HomeMy WebLinkAboutZ-6478 Staff Analysisr' April 30, 1998 f
ITEM NO.: 15 FILE NO.: Z-6479
NAME: Highland Office Complex -- Short -Form POD
LOCATION: End of Embassy Drive; south of Chenal Parkway and
north of Kanis Road
DEVELOPER: ENGINEER:
Boen Family LLC McGetrick Engineering
P. O. Box 22407 11225 Huron Lane
Little Rock, AR 72221 Little Rock, AR 72211
AREA: 3.70 Acres
NUMBER
OF LOTS:
2 FT.
NEW STREET: 650
ZONING: R-2
ALLOWED
USES:
Single -Family
Residential
PROPOSED USE: 0-3 permitted uses and
C-3 permitted uses
VARIANCES/WAIVERS REQUESTED: None
The applicant has submitted a preliminary plat, subdividing the
3.70 acres into two (2) lots with 650 linear feet of new street
(see item #5). Lot 1 is 2.46 acres and Lot 2 is 0.61 acre.
The applicant proposes to construct Embassy Drive with an
alignment approved by Public Works. The new portion of Embassy
Drive will align with Centerview Drive on the south side of Kanis
Road.
The applicant also proposes to abandon the south platted portion
of Embassy Drive, with the west 15 feet being incorporated into
Lot 2 for the construction of the proposed building.
A. PROPOSAWREQUEST:
The applicant proposes to rezone the property to POD. The
applicant proposes a 51,750 square foot building and 192
parking spaces as Lot 1 and a 6,250 square foot building and
18 parking spaces on Lot 2.
The applicant proposes 0-3 permitted uses for Lot 1 and C-3
permitted uses for the much smaller building on Lot 2. This
April 30, 1998
SUBDIVISION
ITEM NO.: 15(Cont.)FILE NO.: Z-6479
is an arrangement very similar to the site plan recently
approved for the Arkansas Systems development on Chenal
Parkway.
B. EXISTING CONDITIONS:
The site is currently undeveloped and heavily wooded.
Embassy Suites Hotel and Pinnacle Point Hospital are located
to the north with Kanis Road to the south. There is a
scattering of single-family residences to the east with a
single-family residence and a day care center located to the
west.
C. NEIGHBORHOOD COMMENTS:
Staff has received no neighborhood comments as of this
writing. The Birchwood Neighborhood Association was
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Grading permit will be required on this new development,
if it disturbs more than one acre.
2. Kanis Road is listed on the Master Street Plan as a
minor arterial. A dedication of right-of-way to 45 feet
from centerline including an additional 10 feet for
right turn lane at Embassy Drive.
3. Embassy Drive is listed as a collector on Master Street
Plan. Construction to 36 feet width with dual sidewalks
required in a 60 feet right-of-way.
4. Driveways shall conform to Sec. 31-210 or Ordinance
16,577.
5. Provide design of streets conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
these streets including 5 foot sidewalks with planned
development.
6. All driveways shall be concrete aprons per City
Ordinance.
7. Stormwater detention ordinance applies to this property.
8. Provide access to properties east of portion of right-
of-way to be abandoned.
9. On site striping and signage plans should be forwarded
to Public Works, Traffic Engineering for approval with
the site development package.
10. Street improvement plans shall include signage and
striping. Completed plans must be approved by Traffic
Engineering prior to construction.
11. Kanis Road has a 1996 average daily traffic count of
7,900.
2
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: 2-6479
12. Obtain permits (barricade/street cut) for improvements
within proposed or existing right-of-way from Traffic
Engineering prior to construction in right-of-way.
13. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
14. Utility excavation within proposed rights-of-way shall
be per Article V of Sec. 30.
E. UTILITIES AND FIRE DEPARTMENT COUNTY PLANNING:
Wastewater: Sewer main extension required with easements
to serve property.
AP&L: No Comment received.
Arkla: No Comment received.
Southwestern Bell: A 5 foot easement is requested along the
north and west property lines of Lot 1, and the east
property line of Lot 2.
Water: On site fire protection will be required. Contact
Dennis Free at 918-3752 for details. An acreage charge
of $150 per acre applies in addition to normal charges
for water service.
