HomeMy WebLinkAboutZ-6318-A Staff AnalysisFILE NO.: Z -6318-A
NAME: Dairyland - Revised PCD (Lease Parcel #2)
LOCATION: 16,111 Chenal Parkway
DEVELOPER: ENGINEER:
Superior Federal Bank Development Consultants, Inc.
5,000 Rogers Avenue 2200 N. Rodney Parham Rd., Ste. 220
Fort Smith, AR 72903 Little Rock, AR 72212
AREA: 25.29 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: PCD ALLOWED USES: Office/Commercial
PROPOSED USE: Branch Bank
VARIANCES/WAIVERS REQUESTED: None
BACKGROUND:
On August 19, 1997 the Little Rock Board of Directors passed
Ordinance No. 17,556 approving the Dairyland PCD. The
property at 16,111 Chenal Parkway was approved for a mixed
commercial and office development in the following phases:
Phase I - 76,560 square foot Kroger Store
9,000 square foot retail/restaurant
building
646 parking spaces
- Lease parcel #1
Phase II - 35,000 square foot retail addition to
Kroger building
Phase III - 90,000 square foot retail addition to
Kroger building
- 306 parking spaces
- Lease parcels #2 and #3
- Street improvements to Kirk Road
Phase I was to be initiated immediately, with Phases II and
III being initiated within a three (3) year period. No
specific site plans were submitted for the three (3) lease
parcels, and development of these parcels will require site
plan approval by the Planning Commission as development is
proposed. Phase I of the development is currently under
construction.
FILE
A.
B.
C.
FBI
Z -6318-A (Cont.
PROPOSALIREOUEST:
The applicant is proposing to make one revision in the
overall site plan and is proposing a site plan for
lease parcel #2. The applicant proposes to revise the
overall plan by moving the existing phase line to
include lease parcel #2 and 12 parking spaces and drive
along the south side of lease parcel #2 to Phase 1. No
other changes are proposed for the overall plan.
The applicant is also proposing a site plan for lease
parcel #2. The applicant proposes to construct a 4,200
square foot branch bank facility on this parcel. The
bank building will be located within the south one-half
of the lease parcel with a canopy over six drive-
through teller lanes and an ATM on the north side of
the building. A total of 29 parking spaces is proposed
to serve the branch bank. Ingress/egress will be
gained by utilizing three (3) internal drives. No
direct access to lease parcel #2 will be taken from
Chenal Parkway.
EXISTING CONDITIONS:
The site has been cleared with site work having taken
place. Phase I of the project is currently under
construction.
There is undeveloped single-family property located
south and west of the site, with a golf driving range
just further west. A convenience store, plant nursery
and church are among the uses across Chenal Parkway to
the north. One Source building supply is located
across Kanis Road to the east with a few single-family
residences or larger lots located to the southeast
along Kanis Road.
NEIGHBORHOOD COMMENTS:
Staff has received no neighborhood comment as of this
writing. All property owners within 200 feet of the
site as well as the St. Charles and Parkway Place
Neighborhood Associations were notified of the public
hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS
Please note access to Chenal will be closed to turn -in
movements except for right-in/right-out with Phase 3
construction per Planning Commission approval. Median
will be reconstructed closing median cut with Phase 3.
011
FILE NO • z -6318-A (Cont.)
E. UTILITIES AND FIRE DEPARTMENT I COUNTY PLANNING:
Wastewater: Sewer main extension required with
easements to serve property.
AP&L: No Comment received.
Arkla: No Comment received.
Southwestern Bell: No Comment.
Water: A development fee based on the size of the
water connection and an acreage charge of $300 per
acre applies in addition to normal charges.
Fire Department: No Comment.
County Planning: No Comment received.
LATA: Not currently served by a CAT fixed -route.
Internal site sidewalks are good. There is some
concern over the walking distance through the parking
lots.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division:
This request is in the Ellis Mountain Planning
District. The property is shown as Mixed office
Commercial on the Land Use Plan. This area is
currently under review by the Rock Creek Neighborhood
Plan, which will go to the Planning Commission October
29, 1998. The neighborhood plan has not proposed any
changes to the Land Use Plan other than recognizing
existing public institutional uses. The proposed
changes to the PCD are consistent with the MOC Land Use
category.
