HomeMy WebLinkAboutZ-6257-A Staff AnalysisSeptember 18, 1997
ITEM NO.: 15 FILE NO.: Z -5257-A
NAME:
LOCATION•
OWNER/APPLICANT:
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1. Site Location:
Pankey Community Center -
Conditional Use Permit
13,700 Cantrell Road
Pankey Community Improvement
Association by James Williams
A conditional use permit is
requested to allow for the
construction of a
community/educational center
on R-2 zoned property.
The proposed site is located on the north side of
Cantrell Road, approximately two (2) miles west of
I-430.
2. Compatibility with Neighborhood:
The proposed community center site is surrounded
entirely by R-2 zoned property. The property
immediately north and west of this site is vacant and
tree -covered. There are two single-family residences
immediately east of the site. The area across Cantrell
Road to the south contains numerous single-family
residences.
With compliance to the Highway 10 Overlay District
standards, this proposed development should not have a
negative impact on the surrounding properties. The
site was formerly occupied by a school.
The Pankey Neighborhood Association was notified of the
public hearing.
3. On -Site Drives and Parking:
Access to the site will be gained by utilizing a single
driveway from Harris Street. The west one-half of
Harris Street, running approximately 150 feet north
from Cantrell Road, will be constructed as required by
Public Works.
September 18, 1997
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z -6257-A
The City's Zoning Ordinance does not have a specific
parking requirement for a "Community Center" use. As a
point of reference, the Central Little Rock Urban
Renewal Project requires one (1) parking space per 400
square feet of floor area for "community centers,
public." This would be equivalent to 15 parking spaces
for the proposed 6,000 square foot building.
Therefore, the 43 parking spaces proposed by the
applicant should be more than adequate to serve the
proposed community center use.
4. screening and Suffers:
Areas set aside for landscaping and buffers comply with
the Highway 10 Overlay District and Landscape Ordinance
requirements. The Highway 10 Overlay District requires
a sprinkler system to water plants. Curb and gutter or
another approved border is required to protect
landscaped areas from vehicular traffic.
5. Public Works Comments:
1. Cantrell Road is listed on the Master Street Plan
as a principal arterial, dedication of right-of-way
to 55 feet from centerline will be required.
2. Construct a portion of Harris Street and use as
primary access. A 5 year deferral will be
supported for the construction of the other
boundary streets.
3. Provide design of boundary streets conforming to
"MSP" (Master Street Plan).
4. Stormwater detention ordinance applies to this
property.
5. Grading permit will be required on this new
development, if it disturbs more than one acre.
6. Contact the AHTD for work within the State Highway
right-of-way.
7. Cantrell Road has a 1995 average daily traffic
count of 14,000.
8. Dedication of an additional 5 feet of right-of-way
will be required for Harris Street, Arnold Street,
and Josephine Street.
6. utility and Fire Department Comments:
L. R. Fire Department - Show fire hydrants.
L. R. Water Works - Little Rock Fire Department needs
to evaluate the site to determine whether additional
public and/or private fire hydrants will be needed.
Water main in Harris Street is inadequate for this
2
September 18, 1997
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: z -6257-A
project but needed to serve others. A line needed
across Cantrell to serve this site.
7. Staff Analysis:
The applicant, Pankey Community Improvement
Association, is requesting a conditional use permit to
allow for the construction of a community center
building and associated parking area on the vacant
property at 13,700 Cantrell Road. The property is
zoned R-2.
The proposed site at 13,700 Cantrell Road is the former
Pankey Elementary School site. Currently, the site is
vacant and partially wooded. There is existing street
right-of-way along the east, west and north sides of
the property. _
The proposed development will include a 6,000 square
foot one-story building and 43 off-street paved parking
spaces. Staff feels that the number of parking spaces
proposed will be adequate to serve the proposed
community center use.
The applicant has stated that the center will be open
daily to the public, with occasional night activities.
Activities the center will offer will include classes
for various age groups (art -related classes,
educational films, etc.) and other various neighborhood
activities (neighborhood meetings, etc.).