Fire Department: Driveways to the south are too long.
Provide turnaround for fire vehicles. Contact Dennis
Free at 918-3752 for details.
Counter Planning: No Comment.
CATA: The site is not on a Central Arkansas Transit bus
route.
F. ISSUES TECHNICAL DESIGN:
Planning Division:
The request is in the I-430 District. The Plan recommends
office. The request is to concentrate all the allowable
commercial in one structure and make the other structure
totally Office use. This request is similar to one approved
for the "Arksys" development area along Chenal. The request
meets the technical requirement as interpreted in the
aforementioned case.
Landscape Issues:
A 3 foot wide landscape strip between public parking areas
and the building is required. Some flexibility is allowed
with this requirement.
The landscape buffer adjacent to residential properties must
not drop below a width of 6 feet.
�J
April 30, 1998
SUBDIVISION
ITEM NO.: 15 (Cont.) FILE NO.: Z-6479
A 6 foot high opaque screen is required along the eastern
and western perimeters. This screen may be a wooden fence
with its face side directed outward or dense evergreen
plantings.
If building #2 is to have a dumpster, its location must be
shown and screened on three sides to a height of 8 feet.
Curb and gutter will be required to protect all landscaped
areas from vehicular traffic.
Existing trees must be left in required buffers adjacent to
residential areas. The City Beautiful Commission recommends
saving as many existing streets on the site as feasible.
Extra credit can be given when saving trees of 6 inch
caliper or larger.
Prior to a building permit being issued, three copies of a
detailed landscape plan must be submitted to and approved by
Bob Brown, Plans Review Specialist. He may be reached at
371-4864.
G. ANALYSIS:
On April 17, 1998, the applicant submitted a revised site
plan to staff. The site plan addresses most of the issues
raised by the Subdivision Committee. The screening fence
shown east of Lot 2 should be placed on the centerline of
the old platted right-of-way, and the sign locations need to
be shown.
Typical ordinance requirements for parking would be for 123
spaces. The applicant is proposing 210 parking spaces.
There should be no outstanding issues associated with
parking as ample parking will exist on the site.
The applicant will need to submit a right-of-way abandonment
application for the southern portion of Embassy Drive to
allow for construction of the building on Lot 2. Public
Works has indicated to the applicant that the City can
assist in obtaining the additional right-of-way needed for
the construction of the northern section of Embassy Drive.
Otherwise, there should be no outstanding issues associated
with the site plan, and the proposed development should have
no adverse effect on the surrounding property.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the POD subject to the
following conditions:
4
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-6479
1. Compliance with the comments noted in paragraphs D, E,
F, and G.
2. Any site lighting shall be low-level and directed away
from adjacent property.
3. Any signage must conform to office standards (as allowed
by ordinance).
4. A right-of-way abandonment application must be submitted
for the south portion of the platted right-of-way.
5. The office aspect of the plan (Lot 1) must be developed
prior to or in conjunction with the commercial aspect
(Lot 2).
SUBDIVISION COMMITTEE COMMENT:
Pat McGetrick was present, representing the application. Staff
gave a brief description of the POD.
Staff noted several items which needed to be shown on the site
plan.
As with Item #5, there was a detailed discussion relating to the
right-of-way issue and the site development. Mr. McGetrick
stated that a revised site plan for Lot 2 would be done, taking
the right-of-way abandonment issue into consideration.
After a brief discussion, the Committee forwarded the item to the
full Commission for final .action.
PLANNING COMMISSION ACTION: (APRIL 30, 1998)
Pat McGetrick was present, representing the application. Staff
gave a brief description of the preliminary plat and POD, with a
recommendation of approval with conditions. Staff noted that the
items were placed on the regular agenda in order to discuss the
construction of Embassy Drive as shown on the site plan and the
abandonment of the southern portion of the old platted right-of-
way.
Bob Turner, Assistant Director of Public Works, informed the
Commission that Public Works has required that the applicant
construct Embassy Drive so that it lines up with Centerview Road
at its Ranis intersection. He stated that the site plan complies
with that requirement. He stated that the problem comes in with
the property that the applicant does not control, the property to
the east. He stated that the applicant has agreed to build the
entire street and that Public Works will work with the applicant
in obtaining the necessary right-of-way for road construction.
