HomeMy WebLinkAboutZ-6488-B Map 8CURB & GUTTER
PARKING LOT
100
EX, CONTOUR LINE
— — PL— —
PROPERTY LINE
S
EX. SEWER LINE
C
EX. GAS LINE
E
EX. OVERHEAD ELECTRIC
Y"
EX. WATER LINE
aEX.
TREE
100
PR. CONTOUR
W
PR. WATER
S
PR. SEWER
G
PR. GAS
ST
PR. STORM PIPE
®
PR. WATERLINE BLOCKING
(DUMPSTER PAD)
PR. CONCRETE
TS
TOP OF SIDEWALK
TP
TOP OF PAVEMENT
TC
TOP OF CURB
TG
TOP OF GROUND
TW
TOP OF WALL
RCAP
REINFORCED ARCH CONCRETE PIPE
CPP
CORRUGATED PLASTIC PIPE
FL
FLOW LINE
C.O.T.G.
CLEAN OUT TO GRADE
EX
EXISTING
PR
PROPOSED -
TIE IN TO EX.
GROUND
REMOVE APPROX. 4' OF N "
LOOSE OVERBURDEN
TO START BENCH
EX. GROUND
0.5'
1.0' o
10,
10%
0.5
1.0'F o
DRAINAGE SWALE
EARTHWORK BENCHING DETAIL (SECTION
NOT TO SCALE
4" PVC THROAT
SUPPORTS 24" O.C.
LIGHT DUTY FLEXIBLE PAVEMENT-_
5'-4" STANDARD THROAT OPENING
AHTD SPECS
10'-8" EXTENDED THROAT OPENING
ALONG GUTTER
7" CLASS 7 CRUSHED STONE BASE
PAVEMENT
24"X24" ROCK SUMP
j n
FOR SUBGRADE DRAIN
J
MATERIAL
PORTLAND CEMENT CONCRETE PAVING
LIGHT DULY RIGID PAVEMENT
2
3,500 PSI ID 28 DAYS
(DUMPSTER PAD)
°
4" CLASS 7 CRUSHED STONE BASE
-
COURSE
c�
a 4W
n
8"
MATCH TOP OF CURB '.
REINFORCE CONCRETE WITH #5 BARS AT
O.C. EACH WAY
24" MANHOLE RING & COVER
BUILDING DOWNSPOUT
I ADD. �5 REBAR CAP
AROUND RING
4" SUBGRADE ( \L
DRAIN —
PLAN VIEW
>= SEE SITE PLAN FOR PIPING CONFIGURATION
BUILDING
4' O" 1 8•
STORM DRAINAGE CURB INLET
NOT TO SCALE
`-SLOPE BOTTOM OF BASIN AT A" PER FOOT
TO DRAIN
I.) DETAIL
CONCRETE HEADWALL DETAIL
NOT TO SCALE
' 5"x 5" DOWNSPOUT
VERIFY
GENERAL
CONTRACTOR.
VERIFY SIZE.
LOOSE FIT 8" SCH. 40 PVC
CAP
(CUT HOLE AND EXTEND
DOWNSPOUT THRU CAP.)
GRADE OR
CONCRETE.
VERIFY.
6" SDR -26 PVC
MIN.
1.0% SLOPE
8X6 REDUCER 45° ELL
DOWNSPOUT (D.S.) CONNECTION DETAIL
NOT TO SCALE
REFER TO THE
GRADING
PLAN FOR COLLECTOR
LINE SIZE AND
MATERIAL.
Z
O
S
511 L UHAUINU & 5 I UHM UHAINAUL FLAN
SCALE: 1" = 20'
0 20 40
CAST IRON
CLEANOUT WITH
THREADED
ADJUSTABLE
HOUSING.
FINISH GRADE
6' THICK x 18" SQUARE CONCRETE
PAD — CROWN TO SHED WATER.
PVC EXTENSION — SIZED
SAME AS SEWER UP TO 6" DIAMETER.
