HomeMy WebLinkAboutZ-6406 Staff AnalysisFILE NO.: Z-6406
NAME: Parkway Motors PD -C Short -Form
LOCATION: 12200 Block of West Markham Street
DEVELOPER:
ENGINEER•
Ron Tabor Joe White, Jr.
Flake, Tabor, Turner & Kelly White-Daters and Assoc.
425 W. Capitol Ave. 401 victory Street
Little Rock, AR 72201 Little Rock, AR 72201
376-8005 374-1666
AREA: 0.71 acres NUMBER OF LOTS: 1
ZONING: C-3 ALLOWED USES:
(being rezoned to PD -C)
PROPOSED USE•
VARIANCES/WAIVERS REQUESTED: None
BACKGROUND:
FT. NEW STREET: None
Auto Dealership (Mazda)
No other use indicated.
Auto Sales
This tract is a remnant from the various actions that created the
Rock Creek Parkway and later what is now Chenal Parkway. When
Markham Street was realigned to the north, this triangle was
created. Most of the time since annexation this lot has been
zoned C-3.
A. PROPOSAL/RE VEST:
To create a commercial lot with one building and twenty-nine
(29) parking spaces. The intended use is auto sales allied
with the new Mazda dealer being developed across Markham
Street. There will be no access from W. Markham Street.
Vehicle access will be on Entergy Drive and an easement next
to Luby Cafeteria.
B. EXISTING CONDITIONS:
The lot is a raised island between Entergy Dr. and W.
Markham Street. There are a few mature trees some of which
could be saved with good design.
This island fronts on Markham Street but has a driveway
along the west boundary that will affect all aspects of the
FILE NO.: Z-6406_ (Cont.
commercial use of the land. That drive has a large Entergy
power line and easement, overlaying, that restricts usage.
C. NEIGHBORHOOD COMMENTS: '
None received at this writing. The Birchwood Neighborhood
Association and all abutting owners were notified.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. W. Markham Street is listed on the MSP as a minor
arterial. A dedication of right-of-way to 45 feet from
the centerline of Markham is required.
2. A 22.5' radial dedication, including the triangular
piece across Entergy Court, is required at the
intersection of Markham and Entergy Court.
3. Provide design of streets conforming to the MSP.
Construct one half street improvements to W. Markham
including sidewalk with construction of building.
4. Driveways shall conform to Sec. 31-210 or Ordinance
16,577. Combine the two entrances off of Entergy Court
and it needs to be a minimum of 100 feet from the
intersection of Entergy and Markham.
5. Close the private drive between Entergy Court and
Markham and construct a commercial standard cul-de-sac
at the terminus of Entergy Court.
6. Construct 5' wide sidewalk along Entergy Court and
Markham at back of right-of-way.
7. Provide an eight foot deep back -out for cars at west end
of parking lot.
8. All driveways shall be concrete aprons.
9. Markham has a 1995 average daily traffic count of
11,000.
10. Repair or replace any damaged improvements in the right-
of-way prior to occupancy.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main required with easements.
AP&L: No response.
Arkla: OK as submitted.
Southwestern Bell: OK as submitted.
Water: The existing 12" water main crossing this property
may be farther east than is shown. This main should be
field located. The existing waterline easement is not
shown. Additional easement may be required.
Fire Department: Review with Water Works on hydrant need
for location.
County Planning: No Comment - inside city
CATA: No response. Nearest bus route at Bowman Road and
Markham. Turns south to Wal-Mart.
PA
FILE NO.: Z-6406 Cont.
F. ISSUES/TECHNICAL/DESIGN:
Landscape:
Areas set aside for landscaping and buffers technically meet
with the ordinance requirements. However, if this property
were to have a typical "C-4" zoning for outdoor display no
merchandise would be allowed to be displayed within the
front 20 feet of the property. Instead, that area would be
reserved for grass and shrubs.
Curb and gutter or another protective border will be
required to protect landscaped areas from vehicular traffic.
Planning Division:
G. ANALYSIS:
This site is in the Ellis Mountain District. The Plan
recommends commercial use. The commercial use is consistent
with the Plan. Note this is a "C-4", Open Display, use
which was not the intended use for this area. Three other
PD -C "C-4" uses have been reviewed and approved, they were
commercial and a PZD. Staff has some concern about
continuing this practice.
H. STAFF RECOMMENDATIONS:
Denial of the PD -C in its current form and suggest a new
design approach that will address the need to maintain more
open space while reducing conflict with the west drive. The
closure and reuse of the west drive is strongly encouraged
to have better vehicle display and lower impact visually.
SUBDIVISION COMMITTEE COMMENT: (OCTOBER 9, 1997)
Mr. Joe white was presented for the owner. Staff presented its
comments and concerns about plat content and design. A lengthy
discussion followed with the Committee asking a number of
questions about this PD -C application. The Committee observed
that plat and PD -C issues are closely tied, with the PD -C
affecting the plats final configuration.
The Committee discussed the elimination of the west drive to
create a better lot, how the building lines could be modified to
help the site buildability and parking arrangement.
After closing comment by Public works staff, the Committee
forwarded the matter to the full Commission for resolution in
conjunction with the plat.
3
ILE NO.: Z-6406 (Cont.
PLANNING COMMISSION ACTION:
(OCTOBER 30, 1997)
The Chairman recognized Richard Wood, of the Staff, for pui-poses
of presenting the staff recommendation. Wood began the
presentation by saying this item is paired with item #8 on the
agenda. This item proposes the one lot subdivision plat and the
item #8 is a planned development for purposes of locating a
commercial use on the one lot. Wood stated that both staff and
Public Works has some continuing questions about the design of
this proposal; therefore, their retention of the item on the
regular agenda.
Wood pointed out there were no objections to this proposal,
either the plat or the planned development and there were
apparently no objectors in attendance of today's meeting. He
stated there were a couple of informational calls from passersby
interested in what may be occurring.
The Chairman then asked if the applicant would come forward and
present item #2. Mr. Ron Tabor came to the lectern and
introduced himself and Mr. Steve Smith with his partner Bill
Carlton who are the prospective developers. He also introduced
the architect for the project. Mr. Tabor offered some background
on the companion project on the north side of Markham Street for
the Mazda dealership indicating the status of that project and
how they had worked through staff and through the Commission to
develop the property.