5
H April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-6479
There was a brief discussion concerning the road construction and
the adjacent property to the east.
Commissioner Berry asked if there would be a -need for
signalization of the Ranis Road - Embassy Drive intersection.
Mr. Turner stated that a traffic signal would be installed if the
increase in traffic after the road construction warranted the
signal. He stated that the traffic generated by the proposed
development alone would not be enough to warrant the signal.
Pat McGetrick addressed the Commission in support of the
zpplication. He described the current platted right-of-way and
the proposed construction of the new right-of-way.
There was a brief discussion concerning the construction of
Embassy Drive.
Commissioner Adcock asked about the Public Works comment
concerning the coordinating of the traffic signal.
Pat McGetrick stated that when the improvements are made to Ranis
Road and the construction of Embassy Drive, conduit will be
installed for the future traffic signal and the street will not
have to be disturbed with the installation of the new signal.
There was a brief discussion concerning the future traffic
patterns with the construction of Embassy Drive. There was also
additional discussion of a future traffic signal, and a possible
contribution by the applicant.
It was determined that due to the fact that the applicant was
constructing the entire street, a contribution for the future
traffic signal was not needed.
A motion was made to approve the application as recommended by
staff. The motion passed with a vote of 10 ayes and 1 nay.
6
April 30, 1998
ITEM NO.: 15 FILE NO.•
NAME: Highland Office Complex -- Short -Form POD
LOCATION: End of Embassy Drive; south of Chenal Parkway and
north of Kanis Road
DEVELOPER: ENGINEER:
Boen Family LLC McGetrick Engineering
P. O. Box 22407 11225 Huron Lane
Little Rock, AR 72221 Little Rock, AR 72211
-647
AREA: 3.70 Acres NUMBER OF LOTS: 2 FT. NEW STREET: 650
ZONING: R-2 ALLOWED USES: Single -Family Residential
PROPOSED USE: 0-3 permitted uses and
C-3 permitted uses
VARIANCES/WAIVERS REQUESTED; None
BACKGROUND:
The applicant has submitted a preliminary plat, subdividing the
3.70 acres into two (2) lots with 650 linear feet of new street
(see item #5). Lot 1 is 2.46 acres and Lot 2 is 0.61 acre.
The applicant proposes to construct Embassy Drive with an
alignment approved by Public Works. The new portion of Embassy
Drive will align with Centerview Drive on the south side of Kanis
Road.
The applicant also proposes to abandon the south platted portion
of Embassy Drive, with the west 15 feet being incorporated into
Lot 2 for the construction of the proposed building.
A. PROPOSAL/RE UEST:
The applicant proposes to rezone the property to POD. The
applicant proposes a 51,750 square foot building and 192
parking spaces as Lot 1 and a 6,250 square foot building and
18 parking spaces on Lot 2.
The applicant proposes 0-3 permitted uses for Lot I and C-3
permitted uses for the much smaller building on Lot 2. This
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-6479
is an arrangement very similar to the site plan recently
approved for the Arkansas Systems development on Chenal
Parkway.
B. EXISTING CONDITIONS:
The site is currently undeveloped and heavily wooded.
Embassy Suites Hotel and Pinnacle Point Hospital are located
to the north with Kanis Road to the south. There is a
scattering of single-family residences to the east with a
single-family residence and a day care center located to the
west.
C. NEIGHBORHOOD COMMENTS:
Staff has received no neighborhood comments as of this
writing. The Birchwood Neighborhood Association was
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Grading permit will be required on this new development,
if it disturbs more than one acre.
2. Kanis Road is listed on the Master Street Plan as a
minor arterial. A dedication of right-of-way to 45 feet
from centerline including an additional 10 feet for
right turn lane at Embassy Drive.
3. Embassy Drive is listed as a collector on Master Street
Plan. Construction to 36 feet width with dual sidewalks
required in a 60 feet right-of-way.
4. Driveways shall conform to Sec. 31-210 or Ordinance
16,577.
5. Provide design of streets conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
these streets including 5 foot sidewalks with planned
development.
6. All driveways shall be concrete aprons per City
Ordinance.
7. Stormwater detention ordinance applies to this property.
8. Provide access to properties east of portion of right-
of-way to be abandoned.