PVC LONG SWEEP 1/4 BEND
OR PVC COMBINATION Y
AND 1/8 BEND. (USE REDUCING WHERE
REQUIRED.)
SEWER MATERIAL AND SIZE AS SHOWN
ON PUNS.
CLEANOUT TO GRADE (C.O.T.G.) DETAIL
NOT TO SCALE
PAVING LEGEND:
NOTE: PAVEMENT SECTIONS WERE TAKEN FROM THE SOILS REPORT BY GARNER ENGINEERS. REFER TO THIS REPORT FOR A
MORE DETAILED DESCRIPTION OF SELECT MATERIAL AND COMPACTION REQUIREMENTS.
41 / �//
II TOP -451.00
TOE=441.00
r
I TOP -440.00
I MI/ 11 l I
TOE �'430 .00
IiI�III�II I�� 11111/111
I �I I l l �j l IIII 11 1 1 1 11.
AI
I I I 2:1 I I
I IIb1l II 111/
TC=429.00 I I I I 1 1 1 11
I I I Illl III111111 11,
n � ��I I IIII I 1/111111111
D07
�
li
SII �I01
ISI I ,II ,1 III/l�� l
1 1 1 1 I I I 11 1 1 11 1 I I I I l
1 I 111 11 1111 1111 /�
r /I � 111 1 1 11 1111 /1111 I l l 1111 1
1 1 TOE=4 41.00
I 11111!1 I 1 1111 11 /I/ 11 111 111
P=4 51 .DO
TOP=440.00 I/ 1 1 IIII 1 1 1 1 1 1 1 1 1 1 1 1
CIE 430.0'
/ 1 III I I I I I I I I I 111 I I
i,
TOE=430.00
GENERAL SITE GRADING NOTES
1. ALL BIDDERS SHALL FIELD VERIFY EXIST SITE CONDITIONS SO AS TO BE FAMILIAR WITH PROJECT PRIOR TO
BIDDING WORK INCLUDED IN THIS CONTRACT. ANY DISCREPANCIES SHALL BE ADDRESSED PRIOR TO BIDDING.
2. CONTRACTOR TO VERIFY AND MARK ALL EXISTING UTIUTIES PRIOR BEFORE ANY DEMOLITION OR NEW
CONSTRUCTION WORK COMMENCES.
3. ALL WORK SHALL CONFORM TO LOCAL & STATE CODES; ELECTRICAL & PLUMBING UNES SHALL
BE INSTALLED BY PROFESSIONALS LICENSED BY THE STATE OF ARKANSAS.
4. FIELD VERIFY EXACT LOCATION OF ALL EXISTING TREES; EXIST TREES NOT IN CONSTRUCTION AREA TO BE
PROTECTED WITH 2x WOOD PLANKS CONT. IN UNE WITH DRIP EDGE OF TREE, SECURED TOGETHER &
FLAGGED W/ORANGE TAPE; HEAVY EQUIPMENT TO WORK AS FAR AS POSSIBLE FROM EXIST TREES TO
PREVENT DAMAGE TO FEEDER ROOTS; CONTRACTOR WILL BE REQUIRED TO COMPENSATE OWNER FOR ANY
EXISTING TREES WHICH ARE DAMAGED OR DIE DUE TO CONSTRUCTION WORK.
5. THE GENERAL CONTRACTOR SHALL HAVE THE GEOTECHNICAL ENGINEER EMPLOYED TO OBSERVE SITE
WORK MEET WITH THE GEOTECHNICAL ENGINEER THAT PROVIDED THE SOIL'S REPORT. THIS MEETING
SHOULD OCCUR AT OR BEFORE THE PRE -CONSTRUCTION MEETING TO INSURE THE AMOUNT OF UNDERCUT
THAT MAY BE REQUIRED FOR THE PROJECT. RECOMMENDATIONS BY GEO-TECHNICAL ENGINEER SHALL
NOT BE IMPLEMENTED INTO WORK WTHOUT AUTHORIZATION FROM OWNER & ARCHITECT. NOTIFY
ARCHITECT IMMEDIATELY IF UNEXPECTED SUBSURFACE CONDITIONS ARE ENCOUNTERED. THE CONTRACTOR
WILL REFERENCE THE GEOTECHNICAL REPORT FOR A MORE DETAILED DESCRIPTION OF EARTHWORK AND
COMPACT10N REQUIREMENTS.