Mr. Tabor then offered a brief outline of the project, its
location relative to neighboring uses and identifying the site as
a somewhat unique property. He defined the abutting streets, the
status of the easement between Entergy Court and Markham and the
inability of this owner to remove that facility. He also
described Entergy in its relationship to the streets. He further
stated that there were some issues relative to landscaping and
setbacks that they have addressed. They identified the type of
use going on this property and the dealership involved and the
project will be developed to high standards. There will be nice
aesthetic features incorporated into the site because of some of
the comments that have been raised by staff. He stated the plan
would not take access to Markham Street but the private drive and
Entergy Court would be utilized for their total access.
He extended his presentation to describe where the building had
been previously sited on the plan, how they had moved it and how
the building had changed in its character. At the conclusion of
Mr. Tabor's remarks, the Chair asked if there was anyone present
that wanted to add comments in favor of the proposal. The
Chairman then asked if there were persons present in opposition.
There were apparently none.
Commissioner Brandon asked Mr. Tabor a question concerning the
trees on the site and how they would be dealt with in this
proposal. Mr. Tabor offered comments about the several trees
that might be saved and those which would obviously have to be
4
FILE NO.: Z-6406 (Cont.)
removed. A landscape contractor would be dealing with tree
retention as well as the overall site preparation and stated that
they may come back and ask the city for a franchise to do
enhanced landscaping within the adjacent right-of-way. The.
discussion then continued at length between commissioners and Mr.
Tabor relative to saving various trees and how that might be
accomplished.
Commissioner Earnest inserted a question to the staff given what
has been said and the commitments made as to whether or not the
staff was willing to accept this proposal and change its
recommendation.
Jim Lawson, of the Staff, indicated yes. However, he expanded to
say the staff would like to enhance landscaping along Markham by
pushing the cars back somewhat. Mr. Tabor came back to the
lectern and addressed this point by pointing out how the site
plan has been and can be modified to incorporate the staff's
additional requirements. Lawson stated that with this change and
other items staff has worked out over the last couple weeks we
can accept the proposal.
Commissioner Putnam then asked a question of Mr. Tabor as to
whether this issue is open display use. After a brief discussion
about the use of the C-4 District versus the PCD District,
Commissioner Putnam understood this was not a relative issue to
the one he had been concerned with on Hwy. 10.
The Chairman then recognized Commissioner Daniel. Commissioner
Daniel stated that he could not support this proposal. He
indicated that he had previously been presented with another plan
that is completely different from this one. He offered an
extensive commentary on his concerns about people not following
through on plans and then changing without commission involvement
or observation of the amendments. Mr. Tabor pointed out this
plan as presented is exactly what the developer will do if it is
approved. Mr. Tabor then followed this remark with another
extensive review of the proposal as it now exists. The concerns
that were expressed by several commissioners and staff resulted
in another comment by commissioners stating that we should
perhaps look at the protocol surrounding the manner in which
applications are closed prior to a hearing.
Commissioner Adcock pointed out that at the Subdivision Committee
meeting it was specifically suggested to the applicant that they
move the building from the east to the west end of the site to
better retain landscaping and do less damage to the property.
Commissioner Putnam then injected comments concerning how the
Subdivision Committee was perhaps placed in difficult
circumstance dealing with the site plans. Jim Lawson instructed
the Chairman that perhaps David Scherer, of Public works, had
comments to offer. Scherer's comments dealt with Entergy Court
the manner in which it was constructed and how it was not
dedicated as a public street, design problems on the corners with
deficient radii, etc. Also, he pointed again to the undedicated
5
FILE NO.: Z-6406 (Cont.
driveway that connects two public streets along the west boundary
of this site. Scherer indicated that there was a requirement for
sidewalk along Entergy that had not been dealt with or discussed
at this point as well as dedication of sufficient right -of' -way
for this commercial street. He stated.that, although this is a
PD -C application, there is a preliminary plat attached which is
item #2 of this agenda. This plat does require sidewalk and
dedication of street right-of-way. He stated that Public Works
recommends these items be provided for in the preliminary plat.
The Chairman then recognized Mr. Joe White for purposes of
discussing these potential waivers. He stated that this private
drive connecting the two streets was required by city at the time
the Rock Creek Parkway was created which was the forerunner to
Chenal Parkway. He said this driveway was constructed because it
solved a site distance problem. He stated Energy Drive was a
private drive and with this narrow site dedication would impact
the development. It would affect the number of parking spaces
that could be gained as well as the landscaping. Jim Lawson
inserted a comment at this point. City staff had looked at
attempting to close this private drive between the two streets
and found that it could not be done. Lawson stated that he felt
the city should look at this as an existing condition and go on
with this project.
The Chairman asked for clarification on this since the
recommendation apparently included the sidewalk and some comments
from Public Works. He stated he did not see this item concerning
dedication of right-of-way in the write-up. Lawson instructed
the Chairman that on the sidewalk issue what the Commission
needed to do was to recommend to the Board the waiver of the
sidewalk and specifically state the City does not want the
sidewalk.
The Chairman stated this issue needs to be clarified because
there are no specific waivers requested in the application. For
the next several.comments, Mr. Tabor specifically stated he did
not want to build the sidewalk along Entergy Court. Again,
questions return to the private drive running between Markham and
Entergy Court as to its status and how it might be dealt with.
David Scherer, of Public Works, said he was simply trying to gain
the status of this roadway as a properly dedicated street since
it was functioning as such. He stated its functioning as such
should be dedicated. He reiterated a prior comment saying that
the sidewalk should be built and the right-of-way should be
dedicated on Entergy Drive. He also stated they could request
waivers of these, however, Public Works, recommendation remains
the same. Scherer stated that the right-of-way that normally
would be required for Entergy Court would be 60 feet, but the
Commission could accept a lesser amount. Scherer stated the
current street was a 36 foot pavement that normally requires a
60 foot right-of-way.
Questions posed by Commissioner Hawn as to whether or not
dedication could not simply occur from the centerline to the
A
FILE NO.: Z-6406(Cont.)
existing improvements. He asked whether or not the developer
would be willing to dedicate that.
A lengthy discussion followed during which Mr. Tabor finally
announced they could dedicate the portion of the existing street
that would be appropriate to their side. Commissioner Hawn asked
for verification as to what this waiver would fall under the plat
or the PD -C. It was determined that it would be the plat, item
#2 on this agenda.
Commissioner McCarthy raised a question about the possibility of
the future owner and protecting the dedication of the right-of-
way. She was assured that if it is accomplished on this plat,
then this would be the case. Lawson clarified if the developer
at this point dedicated the built roadway and this is the right-
of-way the city will accept and maintain from now on. This
dedication would be the existing road width. In response to
Commissioner McCarthy's question "is there some way to ever
capture the 60 feet." The response was no.
