HomeMy WebLinkAboutZ-6274-B Staff AnalysisFII F NO - 7-6274-B
NAME: Grace Connections Short -form PD -C
LOCATION: Located at 9110 1-30
DEVELOPER:
Irwin Partners
1701 Centerview Drive
Little Rock, AR 72211
ENGINEER:
Arkansas Surveying
15825 Childress Road
Bauxite, AR 72011
AREA: 3.5 acres
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING:
PROPOSED USE:
NUMBER OF LOTS: 1
C-4 — Open Display District
Retail with outdoor display
P D -C
Church
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
FT. NEVA STREET: 0 LF
On March 17, 2005, The Little Rock Planning Commission approved a Conditional Use
Permit to allow Jose's Nite Club Latino, Inc. to utilize the site as a special event
center/private club. The Little Rock Board of Directors adopted Resolution No. 11,993
on May 3, 2005, resending the Planning Commission's approval.
A. PROPOSAL/REQUEST:
Grace Connections, A New Testament Church is seeking a rezoning of this site
from C-4, Open Display District to PD -C to allow a church facility to locate on this
site utilizing the existing buildings and parking. Currently, Grace Connection
Church has 142 members. Future plans call for a membership of
500 — 600 people. Grace Connection Church operates typical church hours. A
FILE NO.: Z -6274-B (Cont.
business office will be open during normal weekday operating hours. The church
has worship services on Sunday and Wednesday. Choir and band practice
occur on Thursday nights. Members of Grace Connection Church participate in
Bible Studies and Life Groups at various times throughout the week. Church
sponsored activities conclude before 10:00 pm.
There will be no daycare use or school on the site. Currently the Church is
planning on offering a "Mothers' Day Out" program five days per week; but does
not have firm plans in place.
Currently Grace Connections sponsors two (2) annual events. The first is called
"Fall Fest". Fall fest is an outdoor, family oriented event featuring food, games
and fellowship. The Church also hosts an annual "Racecar Dedication Service".
This service, held in the spring, allows for racecar owners and drivers to bring
their vehicles to the church for food, music, fun, fellowship and prayer. As the
church grows, these types of annual events may increase.
The plan indicates the existing buildings on the property. The Church plans to
keep all existing buildings. It is the intent of the Church to convert the property to
their use in phases. The first, and primary, phase will consist of a renovation of
the main building, or the numerous interior improvements, including adding a
sanctuary and classrooms, as well as adding a new facade to the front of the
building. Eventually, Grace Connection plans on turning the 9,375 square foot
building behind the main building into a family life center, which will include a
gymnasium, kitchen area, and reception hall. Once the family life center has
been finished, Grace Connection Church plans on developing a community
basketball program. No firm timetable has been set for the conversion of the rear
building, but Grace Connection Church plans on beginning construction as soon
as the funds can be raised.
Signage is proposed to comply with City ordinance standards for commercial
zones.
The site contains a parking area in the front of the building and an asphalt -paved
surface along the side and rear of the building. Utilizing the parking lot in the
front of the site and striping the paved areas around the building will result in 211
parking spaces.
B. EXISTING CONDITIONS:
The property fronts the 1-30 Frontage Road and is located in an area of mixed
uses and zoning. Located to the west are an undeveloped, wooded tract, a
vacant commercial building, a mini -warehouse complex and an apartment
development. Adjacent to the north is an apartment development. A Shriner's
Temple is adjacent to the east. Other uses in the area include a single-family
subdivision further to the north and commercial businesses fronting University
Avenue to the northeast.
2
FILE NO.: Z -6274-B Cont.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received a few informational phone calls from area
residents and the South Brookwood/Ponderosa Neighborhood Association. All
property owners located within 200 -feet of the site, all residents who could be
identified located within 300 -feet of the site along with the South
Brookwood/Ponderosa Neighborhood Association and Southwest Little Rock
United for Progress were notified of the public hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions: No comment.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Enter- : No comment received.
Center -Point Energy: No comment received.
SBC: Approved as submitted.
Central Arkansas Water: Contact Central Arkansas Water if larger and/or
additional water meter(s) are required. If larger and/or additional meters are
installed, a Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges. Additional
fire hydrant(s) may be required. Contact the Little Rock Fire Department to obtain
information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
Contact Central Arkansas Water at 377-1225 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAL/DESIGN:
Planninq Division: This request is located in the Geyer Springs West Planning
District. The Land Use Plan shows Commercial for this property. The applicant
has applied for a PCD for a church facility.