6. SEQUENCE OF DIRTWORK ACTIVITIES (REFERENCE GEOTECH REPORT):
1)THE SITE WILL BE CLEARED OF ALL TREES AND HARD SCAPE NECESSARY FOR SITE CONSTRUCTION,
GRUBBED FOR ANY SUBSURFACE ORGANIC MATERIAL AND UTIUTIES REMOVED FROM BENEATH
STRUCTURAL ELEMENTS.
2)THE TOP 6-10" OF SCIL WILL BE STRIPPED UNDER ALL STRUCTURAL ELEMENTS (BUILDINGS, PARKING &
DRIVE AREAS)
3)PROOF ROLL THE SITE TO IDENTIFY ANY AREAS REQUIRING UNDERCUT, REMOVE AND REPLACE 'NTH
COMPACTED SELECT FILL AS DIRECTED.
4)PROVIDE A MINIMUM OF 8" OF RECOMPACTED SUBGRADE FOR ALL PAVEMENT AREAS AND FLOOR
SLABS. EXTEND SUBGRADE 8' BEYOND BUILDING WALLS AND 3' BEYOND CURB AND EDGE OF PAVEMENT.
5)SELECT FILL WILL BE PLACED IN LOOSE 8- UFTS AND COMPACTED TO 95% MODIFIED PROCTOR WITHIN
2% OPTIMUM MOISTURE CONTENT. SEE GEOTECH REPORT FOR SELECT FILL REQUIREMENTS (SOME
ON-SITE SOILS MAY BE SUITABLE, SELECT FILL MUST BE APPROVED BY THE GEOTECH PRIOR TO
PLACEMENT.
7. ALL HANDICAP PARKING AND ACCESSIBLE ROUTES SHALL MEET ADA REQUIREMENTS. MAXIMUM CROSS -
SLOPE ON ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 2.0% AND THE MAXIMUM RUNNING -SLOPE ON
ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 5.0% WITHOUT HANDRAILS AND LANDING AREAS, 8.3% WITH
HANDRAILS AND LANDING AREAS. HANDICAPPED PARKING AREAS SHALL NOT SLOPE
MORE THAN 2.0% IN ANY DIRECTION. EACH HANDICAP PARKING SPOT SHALL HAVE A SIGN. THE
CONTRACTOR WILL REFER TO THE 'CODE OF FEDERAL REGULATIONS" 28 CFR PART 36 "ADA STANDARDS
FOR ACCESSIBLE DESIGN" FOR A MORE DETAILED DESCRIPTION OF STANDARDS.
B. THE CONTRACTOR WILL VERIFY THE LOCATION AND ELEVATION OF ALL ROOF, CONDENSATE AND
FOUNDATION DRAIN CONNECTIONS WITH THE PLUMBING AND FOUNDATION SHEETS PRIOR TO INSTILLATION.
W®U
Q�>
EL
®W2
J
Z U
QOZ •
�r
0
❑
LL
�y. O
�m
m
®cu
Q cu
0 in
LL
N
U
❑m
®�N
JQo
W a: to
3uw
��Z
U�
Qw
Lu
co
O CIS
LuW d
0 Lu Q
LLJ=U
cr
Lu LuO
J
m h~-"
� J
J
Y
v No. 12742 p III
I
`\nlllnl�,�
OF Al/*
\P 'pig
_ MINTON
z ENGINEERING, INC. o=
J NO. 1564 =;
44ANSAS
DATE: 1-24-2017
PROJECT NO: 16023
DRAWN BY: JM
REVISION:
C1.2
2" ACHM SURFACE COURSE
LIGHT DUTY FLEXIBLE PAVEMENT-_
AHTD SPECS
7" CLASS 7 CRUSHED STONE BASE
COURSE
j n
8" COMPACTED SELECT FILL OR
PROOF -ROLLED APPROVED NATIVE
MATERIAL
PORTLAND CEMENT CONCRETE PAVING
LIGHT DULY RIGID PAVEMENT
3,500 PSI ID 28 DAYS
(DUMPSTER PAD)
°
4" CLASS 7 CRUSHED STONE BASE
-
COURSE
ma
n
8" COMPACTED SELECT FILL OR
PROOF -ROLLED APPROVED NATIVE
MATERIAL
NOTE: PAVEMENT SECTIONS WERE TAKEN FROM THE SOILS REPORT BY GARNER ENGINEERS. REFER TO THIS REPORT FOR A
MORE DETAILED DESCRIPTION OF SELECT MATERIAL AND COMPACTION REQUIREMENTS.