9. On site striping and signage plans should be forwarded
to Public Works, Traffic Engineering for approval with
the site development package.
10. Street improvement plans shall include signage and
striping. Completed plans must be approved by Traffic
Engineering prior to construction.
11. Kanis Road has a 1996 average daily traffic count of
7,900.
2
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-6479
12. Obtain permits (barricade/street cut) for improvements
within proposed or existing right-of-way from Traffic
Engineering prior to construction in right-of-way.
13. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
14. Utility excavation within proposed rights-of-way shall
be per Article V of Sec. 30.
E. UTILITIES AND FIRE DEPARTMENT COUNTY PLANNING:
Wastewater: Sewer main extension required with easements
to serve property.
AP&L: No Comment received.
Arkla: No Comment received.
Southwestern Bell: A 5 foot easement is requested along the
north and west property lines of Lot 1, and the east
property line of Lot 2.
Water: On site fire protection will be required. Contact
Dennis Free at 918-3752 for details. An acreage charge
of $150 per acre applies in addition to normal charges
for water service.
Fire Department: Driveways to the south are too long.
Provide turnaround for fire vehicles. Contact Dennis
Free at 918-3752 for details.
County Planning: No Comment.
LATA: The site is not on a Central Arkansas Transit bus
route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
The request is in the I-430 District. The Plan recommends
Office. The request is to concentrate all the allowable
commercial in one structure and make the other structure
totally Office use. This request is similar to one approved
for the "Arksys" development area along Chenal. The request
meets the technical requirement as interpreted in the
aforementioned case.
Landscape Issues:
A 3 foot wide landscape strip between public parking areas
and the building is required. Some flexibility is allowed
with this requirement.
The landscape buffer adjacent to residential properties must
not drop below a width of 6 feet.
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-6479
A 6 foot high opaque screen is required along the eastern
and western perimeters. This screen may be a wooden fence
with its face side directed outward or dense evergreen
plantings.
If building #2 is to have a dumpster, its location must be
shown and screened on three sides to a height of 8 feet.
Curb and gutter will be required to protect all landscaped
areas from vehicular traffic.
Existing trees must be left in required buffers adjacent to
residential areas. The City Beautiful Commission recommends
saving as many existing streets on the site as feasible.
Extra credit can be given when saving trees of 6 inch
caliper or larger.
Prior to a building permit being issued, three copies of a
detailed landscape plan must be submitted to and approved by
Bob Brown, Plans Review Specialist. He may be reached at
371-4864.
G. ANALYSIS:
On April 17, 1998, the applicant submitted a revised site
plan to staff. The site plan addresses most of the issues
raised by the Subdivision Committee. The screening fence
shown east of Lot 2 should be placed on the centerline of
the old platted right-of-way, and the sign locations need to
be shown.
Typical ordinance requirements for parking would be for 123
spaces. The applicant is proposing 210 parking spaces.
There should be no outstanding issues associated with
parking as ample parking will exist on the site.
The applicant will need to submit a right-of-way abandonment
application for the southern portion of Embassy Drive to
allow for construction of the building on Lot 2. Public
Works has indicated to the applicant that the City can
assist in obtaining the additional right-of-way needed for
the construction of the northern section of Embassy Drive.
Otherwise, there should be no outstanding issues associated
with the site plan, and the proposed development should have
no adverse effect on the surrounding property.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the POD subject to the
following conditions:
4
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-6479
1. Compliance with the comments noted in paragraphs D, E,
F, and G.
2. Any site lighting shall be low-level and directed away
from adjacent property.
3. Any signage must conform to office standards (as allowed
by ordinance).
4. A right-of-way abandonment application must be submitted
for the south portion of the platted right-of-way.
5. The office aspect of the plan (Lot 1) must be developed
prior to or in conjunction with the commercial aspect
(Lot 2).
SUBDIVISION COMMITTEE COMMENT:
Pat McGetrick was present, representing the application. Staff
gave a brief description of the POD.
Staff noted several items which needed to be shown on the site
plan.
As with Item #5, there was a detailed discussion relating to the
right-of-way issue and the site development. Mr. McGetrick
stated that a revised site plan for Lot 2 would be done, taking
the right-of-way abandonment issue into consideration.