The request does not require a change to the Land Use Plan.
3
FILE NO.: Z -6274-B (Cont.)
Master Street Plan: The frontage road of 1-30 is shown as a Local Street on the
Master Street Plan and may require dedication of right-of-way and may require
street improvements.
Bic cle Plan: A Class III bike route is located along Chicot Road one-quarter
mile to the west while a Class II bike route is located along Forbing Road to the
north.
City Recognized Neighborhood Action Plan: The applicant's property lies in the
area covered by the 65th Street West Neighborhood Action Plan. The land Use
and Zoning Goal lists the following objective relevant to this case: "Ensure that
non-residential development and multifamily development in the area be limited
to areas currently reserved for such uses on the Future Land Sue Plan or in
areas currently zoned for non-residential and multi -family uses" This application
is not in conflict with this statement.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (March 8, 2006)
The applicants were present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff questioned if any alternative
uses were being requested for the site. The applicant stated a church was the
only use being requested. Staff also questioned any additional improvements to
be constructed on the site. The applicants stated no new construction would
take place on the site; only renovations of existing structures were planned. Staff
noted the proposed remodeling could trigger a landscape upgrade requirement.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS.-
The
NALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the March 8, 2006, Subdivision Committee meeting. The applicant has
indicated no alternative uses are being proposed with the request. Also,
according to the applicant, no exterior modifications or improvements are being
proposed. The site plan indicates the placement of a dumpster located near the
rear of the site. A note on the site plan indicates the dumpster will be screened
per City ordinance requirements. The applicant has indicated the service hours
of the dumpster will be limited to daylight hours.
2
FILE NO.: Z -6274-B
The site plan includes the placement of three (3) crosses within the front building
setback. The wooden crosses are proposed as 15 -feet to 20 -feet in height. The
site plan also indicates the placement of a single sign located in the front yard
area consistent with signage allow in commercial zones. The intent is to utilize
the existing pole sign on the site and replace the existing sign face with the
church's information.
There are no new paved area being proposed. The only modifications to the site
will be the placement of a new fagade on the building and interior renovations.
The site contains approximately 211 parking spaces. The church plans for a
future membership of 500 — 600 persons. Based on the indicated membership
one hundred fifty parking spaces would typically be required.
Grace Connection Church operates typical church hours. A business office will
be open during normal weekday operating hours. The church has worship
services on Sunday and Wednesday. Choir and band practice occur on
Thursday nights. Members of Grace Connection Church participate in Bible
Studies and Life Groups at various times throughout the week. Church
sponsored activities conclude before 10:00 pm. Currently two (2) annual events
are sponsored. The first is called "Fall Fest" and is an outdoor, family oriented
event featuring food, games and fellowship. A sound system will be utilized
during this event. The Church also hosts an annual "Racecar Dedication
Service" which is held in the spring and allows for racecar owners and drivers to
bring their vehicles to the church for food, music, fun, fellowship and prayer. This
event will have live music. In both instances the church plans on utilizing the
front of the church so that the church will not disturb the neighbors to the rear.
All outdoor activities will conclude at or before sunset. As the church grows,
these types of annual events may increase.
There will be no daycare use or school on the site. Currently the Church is
planning on offering a "Mothers' Day Out" program five days per week; but does
not have firm plans in place.
The plan indicates the existing buildings on the property. The Church plans to
keep all existing buildings. It is the intent of the Church to convert the property to
their use in phases. The first, and primary, phase will consist of a renovation of
the main building, or the numerous interior improvements, including adding a
sanctuary and classrooms, as well as adding a new fagade to the front of the
building. Eventually, plans including turning the 9,375 square foot building
behind the main building into a family life center, which will include a gymnasium,
kitchen area, and reception hall. Once the family life center has been finished,
Grace Connection Church plans on developing a community basketball program.
No firm timetable has been set for the conversion of the rear building, but Grace
Connection Church plans on beginning construction as soon as the funds can be
raised.
5
FILE NO.: Z -6274-B (Co
Staff is supportive of the applicant's request. Staff feels the developers have
done an adequate job addressing issues and concerns to protect the adjoining
properties. Staff does not feel the placement of a church at this location will
negatively impact the adjoining properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the above
agenda staff report.
PLANNING COMMISSION ACTION: (MARCH 30, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval subject
to compliance with the comments and conditions as outlined in paragraphs D, E and F
of the agenda staff report.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 recusal (Jeff Yates).