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements when averaged out.
The dumpster location for the proposed bank should be
located further southwest and away from Chenal Parkway.
Prior to a construction permit, detailed landscape
plans must be approved by Bob Brown, Plans Review
Specialist. Mr. Brown may be reached at 371-4864.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
September 30, 1998. The site plan appears to comply
with a the concerns raised by staff. The applicant has
deleted four parking spaces near the northwest corner
of the lease parcel and this area will be converted to
landscaping. The applicant has also increased the
width of the landscape strip along Chenal Parkway.
Berms will be incorporated into the landscaped areas
3
FILE NO.: Z -6318-A Cont.
along Chenal Parkway. The applicant has also moved the
dumpster from the northwest to the southwest corner of
the property.
The applicant has stated that the orientation of the
building needs to stay as originally planned, with the
drive-through element on the north side, to suit their
need for traffic flow and customer service. The
applicant states that visibility and direct access to
the drive-through are important factors for customer
convenience, and that this design and orientation has
worked well in other communities.
with the increased areas of landscaping, including
berms, along Chenal Parkway, staff feels comfortable
with the revised site plan. To staff's knowledge,
there are no other outstanding issues associated with
the proposed site plan.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the revised PCD with the
following conditions:
1. Compliance with the comments as noted in paragraphs
D, E and F of this report.
2. Staff will support no further revisions in the
project phase lines unless there is a renegotiation
of the Kirk Road improvements.
SUBDIVISION COMMITTEE COMMENT:
(SEPTEMBER 24, 1998)
Robert Brown was present, representing the application.
Staff gave a brief description of the revised phase line and
site plan for lease parcel #2. Staff raised several
concerns relating to the proposed site plan. These included
landscaping along Chenal Parkway, dumpster location, drive-
through location and number of parking spaces proposed.
Staff noted that the number of parking spaces along the west
lease line should be reduced with additional landscaped area
along Chenal Parkway. Staff also noted that the dumpster
should be relocated further south away from Chenal Parkway.
Staff also asked the applicant to consider moving the drive-
through teller windows to the south side of the building.
These various issues were briefly discussed.
Mr. Brown noted that the dumpster would be moved and some of
the parking spaces near Chenal Parkway would be deleted in
order to provide more landscaped areas. He stated that he
would approach the bank officials with the idea of moving
the drive-through window location.
After the brief discussion, the Committee forwarded the
issue to the full Commission for final action.
4
FILE NO.: Z -6318-A Cont.
PLANNING COMMISSION ACTION: (OCTOBER 15, 1998)
Robert Brown and Stanley Bailey were present, representing
the application. There were no objectors present. Staff
gave a brief description of the site plan and a
recommendation of approval with conditions.
Robert Brown addressed the Commission in support of the
application. He stated that he had worked with staff and
had revised the site plan based on the concerns of staff.
Commissioner Berry asked about the orientation of the
building and how that was worked out with staff.
Jim Lawson, Director of Planning and Development, stated
that the applicant explained their needs for customer
convenience and the overall concept for the project to
staff. He noted that staff was comfortable with the
proposed plan.
There was a brief discussion regarding access and traffic
issues.
Commissioner Berry expressed concerns regarding the future
use of the property.
Stanley Bailey addressed the Commission in support of the
application. Mr. Bailey reviewed the overall concept for
the proposed project.
There was additional discussion related to the site plan and
pedestrian traffic.
Commissioner Muse asked if the drive-thru lanes would be
striped.
Mr. Bailey indicated that the lanes would be striped.
A motion was made to approve the application as recommended
by staff. The motion passed by a vote of 8 ayes, 0 nays and
3 absent.
6y
October 15, 1998
ITEM NO.: 9 FILE NO.: Z -6318-A
NAME: Dairyland - Revised PCD (Lease Parcel #2)
LOCATION: 16,111 Chenal Parkway
DEVELOPER: ENGINEER:
Superior Federal Bank Development Consultants, Inc.