After a brief discussion, the Committee forwarded the item to the
full Commission for final action.
PLANNING COMMISSION ACTION: (APRIL 30, 1998)
Pat McGetrick was present, representing the application. Staff
gave a brief description of the preliminary plat and POD, with a
recommendation of approval with conditions. Staff noted that the
items were placed on the regular agenda in order to discuss the
construction of Embassy Drive as shown on the site plan and the
abandonment of the southern portion of the old platted right-of-
way.
Bob Turner, Assistant Director of Public Works, informed the
Commission that Public works has required that the applicant
construct Embassy Drive so that it lines up with Centerview Road
at its Kanis intersection. He stated that the site plan complies
with that requirement. He stated that the problem comes in with
the property that the applicant does not control, the property to
the east. He stated that the applicant has agreed to build the
entire street and that Public Works will work with the applicant
in obtaining the necessary right-of-way for road construction.
k,
April 30, 1998
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z-5479
There was a brief discussion concerning the road construction and
the adjacent property to the east.
Commissioner Berry asked if there would be a need for
signalization of the Kanis Road - Embassy Drive intersection.
Mr. Turner stated that a traffic signal would be installed if the
increase in traffic after the road construction warranted the
signal. He stated that the traffic generated by the proposed
development alone would not be enough to warrant the signal.
Pat McGetrick addressed the Commission in support of the
application. He described the current platted right-of-way and
the proposed construction of the new right-of-way.
There was a brief discussion concerning the construction of
Embassy Drive.
Commissioner Adcock asked about the Public Works comment
concerning the coordinating of the traffic signal.
Pat McGetrick stated that when the improvements are made to Kanis
Road and the construction of Embassy Drive, conduit will be
installed for the future traffic signal and the street will not
have to be disturbed with the installation of the new signal.
There was a brief discussion concerning the future traffic
patterns with the construction of Embassy Drive. There was also
additional discussion of a future traffic signal, and a possible
contribution by the applicant.
It was determined that due to the fact that the applicant was
constructing the entire street, a contribution for the future
traffic signal was not needed.
A motion was made to approve the application as recommended by
staff. The motion passed with a vote of 10 ayes and 1 nay.
6
FILE NO.• Z-6479
NAME: Highland Office Complex -- Short -Form POD
LOCATION: End of Embassy Drive; south of Chenal Parkway and
north of Kanis Road
DEVELOPER: ENGINEER:
Boen Family LLC McGetrick Engineering
P. O. Box 22407 11225 Huron Lane
Little Rock, AR 72221 Little Rock, AR 72211
AREA: 3.70 Acres NUMBER OF LOTS: 2 FT. NEW STREET: 650
ZONING: R-2 ALLOWED USES: Single -Family Residential
PROPOSED USE: 0-3 permitted uses and
C-3 permitted uses
VARIANCES WAIVERS REQUESTED: None
BACKGROUND•
The applicant has submitted a preliminary plat, subdividing the
3.70 acres into two (2) lots with 650 linear feet of new street
(see item #5). Lot 1 is 2.46 acres and Lot 2 is 0.61 acre.
The applicant proposes to construct Embassy Drive with an
alignment approved by Public Works. The new portion of Embassy
Drive will align with Centerview Drive on the south side of Kanis
Road.
The applicant also proposes to abandon the south platted portion
of Embassy Drive, with the west 15 feet being incorporated into
Lot 2 for the construction of the proposed building.
A. PROPOSAL/RE_ UEST:
The applicant proposes to rezone the property to POD. The
applicant proposes a 51,750 square foot building and 192
parking spaces as Lot 1 and a 6,250 square foot building and
18 parking spaces on Lot 2.
The applicant proposes 0-3 permitted uses for Lot 1 and C-3
permitted uses for the much smaller building on Lot 2. This
is an arrangement very similar to the site plan recently
FILE NO.: Z-6479
approved for the Arkansas Systems development on Chenal
Parkway.
B. EXISTING CONDITIONS:
The site is currently undeveloped and heavily wooded.
Embassy Suites Hotel and Pinnacle Point Hospital are located
to the north with Kanis Road to the south. There is a
scattering of single-family residences to the east with a
single-family residence and a day care center located to the
west.
