Loading...
HomeMy WebLinkAboutZ-6506-A Map 1Building on Centerline of Property N SITE DEVELOPMENT PLAN for TERRY WOOD, INC. (D 1" = 50' GENERAL NOTES PROJECT THIS SITE IS TO BE DEVELOPED TO INCORPORATE A BUILDING OF APPROXIMATELY 10,000 SQ. FT. FUTURE ADDITIONS COULD BRING THE TOTAL TO APPROXIMATELY 19,000 SQ, FT. TOTAL SITE CONTAINS 9.35 ACRES, MORE OR LESS. PARKING PHASE I PARKING: 75 SPACES + 3 ACCESSIBLE SPACES = 76 TOTAL SPACES PHASE II PARKING: 62 SPACES + 2 ACCESSIBLE SPACES = 64 TOTAL SPACES (EACH PARKING SPACE IS 9'Wx 201) ADA COMPLIANCE THE REQUIREMENTS FOR ACCESSIBILITY WILL BE MEET FOR THIS PROJECT WITH ACCESSIBLE PARKING SPACES. SITE UTILITIES EXISTING WATER, SEWER, ELECTRICITY AND GAS SERVICE ARE AVAILABLE AT THE SITE. THE DESIGN AND LOCATION OF THESE UTILITIES WILL BE COORDINATED WITH THE PUBLIC WORKS DEPARTMENT, WASTEWATER UTILITY, CENTRAL ARKANSAS WATER, GAS UTILITY AND ELECTRIC UTILITIES. FIRE HYDRANTS WILL BE LOCATED INCONJUNCTION WITH THE NEW WATER LINE SERVICING THE PROJECT. FIRE HYDRANT LOCATIONS WILL BE COORDINATED WITH CENTRAL ARKANSAS WATER AND THE FIRE DEPARTMENT. LANDSCAPING BUFFERS AS INDICATED WILL BE 40' WIDE AND ARE TO REMAIN IN A NATURAL STATE. THE BUFFER FACING JOHN BARROW ROAD WILL MAINTAIN THE HEALTHY MATURE TREES AND WILL HAVE THE UNDERBRUSH REMOVED TO PROVIDE A VISUAL ACCESS TO FROM JOHN BARROW TO THE INTERIOR OF THE SITE. THE LAWN AREAS WILL BE PROVIDED WITH SOD AND WILL HAVE SELECTED TREES REMOVED TO ALLOW FOR SPECIMEN TREES TO MORE FULLY DEVELOP, CREATING MORE OF A PARK LIKE ENVIRONMENT. AREAS ADJACENT TO THE BUILDING, PARKING AND ENTRANCE DRIVES ARE TO BE LANDSCAPED. POND CURRENTLY UNDER STUDY IS THE FEASIBILITY OF INCORPORATING A POND ON THE SITE. THIS WILL BE DETERMINED BY THE WATER SHED FOR THIS AREA AND IF THE EXISTING SOIL CONDITIONS ARE SUITABLE FOR THE RETENTION OF WATER. PRELIMINARY INVESTIGATIONS INDICATE THAT THIS WOULD BE AN EXCAVATION TYPE POND WITH MINIMUM BERMS. THIS WATER FEATURE COULD POSSIBLY BE USED FOR THE PROJECT'S GEO-THERMAL HVAC SYSTEM PLUS BE A VISUAL ENHANCEMENT FOR THE SITE. STORM WATER DETENTION THE REQUIREMENTS FOR STORM WATER DETENTION WILL BE INTEGRATED INTO THE SITE WORK, EITHER USING THE POND OR A SEPARATE %TOLDING AREA TO BE DETERMINED. RIGHT OF WAY IMPROVEMENTS RIGHT OF WAY IMPROVEMENTS INCLUDING STREET PAVING, CURBS, SIDEWALKS AND RAMPS SHALL COMPLY WITH THE CITY OF LITTLE ROCK STANDARDS. j)IN VICINITY MAP JUN % 4 zUu[ BY; Stocks ME Mann 00 Architects, PLC 401 W. CAPITOL, SI LITE 402 LITILE NOCK, AR 72201 5013708207 501-3709208 IFdXI CONSULTANTS U Z O O N�N I— W Q OL Y � � Q Z O W � U O m O W = w w � J w I— U) 0 w (A O In O w CL REVISIONS ISSUE DATE JUNE 24, 2002 PROJECT NO. 0210 CONTENTS SITE DEVELOPMENT PLAN SHEET NUMBER Al