D
March 30, 2006
ITEM NO.: 16 FILE NO.: Z -6274-B
NAME: Grace Connections Short -form PD -C
LOCATION: Located at 9110 1-30
DEVELOPER:
Irwin Partners
1701 Centerview Drive
Little Rock, AR 72211
ENGINEER:
Arkansas Surveying
15825 Childress Road
Bauxite, AR 72011
AREA: 3.5 acres
CURRENT ZONING:
ALLOWED USES:
PROPOSED ZONING:
PROPOSED USE
NUMBER OF LOTS: 1
C-4 — Open Display District
Retail with outdoor display
PD -C
Church
VARIANCESM/AIVERS REQUESTED: None requested.
BACKGROUND:
FT. NEW STREET: 0 LF
On March 17, 2005, The Little Rock Planning Commission approved a Conditional Use
Permit to allow Jose's Nite Club Latino, Inc. to utilize the site as a special event
center/private club. The Little Rock Board of Directors adopted Resolution No. 11,993
on May 3, 2005, resending the Planning Commission's approval.
A. PROPOSAUREQUEST:
Grace Connections, A New Testament Church is seeking a rezoning of this site
from C-4, Open Display District to PD -C to allow a church facility to locate on this
site utilizing the existing buildings and parking. Currently, Grace Connection
Church has 142 members. Future plans call for a membership of
March 30, 2006
SUBDIVISION
ITEM NO.: 16 (Cont.) FILE NO.: Z-6274-8
500 — 600 people. Grace Connection Church operates typical church hours. A
business office will be open during normal weekday operating hours. The church
has worship services on Sunday and Wednesday. Choir and band practice
occur on Thursday nights. Members of Grace Connection Church participate in
Bible Studies and Life Groups at various times throughout the week. Church
sponsored activities conclude before 10:00 pm.
There will be no daycare use or school on the site. Currently the Church is
planning on offering a "Mothers' Day Out" program five days per week; but does
not have firm plans in place.
Currently Grace Connections sponsors two (2) annual events. The first is called
"Fall Fest". Fall fest is an outdoor, family oriented event featuring food, games
and fellowship. The Church also hosts an annual "Racecar Dedication Service".
This service, held in the spring, allows for racecar owners and drivers to bring
their vehicles to the church for food, music, fun, fellowship and prayer. As the
church grows, these types of annual events may increase.
The plan indicates the existing buildings on the property. The Church plans to
keep all existing buildings. It is the intent of the Church to convert the property to
their 'use in phases. The first, and primary, phase will consist of a renovation of
the main building, or the numerous interior improvements, including adding a
sanctuary and classrooms, as well as adding a new fagade to the front of the
building. Eventually, Grace Connection plans on turning the 9,375 square foot
building behind the main building into a family life center, which will include a
gymnasium, kitchen area, and reception hall. Once the family life center has
been finished, Grace Connection Church plans on developing a community
basketball program. No firm timetable has been set for the conversion of the rear
building, but Grace Connection Church plans on beginning construction as soon
as the funds can be raised.
Signage is proposed to comply with City ordinance standards for commercial
zones.
The site contains a parking area irrthe front of the building and an asphalt -paved
surface along the side and rear of the building. Utilizing the parking lot in the
front of the site and striping the paved areas around the building will result in 211
parking spaces.
B. EXISTING CONDITIONS:
The property fronts the 1-30 Frontage Road and is located in an area of mixed
uses and zoning. Located to the west are an undeveloped, wooded tract, a
vacant commercial building, a mini -warehouse complex and an apartment
development. Adjacent to the north is an apartment development. A Shriner's
Temple is adjacent to the east. Other uses in the area include a single-family
2
March 30, 2006
SUBDIVISION
ITEM NO.: 16 (Cont.) FILE NO.: _ Z -6274-B
subdivision further to the north and commercial businesses fronting University
Avenue to the northeast.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received a few informational phone calls from area
residents and the South Brookwood/Ponderosa Neighborhood Association. All
property owners located within 200 -feet of the site, all residents who could be
identified located within 300 -feet of the site along with the South
Brookwood/Ponderosa Neighborhood Association and Southwest Little Rock
United for Progress were notified of the public hearing.
D. ENGINEERING COMMENTS:
Public Works Conditions: No comment.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: No comment received.
SBC: Approved as submitted.
Central Arkansas Water: Contact Central Arkansas Water if larger and/or
additional water meter(s) are required. If larger and/or additional meters are
installed, a Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges. Additional
fire hydrant(s) may be required. Contact the Little Rock Fire Department to obtain
information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
Contact Central Arkansas Water at 377-1225 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: This request is located in the Geyer Springs West Planning
District. The Land Use Plan shows Commercial for this property. The applicant
has applied for a PCD for a church facility.
