPMENT
(N) GPS 10' ABOVE
PLATFORM (N) CABLE
BRIDGE
(N) PPC AND 1
TELCO RACK S-1
6
E-4
5 3 (N) PLATFORM LEGS -�
C-5 C-5 AND CONCRETE BLOCKS
EQUIPMENT PLATFORM AND ANTENNA ARE
DESIGNED TO MEET LOCAL BUILDING
CODES AND ANSI/TIA/EIA-222-F
STRUCTURAL STANDARDS FOR STEEL
ANTENNA SUPPORTING STRUCTURES.
THE DESIGN WIND SPEED IS
90 MPH (3 SECOND GUST SPEED)
(E) ANTENNAS 4 150'-0"
(E) ANTENNAS CL @ 134'-0"
PROPOSED T -MOBILE
ANTENNAS � @ 115'-0' 2,3
PANEL ANTENNA MOUNTING c-3
(2+1 FUTURE ANTENNAS PER SECTOR)
AZIMUTH 0' @ 115' RAD CENTER
AZIMUTH 120' @ 115' RAD CENTER
AZIMUTH 2400 @ 115' RAD CENTER
(E) 150'-0" MONOPOLE
ANTENNA PIPE
TNA/LNA COMBINER
(OUTLETS TO FACE
DOWN -VERTICAL)
#6 SHIELD
(MECHANICAL
GROUND VIA ROUND
MEMBER ADAPTER) -
No. 6 STANDARD
GREEN INSULATED
GROUND WIRE TO
UPPER ANTENNA
GROUND BAR (2
HOLE LUGS EA. END)
JUMPERS
I
TO BE
SECURED
WITH 1/2"
I
ANDREWS
BUTTERFLY
HANGERS
W/ 1" STANDOFFSi
1/2" FOAM COAX
JUMPER
(MAX LENGTH 4')
TRANSMISSION
LINES TO BTS
6"
MIN.
DOWNTILT ASSEMBLY
REQUIRED FOR ALL
PANEL TYPE
ANTENNAS
I
RR65-19-OODP
ANTENNA
NOTE: ALL DOWN TILT,
AZIMUTHS AND LNA'S
TO BE VERIFIED BY RF
SITE DATA SHEET. SEE
PROJECT MANAGER
FOR INFORMATION.
BIPOLAR PANEL ANTENNA
AND LNA MOUNTING DETAIL
SCALE: N.T.S.
COAX CABLE IDENTIFICATION
CONTRACTOR MUST PROVIDE EASY IDENTIFICATION
AND UNIFORM MARKING OF ANTENNA CABLING,
PER THE FOLLOWING INSTRUCTION:
1. LOCATION: MARKINGS SHALL BE MADE USING
COLOR TAPE W/3" OF COVERAGE AFFIXED AT
THREE PLACES ON THE COAX CABLE RUN AS
FOLLOWS:
FIRST- ON THE COAX AT THE CONNECTOR
NEAREST THE ANTENNA (WHERE THE COAX AND
JUMPER ARE CONNECTED).
SECOND- AT THE BASE OF THE TOWER
STRUCTURE (FOR TOWERS ONLY).
THIRD- AT A POINT OUTSIDE THE BTS (JUST
PRIOR TO MGB)
(E) FENCE 2. SECTOR IDENTIFICATION: NORMALLY A SITE
WILL HAVE UP TO THREE SECTORS. SECTORS
SHALL BE DESIGNATED IN A CLOCKWISE
GRADE MANNER; THE ALPHA SECTOR IS CLOSEST
TO ZERO DEGREES (NORTH)THE BETA
(E) MONOPOLE AND GAMMA FOLLOW CLOCKWISE IN
FOUNDATION SEQUENCE.
(N) STEEL FRAME 1 2
W/HANDRAIL AND STAIRS C-4 C-4
1 ) TOWER ELEVATION
C-3 N.T.S.
