HomeMy WebLinkAboutZ-6520-A Map 1MASTER PLAN
1" = 100'—O"
1. EARLY CHILDHOOD CENTER
2. LOWER SCHOOL
3. MIDDLE SCHOOL
4. UPPER SCHOOL
5. COMMONS
6. GYMNASIUM
7. OUTDOOR LAB
8. MAINTAINANCE
9. GROUNDSKEEPER
10. CONCESSION/ RESTROOMS
11. FIELDHOUSE
12. TRACK AND PRACTICE FIELD
588 PARKING SPACES
718 SPACES WITH PARALLEL PARKING
ON ONE SIDE OF LOOP DRIVE WHEN
DROP—OFF LANES ARE NOT IN USE
100' POWER LINE
EASEMENT
PUBLIC WORKS NOTES: /
3❑ 1. DRIVEWAYS SHALL CONFORM TO SEC. 31-210 OR ORDINANCE 18,031. GROUND MOUNTED SIGN W/
LIGHTED MESSAGE BOARD S /i
MAXIMUM SIZE 8 X4
❑4 2. STORMWATER DETENTION ORDINANCE APPLIES TO THIS PROPERTY. /
S Qo�Qo�e /
3. EASEMENTS WILL BE PROVIDED FOR STORMWATER DETENTION FACILITIES.
* 6❑ 4. THE WEST DRIVE HAS BEEN CHANGED TO THE LOOP ROAD ENTRANCE/EXIT DRIVE I //
WITH THE SEMI -CIRCULAR DRIVE INTERSECTING THE LOOP ROAD. THE LOOP ROAD * El &H] /
HAS BEEN CHANGED TO 36' IN WIDTH TO ACCOMODATE TWO-WAY TRAFFIC WITH
PARALLEL PARKING ON ONE SIDE AS PER DISCUSSION WITH TRAFFIC ENGINEER 7-12-01 / I
F& 8 5. TAPER AND MERGE LANES ON DENNY ROAD AT EAST AND WEST LOOP ROAD ENTRANCE DRIVES: X s
TO NORTHEAST = 150' OF 3 LANES PLUS 480' OF TAPER BACK TO TWO LANES. I
TO SOUTHWEST = 150' OF 4 LANES [2 LANES TO ACCOMODATE SHIFT LANE AND RIGHT
TURN LANE] PLUS 125' OF TAPER BACK TO 2 LANES.
THESE STANDARDS TO APPLY WHEN TRAFFIC AT EITHER ENTRANCE DRIVE REACHES x
800 VEHICLES PER DAY AT POINT INDICATED ON PLAN AS PER DISCUSSION WITH TRAFFIC / *TRA _IC VO UMN
ENGINEER 7-12-01. DESIGN CONFIGURATION OF EAST AND WEST LOOP ROAD ENTRANCES OUNT�LINE JJJJJJ
WILL BE CONSTRUCTED AS PER TRAFFIC ENGINEER REQUIREMENTS. INTERSECTION OT THE WEST / I 0 ,9
LOOP ROAD ENTRANCE DRIVE TO BE COORIDNATED WITH THE FUTURE RELOCATION OF GORDON ROAD. / / I 1 X
O PHASING PLAN (10 TO 20 YEAR DEVELOPMENT PLAN)
PHASE 1A ATHLETIC FIELD DEVELOPMENT (NO SPECTATORS) - EAST END OF SITE / I I 12
PHASE 1B TRACK AND PRACTICE FIELD - WEST END OF SITE / `6
PHASE 2 PARKING DEVELOPMENT FOR SPECTATOR USE OF FIELDS AND ATHLETIC
FIELD FACILITIES DEVELOPMENT / I I 9 O
PHASE 3 EARLY CHILDHOOD CENTER (3 TO 5 YEARS W FUTURE) &LOOP ROAD CONNECTION TO DENNY
PHASE 4 LOWER SCHOOL FACILITY / I X dl -
PHASE 5 MAINTENANCE FACILITYLo
PHASE 6 COMMONS�� SOFTBALL
PHASE 7 MIDDLE SCHOOL FACILITY �
PHASE 8 UPPER SCHOOL FACILITY
PHASE 9 GYMNASIUM / 9
1. OTHER IDENTIFIED FACILITIES MAY BE DEVELOPED ALONG W/ PHASES 3 THRU 9 / /� 250'-0" 12�
2. SOME PHASES (3 THRU 9) MAY BE COMBINED
i I
3. REQUIRED PARKING WILL BE CONSTRUCTED WITH EACH FACILITY
OR DEVELOPMENT
APPROX LINE OF CUT OR FILL / I I n
REQUIRED FOR DENNY ROAD IMPROVEMENTS
200
LINE OF FENCING FOR ATHLETIC FACILITIES- // - I z
HEIGHT VARIES FOR EACH FIELD I I 3
DEVELOPER SHALL DEDICATE / / I ° I QI
IER.O.W. FOR 1/2 OF A MINOR / - - - - I I U I 14 118 8 8 I
ARTERIAL / - - - - I � II �
310'-0"
—TE NIS
IS
/ I BASEBALL I
// �----� ® I II � I PHASE 1A
DEVELOPER SHALL IMPROVE / I PA ION L- `
ElDENNY ROAD TO 1/2 OFA
MINOR ARTERIAL INCLUDING 10 ROWS 100ROW 1,000 SEATS
5' SIDEWALK s I
® 6
GROUND MOUNTED SIGN / 3
MAXIMUM SIZE 8'X4' / MI IDLE.. TEMPO
MIDDLE SCHOOL
< 17,87S.F.% I 4 LANE
i I 400 M
273
STUDENTS
- EARLY
CHILDHOOD CENTER [3,4 YR, K, 1]
380
STUDENTS
- LOWER
SCHOOL [2,3,4,5 GRADES]
330
STUDENTS
- MIDDLE
SCHOOL [6,7,8 GRADES]
/
''"' [3a,so0.
�i"CEv�`is I
' 50' W/ TOWER
— l I
� / I
8 8 12 I
J� I
51 I I
o I
i I
/ 18
0) u u
Rows O SEATS
o /
/ 22
i o
360 STUDENTS - UPPER SCHOOL [9,10,11,12 GRADES] /
1
1,343 TOTAL STUDENTS J� I
XI
7 o
12
]l
LEGEND (SUBDIVISION COMMENTS JULY 5, 2001
O1 7 PLANNING STAFF COMMENTS / �p 14
/ p I 15
7 PUBLIC WORKS COMMENTS 00
UL LANDSCAPE COMMENTS / 14 15
l / R>
\\ ` 0, I
/ o
GORDON ROAD ♦ /
DELETE FROM C.U.P. 6 0 a 5
GROUND MOUNTED SIGN / 3 , , 0 - 0 ,COMMoi
MAXIMUM SIZE 8'X4'
1 s S [75,353
440.04' - - �\ ��, 21 aiiaoi,
4- LINE OF EXIST. DRAINAGE s= 65' /�
W/ TOWER's
* 7 & F8_1RELOCATE EPORT
/ - T --------
SOF
z, EXISTING DRAI AGE
PLAY ^ 00
��1 / / / r �/ ' 2 j`/G o
LOWER SCHOOL
LOWER LEVEL DROP—OF i
PLAY 22,400 s.F.
/
LOWER LEVEL EXIT i
� 2 LEVEL /
* TRAFIC VOLUM LOWER EL IT
%