C. NEIGHBORHOOD COMMENTS:
Staff has received no neighborhood comments as of this
writing. The Birchwood Neighborhood Association was
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1.
2.
3.
4.
5.
Grading permit will be required on this new development,
if it disturbs more than one acre.
Kanis Road is listed on the Master Street Plan as a
minor arterial. A dedication of right-of-way to 45 feet
from centerline including an additional 10 feet for
right turn lane at Embassy Drive.
Embassy Drive is listed as a collector on Master Street
Plan. Construction to 36 feet width with dual sidewalks
required in a 60 feet right-of-way.
Driveways shall conform to Sec. 31-210 or Ordinance
16,577.
Provide design of streets conforming to "MSP" (Master
Street Plan). Construct one-half street improvements
these streets including 5 foot sidewalks with planned
development.
6. All driveways shall be concrete aprons per City
Ordinance.
L
7. Stormwater detention ordinance applies to this property.
8. Provide access to properties east of portion of right-
of-way to be abandoned.
9. On site striping and signage plans should be forwarded
to Public Works, Traffic Engineering for approval with
the site development package.
10. Street improvement plans shall include signage and
striping. Completed plans must be approved by Traffic
Engineering prior to construction.
11. Kanis Road has a 1996 average daily traffic count of
7,900.
12. Obtain permits (barricade/street cut) for improvements
within proposed or existing right-of-way from Traffic
Engineering prior to construction in right-of-way.
13. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
2
E.
F.
.. Z-6479 (Cont.
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
14. Utility excavation within proposed rights-of-way shall
be per Article V of Sec. 30.
UTILITIES AND FIRE DEPARTMENT COUNTY PLANNING:
Wastewater: Sewer main extension required with easements
to serve property.
AP&L: No Comment received.
Arkla: No Comment received.
Southwestern Hell: A 5 foot easement is requested along the
north and west property lines of Lot 1, and the east
property line of Lot 2.
Water: On site fire protection will be required. Contact
Dennis Free at 918-3752 for details. An acreage charge
of $150 per acre applies in addition to normal charges
for water service.
Fire Department: Driveways to the south are too long.
Provide turnaround for fire vehicles. Contact Dennis
Free at 918-3752 for details.
County Plannin : No Comment.
LATA: The site is not on a Central Arkansas Transit bus
route.
ISSUES/TECHNICAL/DESIGN:
Planning Division:
The request is in the I-430 District. The Plan recommends
Office. The request is to concentrate all the allowable
commercial in one structure and make the other structure
totally Office use. This request is similar to one approved
for the "Arksys" development area along Chenal. The request
meets the technical requirement as interpreted in the
aforementioned case.
Landscape issues_:
A 3 foot wide landscape strip between public parking areas
and the building is required. Some flexibility is allowed
with this requirement.
The landscape buffer adjacent to residential properties must
not drop below a width of 6 feet.
A 6 foot high opaque screen is required along the eastern
and western perimeters. This screen may be a wooden fence
with its face side directed outward or dense evergreen
plantings.
If building #2 is to have a dumpster, its location must be
shown and screened on three sides to a height of 8 feet.
3
FILE NO.: Z-6479
Curb and gutter will be required to protect all landscaped
areas from vehicular traffic.
Existing trees must be left in required buffers adjacent to
residential areas. The City Beautiful Commission recommends
saving as many existing streets on the site as feasible.
Extra credit can be given when saving trees of 6 inch
caliper or larger.
Prior to a building permit being issued, three copies of a
detailed landscape plan must be submitted to and approved by
Bob Brown, Plans Review Specialist. He may be reached at
371-4864.
G. ANALYSIS•
On April 17, 1998, the applicant submitted a revised site
plan to staff. The site plan addresses most of the issues
raised by the Subdivision Committee. The screening fence
shown east of Lot 2 should be placed on the centerline of
the old platted right-of-way, and the sign locations need to
be shown.
Typical ordinance requirements for parking would be for 123
spaces. The applicant is proposing 210 parking spaces.
There should be no outstanding issues associated with
parking as ample parking will exist on the site.