At this point, the Chairman instructed the Commission and staff
that Commissioner Hawn. would attempt a motion on this
application. He began by making a motion that included only item
#2 be approved as filed with the applicant agreeing to dedicate
the private drive to its current constructed width along the west
boundary and that sidewalks not be constructed along Entergy
Drive. Commissioner Earnest injected a thought prior to the vote
that there are all kinds of issues outlined in the write-up which
are contrary to the motion that is on the floor. The Chairman
and others pointed out this was understood. The vote on
Commissioner Hawn's motion passed by a vote of 9 ayes, 1 nay and
1 absent.
Commissioner Hawn was then recognized for purposes of offering a
motion on item #8, the PD -C application. Commissioner Hawn
offered a motion for approval of the site plan as modified in
conformance with the staff's comments. The motion was seconded.
A vote on the motion produced a vote of 9 ayes, 0 nays and
1 absent.
7
FILE NO.: Z-640
NAME: Parkway Motors PD -C Short -Form
LOCATION: 12200 Block of West Markham Street
DEVELOPER•
ENGINEER•
Ron Tabor Joe White, Jr.
Flake, Tabor, Turner & Kelly White-Daters and Assoc.
425 W. Capitol Ave. 401 Victory Street
Little Rock, AR 72201 Little Rock, AR 72201
376-8005 374-1666
AREA: 0.71 acres NUMBER OF LOTS: 1
ZONING: C-3 ALLOWED USES:
(being rezoned to PD -C)
PROPOSED USE•
VARIANCES/WAIVERS REQUESTED: None
BACKGROUND:
FT. NEW STREET: None
Auto Dealership (Mazda)
No other use indicated.
Auto Sales
This tract is a remnant from the various actions that created the
Rock Creek Parkway and later what is now Chenal Parkway. When
Markham Street was realigned to the north, this triangle was
created. Most of the time since annexation this lot has been
zoned C-3.
A. PROPOSALIREQUEST:
To create a commercial lot with one building and twenty-nine
(29) parking spaces. The intended use is auto sales allied
with the new Mazda dealer being developed across Markham
Street. There will be no access from W. Markham Street.
Vehicle access will be on Entergy Drive and an easement next
to Luby Cafeteria.
B. EXISTING CONDITIONS:
The lot is a raised island between Entergy Dr. and W.
Markham Street. There are a few mature trees some of which
could be saved with good design.
This island fronts on Markham Street but has a driveway
along the west boundary that will affect all aspects of the
FILE NO.: Z-6406 Cont.
commercial use of the land. That drive has a large Entergy
power line and easement, overlaying, that restricts usage.
C. NEIGHBORHOOD COMMENTS: ':'
None received at this writing. The Birchwood Neighborhood
Association and all abutting owners were notified.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. W. Markham Street is listed on the MSP as a minor
arterial. A dedication of right-of-way to 45 feet from
the centerline of Markham is required.
2. A 22.5' radial dedication, including the triangular
piece across Entergy Court, is required at the
intersection of Markham and Entergy Court.
3. Provide design of streets conforming to the MSP.
Construct one half street improvements to W. Markham
including sidewalk with construction of building.
4. Driveways shall conform to Sec. 31-210 or Ordinance
16,577. Combine the two entrances off of Entergy Court
and it needs to be a minimum of 100 feet from the
intersection of Entergy and Markham.
5. Close the private drive between Entergy Court and
Markham and construct a commercial standard cul-de-sac
at the terminus of Entergy Court.
6. Construct 5' wide sidewalk along Entergy Court and
Markham at back of right-of-way.
7. Provide an eight foot deep back -out for cars at west end
of parking lot.
8. All driveways shall be concrete aprons.
9. Markham has a 1995 average daily traffic count of
11,000.
10. Repair or replace any damaged improvements in the right-
of-way prior to occupancy.
E. UTILITIES AND FIRE DEPARTMENT COUNTY PLANNING:
Wastewater: Sewer main required with easements.
AP&L: No response.
Arkla: OK as submitted.
Southwestern Bell: OK as submitted.
Water: The existing 12" water main crossing this property
may be farther east than is shown. This main should be
field located. The existing waterline easement is not
shown. Additional easement may be required.
Fire Department: Review with Water Works on hydrant need
for location.
County Planninq: No Comment - inside city
CATA: No response. Nearest bus route at Bowman Road and
Markham. Turns south to Wal-Mart.
2
FILE NO.: Z-6406 (Cont.)'
F. ISSUES/TECHNICAL/DESIGN:
Landscape:
Areas set aside for landscaping and buffers technically meet
with the ordinance requirements. However, if this property
were to have a typical "C-4" zoning for outdoor display no
merchandise would be allowed to be displayed within the
front 20 feet of the property. Instead, that area would be
reserved for grass and shrubs.
Curb and gutter or another protective border will be
required to protect landscaped areas from vehicular traffic.
Planning Division:
G. ANALYSIS•
This site is in the Ellis Mountain District. The Plan
recommends commercial use. The commercial use is consistent
with the Plan. Note this is a "C-4", Open Display, use
which was not the intended use for this area. Three other
PD -C "C-4" uses have been reviewed and approved, they were
commercial and a PZD. Staff has some concern about
continuing this practice.
H. STAFF RECOMMENDATIONS:
Denial of the PD -c in its current form and suggest a new
design approach that will address the need to maintain more
open space while reducing conflict with the west drive. The
closure and reuse of the west drive is strongly encouraged
to have better vehicle display and lower impact visually.
SUBDIVISION COMMITTEE COMMENT: (OCTOBER 9, 1997)
Mr. Joe White was presented for the owner. Staff presented its
comments and concerns about plat content and design. A lengthy
discussion followed with the Committee asking a number of
questions about this PD -C application. The Committee observed
that plat and PD -C issues are closely tied, with the PD -C
affecting the plats final configuration.
The Committee discussed the elimination of the west drive to
create a better lot, how the building lines could be modified to
help the site buildability and parking arrangement.
After closing comment by Public Works staff, the Committee
forwarded the matter to the full Commission for resolution in
conjunction with the plat.
3
NO.: Z-6406 (Cont.)'