ALPHA SECTOR - RED
BETA SECTOR - BLUE
GAMMA SECTOR - WHITE
(ONE RED) (FIVE RED) (SEVEN RED) (FOUR RED)
(TWO RED) (SIX RED) (EIGHT RIED)(THREE RED)
- DIVERSITY - FUTURE FUTURE) MAIN
A-1 * A-3 * A-4 A-2
(FOUR WHITE)
C-2
(THREE WHITE)
MAIN
(EIGHT WHITE)(SEVEN WHITE)
FUTURE C-4*
(SIX WHITE) (FIVE WHITE)
FUTURE] C3'*<
SECTOR 1
1 ALPHA
0' (TYPICAL)
(ONE BLUE)
B-1
(TWO BLUE)
-DIVERSITY
240° 120° (FIVE BLUE) (SIX BLUE)
1kB-3 -FUTURE
GAMMA BETA
C-1 1&\ B-2
(SEVEN BLUE) (EIGHT BLUE)
*B4 �FUTURE-
(TWO WHITE) (ONE WHITE) (FOUR BLUE) (THREE BLUE)
LDIVERSITY-1 E MAIN -j
18 -LINE (DUAL -POLARITY) COLOR CODING
NOTE:
AZIMUTHS SHOWN ARE TYPICAL.
SEE REDS FOR ACTUAL AZIMUTHS.
TYPICAL ANTENNA PLAN
ANTENNA SCHEDULE
REVISIONS
BY
ANTENNA AND COAXIAL
CABLE
SCHEDULE
'4o
-
ANTENNA
MARK
ANTENNA
AZIMUTH
RAD
CENTER
COAXIAL
LENGTH
CABLE
**
COAXIAL
CABLE
A-1
RR65-19-OODP
CN
0'
115'
160'
co
o
(2) - 1-5/8"
W
0
A-2
r
^
RR65-19-DODP
W
Q
0'
115'
160'
3C
(2) - 1-5/8"
=a""
0
A-3
RR65-19-OODP
O
0°
115'
160'
(2) - 1-5/8"
Y
0
A-4
O
RR65-19-OODP
U
Zrv*
0'
115'
160'
(2) - 1-5/8"
0
B-1
J
RR65-19-OODP
120'
115'
160'
Q
(2) - 1-5/8"
0
B-2
RR65-19-OODP
t20'
115'
160'
(2) - 1-5/8"
0
D-3
RR65-19-OODP
120•
115'
160'
(2) - 1-5/8"
0
3-4
RR65-19-OODP
120'
115'
160'
(2) - 1-5/8"
0
C-1
RR65-19-OODP
240'
115'
160'
(2) - 1-5/8"
0
C-2
RR65-19-OODP
240'
115'
160'
(2) - 1-5/8"
0
C-3
RR65-19-OODP
240'
115'
160'
(2) - 1-5/8"
0
C-4
RR65-19-OODP
240'
115'
160'
(2) - 1-5/8"
0
TOTAL LENGTH: 3840' **
*
ESTIMATED LENGTH -
CONTRACTOR TO FIELD VERIFY
FUTURE ANTENNAS
ANTENNA SCHEDULE
REVISIONS
BY
a-_
0
'4o
-
rn
.-a
0 CONST.
HD
A REVIEW
AD
1
'4o
r
rn
.-a
M
o
CN
W
mpcmm
}•
co
Oco
n
co
o
6J
rn
W
¢
w
c
COrp
a>
C
o
r
^
C,6
r�
h
W
Q
O
ox
L
cc
3C
o
=a""
to
Q
O
1
W
r
rn
J
M
o
CN
W
d'
Q
CV
O
°)
Q
p
o
N
to
Q
O
Q
m
3
Y
Z
(/)
O
u->
0
U
Zrv*
O
J
Z
Q
F -
Q
J
0
�os�oms�
k6ez rw
L'
9971
DRAWN BY:
TT
CHECKED BY:
VD/HM
DATE
09/30/02
PLOT SCALE
1•t
0-C3.dwg
SHEET No.
e