Loading...
HomeMy WebLinkAboutZ-6520-A Map 1MASTER PLAN 1" = 100'—O" 1. EARLY CHILDHOOD CENTER 2. LOWER SCHOOL 3. MIDDLE SCHOOL 4. UPPER SCHOOL 5. COMMONS 6. GYMNASIUM 7. OUTDOOR LAB 8. MAINTAINANCE 9. GROUNDSKEEPER 10. CONCESSION/ RESTROOMS 11. FIELDHOUSE 12. TRACK AND PRACTICE FIELD 588 PARKING SPACES 718 SPACES WITH PARALLEL PARKING ON ONE SIDE OF LOOP DRIVE WHEN DROP—OFF LANES ARE NOT IN USE 100' POWER LINE EASEMENT PUBLIC WORKS NOTES: / 3❑ 1. DRIVEWAYS SHALL CONFORM TO SEC. 31-210 OR ORDINANCE 18,031. GROUND MOUNTED SIGN W/ LIGHTED MESSAGE BOARD S /i MAXIMUM SIZE 8 X4 ❑4 2. STORMWATER DETENTION ORDINANCE APPLIES TO THIS PROPERTY. / S Qo�Qo�e / 3. EASEMENTS WILL BE PROVIDED FOR STORMWATER DETENTION FACILITIES. * 6❑ 4. THE WEST DRIVE HAS BEEN CHANGED TO THE LOOP ROAD ENTRANCE/EXIT DRIVE I // WITH THE SEMI -CIRCULAR DRIVE INTERSECTING THE LOOP ROAD. THE LOOP ROAD * El &H] / HAS BEEN CHANGED TO 36' IN WIDTH TO ACCOMODATE TWO-WAY TRAFFIC WITH PARALLEL PARKING ON ONE SIDE AS PER DISCUSSION WITH TRAFFIC ENGINEER 7-12-01 / I F& 8 5. TAPER AND MERGE LANES ON DENNY ROAD AT EAST AND WEST LOOP ROAD ENTRANCE DRIVES: X s TO NORTHEAST = 150' OF 3 LANES PLUS 480' OF TAPER BACK TO TWO LANES. I TO SOUTHWEST = 150' OF 4 LANES [2 LANES TO ACCOMODATE SHIFT LANE AND RIGHT TURN LANE] PLUS 125' OF TAPER BACK TO 2 LANES. THESE STANDARDS TO APPLY WHEN TRAFFIC AT EITHER ENTRANCE DRIVE REACHES x 800 VEHICLES PER DAY AT POINT INDICATED ON PLAN AS PER DISCUSSION WITH TRAFFIC / *TRA _IC VO UMN ENGINEER 7-12-01. DESIGN CONFIGURATION OF EAST AND WEST LOOP ROAD ENTRANCES OUNT�LINE JJJJJJ WILL BE CONSTRUCTED AS PER TRAFFIC ENGINEER REQUIREMENTS. INTERSECTION OT THE WEST / I 0 ,9 LOOP ROAD ENTRANCE DRIVE TO BE COORIDNATED WITH THE FUTURE RELOCATION OF GORDON ROAD. / / I 1 X O PHASING PLAN (10 TO 20 YEAR DEVELOPMENT PLAN) PHASE 1A ATHLETIC FIELD DEVELOPMENT (NO SPECTATORS) - EAST END OF SITE / I I 12 PHASE 1B TRACK AND PRACTICE FIELD - WEST END OF SITE / `6 PHASE 2 PARKING DEVELOPMENT FOR SPECTATOR USE OF FIELDS AND ATHLETIC FIELD FACILITIES DEVELOPMENT / I I 9 O PHASE 3 EARLY CHILDHOOD CENTER (3 TO 5 YEARS W FUTURE) &LOOP ROAD CONNECTION TO DENNY PHASE 4 LOWER SCHOOL FACILITY / I X dl - PHASE 5 MAINTENANCE FACILITYLo PHASE 6 COMMONS�� SOFTBALL PHASE 7 MIDDLE SCHOOL FACILITY � PHASE 8 UPPER SCHOOL FACILITY PHASE 9 GYMNASIUM / 9 1. OTHER IDENTIFIED FACILITIES MAY BE DEVELOPED ALONG W/ PHASES 3 THRU 9 / /� 250'-0" 12� 2. SOME PHASES (3 THRU 9) MAY BE COMBINED i I 3. REQUIRED PARKING WILL BE CONSTRUCTED WITH EACH FACILITY OR DEVELOPMENT APPROX LINE OF CUT OR FILL / I I n REQUIRED FOR DENNY ROAD IMPROVEMENTS 200 LINE OF FENCING FOR ATHLETIC FACILITIES- // - I z HEIGHT VARIES FOR EACH FIELD I I 3 DEVELOPER SHALL DEDICATE / / I ° I QI IER.O.W. FOR 1/2 OF A MINOR / - - - - I I U I 14 118 8 8 I ARTERIAL / - - - - I � II � 310'-0" —TE NIS IS / I BASEBALL I // �----� ® I II � I PHASE 1A DEVELOPER SHALL IMPROVE / I PA ION L- ` ElDENNY ROAD TO 1/2 OFA MINOR ARTERIAL INCLUDING 10 ROWS 100ROW 1,000 SEATS 5' SIDEWALK s I ® 6 GROUND MOUNTED SIGN / 3 MAXIMUM SIZE 8'X4' / MI IDLE.. TEMPO MIDDLE SCHOOL < 17,87S.F.% I 4 LANE i I 400 M 273 STUDENTS - EARLY CHILDHOOD CENTER [3,4 YR, K, 1] 380 STUDENTS - LOWER SCHOOL [2,3,4,5 GRADES] 330 STUDENTS - MIDDLE SCHOOL [6,7,8 GRADES] / ''"' [3a,so0. �i"CEv�`is I ' 50' W/ TOWER — l I � / I 8 8 12 I J� I 51 I I o I i I / 18 0) u u Rows O SEATS o / / 22 i o 360 STUDENTS - UPPER SCHOOL [9,10,11,12 GRADES] / 1 1,343 TOTAL STUDENTS J� I XI 7 o 12 ]l LEGEND (SUBDIVISION COMMENTS JULY 5, 2001 O1 7 PLANNING STAFF COMMENTS / �p 14 / p I 15 7 PUBLIC WORKS COMMENTS 00 UL LANDSCAPE COMMENTS / 14 15 l / R> \\ ` 0, I / o GORDON ROAD ♦ / DELETE FROM C.U.P. 6 0 a 5 GROUND MOUNTED SIGN / 3 , , 0 - 0 ,COMMoi MAXIMUM SIZE 8'X4' 1 s S [75,353 440.04' - - �\ ��, 21 aiiaoi, 4- LINE OF EXIST. DRAINAGE s= 65' /� W/ TOWER's * 7 & F8_1RELOCATE EPORT / - T -------- SOF z, EXISTING DRAI AGE PLAY ^ 00 ��1 / / / r �/ ' 2 j`/G o LOWER SCHOOL LOWER LEVEL DROP—OF i PLAY 22,400 s.F. / LOWER LEVEL EXIT i � 2 LEVEL / * TRAFIC VOLUM LOWER EL IT %