The site plan complies with the Highway 10 Overlay
District Ordinance regarding building setbacks,
landscaping and buffers. One ground -mounted monument -
type sign is proposed which will also conform to the
Highway 10 Overlay District Ordinance (minimum setback
- 5 feet, maximum height - 6 feet, maximum area - 72
square feet). The building height will not exceed 35
feet.
The applicant has stated that the parking lot will not
be lighted. If, at a later date, parking lot lighting
is installed, it must be low-level and directed to the
parking area and not reflected into the adjacent
neighborhood. This is a requirement of the Highway 10
Overlay District Ordinance.
As noted on the survey, there are two (2) platted alley
rights-of-way which run through this property. A 20
foot platted alley runs east -west the entire width of
the property and the other 10 foot platted alley runs
north -south within the north one-half of the property.
3
September 18, 1997
SUBDIVISION
TEM NO.: 15 (Cont.) FILE NO.: Z -6257-A
The applicant is requesting abandonment of these alley
rights-of-way as part of this conditional use permit
application.
The applicant is also requesting deferral of half -
street improvements to Josephine Street, Arnold Street
and the north portion of Harris Street. Public Works
has indicated support of these deferral requests for a
maximum of five (5) years.
With compliance with the Highway 10 Overlay District
Ordinance, the proposed community center development
should have no adverse effect on the neighborhood.
8. Staff Recommendation:
Staff recommends approval of the conditional use
permit,'subject to the following conditions:
1. Compliance with the Highway 10 Overlay District
Ordinance
2. Compliance with the Screening and Buffers Comments
3. Compliance with the Public Works Comments
4. Compliance with the Utility and Fire Department
Comments
5. Staff recommends approval of the abandonment of the
alley rights-of-way.
6. Staff recommends approval of the deferral of half
street improvements to Josephine Street, Arnold
Street and a portion of Harris Street for a maximum
of five (5) years.
SUBDIVISION COMMITTEE COMMENT: (AUGUST 28, 1997)
James Williams and Rose Thompson were present, representing
the application. Staff gave a brief description of the
proposal.
David Scherer, of Public Works, reviewed his comments with
the Committee. He stated that right-of-way dedication of 55
feet from centerline of Cantrell Road would be required. He
also suggested that a portion of Harris Street be
constructed and used as an access to the site.
Mr. Williams indicated that there would be a future phase to
the community center and that they would come back before
the Planning Commission at a later date for review of phase
II.
4
September 18, 1997
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: �-5257-A
Bob Brown, Site Plan Review Specialist, reviewed the Highway
10 Overlay District requirements for landscaping and
buffers.
Staff noted that several parking spaces shown on the site
plan were too small and that the site plan needed to be
revised. Mr. Williams stated that the site plan would be
revised as noted.
After further discussion, the Committee accepted the
presentation and forwarded the issue to the full Commission
for final action.
PLANNING COMMISSION ACTION: (SEPTEMBER 18, 1997)
James Williams, Wali Caradine and Rose Thompson were
present, representing the application. Staff presented the
item with a recommendation of approval with conditions.
Staff noted that Barbara Douglas had filed a letter with
staff asking that the item be deferred in order for the two
groups in Pankey to meet and discuss the proposed community
center.
Jim Lawson, Planning Director, addressed the Commission. He
stated that the current applicants, Pankey Community
Improvement Association, Inc., are the owners of the
property and authorized to file for the conditional use
permit.
Chairman Lichty asked if this application is approved does
the first application have to be voided.
Steve Giles, City Attorney, stated that the first
application may not have to be voided if the applicant was
not authorized to file for the application.
Regina Haralson, attorney for Barbara Douglas, addressed the
Commission. She stated that the citizens acting as officers
of the Pankey Community Improvement Association were not
elected in accordance with the articles of incorporation.
She also stated that Barbara Douglas was authorized to file
for the original conditional use permit. She asked for a
deferral of the item on behalf of Barbara Douglas in order
for the two groups to work together on the project. She
stated that if the conditional use permit is approved her
office will file a lawsuit in Chancery Court.
There was a lengthy discussion regarding the legality of the
ownership issue.
