HomeMy WebLinkAboutZ-6365 MapC
P\05ijence
Fence is abuttirq
Property line
I
— 12' Prive Gate
Property Line
Fence
2" sa, post
�dqe of
Pavement
r
0
L — 4' Walk Gate -
5dewalk
Curb
12th Street
rencina Plan
5ca1e: I / 8" - I' - 0"
FMCIr 51 0101\15 - GMP.AI, M591"ON .
2 Fan - 51ncile elevation
Pickets on 5" centers, overlay construction
pickets; 3/ 4" x 3/ 4" x 16 gaige steel tubing tapped with decorative cast spear points,
gads; 11/ 4" -%We tubrq
posts: 2" scjare 1/ 8 wall
FAINICA11ON \ CON511;Ia ON PlZOCWL9:
Metal preparation — prior to fabrication
After metal Is cut to proper length, pass it thra4 a de- greasing sdutlon and
presstye wash to remove debris,
After fabrication into fence sections, buff and wipe doyen with mineral spirits
for proper adhesion when pai rtimi.
PAINT 5CI-OU rR WA, H''Ot?UCf5 W05W fO War
A two step process consisting of irAmtrlal grade oil based eraW15,
Step I — coverage f all surfaces with a primer coat.
Step 2 — A top coat of kndustrii grade enamel customer choice of colo-,
FEW MOON Pgocew
Metal Im posts are fabricated, painted and set; If set in earth, posts are set in
concrete; If on concrete, posts are fabricated W'01 metal font plate which
Is attached to Concrete,
After metal Ire posts and/ or brick or rock column are set r puce ( no further that
10'— 0" apart) , exact field measurements are taken,
Fence sections are fabricated and painted in the plant,
Painted fence sedlons are welded in place at the site,
rl We M51GN:
Face along 12th street shall be as shown on plan.
fencealorq M5 skeet shall be raked - fdlowinq contrir of ciround,
14+- I I. 4' Walk Gate
fol
Fence Nevation --- 12th Street
5cAe: 1/8'' - 1'-0"
y
C
P\05ijence
Fence is abuttirq
Property line
I
— 12' Prive Gate
Property Line
Fence
2" sa, post
�dqe of
Pavement
r
0
L — 4' Walk Gate -
5dewalk
Curb
12th Street
rencina Plan
5ca1e: I / 8" - I' - 0"
FMCIr 51 0101\15 - GMP.AI, M591"ON .
2 Fan - 51ncile elevation
Pickets on 5" centers, overlay construction
pickets; 3/ 4" x 3/ 4" x 16 gaige steel tubing tapped with decorative cast spear points,
gads; 11/ 4" -%We tubrq
posts: 2" scjare 1/ 8 wall
FAINICA11ON \ CON511;Ia ON PlZOCWL9:
Metal preparation — prior to fabrication
After metal Is cut to proper length, pass it thra4 a de- greasing sdutlon and
presstye wash to remove debris,
After fabrication into fence sections, buff and wipe doyen with mineral spirits
for proper adhesion when pai rtimi.
PAINT 5CI-OU rR WA, H''Ot?UCf5 W05W fO War
A two step process consisting of irAmtrlal grade oil based eraW15,
Step I — coverage f all surfaces with a primer coat.
Step 2 — A top coat of kndustrii grade enamel customer choice of colo-,
FEW MOON Pgocew
Metal Im posts are fabricated, painted and set; If set in earth, posts are set in
concrete; If on concrete, posts are fabricated W'01 metal font plate which
Is attached to Concrete,
After metal Ire posts and/ or brick or rock column are set r puce ( no further that
10'— 0" apart) , exact field measurements are taken,
Fence sections are fabricated and painted in the plant,
Painted fence sedlons are welded in place at the site,
rl We M51GN:
Face along 12th street shall be as shown on plan.
fencealorq M5 skeet shall be raked - fdlowinq contrir of ciround,
14+- I I. 4' Walk Gate
fol
Fence Nevation --- 12th Street
5cAe: 1/8'' - 1'-0"