PLANNING COMMISSION ACTION: (OCTOBER 30, 1997)
The Chairman recognized Richard Wood, of the Staff, for pur=poses
of presenting the staff recommendation. wood began the
presentation by saying this item is paired with item #8 on the
agenda. This item proposes the one lot subdivision plat and the
item #8 is a planned development for purposes of locating a
commercial use on the one lot. Wood stated that both staff and
Public Works has some continuing questions about the design of
this proposal; therefore, their retention of the item on the
regular agenda.
Wood pointed out there were no objections to this proposal,
either the plat or the planned development and there were
apparently no objectors in attendance of today's meeting. He
stated there were a couple of informational calls from passersby
interested in what may be occurring.
The Chairman then asked if the applicant would come forward and
present item #2. Mr. Ron Tabor came to the lectern and
introduced himself and Mr. Steve Smith with his partner Bill
Carlton who are the prospective developers. He also introduced
the architect for the project. Mr. Tabor offered some background
on the companion project on the north side of Markham Street for
the Mazda dealership indicating the status of that project and
how they had worked through staff and through the Commission to
develop the property.
Mr. Tabor then offered a brief outline of the project, its
location relative to neighboring uses and identifying the site as
a somewhat unique property. He defined the abutting streets, the
status of the easement between Entergy Court and Markham and the
inability of this owner to remove that facility. He also
described Entergy in its relationship to the streets. He further
stated that there were some issues relative to landscaping and
setbacks that they have addressed. They identified the type of
use going on this property and the dealership involved and the
project will be developed to high standards. There will be nice
aesthetic features incorporated into the site because of some of
the comments that have been raised by staff. He stated the plan
would not take access to Markham Street but the private drive and
Entergy Court would be utilized for their total access.
He extended his presentation to describe where the building had
been previously sited on the plan, how they had moved it and how
the building had changed in its character. At the conclusion of
Mr. Tabor's remarks, the Chair asked if there was anyone present
that wanted to add comments in favor of the proposal. The
Chairman then asked if there were persons present in opposition.
There were apparently none.
Commissioner Brandon asked Mr. Tabor a question concerning the
trees on the site and how they would be dealt with in this
proposal. Mr. Tabor offered comments about the several trees
that might be saved and those which would obviously have to be
4
FILE NO.: Z-6406 (Cont.) '
removed. A landscape contractor would be dealing with tree
retention as well as the overall site preparation and stated that
they may come back and ask the city for a franchise to do
enhanced landscaping within the adjacent right-of-way. The -
discussion then continued at length between commissioners and Mr.
Tabor relative to saving various trees and how that might be
accomplished.
Commissioner Earnest inserted a question to the staff given what
has been said and the commitments made as to whether or not the
staff was willing to accept this proposal and change its
recommendation.
Jim Lawson, of the Staff, indicated yes. However, he expanded to
say the staff would like to enhance landscaping along Markham by
pushing the cars back somewhat. Mr. Tabor came back to the
lectern and addressed this point by pointing out how the site
plan has been and can be modified to incorporate the staff's
additional requirements. Lawson stated that with this change and
other items staff has worked out over the last couple weeks we
can accept the proposal.
Commissioner Putnam then asked a question of Mr. Tabor as to
whether this issue is open display use. After a brief discussion
about the use of the C-4 District versus the PCD District,
Commissioner Putnam understood this was not a relative issue to
the one he had been concerned with on Hwy. 10.
The Chairman then recognized Commissioner Daniel. Commissioner
Daniel stated that he could not support this proposal. He
indicated that he had previously been presented with another plan
that is completely different from this one. He offered an
extensive commentary on his concerns about people not following
through on plans and then changing without commission involvement
or observation of the amendments. Mr. Tabor pointed out this
plan as presented is exactly what the developer will do if it is
approved. Mr. Tabor then followed this remark with another
extensive review of the proposal as it now exists. The concerns
that were expressed by several commissioners and staff resulted
in another comment by commissioners stating that we should
perhaps look at the protocol surrounding the manner in which
applications are closed prior to a hearing.
Commissioner Adcock pointed out that at the Subdivision Committee
meeting it was specifically suggested to the applicant that they
move the building from the east to the west end of the site to
better retain landscaping and do less damage to the property.
Commissioner Putnam then injected comments concerning how the
Subdivision Committee was perhaps placed in difficult
circumstance dealing with the site plans. Jim Lawson instructed
the Chairman that perhaps David Scherer, of Public Works, had
comments to offer. Scherer's comments dealt with Entergy Court
the manner in which it was constructed and how it was not
dedicated as a public street, design problems on the corners with
deficient radii, etc. Also, he pointed again to the undedicated
5
FILE NO.: Z-6406 (Cont.
driveway that connects two public streets along the west boundary
of this site. Scherer indicated that there was a requirement for
sidewalk along Entergy that had not been dealt with or discussed
at this point as well as dedication of sufficient right-of4'kay
for this commercial street. He stated that, although this is a
PD -C application, there is a preliminary plat attached which is
item #2 of this agenda. This plat does require sidewalk and
dedication of street right-of-way. He stated that Public Works
recommends these items be provided for in the preliminary plat.
The Chairman then recognized Mr. Joe White for purposes of
discussing these potential waivers. He stated that this private
drive connecting the two streets was required by city at the time
the Rock Creek Parkway was created which was the forerunner to
Chenal Parkway. He said this driveway was constructed because it
solved a site distance problem. He stated Energy Drive was a
private drive and with this narrow site dedication would impact
the development. It would affect the number of parking spaces
that could be gained as well as the landscaping. Jim Lawson
inserted a comment at this point. City staff had looked at
attempting to close this private drive between the two streets
and found that it could not be done. Lawson stated that he felt
the city should look at this as an existing condition and go on
with this project.
The Chairman asked for clarification on this since the
recommendation apparently included the sidewalk and some comments
from Public Works. He stated he did not see this item concerning
dedication of right-of-way in the write-up. Lawson instructed
the Chairman that on the sidewalk issue what the Commission
needed to do was to recommend to the Board the waiver of the
sidewalk and specifically state the City does not want the
sidewalk.
The Chairman stated this issue needs to be clarified because
there are no specific waivers requested in the application. For
the next several comments, Mr. Tabor specifically stated he did
not want to build the sidewalk along Entergy Court. Again,
questions return to the private drive running between Markham and
Entergy Court as to its status and how it might be dealt with.
