HomeMy WebLinkAboutZ-6324 Staff AnalysisJune 26, 1997
ITEM NO.: 7 FILE NO.: Z-6324
NAME: Lot #3 GCC Addition Site Plan Review
LOCATION: 12,900 Cantrell Road
DEVELOPER: ENGINEER:
Richard Toll Joe White
10121 North Rodney Parham White-Daters and Associates
Suite 12A 401 South Victory Street
Little Rock, AR 72207 Little Rock, AR 72201
AREA: 2.9 acres NUMBER OF LOTS: N/A FT. NEW STREET: 0
ZONING• 0-2
PLANNING DISTRICT:
CENSUS TRACT: 42.05
PROPOSED USES: Office
#1 River Mountain
VARIANCES/WAIVERS/DEFERRAL REQUESTED: None
BACKGROUND:
This site is an out parcel in front of Grace Community Church at
12,900 Cantrell Road. Access will be taken from a common drive
shared with the church.
A. PROPOSAL:
The applicant proposes two office buildings in Phase I of
4,612 and 7,486 square feet. They are connected by a
breeze -way. Phase II includes a 9,480 square foot building
that faces west. Each phase will provide an adequate number
of parking spaces to stand alone.
B. EXISTING CONDITIONS:
The site is vacant and fronts on Cantrell Road (Highway 10).
Nationwide Insurance is too the west, Grace Community Church
north, Cantrell Road south, and Rock Mountain Cemetery east.
C. NEIGHBORHOOD COMMENTS:
Property owners within 200 feet of the site were notified as
required. Staff has received no adverse comments from the
public.
June 26, 1997
SUBDIVISION
ITEM NO.• 7(Cont.)FILE NO.• Z-6324
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. -National Pollutant Discharge System (NPDES) and grading
permits are required prior to construction, site grading
and drainage plan will need to be submitted and approved.
2. Sidewalk required on both frontages of lot.
3. Stormwater detention ordinance applies to this property.
4. Hwy. 10 is a principal arterial on the Master Street
Plan, dedication of right-of-way to 55 feet from
centerline will be required.
5. Hwy. 10 has a 1995 average daily traffic count of 14,000.
6. Contact the AHTD for permit prior to construction within
the State Highway right-of-way.
E. UTILITIES:
Wastewater: Sewer available
AP&L: No Response.
Arkla: No Response.
Southwestern Bell: No Response.
Water: Pro rata front footage charge of $15/foot applies
in addition to normal charges.
Fire Department: Are buildings to be sprinkled?
County Planning:
LATA: Not transmitted.
F. ISSUES TECHNICAL DESIGN:
Issues:
e Buildings to conform to all 0-2 building standards.
9 Permitted uses to comply with the 0-2 zoning.
r. Highway 10 Overlay requirements for signage and lighting
i Staff has received no information on design or
elevations.
Planning Division: N/A
Landscape:
Proposed areas set aside for landscaping and buffer meet
with the Highway #10 Overlay District requirements.
The Overlay District requires that a sprinkler system be
provided to water landscaped areas.
E
June 26, 1997
SUBDIVISION
ITEM NO.: 7 Cont. FILE NO.: Z-6324
The proposed interior landscaping islands within the parking
lot to be parallel with Cantrell Road should be increased in
area to help break up the large sea of pavement. A six foot
high opaque screen, either a wooden fence with its face
directed outward or dense evergreen plantings, is required
along the residential zoned properties to the -north and
east.
If dumpsters are to be used, their locations should be shown
and also screened on three sides with an eight foot high
wall or wood fence. The City Beautiful Commission
recommends that as many trees be saved as feasible. Extra
credit can be given when existing trees of six inch caliper
or larger are preserved. Curb and gutter or another
approved protective border will be required to protect
landscaped areas from vehicular use.
G. ANALYSIS:
The proposal conforms to all 0-2 "Office and Institutional
District" standards. No variances, waivers, or deferrals
are requested.
H. STAFF RECOMMENDATIONS:
APPROVAL of the Site Plan Review as submitted subject to
conditions listed in paragraphs D, E and F of this staff
report.
SUBDIVISION COMMITTEE COMMENT: (JUNE 5, 1997)
Joe White represented the developer. Staff requested the
following project information from the proponents be included on
the file exhibit:
■ Name, address of land owner and developer
■ Building elevations and design
• Signage and lighting based on Highway 10 standards.
• Adjacent zoning and owners
■ One Lot? Remove reference to Lot #3.
• Phasing line
• List of uses
• Consecutive number all parking spaces by phase.
• Dumpster locations?
3
June 26, 1997
SUBDIVISION
ITEM NO • 7 Cont.) FILE NO.: Z-6324
Staff indicated that the above list of materials be provided to
the Planning Department no later than 5:00 p.m. Wednesday,
June 11, 1997. Mr. Putnam concurred for the Subdivision
committee.
The item was forwarded to the Planning Commission meeting of
June 26, 1997 for consideration.
PLANNING COMMISSION ACTION: (JUNE 26, 1997)
This item was included as part of the Consent Approval Agenda.
Motion to approve the site plan review passed with 7 ayes, 0 nays
and 4 absent.