The applicant will need to submit a right-of-way abandonment
application for the southern portion of Embassy Drive to
allow for construction of the building on Lot 2. Public
Works has indicated to the applicant that the City can
assist in obtaining the additional right-of-way needed for
the construction of the northern section of Embassy Drive.
Otherwise, there should be no outstanding issues associated
with the site plan, and the proposed development should have
no adverse effect on the surrounding property.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the POD subject to the
following conditions:
1. Compliance with the comments noted in paragraphs D, E,
F, and G.
2. Any site lighting shall be low-level and directed away
from adjacent property.
3. Any signage must conform to office standards (as allowed
by ordinance).
4. A right-of-way abandonment application must be submitted
for the south portion of the platted right-of-way.
4
FILE NO.: Z-6479 (Cont.
5. The office aspect of the plan (Lot 1) must be developed
prior to or in conjunction with the commercial aspect
(Lot 2).
SUBDIVISION COMMITTEE COMMENT:
Pat McGetrick was present, representing the application. Staff
gave a brief description of the POD.
Staff noted several items which needed to be shown on the site
plan.
As with Item #5, there was a detailed discussion relating to the
right-of-way issue and the site development. Mr. McGetrick
stated that a revised site plan for Lot 2 would be done, taking
the right-of-way abandonment issue into consideration.
After a brief discussion, the Committee forwarded the item to the
full Commission for final action.
PLANNING COMMISSION ACTION: (APRIL 30, 1998)
Pat McGetrick was present, representing the application. Staff
gave a brief description of the preliminary plat and POD, with a
recommendation of approval with conditions. Staff noted that the
items were placed on the regular agenda in order to discuss the
construction of Embassy Drive as shown on the site plan and the
abandonment of the southern portion of the old platted right-of-
way.
Bob Turner, Assistant Director of Public Works, informed the
Commission that Public Works has required that the applicant
construct Embassy Drive so that it lines up with Centerview Road
at its Kanis intersection. He stated that the site plan complies
with that requirement. He stated that the problem comes in with
the property that the applicant does not control, the property to
the east. He stated that the applicant has agreed to build the
entire street and that Public Works will work with the applicant
in obtaining the necessary right-of-way for road construction.
There was a brief discussion concerning the road construction and
the adjacent property to the east.
Commissioner Berry asked if there would be a need for
signalization of the Kanis Road - Embassy Drive intersection.
Mr. Turner stated that a traffic signal would be installed if the
increase in traffic after the road construction warranted the
signal. He stated that the traffic generated by the proposed
development alone would not be enough to warrant the signal.
41
FILE Na.: z-6479 Cont.
Pat McGetrick addressed the Commission in support of the
application. He described the current platted right-of-way and
the proposed construction of the new right-of-way.
There was a brief discussion concerning the construction of
Embassy Drive.
Commissioner Adcock asked about the Public Works comment
concerning the coordinating of the traffic signal.
Pat McGetrick stated that when the improvements are made to Kanis
Road and the construction of Embassy Drive, conduit will be
installed for the future traffic signal and the street will not
have to be disturbed with the installation of the new signal.
There was a brief discussion concerning the future traffic
patterns with the construction of Embassy Drive. There was also
additional discussion of a future traffic signal, and a possible
contribution by the applicant.
It was determined that due to the fact that the applicant was
constructing the entire street, a contribution for the future
traffic signal was not needed.
A motion was made to approve the application as recommended by
staff. The motion passed with a vote of 10 ayes and 1 nay.
6
April 30, 1998
ITEM NO.: 33
NAME•
LOCATION•
OWNER/APPLICANT:
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1. Site Location:
FILE NO.: Z-6478
Herndon Accessory Dwelling -
Conditional Use Permit
720 Zanzibar
Shirley Herndon/
Patrick McGetrick, Contractor
A conditional use permit is
requested to allow an
accessory dwelling to be built
on this R-2 zoned property.
This site is located west of Zanzibar Road, south of
Pride valley Road, outside the city limits, but within
the City's extraterritorial zoning jurisdiction.
2. Compatibility with Neighborhood:
This property is located in a rural, wooded area,
consisting of large tracts of land with single family
residences. The property is located at the end of
Zanzibar and the proposed use is compatible with uses in
the area. Because of the woods and large tracts,
individual houses are hard to see from one lot to the
next.
