HomeMy WebLinkAboutZ-6438 Staff AnalysisFebruary 5, 1998
ITEM NO.: 26
NAME
LOCATION•
OWNER/APPLICANT•
PROPOSAL•
ORDINANCE DESIGN STANDARDS:
1. Site Location:
FILE NO.: Z-6438
Hall Day Care - Conditional
Use Permit
2601 Battery Street
Harry T. Hall
A conditional use permit is
requested to allow for the
conversion of the residence
located on this R-4 zoned
property into a day care
center.
The site is located at the east side of Battery Street,
one block south of Roosevelt Road.
2. Compatibility with Neighborhood:
The site is located within a large R-4 zoned
residential neighborhood. Most of the surrounding
properties are occupied by older single family or two
family residences. There are several nonresidential
and institutional uses in the vicinity of the
intersection of Roosevelt and Battery including an
elementary school. The POD zoned development at the
northeast corner of Roosevelt and Battery allows a
variety of office, institutional and commercial uses.
The POD zoned property adjacent to the south of this
site is a residence with a detached, one -chair beauty
salon. The Arkansas State Fairgrounds are located two
blocks to the west. With attention to properly
screening the parking and playground areas, this
proposed use should be compatible with the
neighborhood. The Wright Avenue and Southend
Neighborhood Associations were notified of the public
hearing.
3. on-site Drives and Parking:
A day care center with an enrollment of 33 children
with 5 employees requires 8 on-site parking spaces.
The applicant proposes an 8 space parking lot with a
single access point on Battery Street and on the alley
February 5, 1998
SUBDIVISION
ITEM NO.: 26 (Cont.) FILE NO.: Z-6438
to the rear. The applicant is requesting a 12 month
deferral of the paving requirement for this new parking
lot.
4. Screening and Buffers:_
A minimum 4 foot wide landscape strip is required
between the parking lot and the north property` line.: A
6 foot tall wooden fence with its face. side directed
outward or dense evergreen plantings are required to
screen this site from adjacent residential properties.
5. Public Works Comments:
Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards with any
planned construction. T
6. 'utility and Fire Department Comments:
Water: No objection.
Wastewater: Sewer available, not adversely affected.
Fire Department: Show location of nearest fire
hydrants.
Southwestern Bell: Approved as submitted.
CATA: The site is located on a CATA bus route.
7. Staff Analysis:
The R-4 zoned property at 2601 Battery is currently
occupied by a one-story, frame single family
residential structure. The applicants propose to
convert this structure into a day care center with a
maximum enrollment of 33 children. Staff will consist
of four employees plus one director. An 8 spaca
parking lot is proposed to be built on the north side
of the property, in the area of the former 26th Street
right-of-way which was closed as part of the Coliseum
Urban Renewal project in 1967. A playground will be
installed in the rear yard of the property and a fence
erected around the yard and parking lot. No exterior
changes are proposed with the exception of a handicap
ramp, if required. The hours of operation are Monday
through Friday, 6:00 a.m. to 6:00 p.m.
Staff believes the proposed daycare is a reasonable use
of this property. Although much of the surrounding
2
February 5; 1998
SUBDIVISION
ITEM NO.: 26 (Cont.)
FILE NO.: Z-6438
area is zoned R-4, there are other nonresidential and
institutional uses in the vicinity of the intersection
of Roosevelt and Battery. The proposed site plan
provides adequate parking and drop-off Bpac-e. "No
signage plan was submitted. Staff believes any ground -
mounted sign should be limited to 6' iii height and 32
square feet in area. With proper attention to
screening the parking and playground area, this
proposed use should be compatible with the
neighborhood.
The applicant is requesting a 12 month deferral of the
paving requirement for the proposed parking lot. Staff
can support this deferral if the required concrete
driveway apron is installed, sidewalks and ramps are
brought up to current ADA standards and the screening
is installed as required.
8. Staff Recommendation:
Staff recommends approval of the requested conditional
use permit subject to compliance with the following
conditions:
1. Compliance with the Public Works Comments
2. Compliance with the City's Landscape and Buffer
Ordinances to properly screen the parking and.
playground areas
3. Any site lighting is to be low-level and
directional,'aimed away from adjacent residential
properties.
4. The ground mounted sign is to be limited to 6' in
height and 32 square feet in area.
Staff recommends approval of the requested 12 month
deferral of the paving requirement for the parking lot
subject to compliance with the following conditions:
1. Proper concrete driveway apron is to be installed
at this time.
2. The required screening is to be installed at this
time.
3. Sidewalks and ramps are to be brought up to current
ADA standards at this time.
SUBDIVISION COMMITTEE COMMENT:
(JANUARY 15, 1998)
The applicant was present. Staff presented the item. There
was a brief discussion of the item. The applicant was
advised to make minor modifications to the site plan related
to the parking lot and the landscape buffer on the north
3
February 5•, 1998
SUBDIVISION
ITEM NO.: 26 (Cont.) FILE NO.: Z-6438
side. The applicant was instructed to provide a revised
site plan to staff within one week.
The Committee determined there were no other outstanding
issues and forwarded the item to the full Commission for
final resolution.
STAFF UPDATE:
Staff met with the applicant to address modifications to the
site plan. These minor changes were to provide the required
landscape strip on the north side and to provide proper
depth for the parking stalls and maneuvering area.
PLANNING COMMISSION ACTION: (FEBRUARY 5, 1998)
The applicant was present. There were no objectors present.
Staff informed the Commission that a revised site plan had
been received which addressed staff's concerns. Staff
offered a recommendation of approval subject to compliance
with the conditions noted in the staff recommendation.
Staff also recommended approval of the requested 12 month
deferral of the paving requirement subject to compliance
with the conditions noted.
The requested conditional use permit and paving deferral
were placed on the Consent Agenda and approved subject to
compliance with the conditions recommended by staff. The
vote was 11 ayes, 0 noes and 0 absent.
4