3
March 30, 2006
SUBDIVISION
ITEM NO.: 16 (Cont.) — FILE NO.: Z -6274-B
X
H
The request does not require a change to the Land Use Plan.
Master Street Plan: The frontage road of 1-30 is shown as a Local Street on the
Master Street Plan and may require dedication of right-of-way and may require
street improvements.
Bicycle Plan: A Class III bike route is located along Chicot Road one-quarter
mile to the west while a Class II bike route is located along Forbing Road to the
north.
CitV Recognized Nei hborhood Action Plan: The applicant's property lies in the
area covered by the 65th Street West Neighborhood Action Plan. The land Use
and Zoning Goal lists the following objective relevant to this case: "Ensure that
non-residential development and multifamily development in the area be limited
to areas currently reserved for such uses on the Future Land Sue Plan or in
areas currently zoned for non-residential and multi -family uses" This application
is not in conflict with this statement.
Landscape: No comment.
SUBDIVISION COMMITTEE COMMENT:
(March 8, 2006)
The applicants were present representing the request. Staff presented an
overview of the proposed development indicating there were additional items
necessary to complete the review process. Staff questioned if any alternative
uses were being requested for the site. The applicant stated a church was the
only use being requested. Staff also questioned any additional improvements to
be constructed on the site. The applicants stated no new construction would
take place on the site; only renovations of existing structures were planned. Staff
noted the proposed remodeling could trigger a landscape upgrade requirement.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the issues
raised at the March 8, 2006, Subdivision Committee meeting. The applicant has
indicated no alternative uses are being proposed with the request. Also,
according to the applicant, no exterior modifications or improvements are being
proposed. The site plan indicates the placement of a dumpster located near the
rear of the site. A note on the site plan indicates the dumpster will be screened
CI
March 30, 2006
SUBDIVISION
ITEM NO.: 16
FILE NO.: Z -6274-B
per City ordinance requirements. The applicant has indicated the service hours
of the dumpster will be limited to daylight hours.
The site plan includes the placement of three (3) crosses within the front building
setback. The wooden crosses are proposed as 15 -feet to 20 -feet in height. The
site plan also indicates the placement of a single sign located in the front yard
area consistent with signage allow in commercial zones. The intent is to utilize
the existing pole sign on the site and replace the existing sign face with the
church's information.
There are no new paved area being proposed. The only modifications to the site
will be the placement of a new fagade on the building and interior renovations.
The site contains approximately 211 parking spaces. The church plans for a
future membership of 500 — 600 persons. Based on the indicated membership
one hundred fifty parking spaces would typically be required.
Grace Connection Church operates typical church hours. A business office will
be open during normal weekday operating hours. The church has worship
services on Sunday and Wednesday. Choir and band practice occur on
Thursday nights. Members of Grace Connection Church participate in Bible
Studies and Life Groups at various times throughout the week. Church
sponsored activities conclude before 10:00 pm. Currently two (2) annual events
are sponsored. The first is called "Fall Fest" and is an outdoor, family oriented
event featuring food, games and fellowship. A sound system will be utilized
during this event. The Church also hosts an annual "Racecar: Dedication
Service" which is held in the spring and allows for racecar owners and drivers to
bring their vehicles to the church for food, music, fun, fellowship and prayer. This
event will have live music. In both instances the church plans on :utilizing the
front of the church so that the church will not disturb the neighbors to the rear.
All outdoor activities will conclude at or before sunset. As the church grows,
these types of annual events may increase.
There will be no daycare use or school on the site. Currently the Church is
planning on offering a "Mothers' Day Out" program five days per week; but does
not have firm plans in place.
The plan indicates the existing buildings on the property. The Church plans to
keep all existing buildings. It is the intent of the Church to convert the property to
their use in phases. The first, and primary, phase will consist of a renovation of
the main building, or the numerous interior improvements, including adding a
sanctuary and classrooms, as well as adding a new fagade to the front of the
building. Eventually, plans including turning the 9,375 square foot building
behind the main building into a family life center, which will include a gymnasium,
kitchen area, and reception hall. Once the family life center has been finished,
Grace Connection Church plans on developing a community basketball program.