David Scherer, of Public Works, said he was simply trying to gain
the status of this roadway as a properly dedicated street since
it was functioning as such. He stated its functioning as such
should be dedicated. He reiterated a prior comment saying that
the sidewalk should be built and the right-of-way should be
dedicated on Entergy Drive. He also stated they could request
waivers of these, however, Public Works, recommendation remains
the same. Scherer stated that the right-of-way that normally
would be required for Entergy Court would be 60 feet, but the
Commission could accept a lesser amount. Scherer stated the
current street was a 36 foot pavement that normally requires a
60 foot right-of-way.
Questions posed by Commissioner Hawn as to whether or not
dedication could not simply occur from the centerline to the
6
FILE NO.: 2-6406 (Cont.
existing improvements. He asked whether or not the developer
would be willing to dedicate that.
A lengthy discussion followed during which Mr. Tabor finally
announced they could dedicate the portion of the existing street
that would be appropriate to their side. Commissioner Hawn asked
for verification as to what this waiver would fall under the plat
or the PD -C. It was determined that it would be the plat, item
#2 on this agenda.
Commissioner McCarthy raised a question about the possibility of
the future owner and protecting the dedication of the right-of-
way. She was assured that if it is accomplished on this plat,
then this would be the case. Lawson clarified if the developer
at this point dedicated the built roadway and this is the right-
of-way the city will accept and maintain from now on. This
dedication would be the existing road width. In response to
Commissioner McCarthy's question "is there some way to ever
capture the 60 feet." The response was no.
At this point, the Chairman instructed the Commission and staff
that Commissioner Hawn would attempt a motion on this
application. He began by making a motion that included only item
#2 be approved as filed with the applicant agreeing to dedicate
the private drive to its current constructed width along the west
boundary and that sidewalks not be constructed along Entergy
Drive. Commissioner Earnest injected a thought prior to the vote
that there are all kinds of issues outlined in the write-up which
are contrary to the motion that is on the floor. The Chairman
and others pointed out this was understood. The vote on
Commissioner Hawn's motion passed by a vote of 9 ayes, 1 nay and
1 absent.
Commissioner Hawn was then recognized for purposes of offering a
motion on item #8, the PD -C application. Commissioner Hawn
offered a motion for approval of the site plan as modified in
conformance with the staff's comments. The motion was seconded.
A vote on the motion produced a vote of 9 ayes, 0 nays and
1 absent.
7
Octobbr 30, 1997
ITEM NO.: 8 FILE NO.: Z-6406
NAME: Parkway Motors PD -C Short -Form
LOCATION: 12200 Block of West Markham Street
DEVELOPER:
ENGINEER•
Ron Tabor Joe White, Jr.
Flake, Tabor, Turner & Kelly White-Daters and Assoc.
425 W. Capitol Ave. 401 Victory Street
Little Rock, AR 72201 Little Rock, AR 72201
376-8005 374-1666
AREA: 0.71 acres NUMBER OF LOTS: 1 FT. NEW STREET: None
ZONING: C-3 ALLOWED USES:
(being rezoned to PD -C)
PROPOSED USE:
VARIANCES/WAIVERS REQUESTED: None
BACKGROUND:
Auto Dealership (Mazda)
No other use indicated.
Auto Sales
This tract is a remnant from the various actions that created the
Rock Creek Parkway and later what is now Chenal Parkway. When
Markham Street was realigned to the north, this triangle was
created. Most of the time since annexation this lot has been
zoned C-3.
A. PROPOSALIRE4UEST:
To create a commercial lot with one building and twenty-nine
(29) parking spaces. The intended use is auto sales allied
with the new Mazda dealer being developed across Markham
Street. There will be no access from W. Markham Street.
Vehicle access will be on Entergy Drive and an easement next
to Luby Cafeteria.
B. EXISTING CONDITIONS:
The lot is a raised island between Entergy Dr. and W.
Markham Street. There are a few mature trees some of which
could be saved with good design.
October 30, 1997
SUBDIVISION
ITEM NO.: 8 Cont. FILE NO.: Z-5406
This island fronts on Markham Street but has a driveway
along the west boundary that will affect all aspects of the
commercial use of the land. That drive has a large Entergy
power line and easement, overlaying, that restricts usage.
C. NEIGHBORHOOD COMMENTS:
None received at this writing. The -Birchwood Neighborhood
Association and all abutting owners were notified.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. W. Markham Street is listed on the MSP as a minor
arterial. A dedication of right-of-way to 45 feet from
the centerline of Markham is required.
2. A 22.5' radial dedication, including the triangular
piece across Entergy Court, is required at the
intersection of Markham and Entergy Court.
3. Provide design of streets conforming to the MSP.
Construct one half street improvements to W. Markham
including sidewalk with construction of building.
4. Driveways shall conform to Sec. 31-210 or Ordinance
16,577. Combine the two entrances off of Entergy Court
and it needs to be a minimum of 100 feet from the
intersection of Entergy and Markham.
5. Close the private drive between Entergy Court and
Markham and construct a commercial standard cul-de-sac
at the terminus of Entergy Court.
6. Construct 5' wide sidewalk along Entergy Court and
Markham at back of right-of-way.
7. Provide an eight foot deep back -out for cars at west end
of parking lot.
8. All driveways shall be concrete aprons.
9. Markham has a 1995 average daily traffic count of
11,000.
10. Repair or replace any damaged improvements in the right-
of-way prior to occupancy.
E. UTILITIES AND FIRE DEPARTMENTICOUNTY PLANNING:
Wastewater: Sewer main required with easements.
AP&L: No response.
Arkla: OK as submitted.
Southwestern Bell: OK as submitted.
Water: The existing 12" water main crossing this property
may be farther east than is shown. This main should be
field located. The existing waterline easement is not
shown. Additional easement may be required.
Fire Department: Review with Water Works on hydrant need
for location.
K
October 30, 1997
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z-5405
County Planning: No Comment - inside city
CATA: No response. Nearest bus route at Bowman Road and
Markham. Turns south to Wal-Mart.
F. ISSUES/TECHNICAL/DESIGN:
Landscape:
Areas set aside for landscaping and buffers technically meet
with the ordinance requirements. However, if this property
were to have a typical "C-4" zoning for outdoor display no
merchandise would be allowed to be displayed within the
front 20 feet of the property. Instead, that area would be
reserved for grass and shrubs.
Curb and gutter or another protective border will be
required to protect landscaped areas from vehicular traffic.
Planning Division:
G. ANALYSIS•
This site is in the Ellis Mountain District. The Plan
recommends commercial use. The commercial use is consistent
with the Plan. Note this is a "C-411, Open Display, use
which was not the intended use for this area. Three other
PD -C "C-4" uses have been reviewed and approved, they were
commercial and a PZD. Staff has some concern about
continuing this practice.