W
September 18, 1997
SUBDIVISION
ITEM NO.: 15(Cont.)FILE NO.: Z -6257-A
Wali Caradine spoke in favor of the conditional use permit.
Mr. Caradine asked the Commission not to defer the
conditional use permit, but to approve the application so
the community can move forward and start construction before
the January 1, 1998 deadline as stated in the deed.
There was a general discussion regarding the options that
the Commission has to deal with the issue. There was also
additional discussion regarding the legal issues involved
with this item.
Sandy Becker, of Mark's Chapel United Methodist Church,
addressed the Commission in support of the application. He
stated that he supported the first conditional use permit
but is now supporting this current application.
Michael Drake, of CANDO, addressed the Commission, also
supporting the application. He stated that his organization
supported the first conditional use permit. He stated that
he is withdrawing that support and is supporting the current
application.
There was additional discussion regarding the legal issues
associated with this application and the time limit for
construction as set forth in the deed.
Selma Douglas addressed the Commission in support of the
application. She stated that the neighborhood needs the
community center.
Barbara Roberta Douglas addressed the Commission. She
stated that she would like the community to work together on
this project.
There was a brief discussion regarding the procedures in
dealing with deferrals.
Commissioner Hawn asked Mr. Drake about the position of the
churches he represents.
Mr. Drake stated that the churches support the legal owner
of the property, Pankey Community Improvement Association.
There was a brief discussion concerning the site plan
review. Mr. Lawson stated that the site plan had been
reviewed and complies with the ordinance. He stated that
the building shown on the current site plan is approximately
one-quarter the size of the first site plan (approved on
February 20, 1997).
Michael Drake gave additional information involving CANDO.
G
September 18, 1997
SUBDIVISION
ITEM NO.: 15 Cont. FILE NO.: Z -6257-A
A motion was made to approve the application subject to
compliance with the conditions noted in the "Staff
Recommendation". The motion passed with a vote of 9 ayes,
1 nay and 1 absent.
7
ILE NO.: Z-6257
NAME:
LOCATION:
OWNER/APPLICANT:
PROPOSAL:
ORDINANCE DESIGN STANDARDS:
1. Site Location:
Pankey New Life Community
Center - Conditional Use
Permit
13450 Cantrell Road
Pankey New Life Corporation/
Barbara Douglas
A conditional use permit is
requested to allow the phased
construction of a community
center on R-2 zoned property.
The applicant is also
requesting abandonment of
alley rights-of-way.
The proposed site is located on the north side of
Cantrell Road, approximately two (2) miles west of
I-430.
2. Comuatibility with Neighborhood:
The proposed community center site is surrounded
entirely by R-2 zoned property. The property
immediately north and west of this site is vacant and
tree -covered. There are two single-family residences
immediately east of the site. The area across Cantrell
Road to the south contains numerous single-family
residences.
With compliance to the Highway 10 Overlay District
Standards, this proposed development should not have a
negative impact on the surrounding properties. The
site was formerly occupied by a school.
3. an -Site Drives and Park:
Four (4) driveways are proposed with this development.
Phase I will include a driveway from Cantrell Road and
two (2) driveways from Harris Street (one to the
parking lot and one service drive). Harris Street will
be constructed with Phase I. Phase III will include a
service drive from Josephine Street. Josephine Street
will be constructed with Phase III.
A total of 57 parking spaces is required with this
development; 26 with Phase I and 31 with Phase II
FILE NO.: Z-6257 Cont.
(based on a gymnasium seating capacity of 158 persons).
The applicant is proposing 30 parking spaces with Phase
I and 14 parking spaces with Phase II for a total of 44
parking spaces.
4. Screening and Buffers:
The tree spacing requirement within the front 40 foot
buffer is 20 feet. Curb and gutter or another approved
border will be required to protect all landscaped areas
from vehicular traffic.
The dumpster must be enclosed on three sides with an
eight foot high wood fence or wall.
A 15 foot wide landscape buffer is required along the
north, east and west sides of the property.
A sprinkler system to water landscaped areas is
required.
