Loading...
HomeMy WebLinkAboutZ-6365 MapC P\05ijence Fence is abuttirq Property line I — 12' Prive Gate Property Line Fence 2" sa, post �dqe of Pavement r 0 L — 4' Walk Gate - 5dewalk Curb 12th Street rencina Plan 5ca1e: I / 8" - I' - 0" FMCIr 51 0101\15 - GMP.AI, M591"ON . 2 Fan - 51ncile elevation Pickets on 5" centers, overlay construction pickets; 3/ 4" x 3/ 4" x 16 gaige steel tubing tapped with decorative cast spear points, gads; 11/ 4" -%We tubrq posts: 2" scjare 1/ 8 wall FAINICA11ON \ CON511;Ia ON PlZOCWL9: Metal preparation — prior to fabrication After metal Is cut to proper length, pass it thra4 a de- greasing sdutlon and presstye wash to remove debris, After fabrication into fence sections, buff and wipe doyen with mineral spirits for proper adhesion when pai rtimi. PAINT 5CI-OU rR WA, H''Ot?UCf5 W05W fO War A two step process consisting of irAmtrlal grade oil based eraW15, Step I — coverage f all surfaces with a primer coat. Step 2 — A top coat of kndustrii grade enamel customer choice of colo-, FEW MOON Pgocew Metal Im posts are fabricated, painted and set; If set in earth, posts are set in concrete; If on concrete, posts are fabricated W'01 metal font plate which Is attached to Concrete, After metal Ire posts and/ or brick or rock column are set r puce ( no further that 10'— 0" apart) , exact field measurements are taken, Fence sections are fabricated and painted in the plant, Painted fence sedlons are welded in place at the site, rl We M51GN: Face along 12th street shall be as shown on plan. fencealorq M5 skeet shall be raked - fdlowinq contrir of ciround, 14+- I I. 4' Walk Gate fol Fence Nevation --- 12th Street 5cAe: 1/8'' - 1'-0" y C P\05ijence Fence is abuttirq Property line I — 12' Prive Gate Property Line Fence 2" sa, post �dqe of Pavement r 0 L — 4' Walk Gate - 5dewalk Curb 12th Street rencina Plan 5ca1e: I / 8" - I' - 0" FMCIr 51 0101\15 - GMP.AI, M591"ON . 2 Fan - 51ncile elevation Pickets on 5" centers, overlay construction pickets; 3/ 4" x 3/ 4" x 16 gaige steel tubing tapped with decorative cast spear points, gads; 11/ 4" -%We tubrq posts: 2" scjare 1/ 8 wall FAINICA11ON \ CON511;Ia ON PlZOCWL9: Metal preparation — prior to fabrication After metal Is cut to proper length, pass it thra4 a de- greasing sdutlon and presstye wash to remove debris, After fabrication into fence sections, buff and wipe doyen with mineral spirits for proper adhesion when pai rtimi. PAINT 5CI-OU rR WA, H''Ot?UCf5 W05W fO War A two step process consisting of irAmtrlal grade oil based eraW15, Step I — coverage f all surfaces with a primer coat. Step 2 — A top coat of kndustrii grade enamel customer choice of colo-, FEW MOON Pgocew Metal Im posts are fabricated, painted and set; If set in earth, posts are set in concrete; If on concrete, posts are fabricated W'01 metal font plate which Is attached to Concrete, After metal Ire posts and/ or brick or rock column are set r puce ( no further that 10'— 0" apart) , exact field measurements are taken, Fence sections are fabricated and painted in the plant, Painted fence sedlons are welded in place at the site, rl We M51GN: Face along 12th street shall be as shown on plan. fencealorq M5 skeet shall be raked - fdlowinq contrir of ciround, 14+- I I. 4' Walk Gate fol Fence Nevation --- 12th Street 5cAe: 1/8'' - 1'-0"