Loading...
HomeMy WebLinkAboutZ-6278 Staff AnalysisFILE NO.: Z-6278 NAME: Sports Authority Long -Form PCD (Z-6278) LOCATION: Frontage Chenal Parkway and Autumn Road. North of Chenal Parkway and west of Autumn Road. DEVELOPER: Dan Moody III Moody Rambin Interest, Inc. 6100 Hillcroft, Ste. 600 Houston, TX 77081-1006 AREA: 5.93 ACRES ZONING: Existing R-2 Proposed PCD PLANNING DISTRICT: #11 I-430 CENSUS TRACT: 24.04 VARIANCES/WAIVERS REQUESTED: BACKGROUND: ENGINEER• Robert Brown Development Consultants, Inc. 10809 Executive Center Dr. Suite 210 Little Rock, AR 72211-6021 PROPOSED USES: None • Retail Commercial • Office On March 20, 1997 the Planning Commission approved a change in the Land Use plan for this property. The area adjacent to Autumn Road was designated office and the remainder commercial. The rezoning request was delayed two weeks by the Planning Commission to this date. A. PROPOSAL RE UEST: The developer seeks to divide 5.93 acres into two parcels of Lot 1 consisting of 4.85 acres and Lot 2 containing 1.08 acres. The PCD application also request a 44,818 square foot retail building on Lot 1 and 7,200 square feet one story office building on Lot 2 facing Autumn Road. Hours of operation proposed for The Sports Authority (Lot 1) are: Business hours 10:00 a.m. - 10:00 p.m. (except 12 p.m. on some holidays) • Deliveries 6:00 a.m. - 4:00 p.m. Trash pickup 8:00 a.m. - 5:00 p.m. FILE NO.: Z-6278(Cont.) t Proposed use breakdown within the The Sports Authority building is 87.6% in sales floor, 6.1% in office area, and 6.3% in receiving and storage areas. Typical goods offered include: clothing, shoes, athletic equipment of all kinds, fishing tackle, boating accessories, hunting apparel, fire arms, diving gear, etc. There are no specific tenants planned for the proposed one-story office building on Lot 2. The developer has proposed the following list of permitted uses for inclusion in the PCD ordinance. They include: • Bank or Savings and Loan. • Church. • Medical oriented clinics, such as health, dental, optical, psychiatric, and other similar counseling or treatment facilities for the care of people. • Community welfare or health center. • Convent or monastery. • Day nursery or day care center. • Duplication shop. • Family care facility. • Laboratory. • Library, art gallery, museum or similar public use. • Office - general and professional. Photography studio. Private school, kindergarten or institution for special education. School - business. Studio - broadcasting and recording. Studio - art, music, speech, drama, dance or other artistic endeavors. Travel bureau. No drive-thru facilities will be allowed. B. EXISTING CONDITIONS: The site is currently vacant. The parcel fronts on Chenal Parkway and Autumn Road. The property wraps -around the Chenal Center project. Best Buys is located immediately to the west. C. NEIGHBORHOOD COMMENTS: The Birchwood Neighborhood Association was notified of this project. Mrs. Georgiana Henry submitted a letter to staff dated March 31, 1997 concerning the project. Mrs. Henry's letter expresses concern about drainage problems in the Birchwood Neighborhood caused by area developments. She says in part ..."All we ask is that the City take care of one problem (drainage) before it contributes to more of the 2 FILE NO.: Z-527$ Cont. same by allowing additional commercial development adjacent to our neighborhood." D. ENGINEERING COMMENTS: PUBLIC WORKS COMMENTS: 1. National Pollutant Discharge System (NPDES) and grading permits are required prior to construction, site grading and drainage plan will need to be submitted and approved. 2. Provide striping plan utilizing 3M 380 & 381 permanent striping tape and signage plans for the development, for Traffic Engineering approval. 3. Dedication to 50 feet from centerline with a 10 foot sidewalk and utility easement will be required as a condition of closure. Chenal dedication must allow for the Master Street Plan required deceleration lane. 4. All driveways shall be concrete aprons per City Ordinance 5. Stormwater detention ordinance applies to this property. 6. Autumn Road is a collector on the Master Street Plan dedication to 30 feet from centerline is required and reconstruction from centerline. The drainage from this site will have an adverse impact on the adjoining residential property unless property engineered. Recommend capture of all drainage to the west and south, them combine with site drainage and direct to new drainage designed to accommodate flows under Autumn to the east. 7. Property frontage needs to have the sidewalks and ramps brought up to the current ADA standards with any planned construction on both street frontages. 8_ A guardrail may be required adjacent to lane widening on Chenal due to retaining wall location. Recommend extending deceleration to add lane to Autumn intersection. Contact development of adjacent site prior to the construction of improvements including sidewalks. 9. Chenal Parkway has a 1995 average daily traffic count of 21,000. E. UTILITIES/FIRE DEPARTMENTICOUNTY PLANNING: Wastewater: Sewer main extension required with easements. AP&L: Easements required. Arkla : No comment Southwestern Bell: Easements required. Water: The water Works does not want to extend a public water main through to the west line of this property. A more direct route is requested. A minimum 15' wide utility or waterline easement is required. 