HomeMy WebLinkAboutZ-6252 Staff AnalysisFO-bruary 20, 1997
ITEM NO.: 10 FILE NO.: Z-6252
NAME: PAVILION CENTRE PLANNED OFFICE DISTRICT "POD" (Z-6252)
LOCATION: 8315 Cantrell Road
DEVELOPER:
The Irwin Company
10800 Financial Center Parkway
Suite 125
Little Rock, AR 72211
ENGINEER•
Tim Daters
White-Daters & Associates
401 South Victory St.
Little Rock, AR 72201
AREA: 3.05 ACRES NUMBER OF LOTS: N/A FT. NEW STREET: 0
ZONING: R-2 PROPOSED USES: Office
PLANNING DISTRICT: #3, West Little Rock
CENSUS TRACT: 22.03
_VARIANCES/WAIVERS REQUESTED:
a Variance to allow 50 foot right-of-way and 5 foot
utility/sidewalk easement.
BACKGROUND:
Mr. Jim Irwin met with staff several times prior to the
January 13, 1997 submittal deadline to discuss the proposed
project. He was informed that a change in the Land Use Plan was
required from "Single Family" to "Office." The Planning
Commission approved changing the Land Use Plan to "Office" at the
February 6, 1997 meeting.
PROPOSAL:
The proposed development is situated on a 3 -acre site immediately
adjacent to Pavilion in the Park. The proposed structure is a 3
1/2 story office building multi -use containing 48,350 square feet
and 213 parking spaces.
A. PROPOSAL/REOUEST:
The proposed development is situated on a 3 acre site
immediately adjacent to Pavilion in the Park. The proposed
structure is a 3 1/2 story office building multi -use
containing 48,350 square feet and 213 parking spaces.
The proposed development and Pavilion in the Park will be
connected with a common driveway. A cross access easement
February 20, 1997
SUBDIVISION
ITEM NO.: 10 Cont. FILE NO.: Z-6252
between the properties will allow traffic to cross the
Pavilion in the Park parking lot to connect with Andover
Drive. In return, the proposed development shall give a
cross access and parking easement (for 20 to 23 spaces) to
Pavilion in the Park, allowing traffic to cross over the 3
acre parcel to get to Cantrell Road. Also, owners of the
proposed development will give Pavilion in the Park a
parking easement across the easternmost 18 feet, more or
less, of the 3 acre tract to allow for the construction of
an additional 17 to 20 parking spaces to be used by the
Pavilion in the Park.
B. EXISTING CONDITIONS:
The site currently consist of a single family house and a
detached garage. These structures will be removed.
C. NEIGHBORHOOD COMMENTS:
Staff has received a number of calls seeking information on
the project.
D. ENGINEERING COMMENTS:
PUBLIC WORKS
• Grading permit prior to construction is required.
• Stormwater detention ordinance applies to this
property.
• AHTD approval and Traffic Engineering approval of
proposed widening of Cantrell Road including
modifications to the striping will be required prior to
construction.
• Six foot sidewalk with appropriate ramps is required by
AHTD. Continue walk to the entrance of the park (with
the permission of waterworks).
• Cantrell Road has a 1995 average daily traffic count of
22,000.
E. UTILITIES AND FIRE DEPARTMENT:
Wastewater: Sewer main extension with easements
AP&L: 15 foot perimeter easement contact utility
Arkla: No response
Southwestern Bell: Contact utility concerning existing
easement along eastern property line.
Water: Installation of a crossing from the north side of
Cantrell Road will be required to serve this property.
On site fire protection will be required.
Fire Department: If building to be sprinkled, please
advise.
February 20, 1997
SUBDIVISION
ITEM NO.: 10 (Cont.
LATA: No response
FILE NO.: Z-6252
Parks Department: Per letter dated January 29, 1997
F. ISSUES/TECHNICAL/DESIGN:
Landsca e•
Areas set aside for buffers and landscaping meet with
ordinance requirements. However, the Pavilion in the Park
property no longer provides for its minimum four foot wide
landscape strip along its western perimeter adjacent to this
site.
A six foot high opaque screen is required to screen this
site from the residential zoned property to the south and
west. This screen may either be a wooden fence with its
face side directed outward or dense evergreen plantings.
Curb and gutter or another approved border will be required
to protect all landscaped areas from vehicular traffic.
Issues•
s Provide written documentation on agreement with adjacent
property owner for parking and access.
e Lighting plan per exhibit by Williams and Dean dated
February 7, 1997.
■ Detail of monument sign per exhibit above
o Maximum building height to be 42 feet per exhibit above.
• File a final plan to allow for right-of-way dedication on
Cantrell Road.
Planning -Division:
A change from Single Family to Office was approved by the
Planning Commission on February 6, 1997. The property in
question is adjacent to Pavilion in the Park on the west and
Reservoir Park on its south and east sides. Single family
houses sit to the north of the property, across Cantrell
Road.
The property is isolated from other residences on the south
side of Cantrell Road by Reservoir Park. Allowing an office
use on this site would blend well with the existing Single
Family in the area. Office would also provide a good
transition between the commercial use of Pavilion in the
Park and Reservoir Park. The presence of Reservoir Park
3
February 20, 1997
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE NO.: Z-6252
will prevent Office or Commercial uses from continuing
westward on the south side of Cantrell Road.
G. ANALYSIS:
The applicant has worked with the Pavilion in the Park and
the City Parks Department. The Pavilion in the Park has
agreed to joint access and parking. The City Parks
Department has reviewed the possible impact on Reservoir
Park and do not object to the rezoning to "PDO." The Land
Use Plan has been changed to "Office" to accommodate the
rezoning.
The proposed rezoning should be retitled a "PDO" to reflect
multiple office users. The proposal conforms to the
"purpose and intent" for office districts listed in Section
36-452 of the Subdivision and Zoning Ordinance.
H. STAFF RECOMMENDATION:
APPROVAL based on the amended site plan stamped received on
February 10, 1997. Approval is subject to conditions noted
in this staff report and other documentation referenced.
Planning Staff makes no recommendations concerning the
waiver request for improvements to Cantrell Road and right-
of-way dedication. David Scherer will explain the Public
Works Departmental position on these request.
SUBDIVISION COMMITTEE COMMENT: (JANUARY 30, 1997)
Tim Daters presented the project. There was a great deal of
discussion concerning the request for waivers. The applicant
will meet with Public Works staff to resolve these issues.
The item was forwarded to the Planning Commission for
consideration at the February 20, 1997 meeting.
PLANNING COMMISSION ACTION: (FEBRUARY 20, 1997)
This item was included in the Consent Approval Agenda. The
approval is subject to staff conditions.
A motion to approve the Consent Agenda passed with 11 ayes,
0 nays and 0 absent.
4