5
March 30, 2006
SUBDIVISION
ITEM NO.: 16 (Cont.) FILE NO_: Z -6274-B
No firm timetable has been set for the conversion of the rear building, but Grace
Connection Church plans on beginning construction as soon as the funds can be
raised.
Staff is supportive of the applicant's request. Staff feels the developers have
done an adequate job addressing issues and concerns to protect the adjoining
properties. Staff does not feel the placement of a church at this location will
negatively impact the adjoining properties.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the above
agenda staff report.
PLANNING COMMISSION ACTION: (MARCH 30, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval subject
to compliance with the comments and conditions as outlined in paragraphs D, E and F
of the agenda staff report.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 recusal (Jeff Yates).
0
ITEM NO.: 16 Z -6274-B
NAME: Grace Connections Short -form PCD
LOCATION: located at 9110 1-30
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than March 15, 2006. The Office of
Planning and Development must receive the proof of notice no later than March 24,
2006.
2. The cover letter does not indicate any alternative uses for the site. Is in fact the
approval request for a church facility only?
3. The cover letter indicates no school is being proposed as a part of the development.
The cover letter indicates a mother's day out program at some point in the future.
Are there any activities being proposed other than indicated? Will the church facility
be available for leasing to non-members for activities — weddings, funeral?
4. The cover letter indicates no new improvements are anticipated as a part of the
development. Is this in fact true?
5. No new signage is being proposed. The development will utilize existing signage
removing the current sign and replacing the sign with the church sign.
6. Will there be a dumpster located on the site? If so provide the location of the
proposed dumpster along with a note concerning the required screening. Will there
be limits placed on the dumpster service hours? If so indicate the hours of service in
the general notes section of the site plan.
7. Provide details of any outdoor activities to be held on the site along with the
anticipated noise from these activities.
8. Any site lighting must be low level and directional, directed inward away from
residentially zoned or used properties.
Variance/Waivers:
Public Works Conditions: No comment.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy,
Center -Point Energy:
Item # 16
SBC:
Central Arkansas Water: Contact Central Arkansas Water if larger and/or additional
water meter(s) are required. If larger and/or additional meters are installed, a Capital
Investment Charge based on the size of the meter connection(s) will apply to this
project in addition to normal charges. Additional fire hydrant(s) may be required.
Contact the Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding procedures
for installation of the hydrant(s). Contact Central Arkansas Water at 377-1225 for
additional information.
Fire Department: Approved as submitted.
Caunty Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division-
ivision:
Landscape-
Landscape_
Revised
Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, March 15, 2006.
Item # 16
ITEM NO.: 16
NAME: Grace Connections Short -form PCD
LOCATION: located at 9110 1-30
Z -6274-B
Planning Staff Comments:
1. Provide notification of property owners located within 200 -feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than March 15, 2006. The Office of
Planning and Development must receive the proof of notice no later than March 24,
2006.
2. The cover letter does not indicate any alternative uses for the site. Is in fact the
approval request for a church facility only?
3. The cover letter indicates no school is being proposed as a part of the development.
The cover letter indicates a mother's day out program at some point in the future.
Are there any activities being proposed other than indicated? Will the church facility
be available for leasing to non-members for activities — weddings, funeral?
4. The cover letter indicates no new improvements are anticipated as a part of the
development. Is this in fact true?
5. No new signage is being proposed. The development will utilize existing signage
removing the current sign and replacing the sign with the church sign.
6. Will there be a dumpster located on the site? If so provide the location of the
proposed dumpster along with a note concerning the required screening. Will there
be limits placed on the dumpster service hours? If so indicate the hours of service in
the general notes section of the site plan.
7. Provide details of any outdoor activities to be held on the site along with the
anticipated noise from these activities.
8. Any site lighting must be low level and directional, directed inward- away from
residentially zoned or used properties.
Variance/Waivers: ,e,"'OuLp
Public Works Conditions: No comment.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available, not adversely affected.
Entergy: �r4
Center -Point Energy: :)� 0.
ltern # 16
SBC:
Central Arkansas Water: Contact Central Arkansas Water if larger and/or additional
water meter(s) are required. If larger and/or additional meters are installed, a Capital
Investment Charge based on the size of the meter connection(s) will apply to this
project in addition to normal charges. Additional fire hydrant(s) may be required.
Contact the Little Rock Fire Department to obtain information regarding the required
placement of the hydrant(s) and contact Central Arkansas Water regarding procedures
for installation of the hydrant(s). Contact Central Arkansas Water at 377-1225 for
additional information.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division:
Landscape:
Revised plat/pian: Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, March 15, 2006.
Item # 16