3 FILE NO.: Z-6278 (Cont. 1 Fire Department: Check with fire department. LATA: Recommends a bus turnout on Chenal Parkway west of the access drive. F. ISSUES/TECHNICAL/DESIGN: Landscape: Areas set aside for buffers and landscaping meet with ordinance requirements. If the two proposed structure sites are to have separate lot lease lines, then a four to six foot wide landscape strip will be required by the Landscape Ordinance along both sides of the property lines except for entrance and exits. Curb and gutter or another approved border will be required to protect all vehicular use areas from vehicular traffic. If dumpsters are to be used, they must be shown on the site plan and screened on three sides with an eight foot high wall or wood fence. Issues: Staff will present illustrations of staff recommended signage. Planning Division: The Planning Commission approved a Land Use Plan change on the property on March 20, 1997. The western portion of the site was charged to Commercial the remainder Office. G. ANALYSIS: As of the preparation of this staff report the meeting with the Birchwood Neighborhood to discuss drainage concerns has not taken place. The proposed rezoning conforms to the Land Use Plan and Section 36-452(3) of the Subdivision and Zoning Ordinance. No variances or waivers are requested. H. STAFF RECOMMENDATIONS: APPROVAL of the rezoning to PCD and a two lot plat per the amended site plan dated April 15, 1997. The approval is also subject to conditions in this staff report and letters defining project restrictions dated February 24 and March 20, 1997 from Development Consultants, Incorporated. 4 FILE NO.: Z--6278 Cont . SUBDIVISION COMMITTEE COMMENT: (MARCH 13, 1997) Robert Brown presented the project. Staff requested the following information from the applicant: • signage and lighting plan • list of proposed office uses • hours of operation for Sports Authority • dumpster locations • consider providing a turnout for CATA PLANNING COMMISSION ACTION: (APRIL 3, 1997) This item was included in the consent deferral agenda. The rezoning was rescheduled for the April 17, 1997 Planning Commission meeting. The Consent Agenda was approved by a vote of 10 ayes, 0 nays, and 1 absent. PLANNING COMMISSION ACTION: (APRIL 17, 1997) Larry Jones presented the staff report. Project description information included in letters dated February 24, March 20, April 15, and April 17, 1997 from Development Consultants, Inc. was included as conditions. Staff added the following conditions in respect to signage: * Single sign on Chenal Parkway west of the access drive as shown on the project exhibit. Sign is to be a maximum of 8 feet high and 100 square feet total area. • Sports Authority building sign facing Chenal Parkway with dimensions of 10 feet by 60 feet not to exceed 600 square feet in size. The top of the sign will not exceed 36 feet in height when measured from the finished grade elevation. + Single sign on Autumn Road adjacent to the southern drive as shown on the exhibit. Sign is to be a maximum of 8 feet high and 100 square feet total area. • Sports Authority building sign facing Autumn Road with dimensions of 10 feet by 30 feet not to exceed 300 square feet in size. The top of the sign will not exceed 36 feet in height when measured from the finished grade elevation. David Scherer summarized two meeting that were held in early April with the Birchwood Neighborhood. Drainage and traffic concerns were discussed. Mr. Scherer outlined the Birchwood drainage improvements to be completed by the City this summer. 5 FILE ND.:. Z-6278 (Cont Robert Brown presented the project to the Commission for the applicants. He presented preliminary calculations for this site post development that show stormwater detention volume and discharge rates. Jeff Hathaway, representing the Gamble property, suggested that the final grade be lowered by four feet for the retail building and five feet for the office structure. Ruth Bell spoke in favor of the staff recommendation in respect to signage. She also asked that the developer provide CATA with a bus turnout. A group representing the Birchwood Neighborhood Association spoke in opposition to the rezoning. Fred Cason spoke about what they considered to be an inadequate buffer between residential and commercial/office uses. Ken Davis indicated that traffic cuts through the Birchwood Neighborhood between Chenal Parkway and West Markham. F. B. Boyd is opposed to approval of new projects until existing drainage problems are mitigated. Bill Ruck said that the City Board and Planning Commission has violated the City Code by allowing development adjacent to Birchwood. Commissioners Putnam, Mizan and Hawn asked about preliminary drainage calculations for this site after development. David Scherer stated that he had just received the information and that he could not verify the data. Commissioner Hawn asked if the developer would work with CATA to accommodate the needs of mass transportation. Commissioner Daniel agreed with Commissioner Hawn comments on CATA. Commissioner Earnest asked that the developer meet or exceed the preliminary drainage numbers submitted by Robert Brown. Commissioners Adcock and Putnam agreed with that comment. Motion to approve the rezoning to PCD and the two lot preliminary plat. Subject to conditions in the staff report with staff verbal presentation on signage (in minutes) and with the addition of the following: ■ The construction of the office building structure may be delayed up to 3 years from date the rezoning ordinance is approved by the City Board. • The developer will discuss a possible bus turnout location with CATA. • The final drainage system must substantially comply with preliminary calculations presented April 17, 1997 to the Planning Commission for stormwater detention volumes and discharge rates. The motion passed with 10 ayes, 0 nays, and 1 absent. 6