H. STAFF RECOMMENDATIONS:
Denial of the PD -c in its current form and suggest a new
design approach that will address the need to maintain more
open space while reducing conflict with the west drive. The
closure and reuse of the west drive is strongly encouraged
to have better vehicle display and lower impact visually.
SUBDIVISION COMMITTEE COMMENT:
(OCTOBER 9, 1997)
Mr. Joe White was presented for the owner. Staff presented its
comments and concerns about plat content and design. A lengthy
discussion followed with the Committee asking a number of
questions about this PD -C application. The Committee observed
that plat and PD -C issues are closely tied, with the PD -C
affecting the plats final configuration.
3
October 30, 1997
SUBDIVISION
ITEM NO.: 8 Cont. FILE NO.: Z-6406
The Committee discussed the elimination of the west drive to
create a better lot, how the building lines could be modified to
help the site buildability and parking arrangement.
After closing comment by Public Works staff, the Committee
forwarded the matter to the full Commission for resolution in
conjunction with the plat.
PLANNING COMMISSION ACTION:
(OCTOBER 30, 1997)
The Chairman recognized Richard Wood, of the Staff, for purposes
of presenting the staff recommendation. Wood began the
presentation by saying this item is paired with item #8 on the
agenda. This item proposes the one lot subdivision plat and the
item #8 is a planned development for purposes of locating a
commercial use on the one lot. wood stated that both staff and
Public Works has some continuing questions about the design of
this proposal; therefore, their retention of the item on the
regular agenda.
Wood pointed out there were no objections to this proposal,
either the plat or the planned development and there were
apparently no objectors in attendance of today's meeting. He
stated there were a couple of informational calls from passersby
and interested in what may be occurring.
The Chairman then asked if the applicant would come forward and
present item #2. Mr. Ron Tabor came to the lectern and
introduced himself and Mr. Steve Smith with his partner Bill
Carlton who are the prospective developers. He also introduced
the architect for the project. Mr. Tabor offered some background
on the companion project on the north side of Markham Street for
the Mazda dealership indicating the status of that project and
how they had worked through staff and through the Commission to
develop the property.
Mr. Tabor then offered a brief outline of the project, its
location relative to neighboring uses and identifying the site as
a somewhat unique property. He defined the abutting streets, the
status of the easement between Entergy Court and Markham and the
inability of this owner to remove that facility. He also
described Entergy in its relationship to the streets. He further
stated that there were some issues relative to landscaping and
setbacks that they have addressed. They identified the type of
use going on this property and the dealership involved and the
project will be developed to high standards. There will be nice
aesthetic features incorporated into the site because of some of
the comments that have been raised by staff. He stated the plan
would not take access to Markham Street but the private drive and
Entergy Court would be utilized for their total access.
4
October 30, 1997
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z--6406
He extended his presentation to describe where the building had
been previously sited on the plan, how they had moved it and how
the building had changed in its character. At the conclusion of
Mr. Tabor's remarks, the Chair asked if there was anyone present
that wanted to add comments in favor of the proposal. The
Chairman then asked if there were persons present in opposition.
There were apparently none.
Commissioner Brandon asked Mr. Tabor a question concerning the
trees on the site and how they would be dealt with in this
proposal. Mr. Tabor offered comments about the several trees
that might be saved and those which would obviously have to be
removed. A landscape contractor would be dealing with tree
retention as well as the overall site of preparation and stated
that they may come back and ask the city for a franchise to do
enhanced landscaping within the adjacent right-of-way. The
discussion then continued in length between commissioners and Mr.
Tabor relative to saving various trees and how that might be
accomplished.
Commissioner Earnest inserted a question to the staff given what
has been said and the commitments made as to whether or not the
staff was willing to accept this proposal and change its
recommendation.
Jim Lawson, of the Staff, indicated yes. However, he expanded to
say the staff would like to enhance landscaping along Markham by
pushing the cars back somewhat. Mr. Tabor came back to the
lectern and addressed this point by pointing out how the site
plan has been and can be modified to incorporate the staff's
additional requirements. Lawson stated that with this change and
other items staff has worked out over the last couple weeks we
can accept the proposal.
Commissioner Putnam then asked a question of Mr. Tabor as to
whether this issue is open display use. After a brief discussion
about the use of the C-4 District versus the PCD District,
Commissioner Putnam understood this was not a relative issue to
the one he had been concerned with on Hwy. 10.
The Chairman then recognized Commissioner Daniel. Commissioner
Daniel stated that he could not support this proposal. He
indicated that he had previously been presented with another plan
that is completely different from this one. He offered an
extensive commentary on his concerns about people not following
through on plans and then changing without commission involvement
or observation of the amendments. Mr. Tabor pointed out this
plan as presented is exactly what the developer will do if it is
approved. Mr. Tabor then followed this remark with another
extensive review of the proposal as it now exist. The concerns
that were expressed by several commissioners and staff resulted
in another comment by commissioners stating that we should
6•i
Octobhr 30, 1997
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z-6406
perhaps look at the protocol surrounding the manner in which
applications are closed prior to a hearing.
Commissioner Adcock pointed out that at the Subdivision Committee
meeting it was specifically suggested to the applicant that they
move the building from the east to the west end of the site to
better retain landscaping and do less damage to the property.
Commissioner Putnam then injected comments concerning how the
Subdivision Committee was perhaps placed in difficult
circumstance was dealing with the site plans. Jim Lawson
instructed the Chairman that perhaps David Scherer, of Public
Works, had comments to offer. Scherer's comments dealt with
Entergy Court the manner in which it was constructed and how it
was not dedicated as a public street, design problems on the
corners with deficient radii, etc. Also, he pointed again to the
undedicated driveway that connects two public streets along the
west boundary of this site. Scherer indicated that there was a
requirement for sidewalk along Entergy that had not been dealt
with or either discussed at this point as well as dedication of
sufficient right-of-way for this commercial street. He stated
although this is a PD -C application, there is a preliminary plat
attached which is item #2 of this agenda. This plat does require
sidewalk and dedication of street right-of-way. He stated that
Public Works recommends these items be provided for in the
preliminary plat.