5,000 Rogers Avenue 2200 N. Rodney Parham Rd., Ste. 220
Fort Smith, AR 72903 Little Rock, AR 72212
AREA: 25.29 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: PCD ALLOWED USES: Office/Commercial
PROPOSED USE: Branch Bank
VARIANCES/WAIVERS REQUESTED: None
BACKGROUND:
On August 19, 1997 the Little Rock Board of Directors passed
Ordinance No. 17,556 approving the Dairyland PCD. The
property at 16,111 Chenal Parkway was approved for a mixed
commercial and office development in the following phases:
Phase I - 76,560 square foot Kroger Store
- 9,000 square foot retail/restaurant
building
- 646 parking spaces
Lease parcel #1
Phase II - 35,000 square foot retail addition to
Kroger building
Phase III - 90,000 square foot retail addition to
Kroger building
306 parking spaces
Lease parcels #2 and #3
Street improvements to Kirk Road
Phase I was to be initiated immediately, with Phases II and
III being initiated within a three (3) year period. No
specific site plans were submitted for the three (3) lease
October 15, 1998
SUBDIVISION
ITEM NO.: 9 (Cont.) FILE NO.: Z -6318-A
parcels, and development of these parcels will require site
plan approval by the Planning Commission as development is
proposed. Phase I of the development is currently under
construction.
A. PROPOSAL/REQQEST:
The applicant is proposing to make one revision in the
overall site plan and is proposing a site plan for
lease parcel #2. The applicant proposes to revise the
overall plan by moving the existing phase line to
include lease parcel #2 and 12 parking spaces and drive
along the south -side of lease parcel #2 to Phase 1. No
other changes are proposed for the overall plan.
The applicant is also proposing a site plan for lease
parcel #2. The applicant proposes to construct a 4,200
square foot branch bank facility on this parcel. The
bank building will be located within the south one-half
of the lease parcel with a canopy over six drive-
through teller lanes and an ATM on the north side of
the building. A total of 29 parking spaces is proposed
to serve the branch bank. Ingress/egress will be
gained by utilizing three (3) internal drives. No
direct access to lease parcel #2 will be taken from
Chenal Parkway.
B. EXISTING CONDITIONS:
The site has been cleared with site work having taken
place. Phase I of the project is currently under
construction.
There is undeveloped single-family property located
south and west of the site, with a golf driving range
just further west. A convenience store, plant nursery
and church are among the uses across Chenal Parkway to
the north. One Source building supply is located
across Kanis Road to the east with a few single-family
residences or larger lots located to the southeast
along Kanis Road.
C. NEIGHBORHOOD COMMENTS:
Staff has received no neighborhood comment as of this
writing. All property owners within 200 feet of the
site as well as the St. Charles and Parkway Place
Neighborhood Associations were notified of the public
hearing.
2
October 15, 1998
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -5318-A
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
Please note access to Chenal will be closed to turn -in
movements except for right-in/right-out with Phase 3
construction per Planning Commission approval. Median
will be reconstructed closing median cut with Phase 3.
E. UTILITIES AND FIRE DEPARTMENT COUNTY PLANNING:
Wastewater: sewer main extension required with
easements to serve property.
AP&L: No Comment received.
Arkla: No Comment received.
Southwestern Bell: No Comment.
Water: A development fee based on the size of the
water connection and an acreage charge of $300 per
acre applies in addition to normal charges.
Fire Department: No Comment.
Countv Planninq: No Comment received.
LATA: Not currently served by a CAT fixed -route.
Internal site sidewalks are good. There is some
concern over the walking distance through the parking
lots.
F. ISSUER TECHNICAL/DESIGN:
Planninq Division:
This request is in the Ellis Mountain Planning
District. The property is shown as Mixed Office
Commercial on the Land Use Plan. This area is
currently under review by the Rock Creek Neighborhood
Plan, which will go to the Planning Commission October
29, 1998. The neighborhood plan has not proposed any
changes to the Land Use Plan other than recognizing
existing public institutional uses. The proposed
changes to the PCD are consistent with the MOC Land Use
category.