41 / �//
II TOP -451.00
TOE=441.00
r
I TOP -440.00
I MI/ 11 l I
TOE �'430 .00
IiI�III�II I�� 11111/111
I �I I l l �j l IIII 11 1 1 1 11.
AI
I I I 2:1 I I
I IIb1l II 111/
TC=429.00 I I I I 1 1 1 11
I I I Illl III111111 11,
n � ��I I IIII I 1/111111111
D07
�
li
SII �I01
ISI I ,II ,1 III/l�� l
1 1 1 1 I I I 11 1 1 11 1 I I I I l
1 I 111 11 1111 1111 /�
r /I � 111 1 1 11 1111 /1111 I l l 1111 1
1 1 TOE=4 41.00
I 11111!1 I 1 1111 11 /I/ 11 111 111
P=4 51 .DO
TOP=440.00 I/ 1 1 IIII 1 1 1 1 1 1 1 1 1 1 1 1
CIE 430.0'
/ 1 III I I I I I I I I I 111 I I
i,
TOE=430.00
GENERAL SITE GRADING NOTES
1. ALL BIDDERS SHALL FIELD VERIFY EXIST SITE CONDITIONS SO AS TO BE FAMILIAR WITH PROJECT PRIOR TO
BIDDING WORK INCLUDED IN THIS CONTRACT. ANY DISCREPANCIES SHALL BE ADDRESSED PRIOR TO BIDDING.
2. CONTRACTOR TO VERIFY AND MARK ALL EXISTING UTIUTIES PRIOR BEFORE ANY DEMOLITION OR NEW
CONSTRUCTION WORK COMMENCES.
3. ALL WORK SHALL CONFORM TO LOCAL & STATE CODES; ELECTRICAL & PLUMBING UNES SHALL
BE INSTALLED BY PROFESSIONALS LICENSED BY THE STATE OF ARKANSAS.
4. FIELD VERIFY EXACT LOCATION OF ALL EXISTING TREES; EXIST TREES NOT IN CONSTRUCTION AREA TO BE
PROTECTED WITH 2x WOOD PLANKS CONT. IN UNE WITH DRIP EDGE OF TREE, SECURED TOGETHER &
FLAGGED W/ORANGE TAPE; HEAVY EQUIPMENT TO WORK AS FAR AS POSSIBLE FROM EXIST TREES TO
PREVENT DAMAGE TO FEEDER ROOTS; CONTRACTOR WILL BE REQUIRED TO COMPENSATE OWNER FOR ANY
EXISTING TREES WHICH ARE DAMAGED OR DIE DUE TO CONSTRUCTION WORK.
5. THE GENERAL CONTRACTOR SHALL HAVE THE GEOTECHNICAL ENGINEER EMPLOYED TO OBSERVE SITE
WORK MEET WITH THE GEOTECHNICAL ENGINEER THAT PROVIDED THE SOIL'S REPORT. THIS MEETING
SHOULD OCCUR AT OR BEFORE THE PRE -CONSTRUCTION MEETING TO INSURE THE AMOUNT OF UNDERCUT
THAT MAY BE REQUIRED FOR THE PROJECT. RECOMMENDATIONS BY GEO-TECHNICAL ENGINEER SHALL
NOT BE IMPLEMENTED INTO WORK WTHOUT AUTHORIZATION FROM OWNER & ARCHITECT. NOTIFY
ARCHITECT IMMEDIATELY IF UNEXPECTED SUBSURFACE CONDITIONS ARE ENCOUNTERED. THE CONTRACTOR
WILL REFERENCE THE GEOTECHNICAL REPORT FOR A MORE DETAILED DESCRIPTION OF EARTHWORK AND
COMPACT10N REQUIREMENTS.