The Chairman then recognized Mr. Joe White for purposes of
discussing these potential waivers. He stated that this private
drive connecting the two streets was required by city at the time
the Rock Creek Parkway was created which was the forerunner to
Chenal Parkway. He said this driveway was constructed because it
solved a site distance problem. He stated Energy Drive was a
private drive and with this narrow site dedication would impact
the development. It would effect the number of parking spaces
that could be gained as well as the landscaping. Jim Lawson
inserted a comment at this point. City staff had looked at
attempting to close this private drive between the two streets
and found that it could not be done. Lawson stated that he felt
the city should look at this as an existing condition and go on
with this project.
The Chairman asked for clarification on this since the
recommendation apparently included the sidewalk and some comments
from Public Works. He stated he did not see this item concerning
dedication of right-of-way in the write-up. Lawson instructed
the Chairman that on the sidewalk issue what the Commission
needed to do was to recommend to the Board the waiver of the
sidewalk and specifically state the City does not want the
sidewalk.
6
October 30, 1997
SUBDIVISION
ITEM NO.: $ Cont. FILE NO.: Z-6406
The Chairman stated this issue needs to be clarified because
there are no specific waivers requested in the application. For
the next several comments, Mr. Tabor specifically stated he did
not want to build the sidewalk along Entergy Court. Again,
questions return to the private drive running between Markham and
Entergy Court as to its status and how it might be dealt with.
David Scherer, of Public Works, said he was simply trying to gain
the status of this roadway as a properly dedicated street since
it was functioning as such. He stated its functioning as such
should be dedicated. He reiterated a prior comment saying that
the sidewalk should be built and the right-of-way should be
dedicated on Entergy Drive. He also stated they could request
waivers of these, however, Public Works' recommendation remains
the same. Scherer stated that the right-of-way that normally
would be required for Entergy Court would be 60 feet, but the
Commission could accept a less amount. Scherer stated the
current street was a 36 foot pavement that normally requires a
60 foot right-of-way.
Questions posed by Commissioner Hawn as to whether or not
dedication could not simply occur from the centerline to the
existing improvements. He asked whether or not the developer
would be willing to dedicate that.
A lengthy discussion followed during which Mr. Tabor finally
announced they could dedicate the portion of the existing street
that would be appropriate to their side. Commissioner Hawn asked
for verification as to what this waiver would fall under the plat
or the PD -C. It was determined that it would be the plat, item
#2 on this agenda.
Commissioner McCarthy raised a question about the possibility of
the future owner and protecting the dedication of the right-of-
way. She was assured that if it is accomplished on this plat,
then this would be the case. Lawson clarified if the developer
at this point dedicated the built roadway and this is the right-
of-way the city will accept and maintain from now on. This
dedication would be the existing road width. In response to
Commissioner McCarthy's question about is there some way to ever
capture the 60 feet and the response was no.
At this point, the Chairman instructed the Commission and staff
that Commissioner Hawn would attempt a motion on this
application. He began by making a motion that included only item
#2 be approved as filed with the applicant agreeing to dedicate
the private drive to its current constructed width along the west
boundary and that sidewalks not be constructed along Entergy
Drive. Commissioner Earnest injected a thought prior to the vote
that there are all kinds of issues outlined in the write-up which
are contrary to the motion that is on the floor. The Chairman
and others pointed out this was understood. The vote on
7
6ctober 30, 1997
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z-6406
Commissioner Hawn's motion passed by a vote of 9 ayes, 1 nay and
1 absent.
Commissioner Hawn was then recognized for purposes of offering a
motion on item #8, the PD -C application. Commissioner Hawn
offered a motion for approval of the site plan as modified in
conformance with the staff's comments. The motion was seconded.
A vote on the motion produced a vote of 9 ayes, 0 nays and
1 absent.
8
,Octol?er 30, 1997
SUBDIVISION
ITEM NO.: $ Cont. FILE NO.: Z-6406
The Committee discussed the elimination of the west drive to
create a better lot, how the building lines could be modified to
help the site buildability and parking arrangement.
After closing comment by Public
forwarded the matter to the full
conjunction with the plat.
PLANNING COMMISSION ACTION:
Works staff, the Committee
Commission for resolution in
(OCTOBER 30, 1997)
The Chairman recognized Richard Wood, of the Staff, for purposes
of presenting the staff recommendation. Wood began the
presentation by saying this item is paired with item #8 on the
agenda. This item proposes the one lot subdivision plat and the
item #8 is a planned development for purposes of locating a
commercial use on the one lot. Wood stated that both staff and
Public Works has some continuing questions about the design of
this proposal; therefore, their retention of the item on the
regular agenda.
Wood pointed out there were no objections to this proposal,
either the plat or the planned development and there were
apparently no objectors in attendance of today's meeting. He
stated there were a couple of informational calls from passersby
interested in what may be occurring.
The Chairman then asked if the applicant would come forward and
present item #2. Mr. Ron Tabor came to the lectern and
introduced himself and Mr. Steve Smith with his partner Bill
Carlton who are the prospective developers. He also introduced
the architect for the project. Mr. Tabor offered some background
on the companion project on the north side of Markham Street for
the Mazda dealership indicating the status of that project and
how they had worked through staff and through the Commission to
develop the property.
Mr. Tabor then offered a brief outline of the project, its
location relative to neighboring uses and identifying the site as
a somewhat unique property. He defined the abutting streets, the
status of the easement between Entergy Court and Markham and the
inability of this owner to remove that facility. He also
described Entergy in its relationship to the streets. He further
stated that there were some issues relative to landscaping and
setbacks that they have addressed. They identified the type of
use going on this property and the dealership involved and the
project will be developed to high standards. There will be nice
aesthetic features incorporated into the site because of some of
the comments that have been raised by staff. He stated the plan
would not take access to Markham Street but the private drive and
Entergy Court would be utilized for their total access.
4
October 30, 1997
SUBDIVISION
ITEM NO.: $ Cont. FILE NO.: Z-6406
He extended his presentation to describe where the building had
been previously sited on the plan, how they had moved it and how
the building had changed in its character. At the conclusion of
Mr. Tabor's remarks, the Chair asked if there was anyone present
that wanted to add comments in favor of the proposal. The
Chairman then asked if there were persons present in opposition.
There were apparently none.
Commissioner Brandon asked Mr. Tabor a question concerning the
trees on the site and how they would be dealt with in this
proposal. Mr. Tabor offered comments about the several trees
that might be saved and those which would obviously have to be
removed. A landscape contractor would be dealing with tree
retention as well as the overall site preparation and stated that
they may come back and ask the city for a franchise to do
enhanced landscaping within the adjacent right-of-way. The
discussion then continued at length between commissioners and Mr.
Tabor relative to saving various trees and how that might be
accomplished.