Landscape Issues:
Areas set aside for buffers and landscaping meet with
ordinance requirements when averaged out.
The dumpster location for the proposed bank should be
located further southwest and away from Chenal Parkway.
3
October 15, 1998
SUBDIVISION
ITEM NO.: 9 (Cont,) FILE NO.: Z -6318-A
Prior to a construction permit, detailed landscape
plans must be approved by Bob Brown, Plans Review
Specialist. Mr. Brown may be reached at 371-4864.
G. ANALYSIS•
The applicant submitted a revised site plan to staff on
September 30, 1998. The site plan appears to comply
with a the concerns raised by staff. The applicant has
deleted four parking spaces near the northwest corner
of the lease parcel and this area will be converted to
landscaping. The applicant has also increased the
width of the landscape strip along Chenal Parkway.
Berms will be incorporated into the landscaped areas
along Chenal Parkway. The applicant has also moved the
dumpster from the northwest to the southwest corner of
the property.
The applicant has stated that the orientation of the
building needs to stay as originally planned, with the
drive-through element on the north side, to suit their
need for traffic flow and customer service. The
applicant states that visibility and direct access to
the drive-through are important factors for customer
convenience, and that this design and orientation has
worked well in other communities.
With the increased areas of landscaping, including
berms, along Chenal Parkway, staff feels comfortable
with the revised site plan. To staff's knowledge,
there are no other outstanding issues associated with
the proposed site plan.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the revised PCD with the
following conditions:
1. Compliance with the comments as noted in paragraphs
D, E and F of this report.
2. Staff will support no further revisions in the
project phase lines unless there is a renegotiation
of the Kirk Road improvements.
SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 24, 1998)
Robert Brown was present, representing the application.
Staff gave a brief description of the revised phase line and
site plan for lease parcel #2. Staff raised several
concerns relating to the proposed site plan. These included
landscaping along Chenal Parkway, dumpster location, drive-
through location and number of parking spaces proposed.
4
October 15, 1998
SUBDIVISION
ITEM NO.: 9 Cont. FILE NO.: Z -6318-A
Staff noted that the number of parking spaces along the west
lease line should be reduced with additional landscaped area
along Chenal Parkway. Staff also noted that the dumpster
should be relocated further south away from Chenal Parkway.
Staff also asked the applicant to consider moving the drive-
through teller windows to the south side of the building.
These various issues were briefly discussed.
Mr. Brown noted that the dumpster would be moved and some of
the parking spaces near Chenal Parkway would be deleted in
order to provide more landscaped areas. He stated that he
would approach the bank officials with the idea of moving
the drive-through window location.
After the brief discussion, the Committee forwarded the
issue to the full Commission for final action.
PLANNING COMMISSION ACTION: (OCTOBER 15, 1998)
Robert Brown and Stanley Bailey were present, representing
the application. There were no objectors present. Staff
gave a brief description of the site plan and a
recommendation of approval with conditions.
Robert Brown addressed the Commission in support of the
application. He stated that he had worked with staff and
had revised the site plan based on the concerns of staff.
Commissioner Berry asked about the orientation of the
building and how that was worked out with staff.
Jim Lawson, Director of Planning and Development, stated
that the applicant explained their needs for customer
convenience and the overall concept for the project to
staff. He noted that staff was comfortable with the
proposed plan.
There was a brief discussion regarding access and traffic
issues.
Commissioner Berry expressed concerns regarding the future
use of the property.
Stanley Bailey addressed the Commission in support of the
application. Mr. Bailey reviewed the overall concept for
the proposed project.
There was additional discussion related to the site plan and
pedestrian traffic.
5
October 15, 1998
c
SUBDIVISION
STEM NO.: 9 Cont. FILE NO.: Z -5318-A
Commissioner Muse asked if the drive-thru lanes would be
striped.
Mr. Bailey indicated that the lanes would be striped.
A motion was made to approve the application as recommended
by staff. The motion passed by a vote of 8 ayes, 0 nays and
3 absent.