6. SEQUENCE OF DIRTWORK ACTIVITIES (REFERENCE GEOTECH REPORT):
1)THE SITE WILL BE CLEARED OF ALL TREES AND HARD SCAPE NECESSARY FOR SITE CONSTRUCTION,
GRUBBED FOR ANY SUBSURFACE ORGANIC MATERIAL AND UTIUTIES REMOVED FROM BENEATH
STRUCTURAL ELEMENTS.
2)THE TOP 6-10" OF SCIL WILL BE STRIPPED UNDER ALL STRUCTURAL ELEMENTS (BUILDINGS, PARKING &
DRIVE AREAS)
3)PROOF ROLL THE SITE TO IDENTIFY ANY AREAS REQUIRING UNDERCUT, REMOVE AND REPLACE 'NTH
COMPACTED SELECT FILL AS DIRECTED.
4)PROVIDE A MINIMUM OF 8" OF RECOMPACTED SUBGRADE FOR ALL PAVEMENT AREAS AND FLOOR
SLABS. EXTEND SUBGRADE 8' BEYOND BUILDING WALLS AND 3' BEYOND CURB AND EDGE OF PAVEMENT.
5)SELECT FILL WILL BE PLACED IN LOOSE 8- UFTS AND COMPACTED TO 95% MODIFIED PROCTOR WITHIN
2% OPTIMUM MOISTURE CONTENT. SEE GEOTECH REPORT FOR SELECT FILL REQUIREMENTS (SOME
ON-SITE SOILS MAY BE SUITABLE, SELECT FILL MUST BE APPROVED BY THE GEOTECH PRIOR TO
PLACEMENT.
7. ALL HANDICAP PARKING AND ACCESSIBLE ROUTES SHALL MEET ADA REQUIREMENTS. MAXIMUM CROSS -
SLOPE ON ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 2.0% AND THE MAXIMUM RUNNING -SLOPE ON
ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 5.0% WITHOUT HANDRAILS AND LANDING AREAS, 8.3% WITH
HANDRAILS AND LANDING AREAS. HANDICAPPED PARKING AREAS SHALL NOT SLOPE
MORE THAN 2.0% IN ANY DIRECTION. EACH HANDICAP PARKING SPOT SHALL HAVE A SIGN. THE
CONTRACTOR WILL REFER TO THE 'CODE OF FEDERAL REGULATIONS" 28 CFR PART 36 "ADA STANDARDS
FOR ACCESSIBLE DESIGN" FOR A MORE DETAILED DESCRIPTION OF STANDARDS.
B. THE CONTRACTOR WILL VERIFY THE LOCATION AND ELEVATION OF ALL ROOF, CONDENSATE AND
FOUNDATION DRAIN CONNECTIONS WITH THE PLUMBING AND FOUNDATION SHEETS PRIOR TO INSTILLATION.
W®U
Q�>
EL
®W2
J
Z U
QOZ •
�r
0
❑
LL
�y. O
�m
m
®cu
Q cu
0 in
LL
N
U
❑m
®�N
JQo
W a: to
3uw
��Z
U�
Qw
Lu
co
O CIS
LuW d
0 Lu Q
LLJ=U
cr
Lu LuO
J
m h~-"
� J
J
Y
v No. 12742 p III
I
`\nlllnl�,�
OF Al/*
\P 'pig
_ MINTON
z ENGINEERING, INC. o=
J NO. 1564 =;
44ANSAS
DATE: 1-24-2017
PROJECT NO: 16023
DRAWN BY: JM
REVISION:
C1.2