Loading...
HomeMy WebLinkAboutZ-6519-B Staff AnalysisJune 17, 2004 ITEM NO.: 5 FILE NO.: Z -6519-A NAME: River City Gymnastics — Conditional Use Permit LOCATION: 5310 S. Shackleford Road OWNER/APPLICANT: William Hartman/Ola Russenberger for River City Gymnastics PROPOSAL: A conditional use permit is requested to allow a gymnastics and cheerleading training facility on this 1-1 zoned property. K 3 SITE LOCATION: The site is located at the southwest corner of Clearwater Drive and Shackleford Road; '/z mile south of Colonel Glenn Road. COMPATIBILITY WITH NEIGHBORHOOD: The site is occupied by two office warehouse style buildings. The gymnastics facility is located within lease spaces in both buildings. The property is located in an area of industrial uses and undeveloped properties. The facility has been in operation since 1999 with no apparent ill effect on surrounding properties. All owners of property located within 200 feet of the site, all residents within 300 feet who could be identified and the SWLR United for Progress Neighborhood Association were notified of the request. ON SITE DRIVES AND PARKING: The site is accessed via a single driveway off of Shackleford Road and a single driveway off of Clearwater Drive. There are 114 parking spaces on the site. This type of use is required to provide one space per employee plus on-site loading and unloading spaces at the rate of one for each five students based on the maximum number of students on the site at any one time. The training facility occupies 25,000 square feet of the front 41,175 square foot building and 11,500 square feet of the rear 23,450 square foot building. There is sufficient parking and loading/unloading space on the site. Any further expansion of the facility will require closer scrutiny of the on-site parking situation. 4. SCREENING AND BUFFERS: No Comments. June 17, 2004 ITEM NO.: 5 Cont.) FILE NO.: Z -6519-A 5. PUBLIC WORKS COMMENTS: No Comments. 6. UTILITY FIRE DEPT. AND CATA COMMENTS: Wastewater: Sewer available, not adversely affected. Entergy: No Comments received. CenterPoint Energy: Approved as submitted. Southwestern Bell: No Comments received: Water: Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZA) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact Carroll Keatts at 992-2431 if you would like to discuss backflow prevention requirements for this project. Fire Department: Approved as submitted. County Planning: No Comments. CATA: The site is not located on a CATA bus route. SUBDIVISION COMMITTEE COMMENT: (MAY 27, 2004) The applicant, Ola Russenberger, was present. Staff presented the item and informed the Committee that the facility had been in operation at this site for over 5 years. Staff informed the Committee that building permits had apparently been issued in error. Staff emphasized that the applicant had done everything required to occupy the space, short of receiving zoning approval. Staff asked the applicant to provide additional information on the operation of the facility; including days and hours of operation, number of employees and signage. In response to a question from staff, Ms. Russenberger stated the business 2 June 17, 2004 TEM NO.: 5 FILE NO.: Z -6519-A occupied 25,000 square feet in one building and 11,500 square feet in the second building. The Committee had no questions. The applicant was advised to respond to staff issues by June 2, 2004. The Committee forwarded the item to the full Commission. STAFF ANALYSIS: River City Gymnastics and Cheerleading School is located within lease spaces in the two office -warehouse buildings on the 1-1 zoned property at 5310 S. Shackleford Road. The facility has been in operation at this location since 1999. Building permits to allow the school's occupancy of the site were apparently issued in error. It was just recently discovered by staff that the business is operating without proper zoning approval. The applicant is requesting approval of a conditional use permit to allow the gymnastics and cheerleading facility to remain. The site contains two buildings; 41,175 square feet and 23,450 square feet. The school occupies 25,000 square feet of the larger building and 11,500 square feet of the second building. Access to the site is via driveways off of Shackleford Road and Clearwater Drive. A total of 114 parking spaces are located on-site. The facility's days and hours of operation are Monday through Friday, 8:30 a.m. — 8:00 p.m.; Friday, 8:30 a.m. — 7:30 p.m.; Saturday, 8:30 a.m. — 6:30 p.m.; and Sunday, 12:30 p.m. — 5:00 p.m. The facility has 8 full-time employees and 50 part-time employees. Signage consists of wall signs on each of the buildings. The signs comply with ordinance standards. There is no bill of assurance issue. To staff's knowledge, there are no outstanding issues. The gymnastics/cheerleading school has existed at this site since 1999 with no apparent effect on surrounding properties. STAFF RECOMMENDATION: Staff recommends approval of the requested conditional use permit subject to compliance with the Utility Comments in Section 6 of the Staff Report. PLANNING COMMISSION ACTION: (JUNE 17, 2004) The applicant was present. There were no objectors present. Staff presented the item and a recommendation of approval subject to compliance with the Utility Comments in Section 6 of the staff report. There was no additional discussion. N June 17, 2004 ITEM NO.: 5 Cont. FILE NO.: Z -6519-A The item was placed on the Consent Agenda and approved as recommended by staff. The vote was 9 ayes, 0 noes and 2 absent. 4