5. Public Works Comments:
1. National Pollutant Discharge System (NPDES) and
grading permits are required prior to
construction, site grading and drainage plan will
need to be submitted and approved.
2. All driveways shall be concrete aprons per City
Ordinance and the Traffic Engineer recommends a 36
foot drive striped to allow for a left turn stack
lane.
3. This is a principal arterial on the Master Street
Plan, dedication of right-of-way to 55 feet from
centerline will be required.
4. Stormwater detention ordinance applies to this
property.
5. Property frontage needs to have the sidewalks and
ramps brought up to the current ADA standards with
any planned construction.
6. Cantrell Road has a 1995 average daily traffic
count of 14,000.
6. Utility and Fire Department Comments:
L.R. Wastewater - Sewer available at the intersection
of Highway 10 and Harris Street. Also running North
in Harris Street.
Southwestern Bell - A 5 foot easement is requested
along the east, west and south property lines.
L.R. Water Works - On site fire protection will be
needed. This will involve installing a crossing
from the south side of Cantrell Road. There is an
2
FILE NO.: Z-6257 Cont.
existing 2" water main in Harris Street. Water
Works asks that the right-of-way of Harris Street be
retained as a utility easement.
6A. CATA: No comments received.
7. Staff Analysis:
The applicant, the Pankey New Life Corporation, is
requesting a conditional use permit to allow for the
phased construction of a community center on this R-2
zoned property.
The proposed site at 13450 Cantrell Road is the former
Pankey Elementary School site. Currently, the site is
vacant and partially wooded. There is existing street
right-of-way along the east, west and north sides of the
property.
Construction of the community center is planned in three
(3) phases. Phase I will consist of the 11,012 square
foot community center building, a 686 square foot
pavilion, 30 parking spaces and construction of Harris
Street. The community center building will house
administrative offices and classrooms/meeting rooms. The
hours of operation for the community center will be from
6:30 a.m. to 7:00 p.m. daily and there will also be
occasional evening activities.
Phase II construction will include a 10,539 square foot
gymnasium and 14 additional parking spaces. The
gymnasium will have a seating capacity of 158 persons.
Phase III construction will consist of a 2,172 square
foot addition to the gymnasium building, construction of
Josephine Street and a service drive from Josephine
Street. The addition to the gymnasium will be for
lockers, showers and a kitchen.
The site plan complies with the Highway 10 Overlay
District Ordinance regarding building setbacks,
landscaping and buffers. One ground -mounted monument -
type sign is proposed which will also conform to the
Highway 10 Overlay District Ordinance (minimum setback -
5 feet, maximum height - 6 feet, maximum area - 72 square
feet). The building heights will not exceed 35 feet.
As noted on the survey, there are two (2) 20 foot platted
alley rights-of-way which run through this property.
A 20 foot platted alley runs east -west the entire width
of the property and the other 20 foot platted alley runs
north -south within the north one-half of the property.
The applicant is requesting abandonment of these alley
3
FILE NO.: Z-6257 Cont.
rights-of-way as part of this conditional use permit
application.
A total of 57 parking spaces is required by ordinance for
this development. The community center building requires
26 parking spaces (1 space per 400 square feet X 95%) and
the gymnasium requires 31 parking spaces (1 space for
each 5 seats) for the seating capacity of 158 persons.
The applicant is proposing a total of 44 parking spaces;
30 with Phase I and 14 with Phase II. Therefore, the
applicant is requesting a variance to allow a reduced
number of parking spaces. Given the fact that many of
the residents will walk to the site and many of the
children who will utilize the center will be dropped -off,
staff can support the request for a variance for reduced
number of parking spaces.
The parking lot will be lighted. The lighting will be
low-level and directed to the parking area and not
reflected into the adjacent neighborhood. This is also
in compliance with the Highway 10 Overlay District
Ordinance.
The applicant is requesting deferral of half street
improvements to Josephine Street until Phase III
construction and deferral of half street improvements to
Arnold Street until the property along the north side of
Arnold Street is developed. Public works has indicated
support of these deferral requests, as stated, or for a
maximum of five (5) years, whichever occurs first.