There is no neighborhood association within proximity of
this site.
3. On --Site Drives and Parking:
There is one long driveway down the center of the
property which runs past the primary house back to this
accessory dwelling. It concludes with a circle drive
on the end in front of the accessory dwelling. Parking
requirements are met.
4. Screening and Buffers:
Not applicable.
April 30, 1998
SUBDIVISION
ITEM NO.: 33 (Cont.) FILE NO.: Z-6478
5. Public Works Comments:
30-283(6)does not require dedication of right-of-way or
street improvements for two-family residences. Further
development or subdivision of property will trigger
dedication of public right-of-way and a turn -a -round
with appropriate street improvements.
6. utility and Fire Department Comments:
Water: Outside City. Water main extension required
along with execution of Pre -annexation Agreement and
approval by City. Acreage charge of $300/acre
applies in addition to normal connection charges.
Wastewater: Outside service boundary. No comment.
Southwestern Bell: Approved as submitted.
Fire Department: Outside city. No comment.
CATA: The site is not located on a CATA bus route.
7. Staff Analysis:
The applicant is requesting a conditional use permit to
locate a single family accessory dwelling on this R-2
zoned property. The land is 9.67 acres in size.
Therefore, an additional house will not cause any
crowding on this property. There are no setback
issues. This accessory dwelling is in the back central
part of the property and with the trees it will not be
very visible most of the year.
The structure is a two-story, 1,400 square foot house.
Since there is an ordinance limit of 700 square feet of
floor space for an accessory dwelling, a variance is
necessary to permit this size dwelling.
A mobile home is being used on the property for an
accessory dwelling now. That is to be removed once
this new dwelling is ready for occupancy.
Staff believes the proposal is a reasonable use of this
property and will be compatible with development in the
area.
2
April 30, 1998
SUBDIVISION
ITEM NO.: 33 (Cont.) FILE NO.: Z-6478
8. Staff Recommendation:
Staff recommends approval of the requested conditional
use permit with the stipulation that the mobile home be
removed no later than 30 days after the new dwelling is
ready for occupancy. Staff also recommends approval of
the variance to exceed the 700 square feet of floor
space maximum for an accessory dwelling.
SUBDIVISION COMMITTEE COMMENT: (APRIL 9, 1998)
Patrick McGetrick was present representing the applicant.
Staff presented the item. Mr. McGetrick was asked to
provide a revised site plan to show the access drive to the
accessory dwelling and to comment about fire hydrants in the
area. A deadline of April 16 was set for that information.
There being no other issues, the Committee forwarded the
item to the full Commission for final resolution.
STAFF UPDATE:
A revised site plan was submitted. The applicant reported
that there are no water lines or fire hydrants near the
property at this time.
PLANNING COMMISSION ACTION: (APRIL 30, 1998)
Patrick McGetrick was present representing the applicant.
There were no objectors present. Staff presented the item
and a recommendation for approval as submitted including the
variance to exceed the 700 square feet floor space maximum.
One condition included was to remove the mobile home from
the property within 30 days after the new dwelling is ready
for occupancy.
The item was placed on the Consent Agenda and approved, with
staff's above condition, by a vote of 11 ayes, 0 noes and
0 absent.
3
City of Little Rock
Department of Planning and DevelopmentPlanning
Zoning and
723 West Markham Subdivision
Little Rock, Arkansas 72201-1334
IR (501) 371-4790
Pat McGetrick
11225 Huron Lane
Suite 200
Little Rock, AR 72211
Date: may 5, 1998
Dear Mr. McGetrick:
Re: Case No. Z-6478
Location:
720 Zanzibar
Little Rock AR 72211
This is to advise you that in connection with your application for
a conditional use permit, the following action was taken by the
Planning Commission at its meeting on April 30, 1998.
Recommended approval as applied for.
Denied your request as submitted.
Deferred to Meeting.
Recommended approval of
Denied
as amended.
as amended.
(f) X Other: Approved your request with
conditions as noted in meeting minutes
along with the variance to exceed the
700 square foot floor space limitation.
Sincerely,
Jim Oonnell, Planner I
Department of Planning and Development