Commissioner Earnest inserted a question to the staff given what
has been said and the commitments made as to whether or not the
staff was willing to accept this proposal and change its
recommendation.
Jim Lawson, of the Staff, indicated yes. However, he expanded to
say the staff would like to enhance landscaping along Markham by
pushing the cars back somewhat. Mr. Tabor came back to the
lectern and addressed this point by pointing out how the site
plan has been and can be modified to incorporate the staff's
additional requirements. Lawson stated that with this change and
other items staff has worked out over the last couple weeks we
can accept the proposal.
Commissioner Putnam then asked a question of Mr. Tabor as to
whether this issue is open display use. After a brief discussion
about the use of the C-4 District versus the PCD District,
Commissioner Putnam understood this was not a relative issue to
the one he had been concerned with on Hwy. 10.
The Chairman then recognized Commissioner Daniel. Commissioner
Daniel stated that he could not support this proposal. He
indicated that he had previously been presented with another plan
that is completely different from this one. He offered an
extensive commentary on his concerns about people not following
through on plans and then changing without commission involvement
or observation of the amendments. Mr. Tabor pointed out this
plan as presented is exactly what the developer will do if it is
approved. Mr. Tabor then followed this remark with another
extensive review of the proposal as it now exists. The concerns
that were expressed by several commissioners and staff resulted
in another comment by commissioners stating that we should
6i
,October 30, 1997
SUBDIVISION
ITEM NO.: 8(colt.)_FILE NO.: Z-6406
perhaps look at the protocol surrounding the manner in which
applications are closed prior to a hearing.
Commissioner Adcock pointed out that at the Subdivision Committee
meeting it was specifically suggested to the applicant that they
move the building from the east to the west end of the site to
better retain landscaping and do less damage to the property.
Commissioner Putnam then injected comments concerning how the
Subdivision Committee was perhaps placed in difficult
circumstance dealing with the site plans. Jim Lawson instructed
the Chairman that perhaps David Scherer, of Public Works, had
comments to offer. Scherer's comments dealt with Entergy Court
the manner in which it was constructed and how it was not
dedicated as a public street, design problems on the corners with
deficient radii, etc. Also, he pointed again to the undedicated
driveway that connects two public streets along the west boundary
of this site. Scherer indicated that there was a requirement for
sidewalk along Entergy that had not been dealt with or discussed
at this point as well as dedication of sufficient right-of-way
for this commercial street. He stated that, although this is a
PD -C application, there is a preliminary plat attached which is
item #2 of this agenda. This plat does require sidewalk and
dedication of street right-of-way. He stated that Public Works
recommends these items be provided for in the preliminary plat.
The Chairman then recognized Mr. Joe White for purposes of
discussing these potential waivers. He stated that this private
drive connecting the two streets was required by city at the time
the Rock Creek Parkway was created which was the forerunner to
Chenal Parkway. He said this driveway was constructed because it
solved a site distance problem. He stated Energy Drive was a
private drive and with this narrow site dedication would impact
the development. It would affect the number of parking spaces
that could be gained as well as the landscaping. Jim Lawson
inserted a comment at this point. City staff had looked at
attempting to close this private drive between the two streets
and found that it could not be done. Lawson stated that he felt
the city should look at this as an existing condition and go on
with this project.
The Chairman asked for clarification on this since the
recommendation apparently included the sidewalk and some comments
from Public Works. He stated he did not see this item concerning
dedication of right-of-way in the write-up. Lawson instructed
the Chairman that on the sidewalk issue what the Commission
needed to do was to recommend to the Board the waiver of the
sidewalk and specifically state the City does not want the
sidewalk.
The Chairman stated this issue needs to be clarified because
there are no specific waivers requested in the application. For
11
.October 30, 1997
SUBDIVISION
ITEM NO.: 8 Cont. FILE NO.: z-6406
the next several comments, Mr. Tabor specifically stated he did
not want to build the sidewalk along Entergy Court. Again,
questions return to the private drive running between Markham and
Entergy Court as to its status and how it might be dealt with.
David Scherer, of Public Works, said he was simply trying to gain
the status of this roadway as a properly dedicated street since
it was functioning as such. He stated its functioning as such
should be dedicated. He reiterated a prior comment saying that
the sidewalk should be built and the right-of-way should be
dedicated on Entergy Drive. He also stated they could request
waivers of these, however, Public Works' recommendation remains
the same. Scherer stated that the right-of-way that normally
would be required for Entergy Court would be 60 feet, but the
Commission could accept a lesser amount. Scherer stated the
current street was a 36 foot pavement that normally requires a
60 foot right-of-way.
Questions posed by Commissioner Hawn as to whether or not
dedication could not simply occur from the centerline to the
existing improvements. He asked whether or not the developer
would be willing to dedicate that.
A lengthy discussion followed during which Mr. Tabor finally
announced they could dedicate the portion of the existing street
that would be appropriate to their side. Commissioner Hawn asked
for verification as to what this waiver would fall under the plat
or the PD -C. It was determined that it would be the plat, item
#2 on this agenda.
Commissioner McCarthy raised a question about the possibility of
the future owner and protecting the dedication of the right-of-
way. She was assured that if it is accomplished on this plat,
then this would be the case. Lawson clarified if the developer
at this point dedicated the built roadway and this is the right-
of-way the city will accept and maintain from now on. This
dedication would be the existing road width. In response to
Commissioner McCarthy's question "is there some way to ever
capture the 60 feet." The response was no.
At this point, the Chairman instructed the Commission and staff
that Commissioner Hawn would attempt a motion on this
application. He began by making a motion that included only item
#2 be approved as filed with the applicant agreeing to dedicate
the private drive to its current constructed width along the west
boundary and that sidewalks not be constructed along Entergy
Drive. Commissioner Earnest injected a thought prior to the vote
that there are all kinds of issues outlined in the write-up which
are contrary to the motion that is on the floor. The Chairman
and others pointed out this was understood. The vote on
Commissioner Hawn's motion passed by a vote of 9 ayes, 1 nay and
1 absent.
7
.October 30, 1997
SUBDIVISION
ITEM NO.• 8 Cont. FILE NO.! z-540.
Commissioner Hawn was then recognized for purposes of offering a
motion on item #8, the PD -C application. Commissioner Hawn
offered a motion for approval of the site plan as modified in
conformance with the staff's comments. The motion was seconded.
A vote on the motion produced a vote of 9 ayes, 0 nays and
1 absent.
8