The applicant, Pankey New Life Corporation, being a non-
profit corporation is requesting a waiver of the $175.00
filing fee for this application. Given the fact that the
Pankey New Life Corporation is non-profit, staff can
support this request.
8. Staff Recommendation:
Staff recommends approval of the conditional use
permit, subject to the following conditions:
1. Compliance with the Highway 10 Overlay District
Ordinance
2. Compliance with the Screening and Buffers Comments
3. Compliance with the Public works Comments
4. Compliance with the utility Comments
5. Staff recommends approval of the abandonment of
the alley rights-of-way.
4
FILE NO.: Z-6257 (Cont.
6. Staff recommends approval of the variance request
for reduced number of parking spaces.
7. Staff recommends approval of the request for
deferral of half street improvements to Josephine
Street until Phase III construction and deferral
of half street improvements to Arnold Street until
development along the north side of Arnold Street,
or for a maximum of five (5) years, whichever
occurs first.
8. Staff recommends approval of the request to waive
the $175.00 filing fee.
9. Staff suggests that the applicant replat this
property into a single lot. Contact Larry Jones
at 371-6814 for details.
SUBDIVISION COMMITTEE COMMENT: (JANUARY 30, 1997)
Ed Levy and Barbara Douglas were present, representing the
application. Staff gave a brief description of the
proposal.
David Scherer, of Public Works, reviewed his comments with
the Committee. There was a brief discussion regarding the
abutting streets.
Barbara Douglas stated that the hours of operation would be
from 6:30 a.m. to 7:00 p.m. daily with occasional evening
activities.
There was a brief discussion regarding the number of parking
spaces proposed.
After further discussion, the Committee accepted the
presentation and forwarded the issue to the full Commission
for final action.
PLANNING COMMISSION ACTION: (FEBRUARY 20, 1997)
Barbara Douglas, Ed Levy and Michael Drake were present
representing the application. Staff presented the item and
a recommendation of approval as noted in the "Staff
Recommendation." There were persons present in opposition
to the application.
Barbara Douglas, of the Pankey New Life Corporation, spoke
in support of the application. She gave a brief history of
the property. She described some of the programs for
children already in place.
5
FILE NO.: Z-6257 Cont.
Ed Levy, of Cromwell Architects -Engineers, spoke in favor of
the application. He discussed the various phases of the
development. He stated that the exterior of the structure
will be compatible with the existing neighborhood.
Michael Drake, of C.A.N.D.O., also spoke in support of the
application. He introduced the following persons who each
made a brief statement in support of the application:
Rev. Sandy Becker of Mark's Chapel
The Rev. Susan Davidson of St. Michael's Episcopal Church
Lou Ann Gieringer of Christ the Ring Church
C. E. McAdoo of Hunter United Methodist Church
Dr. Hyatt Lee of Second Presbyterian Church
Brian Curry of Grace Church
City Director Brad Cazort
City Director Joan Adcock
Joyce Raynor of the Greater Little Rock Chamber of Commerce
Leroy Wilkins of 5007 Harris Road
O'Dell Harris, of 13600 Cantrell Road, spoke in opposition
to the name of the center.
Jim Lawson, Planning Director, stated that the name of the
community center is not relevant to the conditional use
permit application.
Selma Douglas, of 13640 Cantrell Road, spoke in opposition
to the conditional use permit. Mrs. Douglas stated that she
had thirty-seven names on a petition against the conditional
use permit. Mrs. Douglas stated that she did not want
Harris Street abandoned.
Rose Thompson, whose mother owns property in the area, asked
how the community center would effect the area.
The Commission explained that the conditional use permit
would be for this property and this proposed use only. That
this is not a rezoning of the property.
Commissioner Daniel asked about the rights-of-way in the
area.
Monte Moore, of the Planning Staff, explained that there are
two houses on the east side of Harris Street. He explained
that Harris Street, Josephine Street and Arnold Street would
all be constructed. The only abandonment would be the two
alley rights-of-way within the single ownership of property.
A motion was made to approve the conditional use permit as
recommended by staff. The motion was approved by a vote of
11 ayes and 0 nays.